Thistle, Utah

Last updated

Thistle, Utah
Thistle-School house.jpg
Remnants of the Thistle schoolhouse, September 2006
USA Utah location map.svg
Red pog.svg
Thistle
Location of Thistle within the State of Utah
Usa edcp location map.svg
Red pog.svg
Thistle
Thistle (the United States)
Coordinates: 39°59′29″N111°29′54″W / 39.99139°N 111.49833°W / 39.99139; -111.49833
Country United States
State Utah
County Utah
Established1878
Destroyed1983
Named for Thistle
Elevation
[1]
5,043 ft (1,537 m)
Zip code
84629 [2]
GNIS feature ID1439662 [1]

Thistle is a ghost town in Spanish Fork Canyon in southeastern Utah County, Utah, United States. [1] During the era of steam locomotives, the town's primary industry was servicing trains for the Denver and Rio Grande Western Railroad (often shortened to D&RG, D&RGW, or Rio Grande). The fortunes of the town were closely linked with those of the railroad until the changeover to diesel locomotives, when the town started to decline.

Contents

In April 1983, a massive landslide (specifically a complex earthflow [3] ) dammed the Spanish Fork River. [4] The residents were evacuated as nearly 65,000 acre-feet (80,000,000 m3) of water backed up, flooding the town. Thistle was destroyed; only a few structures were left partially standing. Federal and state government agencies have said this was the most costly landslide in United States history, [5] [6] the economic consequences of which affected the entire region. The landslide resulted in the first presidentially declared disaster area in Utah. [5] [7]

U.S. Route 6 (US‑6), U.S. Route 89 (US‑89) and the railroad (now part of Union Pacific Railroad's Central Corridor) were closed for several months, until they were rebuilt on a higher alignment overlooking the area. The remains of Thistle are visible from a view area along US‑89 or from the California Zephyr passenger train.

Geography

Thistle is about 65 miles (105 km) southeast of Salt Lake City, at the confluence of the two primary tributaries to the Spanish Fork River, Thistle Creek and Soldier Creek. [8] This confluence, at an elevation of 5,043 feet (1,537 m), [1] is also the junction of two naturally formed routes across the mountains of central Utah. The primary route crosses the Wasatch Mountains, via the Wasatch Plateau and Soldier Summit. This route was carved by the tributaries of the Price River on the eastern side of the mountains and the Spanish Fork on the west. In addition, Thistle Creek provides a route south from Thistle towards the communities of the Sanpete and Sevier valleys. [9] :3 The Spanish Fork flows northwest from Thistle, towards and through the city of Spanish Fork, before reaching Utah Lake. [8]

These natural paths have provided the route of several transcontinental trails, highways and railroads since their discovery. The named transportation arteries passing through Thistle include: US‑6 (originally numbered US-50), US‑89, the Denver and Rio Grande Western Railroad's Utah Division (now part of Union Pacific Railroad's Central Corridor) [10] [11] and D&RGW's Marysvale Branch line (abandoned because of the landslide). [12]

History

Thistle around 1871 Thistle. Spanish Fork Canon, Utah, R.G.W.Ry. (Rio Grande Western Railway) C.R. Savage Photo..jpg
Thistle around 1871

The trade route on which Thistle lies was used by Indian tribes before the arrival of European settlers; two Ute chiefs, Taby and Peteetneet, led tribal migrations through the canyon each spring and fall. [9] :98 The first recorded journey by Europeans to modern Thistle was the Domínguez–Escalante expedition, which explored the territory with Indian guides. [13] A small group of Utes inhabiting the canyon frequently raided the newcomers, and as a result were forcibly relocated in the 1870s. [9] :3

Historical population
CensusPop.Note
1880 81
1890 365350.6%
1900 187−48.8%
1910 409118.7%
1920 4172.0%
1930 288−30.9%
1940 31810.4%
1950 248−22.0%
Source: U.S. Census Bureau [14]

Most of Thistle's residents were railroad employees sent to live in the town, but there were some who had settled before the railroads arrived. The first settlers were part of the Mormon migration to Utah, and the first of these was the Pace family, who migrated from Nauvoo, Illinois, reaching Thistle in 1848. Fifth-generation descendants of the Pace settlers continued to operate a family-owned cattle ranch until the town was evacuated. [9] :99 Other settlers included Mormons who originally settled elsewhere in Utah but subsequently arrived to homestead fertile ground on Billies Mountain, on the north wall of the canyon. Among them was the mountain's presumed namesake, William Johnson. Homesteading was practiced in Thistle until the early 1900s. Until the arrival of the railroads, the town's economy was based mainly on farming and ranching, although there was also some mining activity in the region, including a vein of asphaltum that was mined between 1892 and 1914. [9] :94 & 118

Railroads

The first railroad track laid through Thistle was a narrow-gauge spur line servicing coal mines near today's Scofield Reservoir, built in 1878 by the Utah and Pleasant Valley Railway. By 1890, the Denver and Rio Grande Western, which acquired the line in a foreclosure sale in 1882, [9] :5 had rebuilt the line to standard gauge. The D&RGW connected this line with one they had built west from Colorado, completing a link from Salt Lake City to Denver. [15] :157

The railroad built several facilities in Thistle to service and prepare trains for the change in grade and curvature of the line. The railroad placed helper engines on eastbound trains at Thistle for the ascent to Soldier Summit. The town provided a meal service for the trains until the use of on-board dining cars eliminated the need for meal stops. [15] :157

Aerial photo of the Thistle area in spring 1983 showing the dam formed by the landslide, "Lake Thistle" over the submerged town, and the construction to re-route US-6, US-89, and the D&RGW around the landslide area Thistlelandslideusgs.jpg
Aerial photo of the Thistle area in spring 1983 showing the dam formed by the landslide, "Lake Thistle" over the submerged town, and the construction to re-route US-6, US-89, and the D&RGW around the landslide area

Thistle saw more rail traffic with the construction of the Marysvale Branch line. This line branched from the main at Thistle, following modern US‑89 towards mines near Marysvale. Another line through Thistle, paralleling the D&RGW main, was built by the Utah Railway. The two lines were later combined into a dual-track main line as part of a trackage rights agreement between the two companies. [15] :158

Rail traffic through Thistle continued to increase as the Rio Grande cooperated with connecting railroads, making the rail line through Thistle a bridge line for transcontinental rail traffic. The growth of Thistle was closely tied to the success of the Denver and Rio Grande Railroad throughout the era of steam locomotives. [12]

At its peak, around 1917, Thistle had about 600 residents. The town's railroad infrastructure included a five-stall roundhouse, depot, machine shop, and structures to restock passing trains with sand, coal and water. Non-railroad infrastructure included general stores, a post office, barber shop, saloon, pool hall, bakeries and restaurants. The largest building was a two-story schoolhouse, built in 1911. [9] :93

In the 1950s, the Denver & Rio Grande Western began to phase out steam locomotives in favor of diesel locomotives, which require less maintenance. With the change in technology, Thistle faded in importance. [15] :158 Gradually the town shrank in population; the passenger depot was torn down in 1972 and the post office closed in 1974. By 1983, only a few families remained in Thistle. [12]

Landslide

A view from the California Zephyr, after the slide, showing the dam formed by the landslide and the scar from where the dirt slid, August 2003 Thistleslide.png
A view from the California Zephyr , after the slide, showing the dam formed by the landslide and the scar from where the dirt slid, August 2003

Rio Grande maintenance personnel began noticing unstable ground downstream from Thistle years before the landslide occurred. Maintenance crews repaired the track on several occasions, but they did not fully investigate the problem. [15] :158 Beginning with the remnants of Hurricane Olivia, the autumn and winter of 1982–83 featured record-breaking snow and rainfall. As the spring thaw melted the winter snow, the mountains in the area became saturated with water. [9] :13–15

By April 1983, track deformation was a serious issue. On April 13, the division track master flew to Denver to explain the situation at a specially-called staff meeting. On the same day, a Utah Highway Patrol officer struck a newly created buckle in the highway that threw him against the roof of his vehicle. By the end of the day, a full maintenance crew was struggling to keep US‑6/US‑89 open. All trains were limited to speeds less than 10 miles per hour (16 km/h), and were accompanied by maintenance personnel who had to continually work to keep the tracks in line. The last train to pass through downtown Thistle was the westbound Rio Grande Zephyr , on April 14, 1983 at about 8:30 p.m. That night, both US‑6/US‑89 and the rail line were closed. One westbound freight train that had already left Denver was turned back. All through trains between Denver and Salt Lake City were rerouted to Union Pacific Railroad's Overland Route through Wyoming. By April 16, the tracks were completely buried and a voluntary evacuation order was issued for the town. [15] :159 [9] :17–19

Looking northwest from the view area along US-6/US-89 showing the abandoned railroad and highway grades next to the replacement alignments, June 2010 Spanish Fork Canyon-Thistle view area.JPG
Looking northwest from the view area along US-6/US-89 showing the abandoned railroad and highway grades next to the replacement alignments, June 2010

On April 17, a final attempt to keep the landslide from blocking the flow of the river failed. That day, the Utah Department of Transportation and the Rio Grande announced plans to abandon the existing transportation arteries and build new corridors. Both the highway and railroad would be re-routed by blasting a path scaling the north wall of Spanish Fork Canyon. The new arteries would pass the slide by dynamiting through Billies Mountain, also along the north canyon wall. Engineers estimated the dam created by the toe of the landslide would eventually reach 200 to 300 feet (60 to 90 m) tall. The evacuation order was changed from voluntary to mandatory. Volunteers transported as many people and belongings as possible to the small town of Birdseye, about five miles (8 km) south. Most residents were able to recover only a fraction of their belongings; some had less than two hours' notice before the water reached their house. [9] :23 Thistle's oldest resident celebrated her 90th birthday at the evacuation center in Birdseye. [9] :123 By the 18th, the waterline had reached the rooftops of the 22 previously occupied houses. By the 19th, an entire mountain was moving at about two feet (0.6 m) per hour, and US‑6/US‑89 was buried by 50 feet (15 m) of soil. [16]

The intake for the tunnel which rerouted the Spanish Fork River past the dam formed by the Thistle landslide, July 2015 Spanish Fork River tunnel intake, Jul 15.jpg
The intake for the tunnel which rerouted the Spanish Fork River past the dam formed by the Thistle landslide, July 2015

Governor Scott Matheson requested federal aid to deal with the situation. After a visit to the area by the director of the Federal Emergency Management Agency, U.S. president Ronald Reagan issued the first presidential disaster area declaration for the state of Utah. [5] The landslide eventually formed a dam that created a lake three miles (5 km) long and over 200 ft (60 m) deep. [7] Concerned the dam could fail, the state of Utah decided to build a tunnel to re-route the flow of the river. [12] The residents of downstream Spanish Fork were told to be prepared to evacuate. Engineers estimated that if the dam failed, they would have 30 to 45 minutes notice before the water reached the city. [16]

Aftermath

One of the few houses at Thistle to survive the landslide, April 2008 Buried house, Thistle, Utah.jpg
One of the few houses at Thistle to survive the landslide, April 2008

Thistle was almost completely destroyed. Most wooden buildings were carried away in the floodwaters. The state installed a temporary pumping station to prevent the lake from overflowing the dam; patrol boats skimmed up the floating remains of the town to prevent the debris from blocking the pumps. Most remains were either naturally deposited or placed on the eastern shore of the lake. [9] :52

By autumn, the tunnels to restore the flow of the river and drain the lake were operational. Shortly after, debates among former residents, neighboring residents, and government agencies began on what to do with the dam created by the landslide; some wanted to make the lake permanent. The state engineer commissioned a study to determine if the landslide dam could be used to retain water; it recommended building a new dam upstream from the landslide, rather than attempting engineering work on the landslide dam. [17]

In the years following, the former residents of Thistle filed various lawsuits to recover their losses. In one, they claimed that their property was taken to rebuild the road and railroad without just compensation. [18] Another lawsuit claimed negligence on the part of the D&RGW. The residents argued that the railroad's maintenance workers knew the ground was unstable; however, they only repaired the track. The residents contended the slide could have been prevented by using a water drainage system to relieve pressure at the head of the unstable area. They further contended that such a system could have been put in place had the railroad thoroughly investigated the problem upon first noticing it. The engineering firm employed by the Rio Grande said that their studies indicated the crown of the landslide was about 300 feet (90 m) above the level of the tracks, and that the Rio Grande did not know the true size of the unstable area until the slide was in motion. A jury absolved the D&RGW of responsibility. [19] [20] The plaintiffs appealed the decision, and a second trial in 1993 resulted in a $1.1 million award for the landowners (equivalent to $3 million in 2023). [21] The D&RGW filed suit against the Utah Railway over sharing the costs from the landslide. The Utah Railway had an ownership interest in the line, based on a track-sharing agreement. [9] :73–75

Economic effects

The Thistle landslide, as seen from a view area along US-6/US-89, June 2010 Thistle 2010 from US6 rest area.JPG
The Thistle landslide, as seen from a view area along US-6/US-89, June 2010

The landslide closed the main railroad for three months, and US‑6 and US‑89 for eight months, during which time transportation between the communities of eastern and southeastern Utah and the rest of the state was substantially impaired. Security for the isolated part of Utah County was temporarily assigned to the Utah Highway Patrol. [22]

The economic effects of the closure of these transportation arteries were felt throughout the western United States; the closure devastated rural Utah. The operations of coal mines, uranium mines, turkey farms, animal feed companies, gypsum mines, and cement and clay factories were severely impacted. At least two trucking firms and one oil-producing firm suspended or ceased operations. Southeastern Utah's tourism industry suffered without access for visitors from the north and west. Some people who lived and worked on opposite sides of the landslide area suddenly had commutes exceeding 100 miles (160 km). [12] [23] The highway patrol temporarily closed a weigh station at Peerless (a location along the US‑6 corridor near Helper) and built a temporary weigh station near Salina (along I-70 about 90 miles (140 km) south of Thistle), which saw a sudden increase in truck traffic. The highway patrol estimated the temporary facilities inspected 57,000 trucks and made 80 arrests. [22]

The direct cost of the landslide was estimated at $200 million (equivalent to $588 million in 2023). However, some estimates of the total cost reached as high as $400 million (equivalent to $1175 million in 2023). [23] [24] The D&RGW estimated the slide cost them $80 million in lost revenue (equivalent to $235 million in 2023), averaging $1 million for each day that the tracks were out-of-service. This figure included $19 million in payments to the Union Pacific for the use of their lines. [12] The United States Geological Survey and the state of Utah have called the Thistle landslide the most costly ever in the United States. [5] [6]

Railroad

East end of Union Pacific Railroad's tunnels that bypassed the landslide in Thistle, July 2015 East end of rail tunnels in Thistle, Utah, Jul 15.jpg
East end of Union Pacific Railroad's tunnels that bypassed the landslide in Thistle, July 2015

To expedite construction, the railroad had crews in Utah focused on grading the new path and boring a 3,000-foot (910 m) tunnel, while crews in Colorado built track segments that were transported to site. On July 4, 1983, at 3:05 p.m., safety inspectors declared the line ready for operation. At 3:12 p.m., the centralized traffic control signals gave a green light to the first train to pass through the Thistle area since the slide began, an eastbound freight train coming from the Southern Pacific Railroad at Ogden, destined for Herington, Kansas. Although the line's re-opening on Independence Day was coincidental, the first train became part of the local holiday celebrations. The first passenger train to use the new alignment was the California Zephyr , on July 16. [9] :73

Debates ensued over the fate of the Marysvale Branch line. The mines at the end of the line had long closed; the last train to traverse the entire length of the line passed through in 1970. Still, farmers and industry in the Sevier and Sanpete Valleys generated enough traffic that the line broke even most years. However, this line was severely damaged, with several washed-out bridges and railroad tracks draping over the sides of newly created cliffs. The railroad determined that at best it would take years to recover the cost of rebuilding the line. [15] :161

Map of Utah County showing the pre- and post-landslide alignments of US-6, US-89, and the area railroads Thistle landslide.png
Map of Utah County showing the pre- and post-landslide alignments of US-6, US-89, and the area railroads

The residents of Richfield pressured the Rio Grande to use the portion of the line that was still intact and build a connection to an existing Union Pacific line (the Sharp Subdivision) near Nephi, roughly parallel to State Route 28. However, the railroad determined with the additional cost of acquiring land for the new right-of-way, the cost would be comparable to rebuilding the old route. In addition, the Rio Grande would have to pay trackage rights to the Union Pacific for the connection from Nephi, which would further erode profits on a line that was barely profitable. In the end, the Rio Grande sold the line to a scrap dealer who dismantled it. [15] :161 Since the line's closure, there have been multiple proposals to rebuild it. Studies note the loss of railroad access to the region has affected the ability of local industries to compete with producers in other regions that have rail access. A 2002 study placed the cost of rebuilding the modified routing of the Marysvale Branch line at $80 million, [24] while a 2015 study placed the cost of rebuilding the line as far south as Salina at $110 million (equivalent to $136 million in 2023). The 2015 study listed restoring rail access to the region as one of three priorities for new freight rail lines in a study presented by the Utah Department of Transportation detailing the current state of Utah's rail infrastructure. It specifically noted an increase of coal hauling trucks on highways and streets in the area due to the loss of rail access. [25]

Highways

The new alignment of US‑6/US‑89 was opened on December 30, 1983. The dedication was planned for the next day, but lines of cars formed at the barricades as soon as news broke that the highway was complete. Some were residents anxious to see the area or visit relatives they had not seen since the slide; others were truck drivers frustrated by long detours. The Highway Patrol requested the ceremony be canceled and the highway opened early, as they were unable to disperse the crowds. [26]

When the first traffic flowed, crews had not finished some final tasks, such as striping the roadway. Motorists saw a relocation with several mountain cuts built high up the canyon wall, with a view of the slide and former lake. The roadbed was not expected to last, as weather conditions had been unfavorable when the asphalt was laid. Two mountain cuts were unstable, requiring several months of work before they could be left unattended. During this time, the state stationed two full-time watches at the cuts, who would close the road while falling rocks were cleared. The cut through Billies Mountain was described by the construction crews as a new, man-made mountain pass. [26]

The pending completion of the again-rebuilt US‑6/US‑89, with properly laid asphalt and stable rock cuts, was announced in November 1984, 18 months after the closure of the original alignment. [26] [27] Starting in 1993, the Utah Department of Transportation began discussions with former Thistle residents to build a memorial to the town. [28] [29] The department maintains a view area overlooking the townsite along US‑6/US‑89. [30]

Coal Hollow fire

On August 4, 2018, a lightning bolt sparked a large fire in Spanish Fork Canyon. [31] More than 30,000 acres (47 sq mi; 120 km2) of land were destroyed by the fire. [32] Residents of the canyon were evacuated as a precaution. The fire affected Thistle, extending construction projects. Later that year vandals burned one of the remaining homes to the ground.

Geology and climate

The landslide area near Thistle is a valley formed in a depression in an area of bedrock known as the Charleston–Nebo thrust plate. The rock in this plate dates from the Permian and Pennsylvanian to the Jurassic periods, but the plate appears to have formed elsewhere and moved to the modern Thistle area during the Late Cretaceous epoch. The layers of sedimentary rock above the thrust plate are younger, dating to the Cretaceous and Tertiary periods. [17] The rock debris in the landslide itself comes from the North Horn and Ankareh formations. [5]

The area around Thistle has always been prone to landslides. Pre-historic landslides created the more gentle slopes that made the area usable as a transportation corridor across the Wasatch Mountains. [5] [12] Minor landslides have been frequently observed, and continue to occur. The largest recorded landslides are the 1983 slide which destroyed the town, and a smaller one in 1998. [5]

The climate at downstream Spanish Fork is classified as arid with four distinct seasons. [33] Temperatures range from an average high of 92 °F (33 °C) in July and an average low of 20 °F (−7 °C) in January. Except for the spring months, precipitation averages less than 2 inches (5.1 cm) per month. [34]

See also

Related Research Articles

<span class="mw-page-title-main">Denver and Rio Grande Western Railroad</span> American railroad company

The Denver and Rio Grande Western Railroad, often shortened to Rio Grande, D&RG or D&RGW, formerly the Denver & Rio Grande Railroad, was an American Class I railroad company. The railroad started as a 3 ft narrow-gauge line running south from Denver, Colorado, in 1870. It served mainly as a transcontinental bridge line between Denver, and Salt Lake City, Utah. The Rio Grande was also a major origin of coal and mineral traffic.

<i>California Zephyr</i> (1949–1970) Passenger train operated from 1949 to 1970 in the U.S.

The California Zephyr was a passenger train that ran between Chicago, Illinois and Oakland, California via Omaha, Denver, Salt Lake City, Winnemucca, Oroville and Pleasanton. It was operated by the Chicago, Burlington & Quincy (CB&Q), Denver & Rio Grande Western (D&RGW) and Western Pacific (WP) railroads, all of which dubbed it "the most talked about train in America" on March 19, 1949, with the first departure the following day. The train was scheduled to pass through the most spectacular scenery on its route in the daylight. The original train ceased operation in 1970, though the D&RGW continued to operate its own passenger service, the Rio Grande Zephyr, between Salt Lake City and Denver, using the original equipment until 1983. In 1983 a second iteration of the California Zephyr, an Amtrak service, was formed. The current version of the California Zephyr operates partially over the route of the original Zephyr and partially over the route of its former rival, the City of San Francisco.

<span class="mw-page-title-main">Denver and Salt Lake Railway</span> Transport company

The Denver and Salt Lake Railway (D&SL) was a U.S. railroad company located in Colorado. Originally incorporated in 1902 as the Denver, Northwestern and Pacific (DN&P) Railway, it had as a goal a direct connection of Denver, Colorado, with Salt Lake City, Utah. It underwent numerous reorganizations throughout its financially troubled history and by the time the company was acquired in 1931 by the Denver and Rio Grande Western Railroad, it had advanced only as far as Craig, Colorado. After the acquisition the line was connected to the D&RGW main, and the eastern half of the line was used to give the D&RGW a more direct route to Denver. The portions of the railroad still in use today are known as the Moffat Tunnel Subdivision of Union Pacific Railroad's Central Corridor. Amtrak’s California Zephyr service from Denver to Glenwood Springs follows much of the old D&SL route.

<span class="mw-page-title-main">Sevier River</span> River in central Utah, United States

The Sevier River is a 400-mile (640 km)-long river in the Great Basin of southwestern Utah in the United States. Originating west of Bryce Canyon National Park, the river flows north through a chain of high farming valleys and steep canyons along the west side of the Sevier Plateau before turning southwest and terminating in the endorheic basin of Sevier Lake in the Sevier Desert. It is used extensively for irrigation along its course, with the consequence that Sevier Lake is usually dry.

<span class="mw-page-title-main">U.S. Route 89</span> Highway in the United States

U.S. Route 89 is a north–south United States Numbered Highway with two sections, and one former section. The southern section runs for 848 miles (1,365 km) from Flagstaff, Arizona, to the southern entrance of Yellowstone National Park. The northern section runs for 404 miles (650 km) from the northern entrance of Yellowstone National Park in Montana, ending at the Canadian border. Unnumbered roads through Yellowstone connect the two sections. Before 1992, US 89 was a Canada–Mexico, border-to-border highway that ended at Nogales, Arizona, on its southern end.

<span class="mw-page-title-main">Parleys Canyon</span> Canyon in Utah, United States

Parleys Canyon is a canyon located in the U.S. state of Utah. The canyon provides the route of Interstate 80 (I-80) up the western slope of the Wasatch Mountains and is a relatively wide, straight canyon other than near its mouth. The mountain pass at the top of the canyon is known as Parleys Summit. With an elevation of 7,120 feet (2,170 m), the pass is the highest point along I-80 in the state of Utah. Both features are named for Parley P. Pratt, an early settler of the Salt Lake Valley and leader of the Church of Jesus Christ of Latter-day Saints who surveyed the area to find a better transportation route through the Wasatch Mountains than the previous route which traversed Emigration Canyon.

<span class="mw-page-title-main">Thompson Springs, Utah</span> Census-designated place in Utah, United States

Thompson Springs, also officially known for a time as just Thompson, is a small census-designated place in central Grand County, Utah, United States. The population was 39 at the 2010 census. The town is just north of the east–west highway route shared by Interstate 70, U.S. Route 6 and U.S. Route 50, between Crescent Junction and Cisco. Moab, the county seat, is 37 miles (60 km) to the south. Thompson Springs is located in high desert country at an elevation of 5,246 feet (1,599 m), with the Book Cliffs just to the north. The town's ZIP code is 84540. The mystery "The Silver Spur Cafe" by Chinle Miller is partially set in Thompson Springs.

<span class="mw-page-title-main">Heber Valley Railroad</span> Historic railroad in Utah

The Heber Valley Railroad (HVRX) is a heritage railroad based in Heber City, Utah. It operates passenger excursion trains along a line between Heber City and Vivian Park, which is located in Provo Canyon. The HVRX carries over 110,000 passengers a year.

<i>Rio Grande Zephyr</i> Former American passenger train

The Rio Grande Zephyr was a passenger train operated by Denver and Rio Grande Western Railroad between Denver, Colorado and Ogden, Utah from 1970 until 1983. In operation after the creation of publicly-funded Amtrak, the Rio Grande Zephyr was the last privately-operated interstate passenger train in the United States.

<span class="mw-page-title-main">Soldier Summit, Utah</span> Unincorporated community in Utah, United States

Soldier Summit is the name of both a mountain pass in the Wasatch Mountains in Utah, United States and an unincorporated community that is a near-ghost town located at the pass. Soldier Summit has been an important transportation route between the Wasatch Front and Price, Utah, since the area was settled by the Mormon pioneers. It is on the route of both U.S. Route 6 and the old main line of the Denver and Rio Grande Western Railroad (D&RGW), now the Provo Subdivision of the Central Corridor. Located where the road makes a brief bend through the extreme southwest corner of Wasatch County, Soldier Summit historically had more to do with nearby Utah County.

<span class="mw-page-title-main">Interstate 70 in Utah</span> Section of Interstate highway in Utah

Interstate 70 (I-70) is a mainline route of the Interstate Highway System in the United States connecting Utah and Maryland. The Utah section runs east–west for approximately 232 miles (373 km) across the central part of the state. Richfield is the largest Utah city served by the freeway, which does not serve or connect any urban areas in the state. The freeway was built as part of a system of highways connecting Los Angeles and the Northeastern United States. I-70 was the second attempt to connect southern California to the east coast of the United States via central Utah, the first being a failed attempt to construct a transcontinental railroad. Parts of that effort were reused in the laying out of the route of I-70.

<span class="mw-page-title-main">U.S. Route 89 in Utah</span> Section of U.S. Highway in Utah, United States

U.S. Route 89 in the U.S. state of Utah is a north-south United States Highway spanning more than 502 miles (807.891 km) through the central part of the state, making it the longest road in Utah. Between Provo and Brigham City, US-89 serves as a local road, paralleling Interstate 15, but the portions from Arizona north to Provo and Brigham City northeast to Wyoming serve separate corridors. The former provides access to several national parks and Arizona, and the latter connects I-15 with Logan, the state's only Metropolitan Statistical Area not on the Interstate.

<span class="mw-page-title-main">Tucker, Utah</span> Ghost town in Utah, United States

Tucker is a ghost town located near the east end of the Spanish Fork River in Utah County, Utah, United States 7 miles (11 km) below Soldier Summit on U.S. Route 6. It was once an important loading point and construction camp on the Denver and Rio Grande Western Railroad (D&RGW). After the town was abandoned, the state of Utah used the town site for a rest area. In 2009, the site was buried as part of a project to re-align a portion of US-6's western approach to Soldier Summit. To honor the town, the state of Utah built a replacement rest area about 2 miles (3.2 km) downstream from Tucker, called the Tie Fork Rest Area.

<span class="mw-page-title-main">U.S. Route 6 in Utah</span> Section of U.S. Highway in Utah

U.S. Route 6 (US-6) is an east–west United States Numbered Highway through the central part of the U.S. state of Utah. Although it is only about 40 miles (64 km) longer than US-50, it serves more populated areas and, in fact, follows what had been US-50's routing until it was moved to follow Interstate 70 (I-70) in 1976. In 2009, the Utah State Legislature named part of the route the "Mike Dmitrich Highway", named after the Utah state senator, which generated controversy, as the state of Utah had previously joined with all the other states through which US-6 passes in naming all of US-6 the Grand Army of the Republic Highway.

<span class="mw-page-title-main">Utah State Route 209</span>

State Route 209 (SR-209) is a state highway in the U.S. state of Utah, following 9000 South and other east–west streets south of Salt Lake City. It connects the Bingham Canyon Mine with I-15 in Sandy and the ski areas of Little Cottonwood Canyon.

<span class="mw-page-title-main">Utah Division (D&RGW)</span> Rail line in Utah and Colorado

The Utah Division of the former Denver & Rio Grande Western Railroad (D&RGW) is a rail line that connects Grand Junction, Colorado and Salt Lake City, Utah in the Western United States. It is now incorporated into the Union Pacific Railroad (UP) system as part of the Central Corridor. The modern Union Pacific has split the line into two subdivisions for operational purposes, the Green River Subdivision between Grand Junction and Helper, Utah and the Provo Subdivision from Helper to Salt Lake City. Daily passenger service is provided by Amtrak's California Zephyr; the BNSF Railway and Utah Railway have trackage rights over the line.

<span class="mw-page-title-main">Central Corridor (Union Pacific Railroad)</span>

The Central Corridor is a rail line operated by the Union Pacific Railroad from near Winnemucca, Nevada to Denver, Colorado in the western United States. The line was created after the merger with the Southern Pacific Transportation Company by combining portions of lines built by former competitors. No portion of the line was originally built by the Union Pacific; in fact, some portions were built specifically to compete with the Union Pacific's Overland Route. The line is known for significant feats of engineering while crossing the Wasatch Mountains of Utah and the Rocky Mountains of Colorado. The line features numerous tunnels, the longest and highest of these is the Moffat Tunnel.

<i>San Francisco Zephyr</i> Amtrak passenger train in the U.S.

The San Francisco Zephyr was an Amtrak passenger train that ran between Chicago and Oakland from June 1972 to July 1983.

The Uinta Basin Rail project is a proposed 100-mile (160 km) rail line to connect the shale oil rich Uinta Basin region of eastern Utah to the national rail network. Numerous proposals have been made, some as far back as 1902, that are still under consideration. The current effort is a public-private partnership between a coalition of 7 counties in Utah, the Rio Grande Pacific Corporation and Drexel Hamilton Infrastructure Partners. The railroad is also backed by the Ute Tribe who hold a 5% stake in the project. If the rail line is built it will be the first major greenfield rail line built in the United States since the line to the Powder River Basin was built in the 1970s. The Surface Transportation Board approved construction of the line in December 2021.

<i>California Zephyr</i> Amtrak service between Chicago and the San Francisco Bay Area

The California Zephyr is a passenger train operated by Amtrak between Chicago and the San Francisco Bay Area, via Omaha, Denver, Salt Lake City, and Reno. At 2,438 miles (3,924 km), it is Amtrak's longest daily route, and second-longest overall after the Texas Eagle's triweekly continuation from San Antonio to Los Angeles, with travel time between the termini taking approximately 5112 hours. Amtrak claims the route as one of its most scenic, with views of the upper Colorado River valley in the Rocky Mountains, and the Sierra Nevada. The modern train is the second iteration of a train named California Zephyr; the original train was privately operated and ran on a different route through Nevada and California.

References

  1. 1 2 3 4 "Thistle". Geographic Names Information System . United States Geological Survey, United States Department of the Interior.
  2. "Look Up a ZIP Code: ZIP Code by City and State". usps.com. United States Postal Service . Retrieved March 19, 2018.
  3. "Earthflow" (PDF). Institut de Physique du Globe de Paris. 2008. Retrieved November 15, 2014.
  4. "Utah Landslide Hazards" (PDF). Public Information Series. Utah Geological Survey. 2011. Archived from the original (PDF) on August 27, 2013. Retrieved November 15, 2014.
  5. 1 2 3 4 5 6 7 Milligan, Mark (May 2005). "Thistle Landslide Revisited, Utah County, Utah". Survey Notes. 37 (2). Retrieved October 28, 2009.
  6. 1 2 Schuster, Robert L.; Highland, Lynn M. (2001). "Open-File Report 01-0276: Socioeconomic and Environmental Impacts of Landslides in the Western Hemisphere". usgs.gov. United States Geological Survey . Retrieved November 3, 2017.
  7. 1 2 Gore, Rick (June 1985). "The Rising Great Salt Lake–No Way to Run a Desert". National Geographic Magazine . 167 (6): 710.
  8. 1 2 Utah Road and Recreation Atlas (Map) (2002 ed.). 1:250000. Benchmark Maps. 2002. p. 51. § G12. ISBN   0-929591-74-7.
  9. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Sumsion, Oneita Burnside (1983). Thistle – Focus on Disaster. Springville, Utah: Art City Publishing Company. ISBN   978-0-936860-14-5.
  10. "UPRR Common Line Names" (PDF) (Map). uprr.com. Union Pacific Railroad . Retrieved January 4, 2009.
  11. "UP: Chronological History". uprr. Union Pacific Railroad. Archived from the original on March 5, 2014. Retrieved September 21, 2010.
  12. 1 2 3 4 5 6 7 Atwood, Genevieve (1994), "Thistle", in Powell, Allan Kent (ed.), Utah History Encyclopedia, Salt Lake City: University of Utah Press, ISBN   978-0-87480-425-6, OCLC   30473917, archived from the original on October 10, 2013 via Wayback Machine
  13. Vélez de Escalante, Silvestre (1995). Warner, Ted J. (ed.). The Domínguez – Escalante Journal: Their Expedition Through Colorado, Utah, Arizona and New Mexico in 1776. Salt Lake City: University of Utah Press. p. 64. ISBN   978-0-87480-447-8.
  14. "Census of Population and Housing". census.gov. United States Census Bureau. Archived from the original on February 8, 2006. Retrieved March 10, 2010 via Wayback Machine.
  15. 1 2 3 4 5 6 7 8 Carr, Stephen L.; Edwards, Robert W. (1989). Utah Ghost Rails. Salt Lake City: Western Epics. ISBN   978-0-914740-34-6.
  16. 1 2 Polly, Ron (April 19, 1983). "Thistle's way of life washed away". Deseret News . Salt Lake City.
  17. 1 2 Witkind, Irving J. (1986). "Potential Geologic Hazards Near the Thistle Landslide, Utah County, Utah". All U.S. Government Documents (Utah Regional Depository). United States Geological Survey . Retrieved November 20, 2010.
  18. "County seeks dismissal for Thistle residents' suit". Deseret News . Salt Lake City. May 13, 1987. p. B3. Retrieved March 10, 2010.
  19. Rayburn, Ray (August 22, 1989). "Was Thistle Landslide Preventable". Deseret News . Salt Lake City. p. B4.
  20. "D&RGW Wasn't at Fault in Thistle Slide, Jury Rules". Deseret News . August 30, 1989.
  21. "Thistle landowners win suit against railroad". The Salt Lake Tribune . Salt Lake City. May 22, 1993. p. C3.
  22. 1 2 "1980–1989 Thistle Mud Slide". publicsafety.utah.gov. Utah Department of Public Safety. Archived from the original on February 23, 2012. Retrieved March 10, 2010 via Wayback Machine.
  23. 1 2 Schuster, Robert L.; Highland, Lynn M. (2001). "Socioeconomic Impacts of Landslides in the Western Hemisphere". usgs.gov. United States Geological Survey . Retrieved November 12, 2010.
  24. 1 2 Ashland, Francis X. (March 2003). "The Feasibility of Collecting Accurate Landslide-Loss Data in Utah" (PDF). usgs.gov. Utah Geological Survey. p. 17. Retrieved March 19, 2018.
  25. "Utah State Rail Plan" (PDF). udot.utah.gov. Utah Department of Transportation. April 2015. pp. 138–140, 143, & 158. Retrieved March 18, 2018.
  26. 1 2 3 Fackrell, Jerrie (January 1, 1984). "Eager travelers line up to cruise newly reopened road to Thistle". Deseret News . Salt Lake City via Google News.
  27. Fackrell, Jerrie (November 6, 1984). "Crews have nearly finished U.S. 6 over Billies Mountain". Deseret News . Salt Lake City via Google News.
  28. "Meeting Minutes – Utah Transportation Commission". udot.utah.gov. Utah Department of Transportation. October 15, 1993. Retrieved April 6, 2010.
  29. "Meeting Minutes – Utah Transportation Commission". udot.utah.gov. Utah Department of Transportation. January 15, 1993. Retrieved April 6, 2010.
  30. "Highway Reference Information [State Route 6]" (PDF). udot.utah.gov. Utah Department of Transportation. August 16, 2017. p. 11. Retrieved March 19, 2018.
  31. "Coal Hollow Fire closes U.S. 6 through Spanish Fork Canyon, forces evacuation of Diamond Fork Canyon". sltrib.com. The Salt Lake Tribune. August 13, 2018. Retrieved September 26, 2018.
  32. "Coal Hollow Fire information". inciweb.nwcg.gov. InciWeb. September 21, 2018. Retrieved September 26, 2018.
  33. "Spanish Fork – About the City". spanishfork.org. City of Spanish Fork. Archived from the original on September 7, 2010. Retrieved August 16, 2010.
  34. "Monthly Averages for Spanish Fork, UT". weather.com. The Weather Channel . Retrieved August 16, 2010.