USS M-1

Last updated
USS M-1 (SS-47).jpg
USS M-1
Class overview
NameM class
Builders
OperatorsFlag of the United States.svg  United States Navy
Preceded by L class
Succeeded by AA-1 class
Built1914
In service1915-1922
In commission1918–1922
History
US flag 48 stars.svg United States
NameUSS M-1
Builder
Laid down2 July 1914
Launched14 September 1915
Commissioned16 February 1918
Decommissioned15 March 1922
Stricken16 March 1922
FateSold for scrap, 25 September 1922
General characteristics
Class and type Submarine
Displacement
  • 488 long tons (496 t) (surfaced)
  • 676 long tons (687 t) (submerged)
Length197 ft (60 m)
Beam19 ft (5.8 m)
Draft11 ft (3.4 m)
Propulsion
Speed
  • 14  kn (16 mph; 26 km/h) surfaced
  • 10.5 knots (19.4 km/h; 12.1 mph) submerged
Range2,750 nmi (5,090 km) at 11 kn (20 km/h; 13 mph) (surfaced)
Test depth150 ft (46 m)
Complement2 officers, 26 enlisted
Armament
NotesFollowed by AA-1-class submarines

USS M-1 (SS-47) was a unique submarine of the United States Navy. Although built as a fully operational boat, M-1 was built with a radically different double-hulled design. [2] This was in marked contrast to Simon Lake's and Electric Boat's single-hulled concepts. Ultimately shown to be unsuccessful, no other submarines of this class were built, although future advances in construction and metallurgy science made the double hull design a standard one for the USN. [3]

Contents

Design

A double hull design moves most of the fuel and ballast tanks out of the pressure hull and into the spaces between the outer and inner hulls. Electric Boat had built only one other double hull design (EB31A for Russia) [4] and thus lacked experience in this hull type. Due to the boat's still fairly small size the tankage space was very tight and difficult to maintain. It also resulted in a complicated venting and flooding arrangement that at times led to an uneven distribution of ballast water. This led to serious problems in stability when making the transition from submerged to surface. [5] [6] To save weight in the pressure hull the structural strength was reduced, making her test depth only 150 feet (46 m). [7] M-1 was built with the same armament and speed as the preceding L-class, but she was larger due to the double hull design. Her battery was also in one large compartment forward of the control room, as opposed to two compartments fore and aft of control room as in other Electric boat designs. She also had heaters to keep the crew warm in northern waters and an icebox for food storage. [8] The partially retractable 3 in (76 mm)/23 caliber deck gun designed for submarines and intended for incorporation in the L-class was installed on M-1 prior to installation on any of the L-class.

Service history

Her keel was laid down on 2 July 1914 by Fore River Shipbuilding Company in Quincy, Massachusetts, as a subcontractor to the Electric Boat Company of Groton, Connecticut, the designer. She was launched on 14 September 1915 sponsored by Ms. Sara Dean Roberts, and commissioned on 16 February 1918.

Following commissioning, M-1 was assigned to Submarine Division 2 (SubDiv2), and was homeported at Newport, Rhode Island. Unlike most other US submarines, she was not deployed overseas in World War I. For the next three years, she operated off the East Coast, training submariners. During her last year of active service, she was under the operational control of SubDiv 5 and SubDiv 3.

After four years of testing and training service, M-1 was decommissioned at Philadelphia Naval Shipyard on 15 March 1922, struck from the Naval Vessel Register the following day, and was sold for scrap on 25 September to Joseph G. Hitner in Philadelphia, Pennsylvania.

Related Research Articles

USS <i>S-1</i> Submarine of the United States

USS S-1 (SS-105) was the lead boat of the S class of submarines of the United States Navy.

<i>Gato</i>-class submarine US Navy fleet submarine class

The Gato class of submarines were built for the United States Navy and launched in 1941–1943. Named after the lead ship of the class, USS Gato, they were the first mass-production U.S. submarine class of World War II.

USS <i>Dolphin</i> (SS-169) "V-boat" class submarine

USS Dolphin (SF-10/SC-3/SS-169), a submarine and one of the "V-boats", was the sixth ship of the United States Navy to be named for that aquatic mammal. She also bore the name V-7 and the classifications SF-10 and SC-3 prior to her commissioning. She was launched on 6 March 1932 by the Portsmouth Navy Yard, sponsored by Mrs. E.D. Toland, and commissioned on 1 June 1932.

USS <i>Argonaut</i> (SM-1) Submarine of the United States

USS Argonaut (V-4/SF-7/SM-1/A-1/APS-1/SS-166) was a submarine of the United States Navy, the first boat to carry the name. Argonaut was laid down as V-4 on 1 May 1925 at Portsmouth Navy Yard. She was launched on 10 November 1927, sponsored by Mrs. Philip Mason Sears, the daughter of Rear Admiral William D. MacDougall, and commissioned on 2 April 1928. Although never officially designated as "SS-166", at some point she displayed this number on her conning tower.

USS <i>Bonita</i> (SS-165) Submarine of the United States

USS Bonita (SF-6/SS-165), a Barracuda-class submarine and one of the "V-boats," was the third ship of the United States Navy to be named for the bonito. Her keel was laid down by the Portsmouth Navy Yard. She was launched on 9 June 1925 as V-3 (SF-6), sponsored by Mrs. L.R. DeSteiguer, wife of Rear Admiral DeSteiguer, and commissioned on 22 May 1926, Lieutenant Commander Charles A. Lockwood, Jr. in command. Like her sisters, Bonita was designed to meet the fleet submarine requirement of 21 knots (39 km/h) surface speed for operating with contemporary battleships.

<i>Skipjack</i>-class submarine Early cold-war US nuclear attack submarine

The Skipjack class was a class of United States Navy nuclear submarines (SSNs) that entered service in 1959-61. This class was named after its lead boat, USS Skipjack. The new class introduced the teardrop hull and the S5W reactor to U.S. nuclear submarines. The Skipjacks were the fastest U.S. nuclear submarines until the Los Angeles-class submarines, the first of which entered service in 1974.

V-boat Group of U.S. Navy submarines and classes derived from them

The V-boats were a group of nine United States Navy submarines built between World War I and World War II from 1921 to 1934 under authorization as the "fleet boat" program.

USS <i>Bass</i> (SS-164) Submarine of the United States

USS Bass (SF-5/SS-164), a Barracuda-class submarine and one of the "V-boats", was the first ship of the United States Navy to be named for the bass.

USS <i>Cachalot</i> (SS-170) Submarine of the United States

USS Cachalot (SC-4/SS-170), a United States Navy submarine and the lead ship of her class, known as the "V-boats", was the only ship of the United States Navy to be named for the sperm whale. Her keel was laid down by the Portsmouth Navy Yard. She was launched on 19 October 1933 as V-8 (SC-4) sponsored by Miss K. D. Kempff, and commissioned on 1 December 1933 with Lieutenant Commander Merril Comstock in command. Cachalot was the first submarine to have the Torpedo Data Computer, Arma Corporation's Mark 1, installed.

USS <i>Cuttlefish</i> (SS-171) Submarine of the United States

USS Cuttlefish (SC-5/SS-171), a Cachalot-class submarine and one of the "V-boats," was the second ship of the United States Navy to be named for the cuttlefish. Her keel was laid down by Electric Boat Company in Groton, Connecticut. She was launched on 21 November 1933 sponsored by Mrs. B. S. Bullard, and commissioned on 8 June 1934, Lieutenant Commander Charles W. "Gin" Styer in command. Cuttlefish was the first submarine built entirely at Electric Boat's facility in Groton, Connecticut; construction of previous Electric Boat designs had been subcontracted to other shipyards, notably Fore River Shipbuilding of Quincy, Massachusetts. Four Peruvian R-class submarines had previously been finished in Groton, using material from cancelled S-boats salvaged from Fore River.

<i>Tambor</i>-class submarine US Navy submarine class of World War II

The Tambor-class submarine was a United States Navy submarine design, used primarily during World War II. They were the USN's first fully successful fleet submarine, and began the war close to the fighting. Six of the class were in Hawaiian waters or the Central Pacific on 7 December 1941, with Tautog at Pearl Harbor during the attack. They went on to see hard service; seven of the twelve boats in the class were sunk before the survivors were withdrawn from front-line service in early 1945; this was the highest percentage lost of any US submarine class. Tautog was credited with sinking 26 ships, the largest number of ships sunk by a US submarine in World War II. The Tambors attained the top speed of 21 knots (39 km/h) and range of 11,000 nautical miles (20,000 km) of the preceding Sargo class, and improvements included six bow torpedo tubes, a more reliable full diesel-electric propulsion plant, and improved combat efficiency with key personnel and equipment relocated to the conning tower. In some references, the Tambors are called the "T Class", and SS-206 through SS-211 are sometimes called the "Gar class".

<i>Sargo</i>-class submarine US Navy submarine class of World War II

The Sargo-class submarines were among the first United States submarines to be sent into action after the Japanese attack on Pearl Harbor, starting war patrols the day after the attack, having been deployed to the Philippines in late 1941. Similar to the previous Salmon class, they were built between 1937 and 1939. With a top speed of 21 knots, a range of 11,000 nautical miles (20,000 km), and a reliable propulsion plant, along with the Salmons they were an important step in the development of a true fleet submarine. In some references, the Salmons and Sargos are called the "New S Class", 1st and 2nd Groups.

<i>Salmon</i>-class submarine US Navy submarine class of World War II

The United States Navy Salmon-class submarines were an important developmental step in the design of the "fleet submarine" concept during the 1930s. An incremental improvement over the previous Porpoise class, they were the first US submarine class to achieve 21 knots with a reliable propulsion plant, allowing them to operate with the Standard-type battleships of the surface fleet. Also, their 11,000 nautical miles (20,000 km) unrefueled range would allow them to operate in Japanese home waters. These rugged and dependable boats provided yeoman service during World War II, along with their immediate successors, the similar Sargo class. In some references, the Salmons and Sargos are called the "New S Class", 1st and 2nd Groups.

United States <i>Porpoise</i>-class submarine Class of US Navy submarine

The Porpoise class were submarines built for the United States Navy in the late 1930s, and incorporated a number of modern features that would make them the basis for subsequent Salmon, Sargo, Tambor, Gato, Balao, and Tench classes. In some references, the Porpoises are called the "P" class.

USS <i>H-6</i> H-class submarine of the United States

USS H-6 (SS-149) was a H-class submarine originally built for the Imperial Russian Navy. Six of these were not delivered pending the outcome of the Russian Revolution of 1917 before being purchased by the United States Navy on 20 May 1918.

USS <i>H-9</i> Submarine of the United States

USS H-9 (SS-152) was a H-class submarine originally built for the Imperial Russian Navy. Six of these were not delivered pending the outcome of the Russian Revolution of 1917 before being purchased by the United States Navy on 20 May 1918.

<i>Cachalot</i>-class submarine Pair of US Navy submarines, 1933 to 1945

The Cachalot-class submarines were a pair of medium-sized submarines of the United States Navy built under the tonnage limits of the London Naval Treaty of 1930. They were originally named V-8 and V-9, and so were known as "V-boats" even though they were unrelated to the other seven submarines constructed between World War I and World War II. An extensive study was conducted to determine the optimum submarine size under the treaty restrictions, factoring in total force, endurance, and percentage of the force that could be maintained on station far from a base, as in a Pacific war scenario. Joseph W. Paige of the Navy's Bureau of Construction and Repair (BuC&R) developed the basic design, but the builder, Electric Boat, was responsible for detailed arrangement; this was fairly bold, since Electric Boat had not built any new submarines since finishing four obsolescent boats for Peru. The previous V-boats were all built in naval shipyards. Cuttlefish was the first submarine built at EB's facility in Groton, Connecticut; construction of previous Electric Boat designs had been subcontracted to other shipyards, notably Fore River Shipbuilding of Quincy, Massachusetts.

United States R-class submarine United States Navy submarine class

The R-class submarines were a class of United States Navy submarines active from 1918 until 1945. With the first of the class laid down following the American entry into World War I, they were built rapidly. Although R-15 through R-20 were completed July–October 1918, they did not serve overseas, and the bulk of the class were not completed until after the Armistice.

United States F-class submarine United States Navy submarine class

The F-class submarines were a group of four submarines designed for the United States Navy by Electric Boat in 1909. F-1 and F-2 were built by Union Iron Works in San Francisco, while F-3 and F-4 were built by The Moran Company in Seattle, Washington.

United States L-class submarine United States Navy submarine class

The United States L-class submarines were a class of 11 coastal defense submarines built 1914–1917, and were the most modern and capable submarines available to United States Navy when the country entered World War I. Despite being considered a successful design by the USN, war experience in European waters demonstrated that the boats lacked the range, speed, and endurance to conduct extended patrols in the North Atlantic.

References

Notes

Sources