Victoria metro station (Kolkata)

Last updated

Victoria
Kolkata Metro Logo.svg
Construction work of the Victoria metro station of Purple Line of the Kolkata Metro at Maidan (Kolkata) - 1.jpg
Construction work of the Victoria metro station
General information
Location Hastings, Kolkata, West Bengal 700071
Flag of India.svg  India
Coordinates 22°33′05″N88°20′30″E / 22.551344°N 88.341615°E / 22.551344; 88.341615
Operated by Metro Railway, Kolkata
Line(s) Purple Line
PlatformsIsland platform
Tracks2
Connections Calcutta Tramways Company (logo).gif Victoria Memorial
Construction
Structure typeUnderground
Parkingyes
AccessibleYes Wheelchair symbol.svg
Other information
StatusUnder Construction
History
Opening2028 (expected)
Previous namesHastings
Future services
Preceding station Kolkata Metro Logo.svg Kolkata Metro Following station
Khidirpur
towards Joka
Purple Line Park Street
towards Esplanade
Location
Kol met map.svg
Red pog.svg
Victoria
Location within Kolkata Metro
Kolkata location map EN.svg
Red pog.svg
Victoria
Victoria (Kolkata)

Victoria is an under construction underground station of the Kolkata Metro in Kolkata, West Bengal. It is a station of the Kolkata Metro Line 3 at Hastings. [1] Victoria station is located between Park Street and Kidderpore metro station. This station will be built in the second phase of the construction of the Kolkata Metro Line 3. There will be two platforms at this station.

Related Research Articles

<span class="mw-page-title-main">Kolkata Metro</span> Rapid transit system in Kolkata, India

The Kolkata Metro is a rapid transit system serving the city of Kolkata and the Kolkata Metropolitan Region in West Bengal, India. Opened in 1984, it was the first operational rapid transit system in India. As of October 2024, it has four operational lines: the 32.13 km (19.96 mi) long Line 1 from Dakshineswar to Kavi Subhash, 14.1 km (8.8 mi) long Line 2 from Salt Lake Sector V to Howrah Maidan, 7.75 km (4.82 mi) long Line 3 from Joka to Majerhat and 5.4 km (3.4 mi) long Line 6 from Kavi Subhash to Hemanta Mukhopadhyay for a total of 59.38 km (36.90 mi). Two other lines named Line 4 and Line 5 are in various phases of construction and planning. The system has a mix of underground, at-grade, and elevated stations using both broad-gauge and standard-gauge tracks. It operates on a 750 V DC Third rail system. Trains operate between 06:55 and 22:30 IST and the fares range from ₹5 to ₹50.

<span class="mw-page-title-main">Kolkata Metro Rail Corporation</span> Public transport company

Kolkata Metro Rail Corporation (KMRC) is a Government of India enterprise formed in 2008. The agency was formed to oversee the implementing Kolkata Metro Line 2, also known as East West Metro, connecting the twin cities Kolkata and Howrah. The metro rail route is partly underground including the part that will be under the river Ganges. The 16.6 km route has six station each in underground and elevated portions. The terminal stations are Salt Lake Sector V and the Howrah Maidan. The elevated stretch started operations on 13 February 2020.

<span class="mw-page-title-main">Kavi Subhash metro station</span> Kolkata Metros Blue & Orange Line interchange and terminal station

Kavi Subhash is the at-grade southern terminus and interchange metro station of the North-South corridor and Bypass Corridor of Kolkata Metro in Kolkata, West Bengal, India. It is named after poet Subhash Mukhopadhyay. This station was opened to public on the auspicious day of Mahalaya in 2010.

<span class="mw-page-title-main">Barasat Junction railway station</span> Railway station in West Bengal, India

Barasat Junction is a Kolkata Suburban Railway station in Barasat. It is one of the major suburban railway stations in North 24 Parganas district, West Bengal, India. Generally, people commuting daily use this station for travelling to Kolkata's Central Business District or other towns, with the busiest times at the station being the morning and evening peak periods. This station provides the facility of separate rest rooms for both male & female passengers. Barasat Junction Railway station consists of 6 permanent platforms.

<span class="mw-page-title-main">Dum Dum metro station</span> Metro station in Kolkata, India

Dum Dum is an elevated metro station on the North-South corridor of the Blue Line of Kolkata Metro in Kolkata, West Bengal, India. The metro station adjoins the platforms of the Dum Dum Junction railway station where connections can be made with Indian Railways services.

<span class="mw-page-title-main">Kolkata Metro Line 1</span> Transit line of rapid transport in Kolkata, India

Line 1 is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. It consists of 26 operational stations from Dakshineswar to Kavi Subhash, out of which 9 of the stations are elevated, 2 are at-grade and the remaining 15 are underground. With a total distance of 32.13 km (19.96 mi), the line connects Dakshineswar and New Garia and uses 5 ft 6 in broad gauge tracks. This line was the first underground railway to be built in India, with the first operations commencing in October 1984 and the full stretch that was initially planned being operational by February 1995. On 28 December 2010, Kolkata Metro became the 17th zone of the Indian Railways. Being the country's first, and a completely indigenous process, the construction of the Kolkata Metro Line 1 was more of a trial-and-error affair, in contrast to the Delhi Metro, which has seen the involvement of numerous international consultants. As a result, it took nearly 23 years to completely construct around 15 km (9.3 mi) underground railway from Birpara up to Tollygunge.

<span class="mw-page-title-main">Kolkata Metro Line 2</span> Transit line in Kolkata, India

Line 2 is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. It currently consists of two distinctly operational sections from Salt Lake Sector-V to Sealdah, and Esplanade to Howrah Maidan by going underneath the Hooghly River. A future eastern extension from Sector-V to Teghoria is planned. It will cover a distance of 22 km (14 mi) and consist of 17 stations from Teghoria (Haldiram) in the east to Howrah Maidan in the west, of which it will consist of 11 elevated and 6 underground stations, and the operational section consists of 6 elevated and 6 underground stations, with a total distance of 13.1 km (8.1 mi). It is expected to derive a very high ridership, since it will connect India's two largest commuter railway and long-distance railway terminals, Howrah and Sealdah, along with two of its largest business districts, BBD Bagh and Salt Lake Sector V. At present, more than 100,000 passengers commute through the line every day, and this figure is expected to go up to 1 million after it gets fully completed by 2035. It will also connect the industrial hub of Kolkata, i.e., Howrah and the IT hub of Kolkata, i.e., Salt Lake Sector-V. It connects Line 1 at Esplanade and will eventually connect Lines 3 and 6.

<span class="mw-page-title-main">Kolkata Metro Line 3</span> Transit line in Kolkata, India

Line 3 is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. A 6.5 kilometres (4.0 mi) stretch from Joka to Taratala of this line was inaugurated on 30 December 2022 and after extended to Majerhat on 6 March 2024. This line will span 15.08 kilometres (9.37 mi) from Joka in the south to Esplanade in the north with a future southward extension of 3.39 kilometres (2.11 mi) to Diamond Park from Joka. It will connect Blue Line at Park Street in central Kolkata and run in parallel with Blue Line up to Esplanade where it will connect with Green Line also. Line 3 is being built by Rail Vikas Nigam Limited.

<span class="mw-page-title-main">Kolkata Metro Line 4</span> Transit line in Kolkata, India

Line 4 is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. It is a 16.876 km (10.486 mi) long line from Noapara to Barasat in North 24 Parganas, which is under construction. It is being built by RVNL, Senbo & ITD. It will run mostly on underground tunnels, the track will be elevated until Jessore Road from Noapara and then go underground towards Barasat metro station. It will have an interchange at the Kolkata Airport with Orange Line.

<span class="mw-page-title-main">Kolkata Metro Line 6</span> Transit line in Kolkata, India

Line 6 is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. It will connect New Garia with Netaji Subhas Chandra Bose International Airport via two major satellite towns of Kolkata metropolitan region, Salt Lake and New Town. It currently operates between Kavi Subhash and Hemanta Mukhopadhyay. This line will be one of the most important stretches of Kolkata Metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. The total distance of this route will be 29.87 km (18.56 mi). It connects Line 1 at Kavi Subhash and will eventually connect Line 2 at Sector-V and Kaikhali and Line 4 at Airport.

<span class="mw-page-title-main">Howrah metro station</span> Metro station in West Bengal, India

Howrah metro station is a metro station of Kolkata Metro Line 2 in Howrah, India. Built underneath Howrah railway station's new and old complex, the metro station allows interchanging with other zones of Indian Railways as part of the Howrah station transport hub. It is the deepest metro station in India. To the east, the station connects to Mahakaran station in Kolkata through India's biggest under-river metro tunnel beneath the Hooghly river; whilst to the west the adjacent station is Howrah Maidan.

<span class="mw-page-title-main">Joka metro station</span> Kolkata Metros Purple Line terminal metro station

Joka is the elevated southern terminal metro station on the North-South corridor of the Purple Line of Kolkata Metro in Kolkata, West Bengal, India. The station is located in Joka. It will be the terminal station of the Kolkata Metro Line 3 till the phase 2 of the project. In phase 3, the line will be extended 2 km more, till Diamond Park. The station was commissioned on 30 December 2022.

<span class="mw-page-title-main">Thakurpukur metro station</span> Kolkata Metros Purple Line metro station

Thakurpukur is an elevated metro station on the North-South corridor of the Purple Line of Kolkata Metro in Thakurpukur, Kolkata, West Bengal, India. It is located in Thakurpukur, above the Diamond Harbour road. The station was commissioned on 30 December 2022.

Mominpur Metro Station is a under construction station of the Kolkata Metro in Mominpore, Kolkata, India. The elevated station is located near Mominpore bus stop. It will be a station of Kolkata Metro Line 3. This station will be built in the second phase of the construction of the Kolkata Metro Line 3. There will be two platforms at this station.

Khidirpur metro station is an underground metro station in Kidderpore, Kolkata, India. The station is under construction. It is a station of the Kolkata Metro Line 3. This station will be built in the second phase of the construction of the Kolkata Metro Line 3 just below the Boys Gate of St Thomas School, Kolkata. There will be two platforms at this station.

<span class="mw-page-title-main">Dum Dum Cantonment railway station</span> Railway station in West Bengal, India

Dum Dum Cantonment railway station is a Kolkata Suburban Railway station in Dum Dum. Its code is DDC. The Dum Dum Cantonment metro station is adjacent to Dum Dum Cantonment railway station. It was named by the Cantonment area near Dum Dum. It serves Dum Dum Cantonment and the surrounding areas. The station consists of three platforms. The platform is very much well sheltered with newly installed seating arrangements and fans.

Survey Park is a neighbourhood within the Santoshpur area of East Kolkata in Kolkata in the Indian state of West Bengal.

<span class="mw-page-title-main">Majerhat metro station</span> Metro station in Kolkata, India

Majerhat metro station is an operational metro station on Line 3 of Kolkata Metro. It is the terminal station of the first phase 1 of this line and the first and only station built over an existing railway network, from Joka to Majerhat. The line was sanctioned in India's railway budget of 2010–11, but due to various hurdles, construction was delayed and missed multiple deadlines. The most notable reason for delays was the Majerhat Bridge collapse in 2018.

<span class="mw-page-title-main">Sakher Bazar metro station</span> Kolkata Metros Purple Line metro station

Sakher Bazar is an elevated metro station on the North-South corridor of the Purple Line of Kolkata Metro in Kolkata, West Bengal, India. It was opened in the first phase of this line. The station was commissioned on 30 December 2022.

References

  1. "New hope for Joka-BBD Bag Metro stretch".