BelugaXL (A330-743L) | |
---|---|
An Airbus A330-743L BelugaXL during its maiden flight in beluga livery | |
Role | Outsize freight aircraft |
Manufacturer | Airbus |
First flight | 19 July 2018 [1] |
Introduction | 9 January 2020 [2] |
Status | Out of production; In service |
Primary user | Airbus Transport International |
Produced | 2016–2023 [3] |
Number built | 6 |
Developed from |
The Airbus BelugaXL (A330-743L) is a large transport aircraft based on the Airbus A330-200F built by Airbus to replace the original Airbus BelugaST (Super Transporter) to transport very large aircraft components, such as wings. [3] The aircraft made its first flight on 19 July 2018, [1] and received its type certification on 13 November 2019. [3] The BelugaXL entered service with Airbus Transport on 9 January 2020. [2]
In 2013, the five original BelugaSTs could not cope with production growth, and Airbus evaluated the Antonov An-124 and An-225, Boeing C-17 or Dreamlifter, and A400M, before choosing to modify one of its own aircraft. [4] The programme was launched in November 2014 to build five aircraft to replace the existing five BelugaSTs; the design freeze was announced on 16 September 2015. [5] The program cost is €1 billion for development and production. [6]
The original BelugaSTs were not to be withdrawn from service after introduction of the Beluga XL in 2019; a mixed fleet was to operate for at least five years, as the increased production rate of single-aisle aircraft requires the ability to move more parts. [7] The BelugaST fleet flew more than 8,000 hours in 2017, doubled from 2014, but the five BelugaST aircraft were only halfway through their planned service life, and another operator could use them for civil or military logistic applications. [8]
The combined Beluga fleet rose to eight aircraft with the deliveries of the first three XLs, as the five originals stayed in service until being withdrawn from 2021. [9] The BelugaST fleet was reaching its limits, flying five times daily, and six days per week, for 10,000 hours in 2017, while some parts are moved over land. [9] The time required for a BelugaST to move the parts of an A320 is three times as long as for the BelugaXL, and nine times longer for A350 parts. [9]
After an Airbus A350 production increase, Airbus aimed to deliver 880 aircraft in 2019, and raise A320neo output to 63 per month by 2021; the Beluga XL fleet was expanded with a sixth aircraft in June 2019. [10] The BelugaSTs could still have 10–20 years' flying life left, and may be offered for sale, or used to serve external customers. [10]
MSN # | Registration | Type | First Flight | Delivered | Fleet # |
---|---|---|---|---|---|
655 | F-GSTA | Airbus A300-605 ST | 13 Sept 1994 | 25 Oct 1995 | 1 |
751 | F-GSTB | Airbus A300-605 ST | 26 Mar 1996 | 24 Apr 1996 | 2 |
765 | F-GSTC | Airbus A300-605 ST | 21 Apr 1997 | 07 May 1997 | 3 |
776 | F-GSTD | Airbus A300-605 ST | 09 Jun 1998 | 18 Dec 1998 | 4 |
796 | F-GSTF | Airbus A300-605 ST | 12 Dec 2000 | 05 Jan 2001 | 5 |
1824 | F-GXLG | Airbus A330-743L XL | 19 July 2018 | 19 July 2018 | XL1 |
1853 | F-GXLH | Airbus A330-743L XL | 15 Apr 2019 | 06 Dec 2019 | XL2 |
1930 | F-GXLI | Airbus A330-743L XL | 02 July 2020 | 26 Oct 2020 | XL3 |
1985 | F-GXLJ | Airbus A330-743L XL | 20 Jul 2021 | 04 Oct 2021 | XL4 |
2027 | F-GXLN | Airbus A330-743L XL | 21 Jul 2022 | 26 Sep 2022 | XL5 |
2041 | F-GXLO | Airbus A330-743L XL | 21 Jul 2023 | 24 Nov 2023 | XL6 |
The aircraft's lower fuselage is assembled on the Airbus A330 final assembly line, and then moved to another facility for the year-long process of assembling the upper fuselage and the lowered nose fuselage. [7] The first section arrived in Toulouse in November 2016. [13] Final assembly started on 8 December 2016. [14] The first large sections: one central and two lateral rear section panels, arrived on 12 April 2017 at the Toulouse Final Assembly facility (L34) from Aernnova's factory in Berantevilla, Spain. [15]
Constructed by Airbus subsidiary Stelia Aerospace in Meaulte, its 12 m × 4 m (39 ft × 13 ft), 8.2 t (18,000 lb) nose section was delivered in May 2017. [16] The 9 m (30 ft) wide, 8 m (26 ft) long and high, 2.1 t (4,600 lb) upper front fuselage part, framing the cargo door, was delivered from Stelia Rochefort on 7 July 2017. [17] The 3.1 t (3.1 long tons; 3.4 short tons), 10 m (33 ft) long and 8 m (26 ft) high door was delivered by Stelia Rochefort in September 2017. [18]
In October 2017, 75% of the first BelugaXL structural assembly was done; with systems, mechanical, and electrical integration underway before integration of the tail elements, which had already been received. [19] Its maiden flight was scheduled for summer 2018 before 10 months of flight tests necessary for its certification campaign, and a 2019 service entry. [19] The second aircraft was to enter final assembly line in December 2018, and the three remaining each following year. [19]
After mating the vertical fin, tail cone and horizontal stabiliser including the outboard vertical surfaces, the main freight door was to be attached from mid-November, before power-on at the end of 2017. [20] The flight test campaign used a single, instrumented aircraft. [20] The front cargo door was attached in December 2017. [21] In January 2018, the second arrived in Toulouse for its transformation, in two months less after lessons learned from the first. [22]
The first BelugaXL rolled off the assembly line on 4 January 2018, unpainted and without engines. [8] Fewer than 1,000 flight test hours were planned for its certification campaign. [8] After fitting its Rolls-Royce Trent 700 engines, it was ground tested for months to assess its systems operation, while bench tests in Toulouse and Hamburg, on flight simulators and in laboratories, simulated flight loads on full-scale copies of specific joints between the upper bubble and the lower fuselage, clearing the aircraft for flight, then type certification. [22]
In March 2018, the first BelugaXL (MSN1824) was having its engines fitted, while the second (MSN1853) was 30% converted. [9] After successful landing gear and flight-control system checks, MSN1824 was to be fuelled and ground tested. [9] The third was expected to begin its conversion before the end of 2018. [9] MSN1853 was to be first operational in 2019, after proving work in 11 European stations, while MSN1824 flight instrumentation was to be disassembled. [9] It was rolled out with its Rolls-Royce Trent 700 engines but no winglets in April 2018. [23]
It passed the ground vibration test in early June 2018, with Office National d'Etudes et de Recherches Aérospatiales (ONERA) and Deutsches Zentrum für Luft- und Raumfahrt (DLR) measuring its dynamic behaviour compared to flight envelope theoretical models. [24] The flight-test programme was expected to last 600 hours. [25] The second aircraft had its lower fuselage completed by mid-June, before upper shell structural work and freight door fitting after summer, for completion by September or October. [25] The first flight was on 19 July 2018, from Blagnac, Toulouse, France. [1] In February 2019, the first aircraft flew to various destinations, including Airbus's wing plants in Bremen, Germany and Broughton, Wales. [26]
The first BelugaXL to enter service was the second aircraft built, which rolled out on 19 March 2019; the first test aircraft will be retro-fitted after certification. [27] The second aircraft (MSN1853) commenced flight-testing on 15 April, and by then, the first (MSN1824) had completed more than 140 test flights over 500 hours, the final stage before certification. [10] A third airframe was undergoing conversion, expected to last until the fourth quarter of 2019, for delivery in 2020. Operations were expected to start with two XLs in the second half of 2019. [10]
After more than 200 flight tests over 700 hours, the BelugaXL received its European Aviation Safety Agency (EASA) type certification on 13 November 2019. [3]
The last two BelugaXLs to be produced are expected to have 180-minute ETOPS approval, allowing them to be used for transatlantic flights, typically to transport satellites to North American launch sites. As of February 2021, tests were being conducted to gain approval for the XL's autoland capacity. [28]
Airbus started operating the first BelugaXL on 9 January 2020, with all six freighters scheduled to be operating by the end of 2023, and the previous A300-600STs phased out from 2021. [2]
With 30% more capacity than the original BelugaST, the BelugaXL can carry two A350 XWB wings instead of one. [5] Its new fuselage is 6.9 m (23 ft) longer and 1.7 m (5 ft 7 in) wider than the original BelugaST, and it can lift a payload 6 t (5.9 long tons; 6.6 short tons) heavier. [29] Its aft section is based on the A330-300, while its forward is based on the A330-200 for centre of gravity reasons, and the reinforced floor and structure is derived from the A330-200 Freighter. [9] The A330 wings, main landing-gear, central and aft fuselage form a semi-built platform with few systems, without the aft upper fuselage, while the upper central fuselage is cut off, facilitated by the metal construction. [9] The enlarged freight hold is mounted in three months with 8,000 new parts on the junction line. [9]
The unpressurised hold begins with the tail adapted by Spain's Aernnova, and continues by building the upper fuselage with two side panels and a crown for each section, for a maximum diameter of 8.8 m (29 ft). [9] Produced by Stelia Aerospace, its main freight door has 24 latches, and the nose includes the cockpit, while a four-seat courier section is supplied by Airbus. [9] Its vertical stabiliser is 50% larger; it has auxiliary fins on the horizontal stabiliser, and two ventral fins beneath the empennage. [9]
The BelugaXL operates at Mach 0.69 up to 35,000 ft (11,000 m) over 2,300 nmi (4,300 km; 2,600 mi) instead of the original Beluga's 900 nmi (1,700 km; 1,000 mi). [9] Deharde Aerospace and the P3 group provide the upper fuselage, while Aciturri produces the horizontal tail plane extension, auxiliary and ventral fins. [4]
Data fromAirbus. [30]
General characteristics
Performance
Related development
Aircraft of comparable role, configuration, and era
The Airbus A300 is Airbus's first production aircraft and the world's first twin-engine, double-aisle wide-body airliner, developed and manufactured by Airbus from 1971 to 2007.
The Airbus A320 family is a series of narrow-body airliners developed and produced by Airbus. The A320 was launched in March 1984, first flew on 22 February 1987, and was introduced in April 1988 by Air France. The first member of the family was followed by the stretched A321, the shorter A319, and the even shorter A318 . Final assembly takes place in Toulouse in France; Hamburg in Germany; Tianjin in China since 2009; and Mobile, Alabama in the United States since April 2016.
The Airbus A321 is a member of the Airbus A320 family of short to medium range, narrow-body, commercial passenger twin engine jet airliners; it carries 185 to 236 passengers. It has a stretched fuselage which was the first derivative of the baseline A320 and entered service in 1994, about six years after the original A320. The aircraft shares a common type rating with all other Airbus A320-family variants, allowing A320-family pilots to fly the aircraft without the need for further training.
The Airbus A330 is a wide-body aircraft developed and produced by Airbus. Airbus began developing larger A300 derivatives in the mid-1970s, giving rise to the A330 twinjet as well as the Airbus A340 quadjet, and launched both designs along with their first orders in June 1987. The A330-300, the first variant, took its maiden flight in November 1992 and entered service with Air Inter in January 1994. The slightly shorter A330-200 variant followed in 1998 with Canada 3000 as the launch operator.
A wide-body aircraft, also known as a twin-aisle aircraft and in the largest cases as a jumbo jet, is an airliner with a fuselage wide enough to accommodate two passenger aisles with seven or more seats abreast. The typical fuselage diameter is 5 to 6 m. In the typical wide-body economy cabin, passengers are seated seven to ten abreast, allowing a total capacity of 200 to 850 passengers. Seven-abreast aircraft typically seat 160 to 260 passengers, eight-abreast 250 to 380, nine- and ten-abreast 350 to 480. The largest wide-body aircraft are over 6 m (20 ft) wide, and can accommodate up to eleven passengers abreast in high-density configurations.
The Airbus A300-600ST, or Beluga, is a specialised wide-body airliner used to transport aircraft parts and outsize cargoes. It received the official name of Super Transporter early on, but its nickname, after the beluga whale, which it resembles, gained popularity and has since been officially adopted.
Azores Airlines, previously known as SATA Internacional, is a Portuguese airline based in the municipality of Ponta Delgada, on the island of São Miguel in the autonomous archipelago of the Azores. A subsidiary of SATA Air Açores, the airline operates as the international arm of the regional network, connecting the archipelago intercontinentally from its hub at João Paulo II Airport.
Tunisair is the national airline of Tunisia. Formed in 1948, it operates scheduled international services to four continents. Its main base is Tunis–Carthage International Airport. The airline's head office is in Tunis, near Tunis Airport.
The Airbus A350 is a long-range, wide-body twin-engine airliner developed and produced by Airbus. The initial A350 design proposed in 2004, in response to the Boeing 787 Dreamliner, would have been a development of the Airbus A330 with composite wings and new engines. Due to inadequate market support, Airbus switched in 2006 to a clean-sheet "XWB" design, powered by two Rolls-Royce Trent XWB high bypass turbofan engines. The prototype first flew on 14 June 2013 from Toulouse, France. Type certification from the European Aviation Safety Agency (EASA) was obtained in September 2014, followed by certification from the Federal Aviation Administration (FAA) two months later.
The Airbus A220 is a family of five-abreast narrow-body airliners by Airbus Canada Limited Partnership (ACLP). It was originally developed by Bombardier Aviation and had two years in service as the Bombardier CSeries. The program was launched on 13 July 2008. The smaller A220-100 first flew on 16 September 2013, received an initial type certificate from Transport Canada on 18 December 2015, and entered service on 15 July 2016 with launch operator Swiss Global Air Lines. The longer A220-300 first flew on 27 February 2015, received an initial type certificate on 11 July 2016, and entered service with airBaltic on 14 December 2016. Both launch operators recorded better-than-expected fuel burn and dispatch reliability, as well as positive feedback from passengers and crew.
A cargo aircraft is a fixed-wing aircraft that is designed or converted for the carriage of cargo rather than passengers. Such aircraft generally feature one or more large doors for loading cargo. Passenger amenities are removed or not installed, although there are usually basic comfort facilities for the crew such as a galley, lavatory, and bunks in larger planes. Freighters may be operated by civil passenger or cargo airlines, by private individuals, or by government agencies of individual countries such as the armed forces.
The Yakovlev MC-21 is a single-aisle airliner, under development in Russia by the Yakovlev Corporation, a branch of the United Aircraft Corporation (UAC), itself a 92%-owned subsidiary of Russia's state-owned aviation giant Rostec.
The Boeing Dreamlifter, officially the 747-400 Large Cargo Freighter (LCF), is a wide-body cargo aircraft modified extensively from the Boeing 747-400 airliner. With a volume of 65,000 cubic feet (1,840 m3) it can hold three times that of a 747-400F freighter. The outsized aircraft was designed to transport Boeing 787 Dreamliner parts between Italy, Japan, and the U.S., but has also flown medical supplies during the COVID-19 pandemic.
Airbus Corporate Jets (ACJ) is a business unit of Airbus which markets and completes business jet variants of the company’s airliners. Following the entry of the 737-based Boeing Business Jet into the market, Airbus introduced the A319-based Airbus Corporate Jet in 1997. Although the term Airbus Corporate Jet was initially used only for the A319CJ, it is now used for all models in a VIP configuration. As of June 2019, 213 corporate and private jets are operating; 222 aircraft have been ordered, including 128 A320 family jets.
The Airbus A321neo is a single-aisle airliner created by Airbus. The A321neo is developed from the Airbus A321 and Airbus A320neo family. It is the longest stretched fuselage of Airbus's A320 series, and the newest version of the A321, with the original A321ceo entering service in 1994 with Lufthansa. It typically seats 180 to 220 passengers in a two-class configuration, with up to 244 passengers in a high-density arrangement.
The Airbus A320neo family is an incremental development of the A320 family of narrow-body airliners produced by Airbus. The A320neo family is based on the enhanced variant of the previous generation A319, A320, and A321, which was then retrospectively renamed the A320ceo family.
The Airbus A330neo is a wide-body airliner developed by Airbus from the original Airbus A330. A new version with modern engines comparable with those developed for the Boeing 787 was called for by operators of the A330ceo. It was launched on 14 July 2014 at the Farnborough Airshow, promising 14% better fuel economy per seat. It is exclusively powered by the Rolls-Royce Trent 7000 which has double the bypass ratio of its predecessor.
Stelia Aerospace is an aerospace company headquartered in Toulouse, France. It specializes in designing and manufacture of aerostructures, pilot seats and premium class passenger seats, mainly for the commercial aviation sector.
This is a list of aviation-related events in 2018.
This is a list of aviation-related events in 2019.
Development and production will cost 1 billion euros [said Bertrand George, head of BelugaXL]