Eurofighter GmbH

Last updated

Eurofighter Jagdflugzeug GmbH
Company type Joint venture
Industry Aerospace
Founded1986;38 years ago (1986)
Headquarters,
Germany
Area served
Worldwide
Key people
Giancarlo Mezzanatto (CEO) [1]
Products Eurofighter Typhoon
Owner
Number of employees
416 (2020)  OOjs UI icon edit-ltr-progressive.svg
Website eurofighter.com

Eurofighter Jagdflugzeug GmbH (English: Eurofighter Fighter Aircraft GmbH ) is a multinational company that coordinates the design, production and upgrade of the Eurofighter Typhoon military jet.

Contents

Founded in 1986, [2] it has its head office in Hallbergmoos, Germany. [3] The company is owned by the major aerospace companies of the four Eurofighter partner nations:

The Typhoon’s engine is designed and manufactured by EuroJet Turbo GmbH, another consortium of European companies.

Eurofighter's customer is the NATO Eurofighter and Tornado Management Agency (NETMA), operating on behalf of the partner nations. The production and management model closely follows that of the earlier Tornado fighter jet programme. In that case, the Panavia Aircraft partnership was responsible for delivering the aircraft, and the Turbo-Union consortium was responsible for the propulsion system.

History

The first production contract was signed on 30 January 1998 between Eurofighter GmbH, Eurojet and NETMA. [4] The procurement totals were as follows: the UK 232, Germany 180, Italy 121, and Spain 87. Production was again allotted according to procurement: BAe (37.42%), DASA (29.03%), Aeritalia (19.52%), and CASA (14.03%). However, during 1995, concerns over workshare, which was based on the number of units intended to be ordered by each contributing nation, were voiced, as all nations involved has opted to reduce their orders following the end of the Cold War and the enactment of the Peace Dividend. The UK cut its orders from 250 to 232, Germany from 250 to 140, Italy from 165 to 121 and Spain from 100 to 87. [5] According to these order levels the workshare split should have been 39/24/22/15 UK/Germany/Italy/Spain, however Germany was unwilling to give up such a large amount of work. [5] In January 1996, after much negotiation between German and UK partners, a compromise was reached whereby Germany would purchase another 40 aircraft. [5] The workshare split was 43% for EADS MAS in Germany and Spain; 37.5% BAE Systems in the UK; and 19.5% for Alenia in Italy. [6]

The maiden flight of the Eurofighter prototype took place in Bavaria on 27 March 1994, flown by DASA chief test pilot Peter Weger. [7] On 9 December 2004, Eurofighter Typhoon IPA4 began three months of Cold Environmental Trials (CET) at the Vidsel Air Base in Sweden, the purpose of which was to verify the operational behaviour of the aircraft and its systems in temperatures between −25 and 31 °C. [8] The maiden flight of Instrumented Production Aircraft 7 (IPA7), the first fully equipped Tranche 2 aircraft, took place from EADS' Manching airfield on 16 January 2008. [9]

In September 1998, contracts were signed for production of 148 Tranche 1 aircraft and procurement of long lead-time items for Tranche 2 aircraft. [10] In March 2008, the final aircraft out of Tranche 1 was delivered to the German Air Force, with all successive deliveries being at the Tranche 2 standard. [11] On 21 October 2008, the first two of 91 Tranche 2 aircraft, ordered four years before, were delivered to RAF Coningsby. [12]

German Air Force Eurofighter Typhoon 31+17 during takeoff, July 2010 German eurofighter.JPG
German Air Force Eurofighter Typhoon 31+17 during takeoff, July 2010

In October 2008, the Eurofighter nations were considering splitting the 236-fighter Tranche 3 into two parts. [13] In June 2009, RAF Air Chief Marshal Sir Glenn Torpy suggested that the RAF fleet could be 123 jets, instead of the 232 previously planned. [14] In spite of this reduced requirement, on 14 May 2009 British Prime Minister Gordon Brown confirmed the UK would move ahead with the third batch purchase. A contract for the first part, Tranche 3A, was signed during July 2009 for 112 aircraft split across the four partner nations, including 40 aircraft for the UK, 31 for Germany, 21 for Italy and 20 for Spain. [15] [16] These 40 aircraft were said to have fully covered the UK's obligations in the project due to cost overruns. [17] In February 2019, Germany ordered 33 further Typhoons to replace ageing Tranche 1 aircraft. [18]

The Eurofighter Typhoon is unique in modern combat aircraft in that there are four separate assembly lines. Each partner company assembles its own national aircraft, but builds the same parts for all aircraft (including exports); Premium AEROTEC (main centre fuselage), [19] EADS CASA (right wing, leading edge slats), BAE Systems (front fuselage (including foreplanes), canopy, dorsal spine, tail fin, inboard flaperons, rear fuselage section) and Leonardo (left wing, outboard flaperons, rear fuselage sections).

Production is divided into three tranches (see table below). Tranches are a production/funding distinction, and do not imply an incremental increase in capability with each tranche. Tranche 3 are based on late Tranche 2 aircraft with improvements added. Tranche 3 was split into A and B parts. [16] Tranches were further divided up into production standard/capability blocks and funding/procurement batches, though these did not coincide, and are not the same thing; e.g., the Eurofighter designated FGR4 by the RAF is a Tranche 1, block 5. Batch 1 covered block 1, but batch 2 covered blocks 2, 2B and 5. On 25 May 2011 the 100th production aircraft, ZK315, rolled off the production line at BAE Systems' site at Warton. [20]

Expected production summary
TrancheAustriaGermanyItalyKuwaitOmanSaudi ArabiaSpainUKQatarTotal
Tranche 115 [N 1] 33281953148
Tranche 2 [21] 7947483467 [N 2] 275
Tranche 3A [16] 3121281224204024200
Total15143962812727316024623

Related Research Articles

British Aerospace plc (BAe) was a British aircraft, munitions and defence-systems manufacturer that was formed in 1977. Its head office was at Warwick House in the Farnborough Aerospace Centre in Farnborough, Hampshire. It purchased Marconi Electronic Systems, the defence electronics and naval shipbuilding subsidiary of the General Electric Company, in 1999 to form BAE Systems.

<span class="mw-page-title-main">DASA</span> 1989–2000 German aerospace manufacturer

DASA was a German aerospace manufacturer.

<span class="mw-page-title-main">Eurofighter Typhoon</span> 1994 multi-role combat aircraft family by Eurofighter

The Eurofighter Typhoon is a European multinational twin-engine, supersonic, foreplanes delta wing, multirole fighter. The Typhoon was designed originally as an air-superiority fighter and is manufactured by a consortium of Airbus, BAE Systems and Leonardo that conducts the majority of the project through a joint holding company, Eurofighter Jagdflugzeug GmbH. The NATO Eurofighter and Tornado Management Agency, representing the UK, Germany, Italy and Spain, manages the project and is the prime customer.

<span class="mw-page-title-main">Panavia Tornado</span> Family of multi-role combat aircraft

The Panavia Tornado is a family of twin-engine, variable-sweep wing multi-role combat aircraft, jointly developed and manufactured by Italy, the United Kingdom and Germany. There are three primary Tornado variants: the Tornado IDS (interdictor/strike) fighter-bomber, the Tornado ECR SEAD aircraft and the Tornado ADV interceptor aircraft.

<span class="mw-page-title-main">Panavia Tornado ADV</span> Series of interceptor aircraft

The Panavia Tornado Air Defence Variant (ADV) is a long-range, twin-engine swing-wing interceptor aircraft developed by the European Panavia Aircraft GmbH consortium. It was a specialised derivative of the multirole Panavia Tornado.

<span class="mw-page-title-main">Meteor (missile)</span> European beyond visual range air-to-air missile

The Meteor is a European active radar guided beyond-visual-range air-to-air missile (BVRAAM) developed and manufactured by MBDA. It offers a multi-shot capability, and has the ability to engage highly maneuverable targets such as jet aircraft, and small targets such as UAVs and cruise missiles in a heavy electronic countermeasures (ECM) environment with a range far in excess of 200 kilometres (110 nmi).

Alenia Aeronautica was an Italian aerospace company. Its subsidiaries included Alenia Aermacchi and Alenia Aeronavali.

<span class="mw-page-title-main">MTU Aero Engines</span> German aircraft engine manufacturer

MTU Aero Engines AG is a German aircraft engine manufacturer. MTU develops, manufactures and provides service support for military and civil aircraft engines. MTU Aero Engines was formerly known as MTU München.

<span class="mw-page-title-main">Euroradar CAPTOR</span> Captor by Euroradar as seen on the Eurofighter Typhoon (CAPTOR-M/E, Mechanical/AESA)

The Euroradar Captor is a next-generation mechanical multi-mode pulse Doppler radar designed for the Eurofighter Typhoon. Development of Captor led to the Airborne Multirole Solid State Active Array Radar (AMSAR) project which eventually produced the CAESAR, now known as Captor-E.

<span class="mw-page-title-main">Eurofighter Typhoon variants</span> Fighter jet in the European Union

The Eurofighter Typhoon is in service with nine nations: United Kingdom, Germany, Italy, Spain, Saudi Arabia, Oman, Qatar, Kuwait, and Austria, with orders for all nine customers still pending as of September 2017. The aircraft has, as of 2016, been provided in a basic air-defense form and has been upgraded to newer production standards which include internal IRST, air-to-ground precision strike capability, and HMSS helmets. Most of the major systems including the CAPTOR radar and the Defence Aids Sub-System (DASS) are expected to be improved and updated over time, with the radar being updated to an AESA, being the CAPTOR-E/CAESAR, of which the Kuwait Air Force will be the inaugural operator, with first deliveries of their 28 new-built aircraft to commence in 2019.

<span class="mw-page-title-main">British Aerospace EAP</span> Technology demonstrator aircraft

The British Aerospace EAP is a British technology demonstrator aircraft developed by aviation company British Aerospace (BAe) as a private venture. It was designed to research technologies to be used for a future European combat aircraft, and for the multinational Eurofighter Typhoon.

<span class="mw-page-title-main">Timeline of the Eurofighter Typhoon</span>

This is the timeline of the development of the Eurofighter Typhoon, a multirole fighter aircraft manufactured by a consortium of European aerospace manufacturers, Eurofighter GmbH, formed in 1983.

<span class="mw-page-title-main">Royal Air Force of Oman</span> Air warfare branch of Omans military

The Royal Air Force of Oman is the air arm of the Armed Forces of Oman.

EuroJet Turbo GmbH is a multi-national engine manufacturing consortium. It is headquartered in Hallbergmoos, Germany.

BAE Systems Military Air & Information is a business unit of British defence company BAE Systems responsible for the design, development, manufacture and support of fixed wing military aircraft. MAI customers include the Royal Air Force, Royal Saudi Air Force, US Navy and Indian Air Force.

<span class="mw-page-title-main">Aerospace industry in the United Kingdom</span> Overview of the aerospace industry in the United Kingdom

The aerospace industry of the United Kingdom is the second-largest national aerospace industry in the world and the largest in Europe by turnover, with a global market share of 17% in 2019. In 2020, the industry employed 116,000 people.

<span class="mw-page-title-main">Future of the Royal Air Force</span> Planning for the future of the Royal Air Force

The planning for the future of the Royal Air Force involves supporting ongoing British military operations and the introduction of new aircraft types including unmanned aerial vehicles and the BAE Systems Tempest sixth-generation fighter in the 2030s. Priorities include greater focus on network enabled capability and mixing crewed fighter jets with UAVs and swarming drones. The new initiative will focus on increasing interoperability with members of NATO and becoming carbon net-zero, with strategies such as using sustainable aviation fuels in aircraft.

The Future Offensive Air System was a study to replace the Royal Air Force's strike capability, at the time provided by the Tornado GR4. Initial operational capability was expected around 2017. The FOAS was cancelled in June 2005 and was replaced by the Deep and Persistent Offensive Capability (DPOC) requirement, which was itself cancelled in the 2010 Strategic Defence and Security Review.

<span class="mw-page-title-main">BAE Systems Tempest</span> Proposed fighter aircraft concept by BAE Systems

The BAE Systems Tempest is a proposed sixth-generation fighter aircraft that is under development in the United Kingdom for the Royal Air Force (RAF). The aircraft is intended to enter service from 2035, gradually replacing the Eurofighter Typhoon. It is being developed as part of the Future Combat Air System (FCAS) programme by a consortium known as Team Tempest, which includes the Ministry of Defence, BAE Systems, Rolls-Royce, Leonardo, and MBDA UK. £2 billion is planned to be spent by the British government on the initial phase of the project up to 2025.

Eurofighter Typhoon procurement is the planned selection and purchase of the Eurofighter Typhoon jet fighter by various countries.

References

Notes

  1. The change in Austria's order from six Tranche 1 and 12 Tranche 2 aircraft to 15 Tranche 1 jets led to a reduction in Tranche 1 quantities for the four partner nations, with a commensurate increase in Tranche 2 numbers.
  2. 24 Saudi aircraft were taken from UK Tranche 2 production, and were to have been replaced at the end of Tranche 2, but will now be accounted against the UK's Tranche 3A total. This marks an effective reduction of 24 aircraft in the UK order total. [22]

Citations

  1. "New Eurofighter boss targets sale of 150-200 Typhoons by mid-decade".
  2. Cowton, Rodney. "Eurofighter partners: West Germany, Britain, Italy and Spain." The Times, 7 June 1986.
  3. "Impressum: Eurofighter Jagdflugzeug GmbH Am Söldnermoos 17 D-85399 Hallbergmoos Germany". Eurofighter. Retrieved 17 September 2011.
  4. BBC "Euro-fighter contracts signed." BBC News, 30 January 1998. Retrieved: 18 September 2007.
  5. 1 2 3 Eurofighter: Weapon of Mass Construction (TV broadcast). BBC, 6 July 2003 airdate.
  6. Haertl, Ronald. "Eurofighter—A Milestone Report". Archived 26 March 2012 at the Wayback Machine European Security and Defence. Retrieved: 3 July 2011.
  7. "1994: Maiden flight for future fighter jet." BBC News, 27 February 1994. Retrieved: 19 March 2008.
  8. Hastings, David. "Eurofighter Typhoon." Archived 16 May 2008 at the Wayback Machine targetlock.org, 6 October 2009. Retrieved: 12 October 2009.
  9. Hoeveler, Wolfdietrich and Phillip Lee. "First Tranche 2 Eurofighter Typhoon Has Flown." eurofighter.com, 2009. Retrieved: 12 October 2009.
  10. Chuter, Andy. "EF2000 deal firms up first batch order." Flight International, 23 September 1998.
  11. Holm, Kathryn and Martina Schmidmeir. "German Air Force: 10,000 Flying Hours with the Eurofighter." Archived 27 September 2011 at the Wayback Machine Eurofighter.com, 16 March 2009. Retrieved: 3 July 2011.
  12. "New Typhoons fly into RAF Coningsby." Archived 24 October 2008 at the Wayback Machine Mod.uk via Defence News, 20 February 2007. Retrieved: 28 November 2009.
  13. Hoyle, Craig. "Eurofighter nations offered split deal for Tranche 3 order." Flight International via flightglobal.com, 7 October 2008. Retrieved 30 November 2009.
  14. Rayment, Sean. "RAF chief predicts controversial takeover of Royal Naval air power." Telegraph, 7 June 2009. Retrieved: 30 November 2009.
  15. Miatt, Rob and John Neilson. "BAE Systems Welcomes Signing of Typhoon Tranche 3 Production Contract." Archived 21 August 2009 at the Wayback Machine BAE Systems, 31 July 2009. Retrieved: 30 November 2009.
  16. 1 2 3 Hoyle, Craig. "Eurofighter partners sign €9 billion Tranche 3A deal." Flight International via flightglobal.com, 31 July 2009. Retrieved: 7 July 2012.
  17. Doyle, Andrew. "UK has 'no obligation' to meet 232-aircraft Typhoon pledge." Flight International via flightglobal.com, 19 September 2009. Retrieved: 21 July 2010.
  18. "Milliardenauftrag für Airbus: Bundeswehr bestellt 33 Eurofighter". BR24. 1 February 2019. Retrieved 25 June 2019.
  19. Sanchez, Miguel and Serena Di Martino. "EADS-CASA begins the Eurofighter Typhoon final assembly phase." Archived 2 December 2013 at the Wayback Machine eads.com, 26 July 2001. Retrieved: 3 July 2011.
  20. ""Production for the United Kingdom" at targetlock.org.uk". Archived from the original on 28 April 2015. Retrieved 19 November 2014.
  21. Hoyle, Craig. "UK to receive first Tranche 2 Eurofighter Typhoons." Flightglobal.com, 21 October 2008. Retrieved: 7 July 2012.
  22. "Der Darabos-Deal." Airpower.at, 2 April 2007. Retrieved: 28 November 2009.