Fairbank station

Last updated

Fairbank
TTC - Line 5.svg
NewFairbankStationEntrance2024.jpg
Main entrance in June 2024
General information
Location1815 Eglinton Avenue West, [1]
Toronto, Ontario
Canada
Coordinates 43°41′44″N79°27′00″W / 43.69556°N 79.45000°W / 43.69556; -79.45000
Platforms Centre platform
Tracks2
Connections BSicon BUS1.svg TTC buses
Construction
Structure typeUnderground
AccessibleYes
ArchitectIBI Group Architects and
SNC-Lavalin [1]
Other information
StatusUnder construction
History
Opening2024(0 years ago) (2024) [2]
Services
Preceding station Logo of the Toronto Transit Commission.svg Toronto Transit Commission Following station
Caledonia
towards Mount Dennis
Line 5 Eglinton
(opens 2024)
Oakwood
towards Kennedy
Secondary entrance in June 2024 FairbankStationUpdatedJune2024.jpg
Secondary entrance in June 2024

Fairbank is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. [3] It will be located in the Fairbank neighbourhood at the intersection of Dufferin Street and Eglinton Avenue West. Destinations include the Fairbank neighbourhood and Fairbank Memorial Park. As of 2017, construction work related to the station was in progress, [4] having been scheduled to begin in 2014. [5] The station is scheduled to open in 2024. [2]

Contents

During the planning stages for Line 5 Eglinton, the station was given the working name "Dufferin", which is identical to the pre-existing Dufferin station on Line 2 Bloor–Danforth. On November 23, 2015, a report to the TTC Board recommended giving a unique name to each station in the subway system (including Line 5 Eglinton). Thus, the LRT station was renamed "Fairbank" after the Fairbank neighbourhood rather than the intersecting Dufferin Street. [6]

The main entrance will replace the Esso gas station on the east side of St. Hilda's Park, at the southeast corner of Dufferin Street and Eglinton Avenue. [5] A secondary entrance will be on the northwest corner, where a right-turn slip road will be removed to provide the necessary space. A third structure, for mechanical and venting purposes, will replace a storefront near the southwest corner. [3] Fairbank station will include a decorative exterior plaza having grass, a misting feature, 14 shade trees, 15 benches and 10 bicycle parking spaces. It will be suitable for community events. [4]

Surface connections

As of November 2023, the following are the proposed connecting routes that would serve this station when Line 5 Eglinton opens: [7]

RouteNameAdditional information
29A/CDufferinNorthbound to Wilson station
29ASouthbound to Exhibition Place (Dufferin Gate)
29CSouthbound to Exhibition Place (Princes' Gate)
34EglintonWestbound to Mount Dennis station and eastbound to Kennedy station
929Dufferin ExpressNorthbound to Wilson station and southbound to Exhibition Place (Dufferin Gate)

Related Research Articles

<span class="mw-page-title-main">Toronto subway</span> Rapid transit system in Ontario, Canada

The Toronto subway is a rapid transit system serving Toronto and the neighbouring city of Vaughan in Ontario, Canada, operated by the Toronto Transit Commission (TTC). The subway system is a rail network consisting of three heavy-capacity rail lines operating predominantly underground. As of December 2024, three new lines are under construction: two light rail lines and one heavy rail line.

<span class="mw-page-title-main">Eglinton West station</span> Toronto subway station

Eglinton West is a subway station on Line 1 Yonge–University in Toronto, Ontario, Canada. It is located in the median of Allen Road on the north side of Eglinton Avenue West.

<span class="mw-page-title-main">Eglinton station</span> Toronto subway station

Eglinton is a subway station on Line 1 Yonge–University of the Toronto subway. Located on Eglinton Avenue, it is central to the Yonge–Eglinton neighbourhood in Midtown Toronto. Eglinton station is the seventh busiest station of the Toronto Transit Commission (TTC).

<span class="mw-page-title-main">Kennedy station</span> Toronto subway station

Kennedy is the eastern terminal station on Line 2 Bloor–Danforth of the Toronto subway system. Opened in 1980, it is located east of the Kennedy Road and Eglinton Avenue intersection. With the adjacent Kennedy GO station on the Stouffville line of GO Transit, Kennedy is an intermodal transit hub and the fifth busiest station in the system, after Bloor–Yonge, St. George, Sheppard–Yonge, and Union, serving a total of approximately 42881 customer trips a day.

The Eglinton West line was a proposed east–west subway line in Toronto, Ontario, Canada, whose construction began in 1994 but was cancelled in 1995. It was to start from the existing Eglinton West station on the Toronto Transit Commission's Yonge–University–Spadina line, travel underneath Eglinton Avenue West, and terminate at Black Creek Drive in its initial phase.

<span class="mw-page-title-main">Transit City</span> Proposed Toronto public transit plan

Transit City was a plan for developing public transport in Toronto, Ontario, Canada. It was first proposed and announced on 16 March 2007 by Toronto mayor David Miller and Toronto Transit Commission (TTC) chair Adam Giambrone. The plan called for the construction of seven new light rail lines along the streets of seven priority transit corridors, which would have eventually been integrated with existing rapid transit, streetcar, and bus routes. Other transit improvements outlined in the plan included upgrading and extending the Scarborough RT line, implementing new bus rapid transit lines, and improving frequency and timing of 21 key bus routes. The plan integrated public transportation objectives outlined in the City of Toronto Official Plan, the TTC Ridership Growth Strategy and Miller's 2006 election platform.

<span class="mw-page-title-main">Line 5 Eglinton</span> Light rail line under construction in Toronto, Ontario

Line 5 Eglinton, also known as the Eglinton Crosstown LRT or the Crosstown, is a light rail transit line that is under construction in Toronto, Ontario, Canada, to expand and improve public transportation in the Greater Toronto Area. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part of the Toronto subway system. The Crosstown was conceived in 2007 during the administration of Toronto mayor David Miller as part of Transit City, a large-scale transit expansion plan. The line is being constructed in two phases.

<span class="mw-page-title-main">Line 6 Finch West</span> Under construction light rail line in Toronto, Ontario

Line 6 Finch West, also known as the Finch West LRT, is a light rail transit line under construction in Toronto, Ontario, Canada, to be operated by the Toronto Transit Commission. The 10.3-kilometre (6.4 mi), 18-stop line is to extend from Finch West station on Line 1 Yonge–University to the North Campus of Humber Polytechnic in Etobicoke. The line will operate in a dedicated above-ground right-of-way, much of it within Finch Avenue, segregated from street traffic. The line will use transit signal priority and standard gauge rather than the broad Toronto gauge. The line is forecast to carry about 14.6 million rides a year or 40,000 a day by 2031 and will replace the 36B Finch West bus route, which is one of the three busiest bus routes in Toronto. Line 6 was originally expected to open within the first half of 2024, with an estimated cost of CA$2.5 billion. For budget purposes, the TTC made the assumption that Line 6 would open no earlier than September 2024. However, the builder, Mosaic Transit Group, expects the line to open by the end of 2024.

<span class="mw-page-title-main">Mount Dennis station</span> Under construction transit terminal in Toronto, Canada

Mount Dennis is an intermodal transit terminal under construction in Toronto, Ontario, Canada. Located east of the intersection of Eglinton Avenue and Weston Road in the Mount Dennis neighbourhood in the district of York, the station will be the western terminus of the future Line 5 Eglinton as well as an intermediate station on the GO Transit Kitchener line and Union Pearson Express. The station has been designated as one of many "mobility hubs" in Greater Toronto.

<span class="mw-page-title-main">Keelesdale station</span> Future underground LRT station in Toronto, Canada

Keelesdale is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that will be part of the Toronto subway system. It will be located in the Silverthorn neighbourhood at the intersection of Keele Street and Eglinton Avenue and is scheduled to open in 2024. Nearby destinations include the York Civic Centre, Keelesdale Park and Chris Tonks Arena, York Memorial Collegiate Institute, George Harvey Collegiate Institute, and the Silverthorn neighbourhood.

<span class="mw-page-title-main">Caledonia station</span> Future LRT station in Toronto, Canada

Caledonia is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located along Eglinton Avenue between the GO Transit Barrie rail corridor and the entrance to the Westside Mall. This is about 200 metres (660 ft) west of Caledonia Road opposite Blackthorn Avenue.

<span class="mw-page-title-main">Oakwood station (Toronto)</span> Future underground LRT station in Toronto, Canada

Oakwood is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Little Jamaica neighbourhood at the intersection of Oakwood Avenue and Eglinton Avenue. It is scheduled to open in 2024.

<span class="mw-page-title-main">Forest Hill station (Toronto)</span> Future underground LRT station in Toronto, Canada

Forest Hill is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Forest Hill neighbourhood at the intersection of Bathurst Street and Eglinton Avenue. It is scheduled to open no earlier than 2024.

<span class="mw-page-title-main">Chaplin station</span> Future underground LRT station in Toronto, Canada

Chaplin is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Forest Hill neighbourhood at the intersection of Chaplin Crescent and Eglinton Avenue, and is scheduled to open in 2024.

<span class="mw-page-title-main">Avenue station</span> Future underground LRT station in Toronto, Canada

Avenue is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. The station is located in North Toronto on Eglinton Avenue between Avenue Road and Highbourne Road. It is the deepest underground station on the line. Destinations include the Chaplin Estates neighbourhood, Marshall McLuhan Catholic Secondary School, the Eglinton Theatre, and Eglinton Park. The station is scheduled to open in 2024.

<span class="mw-page-title-main">Mount Pleasant station (Toronto)</span> Future underground LRT station in Canada

Mount Pleasant is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. The station will be located in North Toronto at the intersection of Mount Pleasant Road and Eglinton Avenue. Nearby destinations include Northern Secondary School, North Toronto Collegiate Institute, and the Davisville Village neighbourhood. It is scheduled to open in 2024.

<span class="mw-page-title-main">Leaside station</span> Future underground LRT station in Toronto, Canada

Leaside is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It is located in the Leaside neighbourhood at the intersection of Bayview Avenue and Eglinton Avenue. It is scheduled to open in 2024.

<span class="mw-page-title-main">Science Centre station</span> Future underground LRT station in Toronto, Canada

Science Centre is an underground light rail transit (LRT) station and mobility hub under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Flemingdon Park neighbourhood at the intersection of Don Mills Road and Eglinton Avenue. It is scheduled to open in 2024.

<span class="mw-page-title-main">Renforth station</span> Bus station in Mississauga, Ontario

Renforth, referred to during planning as Renforth Gateway, is a bus station on the border of the cities of Mississauga and Toronto, in Ontario, Canada. Located at Eglinton Avenue and Renforth Drive, it is the eastern terminus of the Mississauga Transitway and is close to the interchange between Highway 401 and Highway 427.

References

  1. 1 2 "Dufferin Crosstown Station". Urban Toronto. Archived from the original on September 3, 2014. Retrieved August 31, 2014.
  2. 1 2 Ranger, Michael (May 16, 2023). "Eglinton Crosstown won't open until 2024, construction group to take legal action: Metrolinx". CityNews. Retrieved May 16, 2023.
  3. 1 2 "Dufferin Station". Eglinton Crosstown. Retrieved August 31, 2014.
  4. 1 2 "Fairbank Station Public Information Session". Metrolinx. August 24, 2017. Retrieved September 8, 2017. Slide 22 for plaza, slide 15 for construction progress.
  5. 1 2 Fannie Sunshine (January 31, 2012). "Residents get peek at Crosstown's Dufferin station design". InsideToronto.com. Metroland News. Retrieved June 24, 2017.
  6. "Line 5 Eglinton Station Names" (PDF). Board Presentation. Toronto Transit Commission. November 23, 2015. Archived from the original (PDF) on November 26, 2019. Retrieved November 30, 2015. TTC staff evaluated the initial report and the proposed names and provided feedback and recommendations. A primary TTC concern was to avoid replication and redundancy with existing TTC station names. The proposed names are unique and are not likely to be confused with existing station names.
  7. "2024 Annual Service Plan" (PDF). Toronto Transit Commission. November 17, 2023. p. 106.