![]() Laird station main entrance under construction in January 2024 | |||||||||||
General information | |||||||||||
Location | Eglinton Avenue & Laird Drive Toronto, Ontario Canada | ||||||||||
Coordinates | 43°42′48″N79°21′54″W / 43.71333°N 79.36500°W | ||||||||||
Platforms | Centre platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | ![]() | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
History | |||||||||||
Opening | 2025[1] | ||||||||||
Services | |||||||||||
|
Laird is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. [2] It is located in the Leaside neighbourhood in East York at the intersection of Laird Drive and Eglinton Avenue. It is scheduled to open in 2025. [1]
This station's entrances are both on the south side of Eglinton. The main entrance is at the southwest corner of the Laird Drive intersection replacing a small strip mall and the secondary one is east of that in the Leaside Centre parking lot, just beyond the Pier 1 Imports store. [3]
On the east side of the station, there is a third track between the eastbound and westbound tracks, either to store a train or to allow a train to change direction due to an emergency or a change in service. On the west side of the station, there is a diamond crossover. [4] [5] Laird station is the easternmost underground station in the main tunnel; the line will emerge onto Eglinton about 250 metres (820 ft) east of Brentcliffe Drive and change to predominantly on-street operation in a dedicated right-of-way in the centre of the street east to Kennedy station.
Destinations include the many commercial establishments to the southeast: Leaside Centre, the SmartCentres on Laird, and the Leaside Business Park on Eglinton.
Ontario Premier Kathleen Wynne officiated at the ground-breaking for the station on June 30, 2016. [6]
As of December 2021, the underground portion of the station is structurally complete [7] and was constructed by "mining", a technique more formally called sequential excavation method (SEM). Laird, Avenue and Oakwood stations were all constructed by this method, while the other underground Line 5 stations were built by cut-and-cover. According to Crosslinx, SEM is more common in Europe and the Crosstown is the first project to use the technique in Toronto. [8]
The station's mined cavern is 489 metres (1,604 ft) long because it contains a crossover and a storage track in addition to the train platforms. Both the station platforms and the adjacent switching track assemblies are contained within a single circular tube, and there are no support columns between the tracks. Using cut-and-cover would have disrupted approximately 500 metres (1,600 ft) of Eglinton Avenue. [8]
At Laird, two shafts were built on the south side of Eglinton Avenue on both the east and west sides of Laird Drive. From the vertical shafts, workers mined horizontally towards and above the twin tunnels created by the tunnel boring machines. Large pipe-like sections are used to support the roof of the excavation. Then, workers gradually excavated down to the liners of the twin tunnels, which were removed. When the excavation was finished, there was a multi-storey cavern with an arched ceiling, which provides enough strength to support the ground above. The tunnel walls were sprayed with shotcrete, a special concrete that cures in ten minutes. Excavation was done slowly, about 1.5 metres per day; mining work proceeded on a 24-hour, 7-day-a-week basis using two crews of ten workers each.
As of November 2023 [update] , the following are the proposed connecting routes that would serve this station when Line 5 Eglinton opens: [9]
Route | Name | Additional information |
---|---|---|
34 | Eglinton | Westbound to Mount Dennis station and eastbound to Kennedy station |
51 | Leslie | Northbound to Steeles Avenue via Leslie station and southbound to Donlands station |
88 | South Leaside | Westbound to St. Clair station |
The Toronto subway is a rapid transit system serving Toronto and the neighbouring city of Vaughan in Ontario, Canada, operated by the Toronto Transit Commission (TTC). The subway system is a rail network consisting of three heavy-capacity rail lines operating predominantly underground. As of December 2024, three new lines are under construction: two light rail lines and one heavy rail line.
Eglinton West is a subway station on Line 1 Yonge–University in Toronto, Ontario, Canada. It is located in the median of Allen Road on the north side of Eglinton Avenue West. It will become an interchange station with the upcoming Line 5 Eglinton, at which point it will be renamed Cedarvale.
Eglinton is a subway station on Line 1 Yonge–University of the Toronto subway. Located on Eglinton Avenue, it is central to the Yonge–Eglinton neighbourhood in Midtown Toronto. Eglinton station is the seventh busiest station of the Toronto Transit Commission (TTC).
Kennedy is the eastern terminal station on Line 2 Bloor–Danforth of the Toronto subway system. Opened in 1980, it is located east of the Kennedy Road and Eglinton Avenue intersection. With the adjacent Kennedy GO station on the Stouffville line of GO Transit, Kennedy is an intermodal transit hub and the fifth busiest station in the system, after Bloor–Yonge, St. George, Sheppard–Yonge, and Union, serving a total of approximately 42881 customer trips a day.
The Eglinton West line was a proposed east–west subway line in Toronto, Ontario, Canada, whose construction began in 1994 but was cancelled in 1995. It was to start from the existing Eglinton West station on the Toronto Transit Commission's Yonge–University–Spadina line, travel underneath Eglinton Avenue West, and terminate at Black Creek Drive in its initial phase.
Eglinton Avenue is a major east–west arterial thoroughfare in Toronto and Mississauga in the Canadian province of Ontario. The street begins at Highway 407 at the western limits of Mississauga, as a continuation of Lower Baseline in Milton. It traverses the midsection of both cities and ends at Kingston Road. Eglinton Avenue is the only street to cross all six former cities and boroughs of Metropolitan Toronto.
Transit City was a plan for developing public transport in Toronto, Ontario, Canada. It was first proposed and announced on 16 March 2007 by Toronto mayor David Miller and Toronto Transit Commission (TTC) chair Adam Giambrone. The plan called for the construction of seven new light rail lines along the streets of seven priority transit corridors, which would have eventually been integrated with existing rapid transit, streetcar, and bus routes. Other transit improvements outlined in the plan included upgrading and extending the Scarborough RT line, implementing new bus rapid transit lines, and improving frequency and timing of 21 key bus routes. The plan integrated public transportation objectives outlined in the City of Toronto Official Plan, the TTC Ridership Growth Strategy and Miller's 2006 election platform.
Line 5 Eglinton, also known as the Eglinton Crosstown LRT (ECLRT) or the Crosstown, is a light rail transit line that is under construction in Toronto, Ontario, Canada, to expand and improve public transportation in the Greater Toronto Area. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part of the Toronto subway system. The Crosstown was conceived in 2007 during the administration of Toronto mayor David Miller as part of Transit City, a large-scale transit expansion plan. The line is being constructed in two phases.
The Don Mills LRT was a proposed light rail line in Toronto, Ontario, Canada. It was part of the Transit City proposal announced March 16, 2007, to be operated by the Toronto Transit Commission (TTC). It was expected to cost approximately $675 million, with construction to begin in 2012, and an expected opening in 2016. It would have been the fifth of the seven Transit City lines to be complete after the Sheppard East, Finch West, Waterfront West, and Eglinton lines. Ridership was estimated to be 21.2 million trips in 2021.
The Sheppard East LRT was a proposed light rail line in Toronto, Ontario, Canada. It was first announced as part of the Transit City proposal in 2007. The Sheppard East LRT as proposed was to be 13 kilometres (8.1 mi) long, travel along Sheppard Avenue from Don Mills subway station to east of Morningside Avenue, and be operated by the Toronto Transit Commission (TTC).
The Eglinton East LRT (EELRT), officially named as Line 7 Eglinton East and formerly known as the Scarborough Malvern LRT, is a proposed light rail line in Toronto, Ontario, Canada. The line would be entirely within the district of Scarborough. It was originally part of Transit City, a 2007 plan to develop new light rail lines along several priority transit corridors in the city.
Line 6 Finch West, also known as the Finch West LRT, is a light rail transit line under construction in Toronto, Ontario, Canada, to be operated by the Toronto Transit Commission. The 10.3-kilometre (6.4 mi), 18-stop line is to extend from Finch West station on Line 1 Yonge–University to the North Campus of Humber Polytechnic in Etobicoke. The line will operate in a dedicated above-ground right-of-way, much of it within Finch Avenue, segregated from street traffic. The line will use transit signal priority and standard gauge rather than the broad Toronto gauge. The line is forecast to carry about 14.6 million rides a year or 40,000 a day by 2031 and will replace the 36B Finch West bus route, which is one of the three busiest bus routes in Toronto. In 2023, Line 6 was expected to open within the first half of 2024, with an estimated cost of CA$2.5 billion. In early December 2024, Councillor Jamaal Myers, chairman of the TTC board, stated that the TTC did not expect Line 6 to open before June 2025 at the earliest. Metrolinx, the project owner, has not announced an opening date.
The Hurontario LRT; officially named the Hazel McCallion Line and formerly dubbed the Hurontario–Main LRT, is a light rail line under construction in the cities of Mississauga and Brampton, Ontario, Canada. The line will run along Hurontario Street from Mississauga's Port Credit neighbourhood north to Steeles Avenue in Brampton. The line will be built and operated as a public-private partnership by Mobilinx, a consortium of private European and Japanese companies, with provincial transit agency Metrolinx retaining ownership of the line. It will be the only street railway operating in the Greater Toronto Area outside Toronto proper.
Mount Dennis is an intermodal transit terminal under construction in Toronto, Ontario, Canada. Located east of the intersection of Eglinton Avenue and Weston Road in the Mount Dennis neighbourhood in the district of York, the station will be the western terminus of the future Line 5 Eglinton as well as an intermediate station on the GO Transit Kitchener line and Union Pearson Express. The station has been designated as one of many "mobility hubs" in Greater Toronto.
Caledonia is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located along Eglinton Avenue between the GO Transit Barrie rail corridor and the entrance to the Westside Mall. This is about 200 metres (660 ft) west of Caledonia Road opposite Blackthorn Avenue.
Oakwood is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Little Jamaica neighbourhood at the intersection of Oakwood Avenue and Eglinton Avenue. It was scheduled to open in 2024 but, as of January 2025, its opening has been postponed, with no new opening date provided.
Avenue is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. The station is located in North Toronto on Eglinton Avenue between Avenue Road and Highbourne Road. It is the deepest underground station on the line. Destinations include the Chaplin Estates neighbourhood, Marshall McLuhan Catholic Secondary School, the Eglinton Theatre, and Eglinton Park. The station is scheduled to open in 2024.
Leaside is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It is located in the Leaside neighbourhood at the intersection of Bayview Avenue and Eglinton Avenue. It is scheduled to open in 2024.
Science Centre is an underground light rail transit (LRT) station and mobility hub under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Flemingdon Park neighbourhood at the intersection of Don Mills Road and Eglinton Avenue. It was scheduled to open in 2024 but, as of January 2025, its opening has been postponed, with no new opening date provided.
Renforth, referred to during planning as Renforth Gateway, is a bus station on the border of the cities of Mississauga and Toronto, in Ontario, Canada. Located at Eglinton Avenue and Renforth Drive, it is the eastern terminus of the Mississauga Transitway and is close to the interchange between Highway 401 and Highway 427.
The main entrance will be built on the site of the strip mall on the southwest corner. Across Laird to the east, a second entrance will be built on the parking lot of the RioCan-owned Laird Centre on the southeast corner.
Work is beginning on Laird Station, located near the midpoint of the 19-kilometre Light Rail Transit (LRT) line. Construction began in March on Keelesdale, the first underground station. By the end of the summer, more than half of the underground stations on the 25-station line will be under construction.