Mount Pleasant station (Toronto)

Last updated

Mount Pleasant
TTC - Line 5.svg
Mount Pleasant Station 2024.jpg
Main entrance under construction, January 2024
General information
LocationEglinton Avenue & Mount Pleasant Road
Toronto, Ontario
Canada
Coordinates 43°42′30.2″N79°23′24.6″W / 43.708389°N 79.390167°W / 43.708389; -79.390167
Platforms Centre platform
Tracks2
Connections BSicon BUS1.svg TTC buses
Construction
Structure typeUnderground
AccessibleYes
Other information
StatusUnder construction
History
Opening2024(0 years ago) (2024) [1]
Services
Preceding station Logo of the Toronto Transit Commission.svg Toronto Transit Commission Following station
Eglinton
towards Mount Dennis
Line 5 Eglinton
(opens 2024)
Leaside
towards Kennedy

Mount Pleasant is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. [2] The station will be located in North Toronto at the intersection of Mount Pleasant Road and Eglinton Avenue. Nearby destinations include Northern Secondary School, North Toronto Collegiate Institute, and the Davisville Village neighbourhood. It is scheduled to open in 2024. [1]

Contents

Description

Secondary entrance to Mount Pleasant station under construction in January 2024 Mount Pleasant 2nd Entrance 2024.jpg
Secondary entrance to Mount Pleasant station under construction in January 2024

The station will have two entrances. The main, accessible entrance will be at the northwest corner of Eglinton Avenue and Mount Pleasant Road. The secondary entrance will be just east of Mount Pleasant Road on the north side. The station will have storage for 30 bicycles. [2]

Plaque installed by Heritage Toronto at the main entrance, May 2024 Mount Pleasant Station Heritage Plaque.jpg
Plaque installed by Heritage Toronto at the main entrance, May 2024

The main entrance of the station at 256–258 Eglinton Avenue East was the location of a former branch of the Imperial Bank of Canada, in a building designed by architect Herbert Horner in 1928. Metrolinx had the building's façade disassembled brick-by-brick, cataloged, labelled and stored for reassembly upon completion of station structure. Only the building's façade will be preserved. [3] [4]

Surface connections

The following are the proposed connecting routes that would serve this station when Line 5 Eglinton opens, as announced by the TTC in November 2023: [5]

RouteNameAdditional information
34EglintonWestbound to Mount Dennis station and eastbound to Kennedy station
74Mount PleasantSouthbound to St. Clair station and westbound to Eglinton station
103Mount Pleasant NorthWestbound to Eglinton station and northbound to Doncliffe loop

Related Research Articles

<span class="mw-page-title-main">Line 4 Sheppard</span> Rapid transit line in Toronto, Ontario

Line 4 Sheppard is the newest and shortest subway line of the Toronto subway system, operated by the Toronto Transit Commission (TTC). It opened on November 22, 2002, and has five stations along 5.5 kilometres (3.4 mi) of track, which is built without any open sections in the district of North York along Sheppard Avenue East between Yonge Street and Don Mills Road. All stations are wheelchair accessible and are decorated with unique public art.

<span class="mw-page-title-main">Eglinton West station</span> Toronto subway station

Eglinton West is a subway station on Line 1 Yonge–University in Toronto, Ontario, Canada. It is located in the median of Allen Road on the north side of Eglinton Avenue West.

<span class="mw-page-title-main">Eglinton station</span> Toronto subway station

Eglinton is a subway station on Line 1 Yonge–University of the Toronto subway. Located on Eglinton Avenue, it is central to the Yonge–Eglinton neighbourhood in Midtown Toronto. Eglinton station is the seventh busiest station of the Toronto Transit Commission (TTC).

<span class="mw-page-title-main">Kennedy station</span> Toronto subway station

Kennedy is the eastern terminal station on Line 2 Bloor–Danforth of the Toronto subway system. Opened in 1980, it is located east of the Kennedy Road and Eglinton Avenue intersection. With the adjacent Kennedy GO station on the Stouffville line of GO Transit, Kennedy is an intermodal transit hub and the fifth busiest station in the system, after Bloor–Yonge, St. George, Sheppard–Yonge, and Union, serving a total of approximately 50,503 customer trips a day.

<span class="mw-page-title-main">Eglinton Avenue</span> Road in Toronto and Mississauga, Canada

Eglinton Avenue is a major east–west arterial thoroughfare in Toronto and Mississauga in the Canadian province of Ontario. The street begins at Highway 407 at the western limits of Mississauga, as a continuation of Lower Baseline in Milton. It traverses the midsection of both cities and ends at Kingston Road. Eglinton Avenue is the only street to cross all six former cities and boroughs of Metropolitan Toronto.

<span class="mw-page-title-main">Transit City</span> Proposed Toronto public transit plan

Transit City was a plan for developing public transport in Toronto, Ontario, Canada. It was first proposed and announced on 16 March 2007 by Toronto mayor David Miller and Toronto Transit Commission (TTC) chair Adam Giambrone. The plan called for the construction of seven new light rail lines along the streets of seven priority transit corridors, which would have eventually been integrated with existing rapid transit, streetcar, and bus routes. Other transit improvements outlined in the plan included upgrading and extending the Scarborough RT line, implementing new bus rapid transit lines, and improving frequency and timing of 21 key bus routes. The plan integrated public transportation objectives outlined in the City of Toronto Official Plan, the TTC Ridership Growth Strategy and Miller's 2006 election platform.

<span class="mw-page-title-main">Line 5 Eglinton</span> Under construction light rail line in Toronto, Ontario

Line 5 Eglinton is a light rail line that is under construction in Toronto, Ontario, Canada. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part of the Toronto subway system as its fifth route. The first phase of the 19-kilometre (12 mi) line will include 25 stops along Eglinton Avenue, from Mount Dennis station mostly underground to Laird station, after which it will run predominantly at-grade within the street's median to Kennedy station, where it will connect underground with Line 2 Bloor–Danforth. The second phase, a 9.2-kilometre (5.7 mi) westward extension from Mount Dennis, will run mostly underground or elevated to Renforth station, with seven new stations.

The Don Mills LRT was a proposed light rail line in Toronto, Ontario, Canada. It was part of the Transit City proposal announced March 16, 2007, to be operated by the Toronto Transit Commission (TTC). It was expected to cost approximately $675 million, with construction to begin in 2012, and an expected opening in 2016. It would have been the fifth of the seven Transit City lines to be complete after the Sheppard East, Finch West, Waterfront West, and Eglinton lines. Ridership was estimated to be 21.2 million trips in 2021.

<span class="mw-page-title-main">Line 6 Finch West</span> Under construction light rail line in Toronto, Ontario

Line 6 Finch West, also known as the Finch West LRT, is a light rail line under construction in Toronto, Ontario, Canada, to be operated by the Toronto Transit Commission. The 10.3-kilometre (6.4 mi), 18-stop line is to extend from Finch West station on Line 1 Yonge–University to the North Campus of Humber College in Etobicoke. The line will operate in a dedicated above-ground right-of-way, much of it within Finch Avenue, segregated from street traffic. The line will use transit signal priority and standard gauge rather than the broad Toronto gauge. The line is forecast to carry about 14.6 million rides a year or 40,000 a day by 2031 and will replace the 36B Finch West bus route, which is one of the three busiest bus routes in Toronto. Line 6 was originally expected to open within the first half of 2024, with an estimated cost of CA$2.5 billion. For budget purposes, the TTC made the assumption that Line 6 would open no earlier than September 2024. However, the builder, Mosaic Transit Group, expects the line to open by the end of 2024.

<span class="mw-page-title-main">Mount Dennis station</span> Future transit terminal in Toronto, Canada

Mount Dennis is an intermodal transit terminal under construction in Toronto, Ontario, Canada. Located east of the intersection of Eglinton Avenue and Weston Road in the Mount Dennis neighbourhood in the district of York, the station will be the western terminus of the future Line 5 Eglinton as well as an intermediate station on the GO Transit Kitchener line and Union Pearson Express. The station has been designated as one of many "mobility hubs" in Greater Toronto. It is scheduled to open in 2024.

<span class="mw-page-title-main">Caledonia station</span> Future LRT station in Toronto, Canada

Caledonia is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located along Eglinton Avenue between the GO Transit Barrie rail corridor and the entrance to the Westside Mall. This is about 200 metres (660 ft) west of Caledonia Road opposite Blackthorn Avenue.

<span class="mw-page-title-main">Fairbank station</span> Future LRT station in Toronto, Canada

Fairbank is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Fairbank neighbourhood at the intersection of Dufferin Street and Eglinton Avenue West. Destinations include the Fairbank neighbourhood and Fairbank Memorial Park. As of 2017, construction work related to the station was in progress, having been scheduled to begin in 2014. The station is scheduled to open in 2024.

<span class="mw-page-title-main">Oakwood station (Toronto)</span> Future underground LRT station in Toronto, Canada

Oakwood is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Little Jamaica neighbourhood at the intersection of Oakwood Avenue and Eglinton Avenue. It is scheduled to open in 2024.

<span class="mw-page-title-main">Forest Hill station (Toronto)</span> Future underground LRT station in Toronto, Canada

Forest Hill is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Forest Hill neighbourhood at the intersection of Bathurst Street and Eglinton Avenue. It is scheduled to open no earlier than 2024.

<span class="mw-page-title-main">Chaplin station</span> Future underground LRT station in Toronto, Canada

Chaplin is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Forest Hill neighbourhood at the intersection of Chaplin Crescent and Eglinton Avenue, and is scheduled to open in 2024.

<span class="mw-page-title-main">Avenue station</span> Future underground LRT station in Toronto, Canada

Avenue is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. The station is located in North Toronto on Eglinton Avenue between Avenue Road and Highbourne Road. It is the deepest underground station on the line. Destinations include the Chaplin Estates neighbourhood, Marshall McLuhan Catholic Secondary School, the Eglinton Theatre, and Eglinton Park. The station is scheduled to open in 2024.

<span class="mw-page-title-main">Leaside station</span> Future underground LRT station in Toronto, Canada

Leaside is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It is located in the Leaside neighbourhood at the intersection of Bayview Avenue and Eglinton Avenue. It is scheduled to open in 2024.

<span class="mw-page-title-main">Laird station</span> Future underground LRT station in Toronto, Canada

Laird is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It is located in the Leaside neighbourhood in East York at the intersection of Laird Drive and Eglinton Avenue. It is scheduled to open in 2024.

<span class="mw-page-title-main">Science Centre station</span> Future underground LRT station in Toronto, Canada

Science Centre is an underground light rail transit (LRT) station and mobility hub under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Flemingdon Park neighbourhood at the intersection of Don Mills Road and Eglinton Avenue. It is scheduled to open in 2024.

<span class="mw-page-title-main">Renforth station</span> Bus station in Mississauga, Ontario

Renforth, referred to during planning as Renforth Gateway, is a bus station on the border of the cities of Mississauga and Toronto, in Ontario, Canada. Located at Eglinton Avenue and Renforth Drive, it is the eastern terminus of the Mississauga Transitway and is close to the interchange between Highway 401 and Highway 427.

References

  1. 1 2 Ranger, Michael (May 16, 2023). "Eglinton Crosstown won't open until 2024, construction group to take legal action: Metrolinx". CityNews. Retrieved May 16, 2023.
  2. 1 2 "Mount Pleasant Station". Eglinton Crosstown. Retrieved October 31, 2015.
  3. "McDonalds to be demolished for Bayview LRT". Bayview News. November 7, 2013. Retrieved October 21, 2015. A nice bit of news on the northwest corner of Mt Pleasant and Eglinton where, according to Metrolinx information, the facade of the old building will be retained.
  4. "Mount Pleasant Station Open House". Metrolinx. October 19, 2017. Retrieved March 31, 2017. •Designed by architect Herbert Horner in 1928, and established as an Imperial Bank of Canada. •In July 2016 demolition of the 256–258 Eglinton Avenue East began. •The façade was disassembled brick-by-brick, cataloged, labelled and stored. •The east portion of the façade will be reassebled upon completion of station structure. From slide 32 of url's slideshow.
  5. "2024 Annual Service Plan" (PDF). Toronto Transit Commission. November 17, 2023. p. 106.