Mount Pleasant Road

Last updated

Mount Pleasant Road

Mt Pleasant Rd map.png
Map of Mount Pleasant Road, Jarvis Street is in pink
Route information
Maintained by City of Toronto
Length7.6 km [1] [2]  (4.7 mi)
Existed1915 [3] –present
Major junctions
South end Jarvis Street / Ted Rogers Way
Major intersections Bloor Street East
St. Clair Avenue East
Eglinton Avenue East
Lawrence Avenue East
North endGlen Echo Drive
Location
Country Canada
Province Ontario
Major cities Toronto
Highway system
  • Roads in Toronto
Nearby arterial roads
  Yonge Street Mount Pleasant Bayview Avenue  

Mount Pleasant Road is a major arterial thoroughfare in Toronto, Ontario, Canada. The street extends from Jarvis Street south of Bloor Street north to Glen Echo Drive. The road is unique as one of the few arterial roads in Toronto to be created after the development of the suburbs which it passes through. These include the wealthy Rosedale, Moore Park and Lawrence Park neighbourhoods. The road also passes through the centre of Mount Pleasant Cemetery, after which it takes its name.

Contents

Mount Pleasant Road was first established in 1915 when the city of Toronto, having recently annexed Moore Park, purchased the right-of-way for a new road through the cemetery. This road opened to traffic in 1919, from St. Clair Avenue to the Blythwood Ravine, south of Lawrence Avenue. Several streets were absorbed into the length of Mount Pleasant Road in 1919, 1920 and 1935; the latest as part of a northward extension through Lawrence Park. In the late 1940s, what originally began as the Clifton Road Extension opened a new right-of-way between St. Clair Avenue and Jarvis Street, despite opposition from the Toronto Transit Commission (TTC), bringing the road to its current length of 7.6 km (4.7 mi). This extension is considered Toronto's first expressway.

Route description

Northern Secondary School lies on the east side of Mount Pleasant Road, north of Eglinton Avenue. It was built prior to the amalgamation of North Toronto. Northern Secondary, Toronto.JPG
Northern Secondary School lies on the east side of Mount Pleasant Road, north of Eglinton Avenue. It was built prior to the amalgamation of North Toronto.

Between Bloor Street and York Mills Road, Mount Pleasant Road is the first major thoroughfare east of Yonge Street, the centreline of Toronto. It is classified by the city as a "major arterial", [4] with a speed limit of 50 km/h (31 mph) in most places (40km/h above lawrence). The road is 7.6 km (4.7 mi) in length. [1]

Mount Pleasant begins as an extension of Jarvis Street, in downtown Toronto. [1] Until late 2009, Jarvis extended north to Bloor; however, this section was renamed Ted Rogers Way on October 27, 2009, truncating Jarvis at Mount Pleasant. [5] The road forks to the northeast between large buildings and passes beneath Bloor Street, then crosses the Rosedale Ravine. It passes through residential South Rosedale, entering a trench and passing beneath Crescent Road. The road descends into Avoca Ravine (crossing Yellow Creek, passing David A. Balfour Park) along the former route of Roxborough Drive, then climbs to pass beneath the Canadian Pacific Railway tracks. It continues to climb along the eastern bank of the ravine, entering Moore Park and turning north at St. Clair Avenue East. The road passes through the centre of Mount Pleasant Cemetery, after which it takes its name. [6] It crosses the old Belt Line Railway trail, and winds northeast into Davisville Village. [1]

Continuing north and resuming its straight northward course, Mount Pleasant passes through a historic commercial strip, then meets Eglinton Avenue East. [7] It passes into a primarily residential area, though several auto service shops exist along this stretch, as well as Northern Secondary School. The road heads slightly west south of Blythwood Road, then crosses Blythwood Ravine, which contains the small Burke Brook. [1] After climbing into Lawrence Park, the road meets Lawrence Avenue East. This intersection, featuring a multi-stage traffic light, directs drivers to the east before continuing north. From here to the northern terminus, it is classified as a collector road and is a wide residential street with several stop signs. [4] The road ends near the edge of the West Don Valley at an intersection with Glen Echo Drive, adjacent to the Doncliffe Bus Loop. [1] [6]

History

Alberta Avenue was a short muddy street which was incorporated into the alignment of Mount Pleasant Road by 1919 Mount Pleasant Road south to Merton Street 1916.jpg
Alberta Avenue was a short muddy street which was incorporated into the alignment of Mount Pleasant Road by 1919

The outward growth of Toronto presented an ever increasing need for a dedicated burial ground. The Toronto General Burying Grounds Trust was formed by the owners of the Potter's Field cemetery, which lay at the northwest corner of Yonge and Bloor. As the cemetery blocked the growth of Yorkville, the village pressured the province to move the interred to a new burial ground; the trust purchased The Necropolis. [8] As Toronto continued to grow, the need for a new cemetery grew. As a result, the trust purchased a 0.81 km2 (200 acres) farm north of Deer Park. The new grounds, named Mount Pleasant Cemetery, opened to the public on November 4, 1876. [9] Thereafter, the "outer suburbs" of Rosedale, Deer Park, North Toronto and Moore Park grew, being annexed by the City of Toronto in 1905, 1908 and the latter two in 1912, respectively. [10]

Mount Pleasant Road was constructed over the course of several years by interconnecting several existing streets as well as building a new road in other places; at that time, a road existed to the north and south of the cemetery. The road to the south, running between Clarence Street (renamed Heath Street on April 7, 1913) and Moore Avenue, was known as Lyle Street and Kinsman Avenue. The road to the north, running between Balliol Street and Merton Street, was known as Alberta Avenue. [11]

Despite opposition by the TTC, an underpass was constructed at Bloor Street Mount Pleasant bridge at Bloor.jpg
Despite opposition by the TTC, an underpass was constructed at Bloor Street

In an attempt to improve the flow of traffic coming from within the city, the operators of Mount Pleasant Cemetery were approached beginning in 1912 with the goal of opening a new right-of-way through the property. The operators initially refused, prompting the city to pass By-law 7311 in March 1915, which allowed for the expropriation of the cemetery property. Over the next several months, the city and the Toronto General Burying Grounds Trustees bargained over the price of the land, settling for the extraordinary sum of $98,921.88 ($2,090,000, adjusted for inflation) by July; construction began the following spring. [3] The route through Moore Park incorporated a small street known as Kinsman Avenue (known as Lyle Street until April 7, 1913), [12] while north of the cemetery, the short Alberta Avenue between Merton Street And Balliol Street was absorbed. [13] The muddy road was opened to traffic in 1919, featuring a paved bridge with streetcar tracks over the abandoned Belt Line Railway. [3]

By the end of 1919, Mount Pleasant Road existed between St. Clair Avenue and Blythwood Road, ending at the rim of the Blythwood Ravine. Despite this, the road on the opposite rim was renamed from Sidmouth Avenue in 1920. [13] Following the construction of the Vale of Avoca Bridge in the first half of the 1920s, the newly formed Toronto Transit Commission extended the St. Clair streetcar line east to Mount Pleasant Road December 1, 1924 and then north to Eglinton Avenue on November 4, 1925. [14] Between 1934 and 1936, after gaining approval from Lawrence Park developers, a bridge was constructed over the ravine and Mount Pleasant extended north to Lawrence Avenue. In 1935, Hilda Avenue was renamed, extending Mount Pleasant Road north to Forest Glen Crescent. [13]

Clifton Road Extension

Grading was well underway on the Clifton Road Extension in September 1948 Clifton Road Extension.png
Grading was well underway on the Clifton Road Extension in September 1948

In November 1945, at the recommendation of the planning board, in an effort to improve traffic flow outward from the downtown core, city council initiated what would come to be known as the Clifton Road Extension. [15] Prior to the opening of this route, a road travelled southwest from the intersection of Inglewood Drive and Clifton Road into the ravine, crossed Yellow Creek, and climbed up the opposite slope north to the corner of Avoca Avenue and Rosehill Drive; most of this route exists as a recreational path today. Roxborough Drive also crossed the ravine along the same route as Mount Pleasant today. [13] A third route followed MacLennan Avenue north across the CPR tracks, ascending the steep MacLennan Hill. A decades-old contract signed with CPR required the closing of the MacLennan Avenue crossing if a road should ever pass beneath the tracks. [16]

The Maclennan Hill was a dangerous and steep bottleneck for traffic leaving the inner city. The first recommendations involved creating an underpass beneath the CPR tracks. A vote was held on January 1, 1946, with an overwhelming majority of voters approving the project. [15] After several months of negotiation with residents of South Rosedale, bylaw 16622 formally approved the extension of Clifton Road to Jarvis Street on June 24, 1946. [17]

Residents of Moore Park, opposed to the notion of widening their small residential street, approached city council in September 1948 to request the new extension connect to Mount Pleasant Road instead. A petition of residents followed, and city council accepted the recommendations. Bylaw 17489, passed February 7, 1949, formally approved the project. Despite the loss of ten houses, this plan was carried out. [18]

Construction included a new bridge excavated at the intersection of Huntley and Jarvis Streets, requiring the TTC to divert its streetcar tracks to the south. The closing of the MacLennan Avenue CPR crossing resulted in the construction of a pedestrian overpass. Traffic descending the MacLennan Hill was directed west along a new road to Mount Pleasant. [16] On January 23, 1950, the Clifton Road Extension was renamed Mount Pleasant Road. [19] It opened to traffic on May 17, and is considered the first expressway in Toronto. [20] [21]

Public transit

Mount pleasant road is currently served by TTC route 74 Mount Pleasant from St. Clair Avenue to Doncliffe Drive. [22] Before 2020, the 141 Mount pleasant express operated during rush hours for a increased fare, operating from Lawrence to the terminus at Bloor, then continuing along Jarvis to Downtown, though it has been suspended due to Covid-19. [23]

Before 2016, route 74 was split at Eglinton Ave, and would go to Eglinton station, and the 103 Mount Pleasant north would operate north of Eglinton Ave to Doncliffe. However, due to the construction of the Eglinton crosstown, the 103 was discontinued and the 74 was extended north of Eglinton to Doncliffe. The 74/103 split at Eglinton will most likely come back after the Eglinton crosstown is completed in late 2023, as seen in TTC line 5 opening maps. [24] [25]

Major intersections

The following table lists the notable crossroads encountered along Mount Pleasant Road. The entirety of the road lies within the city of Toronto.

LocationkmDestinationsNotes
Cabbagetown 0.0 Jarvis Street,

Charles Street East

Mount Pleasant becomes Jarvis Street
Moore Park 2.4 St. Clair Avenue East St. Clair Avenue becomes a local street east of Mount Pleasant Road
Davisville Village 3.5Davisville Avenue
North Toronto 4.5 Eglinton Avenue East
Lawrence Park 5.6Blythwood Road
6.5 Lawrence Avenue East Mount Pleasant Road becomes a collector road north of Lawrence [4]
7.6Glen Echo Road

Forest Glen Crescent

Bends into Glen Echo Road

Related Research Articles

<span class="mw-page-title-main">North Toronto</span> Place in Ontario, Canada

North Toronto is a former town and informal district located in the northern part of the Old Toronto district in Toronto, Ontario, Canada. Currently occupying a geographically central location within the city of Toronto, the Town of North Toronto was incorporated in 1890, when much of the area was still farmland, and annexed by Toronto in 1912. The name is still used to refer to the area in general, although Yonge–Eglinton and Midtown Toronto are officially used.

<span class="mw-page-title-main">Line 1 Yonge–University</span> Subway line in Toronto, Ontario, Canada

Line 1 Yonge–University is a rapid transit line on the Toronto subway. It serves Toronto and the neighbouring city of Vaughan in Ontario, Canada. It is operated by the Toronto Transit Commission, has 38 stations and is 38.4 km (23.9 mi) in length, making it the longest line on the subway system. It opened as the "Yonge subway" in 1954 as Canada's first underground passenger rail line, and was extended multiple times between 1963 and 2017. Averaging over 670,000 riders per weekday, Line 1 is the busiest rapid transit line in Canada, and one of the busiest lines in North America.

<span class="mw-page-title-main">St. Clair Avenue</span> Road in Toronto, Ontario, Canada

St. Clair Avenue is a major east-west street in Toronto, Ontario, Canada. It was laid out in the late 18th century by the British as a concession road, 2 kilometres (1.2 mi) north of Bloor Street and 4 kilometres (2.5 mi) north of Queen Street.

<span class="mw-page-title-main">Lawrence Park, Toronto</span> Neighbourhood in Toronto, Ontario, Canada

Lawrence Park is a neighbourhood in Toronto, Ontario, Canada. It is bordered by Yonge Street to the west and Bayview Avenue to the east, and from Blythwood Ravine on the south to Lawrence Avenue on the north. Lawrence Park was one of Toronto's first planned garden suburbs. Begun in the early part of the 20th century, it did not fully develop until after the Second World War. It was ranked the wealthiest neighbourhood in all of Canada in 2011.

<span class="mw-page-title-main">Toronto—St. Paul's</span> Federal electoral district in Ontario, Canada

Toronto—St. Paul's is a federal electoral district in Toronto, Ontario, Canada, that has been represented in the House of Commons of Canada since 1935. Its current MP is Carolyn Bennett. Prior to the 2015 election, the riding was known as St. Paul's.

William R. Allen Road, also known as Allen Road, the Allen Expressway and colloquially as the Allen, is a short expressway and arterial road in Toronto. It starts as a controlled-access expressway at Eglinton Avenue West, heading north to just south of Transit Road, then continues as an arterial road north to Kennard Avenue, where it continues as Dufferin Street. Allen Road is named after Metro Toronto chairman William R. Allen and is maintained by the City of Toronto. Landmarks along the road include the Lawrence Heights housing project, Yorkdale Shopping Centre and Downsview Park, and Downsview Airport. A section of the Line 1 Yonge–University subway is located within the median of the expressway from Eglinton Avenue to north of Wilson Avenue.

<span class="mw-page-title-main">St. Clair station</span> Toronto subway station

St. Clair is a subway station on Line 1 Yonge–University in Toronto, Ontario, Canada. The station opened in 1954 as part of the original Yonge Street subway.

<span class="mw-page-title-main">Toronto Civic Railways</span> Streetcar operator in Toronto, Canada, from 1912 to 1921

Toronto Civic Railways (TCR) was a streetcar operator created and owned by the City of Toronto, Ontario, Canada, to serve newly annexed areas of the city that the private operator Toronto Railway Company refused to serve. When the Toronto Railway Company's franchise expired in 1921, its services were combined with those of the Toronto Civic Railways, and are now assumed by the new Toronto Transportation Commission (TTC). The first route of the TCR started operation on December 18, 1912.

<span class="mw-page-title-main">Cancelled expressways in Toronto</span> Unbuilt freeways in Toronto, Canada

The cancelled expressways in Toronto were a planned series of expressways in Toronto, Ontario, Canada that were only partially built or cancelled due to public opposition. The system of expressways was intended to spur or handle growth in the suburbs of Toronto, but were opposed by citizens within the city of Toronto proper, citing the demolition of homes and park lands, air pollution, noise and the high cost of construction. The Spadina Expressway, planned since the 1940s, was cancelled in 1971 after being only partially constructed. After the Spadina cancellation, other expressway plans, intended to create a 'ring' around the central core, were abandoned.

<span class="mw-page-title-main">Eglinton Avenue</span> Road in Toronto and Mississauga, Canada

Eglinton Avenue is a major east–west arterial thoroughfare in Toronto and Mississauga in the Canadian province of Ontario. The street begins at Highway 407 at the western limits of Mississauga, as a continuation of Lower Baseline in Milton. It traverses the midsection of both cities and ends at Kingston Road. Eglinton Avenue is the only street to cross all six former boroughs of Metropolitan Toronto.

<span class="mw-page-title-main">Bathurst Street (Toronto)</span> Street in Toronto and York Region in Ontario, Canada

Bathurst Street is a main north–south thoroughfare in Toronto, Ontario, Canada. It begins at an intersection of the Queens Quay roadway, just north of the Lake Ontario shoreline. It continues north through Toronto to the Toronto boundary at Steeles Avenue. It is a four-lane thoroughfare throughout Toronto. The roadway continues north into York Region where it is known as York Regional Road 38.

Black Creek Drive is a four lane north–south arterial road in Toronto, Ontario, Canada. It connects Weston Road and Humber Boulevard with Highway 401 via Highway 400, the latter of which it forms a southerly extension. Black Creek Drive officially transitions into Highway 400 at the Maple Leaf Drive overpass, southeast of Jane Street. The roadway is named after the Black Creek ravine, which it parallels for most of its route. It features a maximum speed limit of 70 km/h (43 mph). As a municipal road, it is patrolled by the Toronto Police Service.

<span class="mw-page-title-main">Keele Street</span> Street in Toronto and York region in Ontario, Canada

Keele Street is a north–south road in Toronto, Vaughan and King in Ontario, Canada. It stretches 47 kilometres (29 mi), running from Bloor Street in Toronto to the Holland Marsh. South of Bloor Street, the roadway is today known as Parkside Drive, but was originally part of Keele Street. It was renamed in 1921 by the City of Toronto.

<span class="mw-page-title-main">Bayview Avenue</span> Major north-south route in the Greater Toronto Area of Ontario

Bayview Avenue is a major north–south route in the Greater Toronto Area of Ontario. North of Toronto, in York Region, Bayview is designated as York Regional Road 34.

<span class="mw-page-title-main">Castle Frank Brook</span> River in Ontario, Canada

Castle Frank Brook is a buried creek and south-west flowing tributary of the Don River in central and north-western Toronto, Ontario, originating near the intersection of Lawrence Avenue and Dufferin Street.

King's Highway 11A, commonly referred to as Highway 11A, was the highway designation for an alternate route of Highway 11 in the Canadian province of Ontario. The north-south route paralleled Highway 11 within Toronto, serving as a secondary access to Downtown Toronto. It began at the York exit of the Gardiner Expressway (Highway 2) and travelled north on York Street to Front Street, where it transitioned onto University Avenue. It continued north on University Avenue to Queen's Park, where Highway 11A followed Queen's Park Crescent, encircling the Ontario Legislative Building, before continuing along Avenue Road. Highway 11A travelled along Avenue Road to Upper Canada College. It followed Lonsdale Road, Oriole Parkway, and Oxton Avenue around the campus and back to Avenue Road, which resumes north of the school. It continued north along Avenue Road to Highway 401, ending just north of the highway at Bombay Avenue.

<span class="mw-page-title-main">Beltline Trail</span> Rail trail in Toronto, Ontario

The Beltline Trail is a 9-kilometre (5.6 mi)-long cycling and walking rail trail in Toronto, Ontario, Canada. It consists of three sections, the York Beltline Trail west of Allen Road, the Kay Gardner Beltline Park from the Allen to Mount Pleasant Road, and the Ravine Beltline Trail south of Mount Pleasant Cemetery through the Moore Park Ravine. Built on the former right-of-way of the Toronto Belt Line Railway, the linear park passes through the neighbourhoods of Rosedale, Moore Park, Forest Hill, Chaplin Estates, and Fairbank.

<span class="mw-page-title-main">Burke Brook</span> River in Ontario, Canada

Burke Brook is a small stream in Toronto, Ontario. It is part of the Don River watershield, a major river that flows into Lake Ontario. The north end of the stream begins near Glenview Senior Public School.

References

  1. 1 2 3 4 5 6 MapArt (2008). Toronto & Area (Map). Peter Heiler Ltd. pp. 109, 115. § H–Q20. ISBN   978-1-55368-978-2.
  2. Google (January 7, 2010). "Mount Pleasant Road, length and route" (Map). Google Maps . Google. Retrieved January 7, 2010.
  3. 1 2 3 Filey, Mike (1999). Mount Pleasant Cemetery. Dundurn Press. pp. 161–164. ISBN   1-55002-322-5.
  4. 1 2 3 Toronto Road Classification System Map (PDF) (Map). Cartography by Transportation Services. City of Toronto. 2000. Retrieved December 29, 2010.
  5. By-Law 1071-2009 (PDF) (Report). City of Toronto. October 27, 2009. Retrieved January 7, 2010.
  6. 1 2 Wise, Leonard; Gould, Allan (2000). Toronto Street Names. Firefly Books. p.  152. ISBN   1-55209-386-7.
  7. blogTO. "Mount Pleasant". Freshdaily. Retrieved January 8, 2010.
  8. Filey, Mike (2010). "Yorkville the First 'Burb". Toronto Sketches 10: The Way We Were. Dundurn Press. p. 135. ISBN   978-1-55488-780-4.
  9. "Early History of Mount Pleasant Cemetery". Mount Pleasant Group. Retrieved January 1, 2011.
  10. Glazebrook, George (1971). The story of Toronto. University of Toronto Press. p. 211.
  11. Plan of the City of Toronto (Map). The Toronto Lube Company. 1912.
  12. Toronto bylaw 6402 (1913)
  13. 1 2 3 4 Map of Greater Toronto and Suburbs (Map). Toronto Map Company. 1916. § A–G15.
  14. "The St. Clair Streetcar: The TTC Takes Over". Transit Toronto. March 2, 2010. Retrieved January 8, 2010.
  15. 1 2 Archer, William (1970). Chronology of Clifton Road and Mount Pleasant Road Extension Projects (Report). City of Toronto, Clerk's Department. p. 1. 36,116 yes, 7,471 no
  16. 1 2 "End of a Level Crossing". The Toronto Daily Star. June 16, 1947. p. 6.
  17. Archer, William (1970). Chronology of Clifton Road and Mount Pleasant Road Extension Projects (Report). City of Toronto, Clerk's Department. p. 4.
  18. Archer, William (1970). Chronology of Clifton Road and Mount Pleasant Road Extension Projects (Report). City of Toronto, Clerk's Department. pp. 4–5.
  19. Archer, William (1970). Chronology of Clifton Road and Mount Pleasant Road Extension Projects (Report). City of Toronto, Clerk's Department. p. 6.
  20. Filey, Mike (2004). "City's First Superhighway". Toronto Sketches 8: The Way We Were. Dundurn Press. pp.  119–122. ISBN   1-55002-527-9 . Retrieved January 7, 2010.
  21. Downey, Donn (November 20, 1999). "Mayor Gave City Sunday Sport, Planning". The Globe and Mail. Toronto. p. A26.
  22. "Routes and schedules". TTC. Retrieved 2022-10-25.
  23. "TTC changes amid COVID-19 crisis". TTC. Retrieved 2022-10-25.
  24. "TTC service changes starting Sunday". TTC website. Retrieved 2022-10-03.
  25. "TTC 2022 annual service plan" (PDF). TTC website. Retrieved February 10, 2022.