German destroyer Z20 Karl Galster

Last updated

Z20Zerstorer1936Draw.svg
Drawing of Z20 Karl Galster as of 1945
History
War ensign of Germany (1938-1945).svg Nazi Germany
NameKarl Galster
NamesakeKarl Galster
Ordered6 January 1936
Builder AG Weser (Deschimag), Bremen
Yard numberW922
Laid down14 September 1936
Launched15 June 1937
Completed21 March 1939
FateAllocated to the Soviet Union as a war prize
History
Naval Ensign of the Soviet Union (1950-1991).svg Soviet Union
NameProchnyy
Acquired6 February 1946
RenamedPKZ 99, 28 November 1954
Reclassified
Fate Scrapped, 1958
General characteristics (as built)
Class and type Type 1936 destroyer
Displacement
Length125.1 m (410 ft 5 in) (o/a)
Beam11.8 m (38 ft 9 in)
Draft4.5 m (14 ft 9 in)
Installed power
Propulsion
Speed36 knots (67 km/h; 41 mph)
Range2,050  nmi (3,800 km; 2,360 mi) at 19 knots (35 km/h; 22 mph)
Complement323
Armament
Service record
Commanders:
  • Theodor von Bechtolsheim March 1939 – August 1942
  • Harmsen August 1942 – January 1945
  • Kuno Schmidt January – May 1945

Z20 Karl Galster was one of six Type 1936 destroyers built for the Kriegsmarine (German Navy) in the late 1930s. Completed in early 1939, the ship spent most of her time training. At the beginning of World War II in September, she was initially deployed to lay minefields off the German coast, but was soon transferred to the Skagerrak where she inspected neutral shipping for contraband goods. In late 1939 and early 1940, Z20 Karl Galster helped to laid three offensive minefields off the English coast that claimed one British destroyer, a fishing trawler, and twenty merchant ships. After a refit that prevented her from participating in the German invasion of Norway in April, the ship was sent to Norway for escort duties. Later that year Z20 Karl Galster was transferred to France, where she made several attacks on British shipping.

Contents

The ship returned to Germany in early 1941 for a refit and was transferred to Norway in June as part of the preparations for Operation Barbarossa, the German invasion of the Soviet Union. Z20 Karl Galster spent some time at the beginning of the campaign conducting anti-shipping patrols in Soviet waters but these were generally fruitless. She escorted a number of German convoys in the Arctic later in the year until engine problems sent her back to Germany for repairs. The ship returned to Norway in mid-1942, but was badly damaged when she ran aground in July and did not return until December. Z20 Karl Galster participated in the German attack (Operation Zitronella) on the Norwegian island of Spitzbergen, well north of the Arctic Circle, in September 1943. Plagued by engine problems, the ship was under repair from November to August 1944 and then spent the next six months on convoy escort duties in southern Norway when not laying minefields.

Around March 1945, Z20 Karl Galster was transferred to the Baltic Sea where she helped to escort convoys of refugee ships and also rescued evacuees herself in May, around the time that Germany surrendered. When the surviving German warships were divided between the Allies after the war, the ship was eventually allocated to the Soviet Union. Z20 Karl Galster was handed over in 1946 and renamed Prochnyy. The ship was converted into a training ship in 1950 and then became an accommodation ship in 1954. She was scrapped four years later.

Design and description

Z20 Karl Galster had an overall length of 125.10 meters (410 ft 5 in) and was 120 meters (393 ft 8 in) long at the waterline. The ship had a beam of 11.8 meters (38 ft 9 in), and a maximum draft of 4.5 meters (14 ft 9 in). She displaced 2,411 long tons (2,450 t) at standard load and 3,415 long tons (3,470 t) at deep load. The two Wagner geared steam turbine sets, each driving one propeller shaft, were designed to produce 70,000  PS (51,000  kW ; 69,000  shp ) using steam provided by six Wagner boilers for a designed speed of 36 knots (67  km/h ; 41  mph ). [1] During Z20 Karl Galster's sea trials on 16–May 1939, she reached 39 knots (72.2 km/h; 44.9 mph) from 76,500 PS (56,300 kW; 75,500 shp). [2] The ship carried a maximum of 739 metric tons (727 long tons) of fuel oil which gave a range of 2,050 nautical miles (3,800 km; 2,360 mi) at 19 knots (35 km/h; 22 mph). Her crew consisted of 10 officers and 313 sailors. [1]

The ship carried five 12.7-centimeter (5.0 in) SK C/34 guns in single mounts with gun shields, two each superimposed, fore and aft of the superstructure. The fifth mount was positioned on top of the rear deckhouse. The guns were numbered from 1 to 5 from front to rear. Her anti-aircraft armament consisted of four 3.7-centimeter (1.5 in) SK C/30 guns in two twin mounts abreast the rear funnel and six 2-centimeter (0.8 in) C/30 guns in single mounts. The ship carried eight above-water 53.3-centimeter (21.0 in) torpedo tubes in two power-operated mounts. [1] Two reloads were provided for each mount. She had four depth charge launchers and mine rails could be fitted on the rear deck that had a maximum capacity of 60 mines. [3] 'GHG' (Gruppenhorchgerät) passive hydrophones were fitted to detect submarines and an active sonar system was installed by the end of 1939. [4]

Modifications

In 1942, the ship had a FuMO 24/25 radar installed above the bridge as well as two FuMO 63 Hohentwiel radars, one of which replaced the aft searchlight. A FuMB 1 Metox radar detector was also installed that year. The details of the changes made to her anti-aircraft suite are not well documented, but photographic evidence shows that a quadruple 2 cm mount had been added by early 1944. Before the end of the war, the ship had her midships 2 cm guns replaced by a pair of 3.7 cm Flak M42 gun in single mounts and that four twin 2 cm mounts had probably been added in the forward superstructure. [5]

Construction and career

Z20 Karl Galster was named after Kapitänleutnant (Lieutenant) Karl Galster who commanded the torpedo boat S22 and was killed in action on 21 March 1916. The ship was ordered from AG Weser (Deschimag) on 6 January 1936. She was laid down at Deschimag's Bremen shipyard as yard number W922 on 14 September 1937, launched on 15 June 1938, and commissioned on 21 March 1939. She visited Åndalsnes, Norway, in July and then participated in a torpedo training exercise the following month. [6]

When World War II began in September, Z20 Karl Galster was initially deployed in the German Bight where she laid defensive minefields. The ship then patrolled the Skagerrak to inspect neutral shipping for contraband goods. [7] On the night of 17/18 October, Konteradmiral (Rear Admiral) Günther Lütjens, aboard his flagship Z21 Wilhelm Heidkamp, led Z16 Friedrich Eckoldt, Z17 Diether von Roeder, Z18 Hans Lüdemann, Z19 Hermann Künne, and Z20 Karl Galster as they laid a minefield off the mouth of the River Humber. The British were unaware of the minefield's existence and lost seven ships totaling 25,825  gross register tons  (GRT). Missions on the nights of 8/9 and 10/11 November had to be aborted because of seawater contamination in Z19 Hermann Künne's fuel. On the night of 12/13 November Z21 Wilhelm Heidkamp, now the flagship of the Führer der Zerstörer (FdZ) (Commander of Destroyers), Kapitän zur See (KzS) (Captain) Friedrich Bonte, escorted Z18 Hans Lüdemann, Z19 Hermann Künne, and Z20 Karl Galster as they laid 288 magnetic mines in the Thames estuary. Once again unaware of the minefield's existence, the British lost the destroyer Blanche and thirteen merchant ships of 48,728 GRT. The ship spent the rest of the year patrolling in the German Bight. [8]

Bonte and Z21 Wilhelm Heidkamp led a minelaying sortie to the Newcastle area together with Z16 Friedrich Eckoldt, Z20 Karl Galster, and Z22 Anton Schmitt on the night of 10/11 January 1940. The destroyers Z14 Friedrich Ihn and Z4 Richard Beitzen were also supposed to participate, but the former had problems with her boilers that reduced her maximum speed to 27 knots (50 km/h; 31 mph) and she had to be escorted back to Germany by the latter ship. The minefield only claimed one fishing trawler of 251 GRT. [9]

In retaliation for the Altmark Incident where the Royal Navy seized captured British sailors from the German tanker Altmark in neutral Norwegian waters on 16 February, the Kriegsmarine organized Operation Nordmark to search for Allied merchant ships in the North Sea as far north as the Shetland Islands. Z20 Karl Galster and Z21 Wilhelm Heidkamp escorted the battleships Scharnhorst and Gneisenau as well as the heavy cruiser Admiral Hipper during the sortie on 18 February. Upon her return Z20 Karl Galster began a refit that lasted until 27 May. [10]

After the catastrophic destroyer losses in the Battles of Narvik in April, the Kriegsmarine reorganized its surviving destroyers and Z20 Karl Galster became the flagship of the FdZ. In June the ship was tasked to lead the escort force for Scharnhorst, Gneisenau, and Admiral Hipper during Operation Juno, a planned attack on Harstad, Norway, to relieve pressure on the German garrison at Narvik. The ships sortied on 8 June and sank the troop transport Orama, the oil tanker Oil Pioneer and the minesweeping trawler Juniper en route, Z20 Karl Galster assisting in the rescue of Orama's survivors. The German commander, Admiral Wilhelm Marschall, then ordered Admiral Hipper and all four destroyers to Trondheim because of the heavy weather, where they arrived in the morning of 9 June. Z20 Karl Galster remained there until she had to help screen the crippled Gneisenau as she returned to Kiel on 25 July. After a brief refit, the ship helped to lay minefields in the North Sea between 14 August and 7 September. [11]

Z20 Karl Galster, now the flagship of KzS Fritz Berger, commander of the 5th Destroyer Flotilla (5. Zerstörerflotille), transferred to France on 9 September in preparation for Operation Sealion, the planned invasion of Great Britain. Now based at Brest, the ship helped to lay a minefield in Falmouth Bay during the night of 28/29 September. Five ships totaling only 2,037 GRT were sunk by this minefield. [12] Aboard his flagship Z10 Hans Lody, the Führer der Torpedoboote (Commander of Torpedo Boats), KzS Erich Bey, led Z20 Karl Galster and three other destroyers during a sortie for the Southwest Approaches on 17 October and were intercepted by a British force of two light cruisers and five destroyers. The British opened fire at extreme range and were forced to disengage in the face of long-range torpedo volleys and attacks by Luftwaffe bombers without having hit any of the German ships. On the night of 24–25 November, Z20 Karl Galster, no longer Berger's flagship, Z4 Richard Beitzen and Z10 Hans Lody sortied from Brest, bound for the Land's End area. En route they encountered some fishing ships south-west of Wolf Rock and engaged them with gunfire with little effect. The German ships then spotted a small convoy and Z20 Karl Galster sank one of the three merchantmen and damaged another. The flash from the guns alerted the five destroyers of the British 5th Destroyer Flotilla, but they could not intercept the German destroyers before dawn. Three nights later the German ships sortied again for the same area. They encountered two tugboats and a barge, but only sank one of the former and the barge, totaling 424 GRT. This time the 5th Destroyer Flotilla was able to intercept around 06:30 on 29 November. The Germans opened fire first, each destroyer firing four torpedoes, of which only two from Z10 Hans Lody hit their target, the destroyer HMS Javelin. The torpedoes hit at each end of the ship and blew off her bow and stern, but the British were able to tow her home. Z20 Karl Galster returned home on 5 December for a turbine overhaul in Wesermünde that lasted until 9 June 1941. [13]

Arctic service

Two days later, the ship was one of the escorts for the heavy cruiser Lützow from Kiel to Norway as the latter ship attempted to break through the British blockade. Several Bristol Beaufort torpedo bombers spotted Lützow and her escorts en route and one managed to surprise the ships and torpedo the cruiser early on the morning of 13 June, forcing her to return to Germany for repairs. [14] Z20 Karl Galster was then sent to Kirkenes, Norway, arriving on 11 July. Now a part of the 6th Destroyer Flotilla (6. Zerstörerflottille), she participated in a sortie on 12–13 July that sank two small Soviet ships at the cost of expending 80% of their ammunition. Another sortie on 22 July saw Z20 Karl Galster temporarily serve as the flagship for KzS Alfred Schulze-Hinrichs, commander of the 6. Zerstörerflottille, when his usual flagship Z10 Hans Lody had condenser problems. The destroyers sank a small survey ship and a flying boat and they were repeatedly attacked by Soviet aircraft to no effect before their return on the 24th. When the British aircraft carriers Victorious and Furious attacked Petsamo and Kirkenes on 29 July, the destroyers were far to the east and could not catch the British ships before they left the area. Z20 Karl Galster was now assigned to escort convoys between Tromsø and Kirkenes; during one of these missions, the submarine Trident sank two troop-carrying freighters, Bahia Laura and Donau II despite the destroyers. Z20 Karl Galster rescued over 500 survivors from the two ships. When Z10 Hans Lody required a refit in late September, Schulze-Hinrichs transferred his flag to Z20 Karl Galster until she had engine problems of her own and sailed for Germany on 23 November to begin a refit that lasted until 5 May 1942. [15]

The ship, now flagship of KzS Gottfried Pönitz, commander of the 8. Zerstörerflottile (8th Destroyer Flotilla), sailed for Trondheim on 11 June. She was one of four destroyers assigned to escort the battleship Tirpitz during Operation Rösselsprung, an attack on the Russia-bound Convoy PQ 17. The ships sailed from Trondheim on 2 July for the first stage of the operation, although three of the destroyers, including Z20 Karl Galster, assigned to Tirpitz's escort ran aground in the dark and heavy fog and were forced to return to port for emergency repairs. The destroyer had damaged her port turbine and buckled the port propeller shaft. Escorted by two other destroyers, Z20 Karl Galster sailed for Kiel on 12 July, steaming only on one turbine. Permanent repairs were finished by mid-November, but the ship was working up until 8 December when she was one of the escorts for Lützow's voyage to Norway, although storm damage en route forced the destroyer to put into Trondheim for repairs that lasted until 9 January 1943. Boiler damage put her back into the dockyard there until 27 February. [16]

On 11 March Z20 Karl Galster screened Tirpitz en route to Bogen Bay, and continued onward to Altafjord with Tirpitz, Scharnhorst, and Lützow. Several weeks later, Z20 Karl Galster, and the destroyers Z5 Paul Jacobi and Z6 Theodor Riedel, sailed for Jan Mayen island on 31 March to rendezvous with the blockade runner, MV Regensburg. They searched for several days before increasingly heavy weather forced them to return to port with storm damage. Unbeknownst to the Germans, Regensburg had been intercepted and sunk by a British cruiser on 30 March. Z20 Karl Galster took part in the raid on the island of Spitsbergen in 6–9 September, during which she landed troops on the island. Two months later the ship sailed for Bremen to begin an overhaul. [17]

Further service

Problems with her starboard turbine, after the overhaul was finished in April 1944, put Z20 Karl Galster back in the dockyard for further work until about August when she began escorting convoys in southern Norway and helping to lay minefields in the Skagerrak. The ship continued to perform those duties until she began a brief refit in Oslo, Norway, between 20 December and 13 January 1945. Z20 Karl Galster helped to lay a minefield in the North Sea on 8 March. Afterwards, she was transferred to the Baltic and assigned to escort and patrol duties. [18]

In May, the ship was assigned to evacuate civilians and troops trapped in ports along the Baltic Sea by advancing Soviet forces. The survivors were transported to Copenhagen, Denmark. When the German troops in Denmark surrendered on 5 May, Z20 Karl Galster transferred survivors to smaller ships outside the harbour to avoid having to surrender. There the ship received an open radio transmission by Grand Admiral (Großadmiral) Karl Dönitz asking "everybody to "Curry" who can make it until dawn on the 8th". Dönitz had chosen the word "Curry" to obscure the fact that he wanted the ships to go on a rescue mission. The German captains knew "Curry" to be the nickname of their former naval academy instructor, Admiral August Thiele, commander in Hela on the Hel Peninsula. [19]

So the ship's final mission led back to the Peninsula, which was one of the few remaining footholds on the coast under German control on 8 May. At 22:00, two hours before the surrender became effective, Z20 Karl Galster, Z14 Friedrich Ihn, the destroyer Z25 and two torpedo boats, T23 and T28, picked up some 1,200 to 2,000 soldiers each. [20] Every German vessel located east of Bornholm at midnight was to return to a port under Soviet control, but Z20 Karl Galster, using its superior speed, managed to outrun pursuing Soviet torpedo boats and headed to Flensburg. From there the ship was sent to Kiel, where she surrendered to the British and was decommissioned on 10 May. [21]

Postwar activities

After the war Z20 Karl Galster sailed to Wilhelmshaven while the Allies decided how to divide the surviving ships of the Kriegsmarine amongst themselves as war reparations. The ship was allotted to the Soviet Union in late 1945 and turned over to the Soviets on 6 February 1946 in Liepāja, Latvia. She was renamed Prochnyy and assigned to the Red Banner Baltic Fleet on 5 November. Prochnyy was converted into a training ship in 1950 and was then reclassified as an accommodation ship, designated PKZ 99, on 28 November 1954. The ship was scrapped in 1958. [22]

Notes

  1. 1 2 3 Gröner, p. 202
  2. Koop & Schmolke, pp. 99–100
  3. Whitley, p. 68
  4. Whitley, pp. 71–72
  5. Koop & Schmolke, pp. 35, 40, 101, 165; Whitley, pp. 26, 73
  6. Koop & Schmolke, pp. 24, 99–100; Whitley, p. 82
  7. Rohwer, pp. 2, 5
  8. Hervieux, p. 112; Koop & Schmolke, p. 100; Rohwer, p. 11; Whitley, pp. 86–92
  9. Hervieux, p. 113; Koop & Schmolke, p. 100; Whitley, p. 92
  10. Koop & Schmolke, p. 100; Rohwer, p. 15
  11. Koop & Schmolke, p. 100; Rohwer, p. 26; Whitley, pp. 105–06
  12. Whitley, pp. 106–107
  13. Koop & Schmolke, p. 100; Whitley, pp. 107–114
  14. Whitley, pp. 122–24
  15. Koop & Schmolke, p. 100; Whitley, pp. 124–129
  16. Koop & Schmolke, p. 100; Whitley, pp. 141–142
  17. Koop & Schmolke, p. 100; Whitley, pp. 165–167
  18. Koop & Schmolke, pp. 100–101; Rohwer, pp. 347, 394; Whitley, pp. 168, 170–171
  19. "Immer die Angst im Nacken". Hamburger Abendblatt (in German). 30 January 1981.
  20. Becker, p. 360
  21. Koop & Schmolke, p. 101; Müller & Kramer, p. 24
  22. Koop & Schmolke, p. 101; Whitley, pp. 191–192, 198

Related Research Articles

German cruiser <i>Admiral Hipper</i> Lead ship of titular class of heavy cruisers

Admiral Hipper was the lead ship of the Admiral Hipper class of heavy cruisers which served with Nazi Germany's Kriegsmarine during World War II. The ship was laid down at the Blohm & Voss shipyard in Hamburg in July 1935 and launched February 1937; Admiral Hipper entered service shortly before the outbreak of war, in April 1939. The ship was named after Admiral Franz von Hipper, commander of the German battlecruiser squadron during the Battle of Jutland in 1916 and later commander-in-chief of the German High Seas Fleet. She was armed with a main battery of eight 20.3 cm (8 in) guns and, although nominally under the 10,000-long-ton (10,160 t) limit set by the Anglo-German Naval Agreement, actually displaced over 16,000 long tons (16,260 t).

German destroyer <i>Z4 Richard Beitzen</i> Type 1934 class destroyer

The German destroyer Z4 Richard Beitzen was one of four Type 1934 destroyers built for the German Navy (Kriegsmarine) during the mid-1930s. Completed in 1937, the ship spent most of her time training although she did participate in the occupation of Memel in early 1939. At the beginning of World War II in September 1939, the ship was initially deployed to blockade the Polish coast, but was soon transferred to the Kattegat where she inspected neutral shipping for contraband goods. In late 1939 and early 1940, the ship laid two offensive minefields off the English coast that claimed 17 merchant ships. Z4 Richard Beitzen was in reserve during the Norwegian Campaign of early 1940 and was transferred to France later that year, where she made several attacks on British shipping.

Z5 Paul Jacobi was a Type 1934A destroyer built for the Kriegsmarine in the mid-1930s. The ship was being refitted when World War II began on 1 September 1939 and was tasked to inspect neutral shipping for contraband goods in the Kattegat until early 1940. She participated in the early stages of the Norwegian Campaign by transporting troops to the Trondheim area in early April 1940 and was transferred to France later that year where she made several attacks on British shipping. Paul Jacobi spent most of 1941 under repair and returned to France in early 1942 to successfully escort two German battleships and a heavy cruiser home through the English Channel. The following month, the ship helped to escort another German battleship to northern Norway and returned in May to begin another lengthy refit.

German destroyer <i>Z6 Theodor Riedel</i> Type 1934A-class destroyer

The German destroyer Z6 Theodor Riedel was a Type 1934A-class destroyer built for the Kriegsmarine during the mid-1930s. At the beginning of World War II in September 1939, the ship laid defensive minefields to the North Sea. She covered her sister ships over the next few months as they laid offensive minefields in English waters in late 1939–early 1940. She participated in the early stages of the Norwegian Campaign by transporting troops to the Trondheim area in early April 1940 and was transferred to France later that year where the ship covered another minelaying sortie before engine problems caused her to return to Germany in November for repairs. Theodor Riedel was badly damaged when she ran aground three days after her repairs were completed and was out of action until May 1942.

German destroyer <i>Z7 Hermann Schoemann</i> Type 1934A-class destroyer

Z7 Hermann Schoemann was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the mid-1930s. The ship was plagued by machinery problems for most of her life and was under repair when the Second World War began in September 1939. She covered her sister ships over the next few months as they laid offensive minefields in English waters in late 1939 – early 1940. Hermann Schoemann played a minor role in the Norwegian Campaign as engine problems limited her availability throughout 1940 and for most of 1941.

German destroyer <i>Z10 Hans Lody</i> Type 1934A-class destroyer

Z10 Hans Lody was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the mid-1930s. At the beginning of World War II on 1 September 1939, the ship was initially deployed to blockade the Polish coast, but she was quickly transferred to the North Sea to lay defensive minefields. In late 1939 the ship laid multiple offensive minefields off the English coast that claimed nine merchant ships and she crippled a British destroyer during one of these missions.

Z11 Bernd von Arnim was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the late 1930s. At the beginning of World War II, the ship was initially deployed to blockade the Polish coast, but she was quickly transferred to the German Bight to lay minefields in German waters. In late 1939 the ship made one successful minelaying sortie off the English coast that claimed one British warship and seven merchant ships. During the early stages of the Norwegian Campaign, Bernd von Arnim fought the British destroyer Glowworm while transporting troops to the Narvik area in early April 1940, but neither ship was damaged during the action. The ship fought in both naval Battles of Narvik several days later and had to be scuttled after she exhausted her ammunition.

Z12 Erich Giese was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the late 1930s. At the beginning of World War II, the ship was used in the German Bight to lay minefields in German waters. In late 1939 the ship made one successful minelaying sortie off the English coast that claimed two merchant ships. While returning from that sortie, she torpedoed a British destroyer without being detected and continued on her way. During the early stages of the Norwegian Campaign, Erich Giese fought in both naval Battles of Narvik in mid-April 1940 and was sunk by British destroyers during the Second Battle of Narvik.

Z14 Friedrich Ihn was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the mid-1930s. The ship was named after the First World War German naval officer Friedrich Ihn. At the beginning of World War II, the ship was initially deployed to blockade the Polish coast, but she was quickly transferred to the German Bight to lay defensive minefields in German waters. In late 1939 and early 1940, the ship laid multiple offensive minefields off the English coast that claimed 18 merchant ships and a destroyer. Ihn was under repair during the Norwegian Campaign of early 1940 and was transferred to France later that year.

Z15 Erich Steinbrinck was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the mid-1930s. The ship was named after the First World War German naval officer Erich Steinbrinck. At the beginning of World War II on 1 September 1939, the ship was initially deployed to blockade the Polish coast, but she was quickly transferred to the North Sea to lay defensive minefields. In late 1939 and 1940 the ship laid multiple offensive minefields off the English coast that claimed 24 merchant ships and a destroyer. Steinbrinck was under repair for most of the Norwegian Campaign of early 1940 and was transferred to France later that year.

German destroyer Z16 <i>Friedrich Eckoldt</i> Z5-class destroyer of the Kriegsmarine

Z16 Friedrich Eckoldt was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the late 1930s. It was named after Kapitänleutnant Friedrich Eckoldt (1887–1916), the commander of torpedo boat V 48, who was killed when his boat was sunk during the Battle of Jutland on 31 May 1916.

Type 1936 destroyers Class of German destroyers

The Type 1936 destroyers, also known as the Z17 class, were a group of six destroyers built for Nazi Germany's Kriegsmarine during the late 1930s, shortly before the beginning of World War II. All six sister ships were named after German sailors who had been killed in World War I. They were engaged in training for most of the period between their completion and the outbreak of war, although several did participate in the occupation of Memel in Lithuania, in early 1939.

German destroyer <i>Z17 Diether von Roeder</i> Type 1936-class destroyer

Z17 Diether von Roeder was one of six Type 1936 destroyers built for the Kriegsmarine in the late 1930s. Completed in 1938, the ship spent most of her time training although she did participate in the occupation of Memel in early 1939. At the beginning of World War II in September, the ship was initially deployed to lay minefields off the German coast, but was soon transferred to the Skagerrak where she inspected neutral shipping for contraband goods. In late 1939, the ship helped lay an offensive minefield off the English coast that claimed seven merchant ships.

German destroyer <i>Z18 Hans Lüdemann</i> Type 1936-class destroyer

Z18 Hans Lüdemann was one of six Type 1936 destroyers built for the Kriegsmarine in the late 1930s. Completed in 1938, the ship spent most of her time training. At the beginning of World War II in September 1939, she was initially deployed to lay minefields off the German coast, but was soon transferred to the Skagerrak where she inspected neutral shipping for contraband goods. In late 1939, Z18 Hans Lüdemann helped to lay two offensive minefields off the English coast that claimed one destroyer and twenty merchant ships.

German destroyer <i>Z19 Hermann Künne</i> Type 1936-class destroyer

Z19 Hermann Künne was one of six Type 1936 destroyers built for the Kriegsmarine in the late 1930s. Completed at the beginning of 1939, the ship spent most of her time training although she did participate in the occupation of Memel a few months later. At the beginning of World War II in September, she was initially deployed to lay minefields off the German coast, but was soon transferred to the Skagerrak where she inspected neutral shipping for contraband goods. In late 1939, Z18 Hans Lüdemann helped to laid four offensive minefields off the English coast that claimed two British destroyers and thirty-eight merchant ships.

German destroyer <i>Z21 Wilhelm Heidkamp</i> German destroyer

Z21 Wilhelm Heidkamp was one of six Type 1936 destroyers built for the Kriegsmarine in the late 1930s. Completed a few months before the start of World War II in September 1939, the ship served as a flagship throughout her career. She briefly patrolled the Skagerrak where she inspected neutral shipping for contraband goods. Z21 Wilhelm Heidkamp later helped to lay four offensive minefields off the English coast that claimed two British destroyers, 2 fishing trawlers, and twenty-seven merchant ships. During the German invasion of Norway in April 1940, she sank a Norwegian coastal defense ship off Narvik and was crippled with the opening shots of the First Naval Battle of Narvik on 10 April, with the loss of 81 crewmen. The ship sank the following day.

German destroyer <i>Z22 Anton Schmitt</i> Type 1936-class destroyer

Z22 Anton Schmitt was one of six Type 1936 destroyers built for the Kriegsmarine in the late 1930s. Completed after the beginning of World War II in September 1939, she helped to lay an offensive minefield off the English coast that claimed one small ship. During the German invasion of Norway in April 1940, the ship was tasked to attack Narvik and was sunk during the First Naval Battle of Narvik on 10 April.

German destroyer <i>Z23</i> German Navy Type 1936A destroyer (1940–44)

Z23 was one of fifteen Type 1936A destroyers built for the Kriegsmarine during World War II. Completed in 1940, the ship spent the war in Norwegian and French waters, escorting German ships and occasionally engaging Allied warships. In early 1941 she escorted ships between the Baltic and southern Norway before spending four months protecting ships as they transited through the Bay of Biscay. A few months after the Operation Barbarossa began in June, Z23 was transferred to northern Norway where she attempted to intercept one of the Arctic convoys returning from the Soviet Union and helped to lay several minefields.

German destroyer <i>Z25</i> German World War II destroyer

Z25 was one of fifteen Type 1936A destroyers built for the Kriegsmarine during World War II. Completed in 1940, the ship spent most of the war in Norwegian waters, escorting German ships and laying minefields, despite venturing to France in early 1942 for the Channel Dash, escorting two battleships and a heavy cruiser home through the English Channel. She was active in attacking the Arctic convoys ferrying war materials to the Soviet Union in 1941–1942 but only helped to sink one Allied ship.

German destroyer <i>Z27</i> Destroyer

Z27 was one of fifteen Type 1936A destroyers built for the Kriegsmarine during World War II. Completed in 1941, the ship was transferred to Norwegian waters later that year where she remained for most of the next several years, escorting convoys and laying minefields. She sank a Soviet oil tanker in late 1942 before sailing to Germany for a refit. Upon its completion in mid-1943, Z27 returned to Norway and participated in Operation Zitronella, the raid on the island of Spitsbergen in September.

References