Harriman | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||
Location | Grove Street, Harriman, New York | ||||||||||||||||||||
Coordinates | 41°18′33″N74°08′43″W / 41.309123°N 74.145274°W | ||||||||||||||||||||
Owned by | Erie Railroad (1838 – 1960) Erie-Lackawanna Railway (1960 – 1976) Conrail (1976 – 1999) Norfolk Southern Railroad (1999 – 2006) | ||||||||||||||||||||
Line(s) | Erie Railroad Main Line | ||||||||||||||||||||
Platforms | 1 side platform | ||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Platform levels | 1 | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Station code | 2539 [1] | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 1838 | ||||||||||||||||||||
Closed | April 18, 1983 | ||||||||||||||||||||
Rebuilt | 1873; 1911 | ||||||||||||||||||||
Previous names | Turner (1838 – 1910) | ||||||||||||||||||||
Former services | |||||||||||||||||||||
| |||||||||||||||||||||
|
Harriman Station, formerly known as Turner Station until 1910, was the first station on the Erie Railroad Main Line west of Newburgh Junction in Harriman, New York. Built adjacent to Grove Street in Harriman, one of the earlier structures built here in 1838 was a three-story hotel-train station combination. This station caught fire in 1873 and was replaced by a one-story wooden structure. That structure remained in use for decades before it began decaying and was replaced in 1911 with a new station on land donated by the widow of Edward Henry Harriman. A new one-story structure was built on the land. The station was maintained as a one-story depot with an adjacent monument dedicated to the work of Charles Minot. Minot was a director of the Erie Railroad who, in 1851, while his train was stopped at Turner, made the first railroad call by telegraph.
The station depot remained in use by the Erie through October 1960, when that was folded into the Erie-Lackawanna Railroad, which itself would fold in April 1976, as it was absorbed into the Consolidated Rail Corporation (Conrail). Conrail maintained passenger services until 1983, when that job was taken over by Metro-North Railroad. On April 18, 1983, the last passenger train left the Harriman station, as Conrail and Metro-North abandoned the tracks in favor of using the Graham Line (a high-speed freight line) for passenger and freight service. At that time, a new park & ride near New York State Route 17 in Harriman opened for the Port Jervis Line, the newly-realigned passenger service along the ex-Graham Line.
By the time passenger service transitioned to the Graham Line, the Harriman depot had been neglected for decades. The station depot remained on its concrete platform when the tracks were torn up on the old mainline. In 1996, workers removed the plaque attached to the Minot monument, but it was soon returned. However, the plaque was stolen shortly afterward and has not been recovered. The station depot itself was left in a decrepit condition as a result of the deterioration of its tiled roof. In 2006, the village of Harriman's building inspector ordered Norfolk Southern Railroad (the successor to Conrail and who owned the right-of-way) to either restore the building or demolish it. Norfolk Southern followed through with a demolition permit and in May 2006, the station depot was demolished by a front loader. The station remains were taken to a dump in Hillburn, New York.
The first station in Harriman, New York, then known as Turner, was first constructed around 1838 by Peter Turner, as one of the many stretches of the New York and Lake Erie Railroad was constructed through the town. The station itself was a 400 feet (120 m) long brick depot, three stories tall, and topped with a French roof. The station sat alongside the railroad tracks and was called the Orange Hotel. [2] The dining room of the new structure was able to hold 500 people at a time and accommodate them with good food. [3] During the planning of the Erie, there was some concern to whether or not the railroad would work its way through Harriman at all, instead of bypassing nearby Goshen and Middletown in favor of a terminus at Newburgh, also on the Hudson River. [4] Train service to Harriman began in 1841, when the New York and Lake Erie ran its first trains on June 30, 1841, from Piermont-on-Hudson, the determined eastern terminus, to Goshen, the western end. [5]
Construction progressed on the Erie Railroad, and by the end of 1841, grading from Middletown to Goshen was in progress and 410 of the 447 miles (719 km) chartered for the new railroad was contracted. The railroad had been running trains on the 46 miles (74 km) railroad line, carrying about 250 passengers per day. The new railroad was completed in April 1851 at its intended length to Dunkirk on Lake Erie. [6] On May 12, 1851, just about a month after the completion, a completion gala was held from Washington D.C. Then-president Millard Fillmore and several members of his cabinet, along with several former governors of New York, attended. Several other distinguished individuals came from around the United States. On May 14, the tour arrived in New York City and began their trip on the first 447 miles (719 km) ride at Piermont at 7:45 that morning. The Fillmore train arrived at Dunkirk just past 4:00 pm the next afternoon. [7]
In 1847, Ezra Cornell of Ithaca, New York worked to expand telegraphic communication through the New York and Lake Erie Railroad right-of-way with the Western Union Telegraph Company, [8] saving a telegraph line he built from New York City to Fredonia. [9] The new telegraph was an instant hit and was commonly used for gossip and casual chatting. [10] The then-superintendent of the New York and Lake Erie, Charles Minot, looked to expand this new technology with the railroad. He developed a system using telegraphs for train dispatches, for use when trains would want to pass one another along the line, such as at stations. Two-letter telegraph codes were designated, and the new modern system was set up. For the ten years of the new railroad's existence, passengers had been disgusted as trains waited for hours as another train had to pass them. This new system would relieve this issue. [11]
On September 22, 1851, Minot was in a parked passenger train at Turner Station. He glanced out the window of the train and saw the new telegraph wires. Departing the train, Minot ran into the station, got on the new telegraph, and wired the next station along the line, Monroe, to see if the eastbound train to Piermont-on-Hudson had gone past. The station agent said no. At that point, Minot ordered the engineer of the train to proceed on their way to Goshen. [11] The engineer refused to take Minot's order, and instead, Minot got into the cab car himself and drove the train himself to Port Jervis, hours ahead of the planned scheduled time of arrival. [12] This was the second of the several "firsts" the Erie Railroad created in its time, along with the shipment of milk by rail at Chester station in 1842. [13] The use of the telegraph and Minot's system remained until 1888, when a new system of block signaling, developed by the competitor Pennsylvania Railroad, helped expand Minot's use of telecommunications to control rail traffic. [11]
Around 6:30 pm on the evening of Friday, December 26, 1873, the three-story Orange Hotel station depot caught fire. Some staff of the re-christened Erie Railroad were examining a room in the roof of the building, and upon looking into it, found it engulfed in smoke. The fire quickly spread, consuming the entire story. There was a lull, but the building re-ignited as flames continued through the building. The Mansard roof on top of the building was destroyed by the flames. No fire-ridding materials to douse the blaze were available to staff and no one could get near the building to inspect where the flames were. The flames finally destroyed the entire building, and just two hours after the fire was discovered, the walls began to collapse on the structure. Within a half-hour, the entire hotel/depot had collapsed and was a pile of brick ruins. Train service on the Erie mainline was disrupted for several hours due to the fire and station depot collapse. [2] A later study determined the station depot burned down due to a defective flue. [3]
The station depot was replaced by a wooden one-story depot, referred to by locals as a shack, along the side of the tracks in downtown Turner. [3] The new station itself lasted around the same amount of time that its predecessor station depot had; however, the widow of Edward Henry Harriman (d. September 9, 1909 [14] ), a local railroad executive whose Arden estate was in the nearby hills, donated land in February 1910 in a different portion of Turner to build a brand new station to the east. [15] The old one-story depot had a roof and structural supports that were aging and on the verge of collapsing to the ground. [16]
Plans for a new station didn't come without controversy though, as, in 1910 with the death of E.H. Harriman, there was a proposal by the Turner Village Improvement Association to rename the borough from Turner to Harriman as an honor to the late executive. On May 25, 1910, the association voted 58 to 13 to change the name. Harriman's widow said if they changed the name, she'd donate $25,000 (1910 USD, equivalent to $817,500 in 2024) to help improvement the look and design of the village and $6,000 (1910 USD, equivalent to $196,200 in 2024) more for a brand-new railroad station. It was proposed that by having the Erie Railroad change the station name on the decrepit depot from Turner to Harriman, the local Post Office would adopt the new name almost immediately. Erie conductors were told upon approaching Turner station to call the name Harriman. However, a local priest at the forefront of the controversy, Father McAran, thought the entire situation regarding the train from New York was a joke. To add to the annoyance of the priest, the old sign attached to the 1873 depot was replaced by a brand new one saying "Harriman". [17]
On the morning of May 26, the Erie Railroad sent a statement out from Pavonia Terminal in Jersey City, New Jersey to disregard the order from the previous day. The new sign came down instantly and the conductors continued to call the station Turner once again. Old-time locals felt the name Turner had more value to them and shouldn't be touched. A self-appointed committee run by the priest proposed a meeting on Saturday, June 4, 1910, at nearby Gillette Hall to protest the name change. The priest also offered that if the name was to remain Turner's, he would contribute $500 towards the construction of a new station. The post office also said they would remain named Turner even if the signage on the Erie Railroad station went back to the Harriman name. [17] Sometime during the night between June 1 and June 2, the Erie Railroad took the station depot sign for Turner down once again and re-attached the Harriman sign to the station depot. Local resolutions were sent to the Erie showing citizens' displeasure at changing the signage once again. [18] The order from the Erie stated that beginning on July 15, the station name would remain "Harriman" permanently. Father McAran returned to his outrage and continued to go to the press and give interviews on the issue at hand. To wrap the issue up, a sign in the front of the local church proclaiming "LONG LIVE TURNER" was destroyed. This hurt the enthusiasm of locals, who suggested renaming the local Arden station near the Harriman estate instead. [3]
A year after the great naming controversy and the station permanently being established as Harriman, construction began on a new station to replace the "disgraceful shack" that residents called Harriman. [3] That year a new station, built with the $6,000 from Edward Henry Harriman's widow, was constructed of brick with a stucco outlier. The roof of the one-story depot was built with shingles, which helped it match the Tudor-style used at the Tuxedo station eleven miles eastbound. The station, which was grounded on a large and wide concrete platform that also served as the new station platform, was built on Grove Street and had measurements of 20' x 26.5' x 19', common for a Type-9 Erie Railroad station design. [19] Just a year after the new station depot opened, the Erie honored the late Charles Minot on May 2, 1912, at the new station with a large ceremony attend by Mrs. Harriman, Erie president Frederick Underwood, several relatives to Minot, and other distinguished guests. At the ceremony, Minot's assistance to the railroad community was honored and a bronze tablet on a stone backing was unveiled as a monument to him. [20]
At this point, the Erie Railroad continued on with a new station at Harriman, which remained prosperous for years to come. The station featured both the main depot as well as a small shelter on the opposite side of the double-tracked line. In June 1931, James Gorney, a resident of Pine Island, allegedly attempted to rob the station and station agent. Harriman police shot Gorney in the leg, which was crippling enough that it required amputation of the leg. His lawyer, who got him off third-degree burglary charges and several acquittals, also negotiated a payment of $20,000 to Gorney from Harriman for the pain and suffering of the amputated leg, despite the attempted crime he was shot for. The jury deliberated for five hours before reaching a verdict of awarding Gorney the money. [21]
By the 1930s, long-distance passenger trains to Chicago, such as the Erie Limited and the Lake Cities, ran through Harriman but made no stops. Passengers would need to take a local train to Goshen or Middletown to transfer to the long-distance trains. [22]
Over the ensuing decades, the Erie Railroad fell into debt along with its competitor, the Delaware, Lackawanna and Western Railroad. On September 16, 1960, the Interstate Commerce Commission approved the railroads to go forward with a merger, creating the new Erie-Lackawanna Railroad on October 15, 1960. [23] The new railroad lasted only 16 years. In 1976, the Erie Lackawanna and several other large railroad companies were merged into the newly formed federal Consolidated Rail Corporation (Conrail). [24] At this point, stations had to fight for survival. [25] The station depot at Harriman has been closed and boarded up since at least 1970. [19] Passenger train service, however, remained intact through the early 1980s. [26]
In 1983, the station was finally closed when Conrail and the newly formed Metro-North Railroad announced that all service, both passenger and freight, would be transferred to the Graham Line (built by the Erie for high-speed freight) with new passenger stations with parking lots being constructed. Service to the town of Harriman would be provided at a new park-and-ride built to the south, near Newburgh Junction. [27] The former 1911 station depot, however, remained standing until 2006, when the Harriman village building inspector forced the new owners of the right-of-way for the old mainline, Norfolk Southern, to either revamp or demolish the former station depot. The railway chose the latter, and in May 2006, an excavator tore down the 1911 depot, with the remains were taken to a dump in nearby Hillburn. [28]
The Main Line is a commuter rail line owned and operated by New Jersey Transit running from Suffern, New York to Hoboken, New Jersey, in the United States. It runs daily commuter service and was once the north–south main line of the Erie Railroad. It is colored yellow on NJ Transit system maps, and its symbol is a water wheel.
The Port Jervis Line is a predominantly single-track commuter rail line running between Suffern and Port Jervis, in the U.S. state of New York. At Suffern, the line continues south into New Jersey on NJ Transit's Main Line. The line is operated by NJ Transit Rail Operations under a contract with Metro-North Railroad (MNRR).
Lake Hopatcong is a commuter railroad station for New Jersey Transit. The station, located in the community of Landing in Roxbury Township, Morris County, New Jersey, United States, serves trains for the Montclair-Boonton Line and Morristown Line at peak hours and on holiday weekends. Service from Lake Hopatcong is provided to/from Hackettstown to New York Penn Station and Hoboken Terminal. The stop is located on the tracks below Landing Road next to the eponymous Lake Hopatcong. The station consists of one active platform with shelter, and an abandoned side platform. There is no accessibility for handicapped people.
Hackettstown is a New Jersey Transit station in Hackettstown, New Jersey. The station is located at the intersection of Valentine Street and Beatty Street and is the western terminus of the Morristown Line and the Montclair-Boonton Line, which both provide service to Hoboken Terminal or to Pennsylvania Station in Midtown Manhattan via Midtown Direct. Hackettstown station is the only active New Jersey Transit station in Warren County. The line from Hackettstown–Dover is diesel powered, requiring a transfer at Dover, Montclair State University or Newark Broad Street to an electrified train to New York Penn Station. Proposals exist of an extension of the Montclair-Boonton Line, including an extension to Washington and possibly Phillipsburg further along the Washington Secondary.
Suffern station is a railroad station in the village of Suffern. The station, located on Ramapo Avenue in Suffern, services trains of New Jersey Transit's Main Line and Metro-North Railroad's Port Jervis Line. Suffern station serves as the terminal for Main Line trains, as trains continue north into Hillburn Yard. The next Main Line station, located in New Jersey, is Mahwah. The next Port Jervis Line station to the north is Sloatsburg. The station consists of two low-level side platforms for trains in both directions, neither of which are handicap accessible for the Americans with Disabilities Act of 1990.
Watsessing Avenue station is a New Jersey Transit rail station in Bloomfield, New Jersey, along the Montclair-Boonton Line. It is located beneath the Bloomfield Police Benevolent Association meeting hall near the corner of Watsessing Avenue and Orange Street in Bloomfield. It is one of two stations on the line where the boarding platform is below ground level. The Watsessing station and the Kingsland station in Lyndhurst on the Main Line shared similar designs and were built about the same time.
Little Falls station is a NJ Transit station located at Union Avenue in Little Falls, New Jersey. The station, on the Montclair-Boonton Line is the first to receive limited revenue service due to the end of electrification at the site of the former Great Notch station.
Kingsland is a railroad station on New Jersey Transit's Main Line. It is located under Ridge Road (Route 17) between New York and Valley Brook Avenues in Lyndhurst, New Jersey, and is one of two stations in Lyndhurst. The station is not staffed, and passengers use ticket vending machines (TVMs) located at street level to purchase tickets. The station is not handicapped-accessible. Originally part of the Delaware, Lackawanna and Western Railroad's Boonton Branch, the current Kingsland station was built in 1918.
Paterson is a New Jersey Transit commuter railway station located on an elevated viaduct above Market Street in downtown Paterson, New Jersey. The railway through the station is double tracked, for north and south traffic on the NJT Main Line.
Carlton Hill station was a railroad station for the Erie Railroad in East Rutherford, New Jersey, United States. Carlton Hill station was the second station along the Erie's main line and the first station after Rutherford Junction, where the Erie's main line forked from the Bergen County Railroad. The station provided service for passengers in Rutherford and East Rutherford's Carlton Hill district and freight billing for the Royce Chemical Company, producer of Royox household cleaner, epoxies and dyes.
Lake View is a former railroad station for the Erie Railroad in the community of Paterson, New Jersey. The station was located at the intersection of Railway Avenue and Crooks Avenue in the Lakeview district of Paterson, just north of the Clifton town line. The station consisted of two platforms, with a small shelter-sized depot on the westbound tracks and no shelter whatsoever on the eastbound side heading towards Pavonia Terminal. The station was first opened in 1883 in the Lakeview district, and remained in use for nearly eight decades. In 1952 and 1953, as a deal made for Passaic, New Jersey, stations at Clifton and Main Street-Passaic were rebuilt. However, Lake View was not, and when the Passaic Plan was enacted on April 2, 1963, the last passenger trains served Lake View served the old 1883 depot. The depot was razed in the autumn of 1967.
West Arlington was a former commuter railroad train station in the Arlington section of Kearny, Hudson County, New Jersey. Located overlooking Passaic Avenue, West Arlington station was one of two in Kearny on the Erie Railroad's New York and Greenwood Lake Railroad, the other one being Arlington at Garafola Place. The station contained two low-level side platforms, with a pair of depots, one of which was on each platform. Trains went from Pavonia Terminal in Jersey City to Wanaque–Midvale station in Wanaque. The next station to the west was North Newark, across nearby WR Draw, a swing bridge over the Route 21, the Passaic River and Passaic Avenue.
Verona station was a station on the Caldwell Branch of the Erie Railroad in Verona, New Jersey. The station was originally constructed in 1891 at the intersection of Depot Street and Personette Street by the Caldwell Railway, which was soon merged into the Erie Railroad system. The station burned down twice: the 1891 station depot burned down in 1905, and the second station survived until April 1, 1962, when arsonists destroyed it.
Warren was a former station for the Erie Railroad on its main line and on the Mahoning Division's first subdivision between Cleveland and Pymatuning station. Along the main line, the next station west towards Dearborn Station was Leavittsburg, while east towards Pavonia Terminal was Niles. The station was located 585.7 miles (942.6 km) from Pavonia Terminal and 412.8 miles (664.3 km) from Dearborn Station.
The Graham Line is the portion of the former Erie Railroad in New York State from Highland Mills to Guymard, constructed from 1906 to 1909 as a high-speed freight line. The Graham Line bypasses the original Erie Main Line through Monroe, Chester, Goshen and Middletown.
Essex Fells was the terminus of the Erie Railroad's Caldwell Branch in the Essex County community of Essex Fells, New Jersey. Located at the junction of Oak Lane and Chestnut Lane in Essex Fells, the station was also a connection to the Morristown and Erie Railroad, which continued west through Roseland towards Morristown. The next station north from the Essex Fells station was Caldwell heading northward to Great Notch in Little Falls, where the line connected to the New York and Greenwood Lake Railroad.
Charles Minot was an American railroad executive at the Erie Railroad, where in 1850 he became Superintendent as successor of James P. Kirkwood, and was succeeded by Daniel McCallum in 1854. After the bankruptcy of the Erie in 1859 he was reinstated as general superintendent of the Erie railroad.
Salamanca was a railroad station for the Erie Railroad in Salamanca, New York, United States. The station was located at 137 Main Street in Salamanca, across the track from the Buffalo, Rochester and Pittsburgh Railway depot. Located as the terminus of the Meadville Division of the Erie Railroad main line, Salamanca was considered part of the Allegany Division, which went between Dunkirk and Hornell.
Corning was a major station along the Erie Railroad, located on the Susquehanna Division of the main line. Located originally in downtown Corning, New York, the station first opened on the line in January 1850, with the completion of the New York and Erie Railroad from Piermont in Rockland County to Dunkirk in Chautauqua County. The first depot at Corning was built in 1861 and located at the intersection of Erie Avenue and Pine Street in Corning. The station lasted at this location until 1952, when construction of a new track bypass of Corning began. The newer depot opened on November 21, 1952. This new station was located at the junction of West Sycamore Street and North Bridge Street on the north side of Corning.
North Newark was a former commuter railroad train station in the Woodside section of the city of Newark, Essex County, New Jersey. Located at the intersection of Broadway and Verona Avenue, the station served trains on NJ Transit's Boonton Line, which operated at the time between Netcong and Hoboken Terminal. The station consisted of two low-level side platforms, accessible by stairs from Broadway. The next station to the east was Arlington in nearby Kearny, with the next station to the west being Rowe Street in Bloomfield.