Herefordshire and Gloucestershire Canal | |
---|---|
![]() The restored basin at Over | |
![]() | |
Specifications | |
Maximum boat length | 70 ft 0 in (21.34 m) |
Maximum boat beam | 8 ft 0 in (2.44 m) |
Locks | 23 |
Status | Several sections under restoration |
Navigation authority | none |
History | |
Original owner | Herefordshire and Gloucestershire Navigation Co |
Principal engineer | Josiah Clowes |
Other engineer(s) | Robert Whitworth, Stephen Ballard |
Date of act | 1791 |
Date of first use | 1798 |
Date completed | 1845 |
Date closed | 1881 |
Geography | |
Start point | Over, nr Gloucester |
End point | Barrs Court Basin, Hereford |
Branch(es) | Oxenhall Coal Branch |
Connects to | River Severn |
Herefordshire and Gloucestershire Canal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Herefordshire and Gloucestershire Canal (sometimes known as the Hereford and Gloucester Canal) is a canal in the west of England, which ran from Hereford to Gloucester, where it linked to the River Severn. It was opened in two phases in 1798 and 1845, and closed in 1881, when the southern section was used for the course of the Ledbury and Gloucester Railway. It is the subject of an active restoration scheme.
The first plans for a canal between Hereford and Gloucester were made by Robert Whitworth, one of James Brindley's pupils, in 1777. The route was part of a grander plan to Stourport-on-Severn and Leominster as well. Twelve years later, Richard Hall submitted plans for a canal via Ledbury. [1]
Herefordshire and Gloucestershire Canal Act 1791 | |
---|---|
Act of Parliament | |
![]() | |
Long title | An Act for making and maintaining a Navigable Cut or Canal from the City of Hereford to the City of Gloucester, with a Collateral Cut from the same to the Town of Newent in the County of Gloucester. |
Citation | 31 Geo. 3. c. 89 |
Dates | |
Royal assent | 11 April 1791 |
In March 1790, the promoters decided to submit the plans to Parliament. Josiah Clowes, an engineer who had previous experience of working on the Chester Canal and who had worked with Whitworth on the Thames and Severn Canal, was to be the engineer. It appears that he re-surveyed the route, and recommended a change, so that it passed through Ledbury. A branch would be built to Newent where there were minor coalfields, and the canal would be suitable for boats 70 by 8 feet (21.3 by 2.4 m), capable of carrying 35 tons. The estimated cost was £70,000, and it was expected to carry 33,203 tons per year, generating £9,582 in revenue. Some of the promoters began to think that improving the River Wye might be a better option, but the announcement of new seams of coal at Newent resulted in a decision to obtain an act of Parliament, the Herefordshire and Gloucestershire Canal Act 1791 (31 Geo. 3. c. 89), which was granted in April 1791. [2]
Act of Parliament | |
![]() | |
Long title | An Act to vary and extend the Line of the Canal authorized to be made by an Act passed in the Thirty-first Year of the Reign of His present Majesty, intituled, "An Act for making and maintaining a Navigable Canal from the City of Hereford to the City of Gloucester, with a Collateral Cut from the same to the Town of Newent, in the County of Gloucester;" and to amend the said Act. |
---|---|
Citation | 33 Geo. 3. c. 119 |
Dates | |
Royal assent | 11 June 1793 |
Hugh Henshall, who was the brother-in-law of James Brindley, was asked to re-survey the route in 1792, and recommended a diversion to Newent. This route required a tunnel at Oxenhall, and another act of Parliament was obtained, the Herefordshire and Gloucestershire Canal Act 1793 (33 Geo. 3. c. 119), to sanction the new route. [3] Josiah Clowes died in 1795, and was succeeded as engineer by Robert Whitworth. By late 1795, the initial section was open to Newent, but the tunnel was causing major problems. [4]
In order to build the tunnel, twenty shafts were sunk along its route, so that there could be multiple working faces. However, there were considerable difficulties caused by the volume of water entering the shafts. Horse-powered pumps proved inadequate, and eventually steam-powered pumps were employed, but this added to the cost, and the tunnel was a large factor in the failure to complete the canal. [5]
The canal was opened to within one mile of Ledbury in 1798, but stopped there as the cost had far exceeded the estimates. The Coal Branch to the mines at Newent was never a success, as the coal was of very poor quality, and the branch fell into disuse very quickly. The price of coal in the region dropped from 24 shillings (£1.20) per ton to 13/6 (68p) but the coal was a good quality product which travelled up the canal from the River Severn. [6] Ledbury remained the terminus for another forty years, although a short extension to enable coal to be delivered to the Ledbury gas works was completed in 1832. [7]
Herefordshire and Gloucestershire Canal Act 1839 | |
---|---|
Act of Parliament | |
![]() | |
Long title | An Act for enabling the Company of Proprietors of the Herefordshire and Gloucestershire Canal Navigation to raise a further Sum of Money, and for amending the Acts relating thereto. |
Citation | 2 & 3 Vict. c. xxvi |
Dates | |
Royal assent | 4 June 1839 |
Text of statute as originally enacted |
In 1827, Stephen Ballard became the new clerk of the company, and produced a report on how to complete the canal in 1829. [8] In 1838, he proposed a new route for the final section, but the engineer James Walker advised against it, and so in May 1839, a new act of Parliament, the Herefordshire and Gloucestershire Canal Act 1839 (2 & 3 Vict. c. xxvi), was obtained, allowing the company to raise the money to complete the canal. [9] Work started on 17 November. [10] A feeder from the River Frome to the summit level was completed in August 1842, [11] and the canal opened in stages as it was completed, with extensions to Canon Frome wharf in January 1843, Whithington wharf in February 1844, and finally to Hereford basin on 22 May 1845. [12]
As with the first phase, it was the tunnel construction which caused the most problems, and Ashperton tunnel, although only 400 yards (370 m) long, was affected by water flooding the work faces and by unstable rock, resulting in the need to construct a brick and stone lining. Again, costs escalated well beyond the original estimates. [13]
The canal had cost far more to build than was originally planned. The whole canal had been estimated at £69,997 by Josiah Clowes in 1790, but the section to Ledbury had cost in excess of £104,000. Stephen Ballard had estimated the cost of the second phase at £53,000, but the final cost had been £141,436. With little increase in trade from the longer canal, the company tried to sell it to a railway company almost immediately, but were unsuccessful, and so tried to boost trade. [14]
Traffic started to increase, to the extent that a timetable for the transit of the Oxenhall tunnel had to be introduced in 1849. [14] This was not always successful, as the Hereford Times carried articles in May 1851 about an incident in which boats travelling in opposite directions had met in the middle, and neither would give way. There was deadlock for a period of 58 hours. [15]
In 1858, the canal carried 47,560 tons of goods, and generated an income of £7,061 in 1860, but some of this was derived from the carriage of materials to build railways in the area. [16] On 17 January 1862, less than 17 years after the opening to Hereford, the canal was leased to the Great Western and West Midland Railway, with a view to converting it to a railway. [17] This did not take place immediately, but on 30 June 1881, half of the canal was closed, and sections of it were used for the course of the Ledbury and Gloucester Railway. The Hereford to Ledbury section remained open, but gradually became disused. The canal company continued to receive rent from the Great Western Railway, which it distributed to its shareholders as dividends, and was not formally wound up until the railways were nationalised in 1948. [18]
The canal ran for 34 miles (55 km) from Hereford basin through Ledbury, Dymock and Newent to Over, on the West Channel of the River Severn west of Gloucester, with a short branch to the coal fields at Gorsley. The first 6 miles (9.7 km) from Hereford to Withington, which includes the Aylestone tunnel, was level, after which the canal rose by 37 feet (11 m) through three locks over the three miles to Monkhide. This section includes the skew bridge at Monkhide, built by Ballard at an angle of only 27° to the canal. [19] [20] The bridge was constructed of red brick with some stone dressing, and the parapets are capped with large black engineering bricks which indicate that they were made by B W Blades of West Bromwich. The bridge is a grade II listed structure. [21] There is then another level section of more than twelve miles to the outskirts of Ledbury, which includes the Ashperton tunnel. Water is fed into this section from the River Frome. The final 18 miles (29 km) to Over falls by 195 feet (59 m), and includes the 2,192-yard (2,004 m) Oxenhall tunnel, [22] which was not destroyed by the construction of the railway, as the railway company took the sensible decision to avoid the likely problems of enlarging it, and built a diversion to the south-west. The coal branch left the canal below the tunnel. The canal had 22 locks, and three tunnels. Like many English canals it was built to carry valuable cargoes by narrowboats.
A series of articles about the canal were published in the local press in early 1983, and this led to calls for a society to be formed which would raise public awareness of the canal. A meeting was held in Hereford to facilitate this on 13 April 1983, at which a canal society was formed, which soon became actively engaged in restoration. [23] While the original goal was preservation of the remains, in 1992 the society became the Herefordshire and Gloucestershire Canal Trust (H&G Canal Trust) and the aim became full restoration of the 34 miles (55 km) of canal and locks so that Hereford would once again be linked with Ledbury, Dymock, Newent and the rest of the inland waterway system at Gloucester. [24]
Since 1991 the local council authorities in Herefordshire have set aside land for development as a canal route. The planning department has approved projects with the canal in mind, and has taken action against those trying to build on the proposed route of the canal. Protection of the route of the canal is mandated by the Herefordshire Local Plan, and core strategy E4 not only safeguards the route, but also requires that when adjoining developments are being planned, they must include restoration of the canal. Plans for Hereford city centre include a new basin near the site of the original basin, with the towpath forming an attractive green corridor between there and Aylestone Park. [25] Similar support has been given by the local council authorities in Gloucestershire.[ citation needed ]
In 2000, the Over Canal Basin (adjacent to the River Severn at Over on the outskirts of Gloucester, where the Canal links with the inland waterways network) was reconstructed entirely by volunteers from the Canal Trust and the national volunteer body the Waterway Recovery Group. The estimated commercial cost of the work was some £500,000, but it was completed against a 10-month deadline, with a budget of just £60,000. The basin was originally filled in when the Over Isolation Hospital was built in 1903. [26] The site was sold for housing development to Swan Homes, and agreement was reached to excavate the basin to enhance the project, under which Wharf House was rebuilt to provide a new canal centre. [27] In late 2011, the Trust were able to buy a short section of the former canal route adjacent to the basin site (Vineyard Hill). This had been purchased by residents in 2004 to protect their communal interests, and was passed to the Trust for a nominal sum. Like the basin, there was a deadline on development, which had to be completed by September 2012, [28] but a major effort by the Waterway Recovery Group and members of the Trust resulted in most of the work being completed in April 2012. It was re-watered by 18 April, four months before its scheduled completion date. [29] It was formally re-opened by Timothy West and Prunella Scales at the 2012 Over Canal Festival. [30]
Major re-development in Hereford city centre has resulted in the provision for a new canal bed which it is hoped will eventually link to a new terminal basin. Further development has also taken place on the Aylestone Park section, after the removal of silt containing heavy metals. [31] Following partial restoration, which saw the Trust working on the park, and Herefordshire Council, owners of the park, working on the canal, a short section at Aylestone was used for a boat rally in May 2011. A slipway enabled the boats to be launched, and the canal will be made wider in due course. [24]
The canal connects to an un-navigable part of the River Severn, separated from the main channel by weirs at Maisemore and Llanthony, both of which have derelict locks associated with them. Maisemore was sold by British Waterways some years ago, and they decided to dispose of Llanthony in 2007. The Canal Trust used a legacy to purchase the site, which includes two cottages, some land, and a small section of the River Severn as well as Llanthony lock. The lock is bigger than that at Maisemore, and access to the entrance lock at Over is easier because boats would be travelling against the flow of the river as they approach it. [32] Over Lock is around 30 feet (9.1 m) deep, as it has to cope with the large tidal range of the River Severn, and so restoration would be difficult. In early 2022 the Trust asked a consulting engineer from the Inland Waterways Association's Restoration Hub to assess how the canal could be connected to the river. Three options were suggested, two of which involved restoring Over Lock, but the third was to cross the west channel of the Severn on an aqueduct, and construct a new cut across Alney Island to join the non-tidal river above the entrance to Gloucester Docks and the Gloucester and Sharpness Canal. [33]
At Newent, Bridge Street crossed over the canal on a bridge. [34] When the railway replaced the canal, they constructed a high level bridge over the road, which was lowered to accommodate this solution. [35] The Canal Trust envisaged that the canal could be rebuilt between the platforms of Newent railway station, but this would have involved the construction of large embankments, which were thought to be out of scale with the environment. In 2019, they therefore reconsidered what options were possible, and proposed the use of an inclined plane, using a cradle running on rails to raise boats from the canal level up to the station, with a level section between the platforms, followed by another incline to reach the height required to cross the road and another incline to return boats to the level of the canal on the other side. [36]
In November 2021, planning permission was granted to allow the Trust to construct 660 yards (600 m) of new canal at Malswick, on the section that was converted into a railway. An embankment had been built over the original route of the canal, and its removal would have been extremely difficult. The new route therefore runs alongside the embankment, and major construction work took place in 2022. Because the channel cuts through natural clay, it is not expected to need lining when the work is completed. The project included the planting of around 1,000 hedge plants and trees near to the canal. [33]
The Wharf House at Over Basin is a restored lock cottage that, until 2019, served as a visitor centre and restaurant. From its inception in 2005 until 2019, the Wharf House was operated by the Herefordshire & Gloucestershire Canal Trust, with profits donated to the H&G Canal Trust Charity. In 2019, management of the Wharf House was transferred to a private firm, and the restaurant was renamed The Lock Keepers. [37]
{{cite web}}
: CS1 maint: unfit URL (link)The River Severn, at 220 miles (354 km) long, is the longest river in Great Britain. It is also the river with the most voluminous flow of water by far in all of England and Wales, with an average flow rate of 107 m3/s (3,800 cu ft/s) at Apperley, Gloucestershire. It rises in the Cambrian Mountains in mid Wales, at an altitude of 2,001 feet (610 m), on the Plynlimon massif, which lies close to the Ceredigion/Powys border near Llanidloes. The river then flows through Shropshire, Worcestershire and Gloucestershire. The county towns of Shrewsbury, Worcester and Gloucester lie on its course.
The Stratford-upon-Avon Canal is a canal in the south Midlands of England. The canal, which was built between 1793 and 1816, runs for 25.5 miles (41.0 km) in total, and consists of two sections. The dividing line is at Kingswood Junction, which gives access to the Grand Union Canal. Following acquisition by a railway company in 1856, it gradually declined, the southern section being un-navigable by 1945, and the northern section little better.
The Thames and Severn Canal is a canal in Gloucestershire in the south-west of England, which was completed in 1789. It was conceived as part of a cargo route from Bristol and the Midlands to London, linking England's two largest rivers for better trade. The route climbs the steep Cotswold escarpment through the Golden Valley, tunnels underneath the summit of the Cotswold Edge, and emerges near the source of the Thames.
The Ellesmere Canal was a waterway in England and Wales that was planned to carry boat traffic between the rivers Mersey and Severn. The proposal would create a link between the Port of Liverpool and the mineral industries in north east Wales and the manufacturing centres in the West Midlands. However, the canal was never completed as intended because of its rising costs and failure to generate the expected commercial traffic.
Newent is a market town and civil parish in the Forest of Dean in Gloucestershire, England. The town is 11 miles (18 km) north-west of Gloucester. Its population was 5,073 at the 2001 census, rising to 5,207 in 2011, The population was 6,777 at the 2021 Census. Once a medieval market and fair town, its site had been settled at least since Roman times. The first written record of it appears in the 1086 Domesday Book.
Caldon Canal is a branch of the Trent and Mersey Canal which opened in 1779. It runs 18 miles (29 km) from Etruria, Stoke-on-Trent, to Froghall, Staffordshire. The canal has 17 locks and the 76-yard (69 m) Froghall Tunnel.
The Montgomery Canal, known colloquially as "The Monty", is a partially restored canal in eastern Powys and northwest Shropshire. The canal runs 33 miles (53 km) from the Llangollen Canal at Frankton Junction to Newtown via Llanymynech and Welshpool and crosses the England–Wales border.
Sharpness is a port in the civil parish of Hinton, in the Stroud district, in Gloucestershire, England, one of the most inland in Britain, and eighth largest in the South West England region. It is on the River Severn at grid reference SO669027, at a point where the tidal range, though less than at Avonmouth downstream, is still large.
The Droitwich Canal is a synthesis of two canals in Worcestershire, England; the Droitwich Barge Canal and the Droitwich Junction Canal. The Barge Canal is a broad canal which opened in 1771 linking Droitwich Spa to the River Severn at Hawford Bottom Lock, Claines. The Droitwich Junction Canal is a narrow canal, opened in 1854, which linked Droitwich to the Worcester and Birmingham Canal. Both were built to carry salt, and were abandoned in 1939. They have been the subject of a restoration plan since 1973, and the Barge Canal was officially reopened in 2010, while the Junction Canal reopened in July 2011. Following the opening of the canal, ownership transferred to the newly created Canal and River Trust
The Leominster Canal was an English canal which ran for just over 18 miles from Mamble to Leominster through 16 locks and a number of tunnels, some of which suffered engineering problems even before the canal opened. Originally, the canal was part of a much more ambitious plan to run 46 miles from Stourport to Kington.
The Shrewsbury Canal was a canal in Shropshire, England. Authorised in 1793, the main line from Trench to Shrewsbury was fully open by 1797, but it remained isolated from the rest of the canal network until 1835, when the Birmingham and Liverpool Junction Canal built the Newport Branch from Norbury Junction to a new junction with the Shrewsbury Canal at Wappenshall. After ownership passed to a series of railway companies, the canal was officially abandoned in 1944; many sections have disappeared, though some bridges and other structures can still be found. There is an active campaign to preserve the remnants of the canal and to restore the Norbury to Shrewsbury line to navigation.
The Stroudwater Navigation is a canal in Gloucestershire, England which linked Stroud to the River Severn. It was authorised in 1776, although part had already been built, as the proprietors believed that an Act of Parliament obtained in 1730 gave them the necessary powers. Opened in 1779, it was a commercial success, its main cargo being coal. It was 8 miles (13 km) in length and had a rise of 102 ft 5 in (31.22 m) through 12 locks. Following the opening of the Thames and Severn Canal in 1789, it formed part of a through route from Bristol to London, although much of its trade vanished when the Kennet and Avon Canal provided a more direct route in 1810. Despite competition from the railways, the canal continued to pay dividends to shareholders until 1922, and was not finally abandoned until 1954.
Llanthony Secunda Priory was a house of Augustinian canons in the parish of Hempsted, Gloucestershire, England, situated about 1/2 a mile south-west of Gloucester Castle in the City of Gloucester. It was founded in 1136 by Miles de Gloucester, 1st Earl of Hereford, a great magnate based in the west of England and the Welsh Marches, hereditary Constable of England and Sheriff of Gloucestershire, as a secondary house and refuge for the canons of Llanthony Priory in the Vale of Ewyas, within his Lordship of Brecknock in what is now Monmouthshire, Wales. The surviving remains of the Priory were designated as Grade I listed in 1952 and the wider site is a scheduled ancient monument. In 2013 the Llanthony Secunda Priory Trust received funds for restoration work which was completed in August 2018 when it re-opened to the public.
The Bullo Pill Railway was an early British railway, completed in 1810 to carry coal mined in the Forest of Dean Coalfield to a port on the River Severn near Newnham, Gloucestershire. It was later converted to a broad gauge steam line by the Great Western Railway, and was closed in the 1960s.
The Ledbury and Gloucester Railway,, was a railway line in Herefordshire and Gloucestershire, England, running between Ledbury and Gloucester. It opened in 1885 and closed in 1964.
Newent railway station served the town of Newent in Gloucestershire, England.
Hereford Road Skew Bridge is a disused railway bridge in Ledbury, Herefordshire. Built in 1881 to carry the Ledbury and Gloucester Railway across the Hereford Road at an angle of approximately 45°, it was built as a ribbed skew arch with stone spandrels and wing walls, and ribs of blue brick. The railway line was closed in 1959 and the bridge is now used as part of the Ledbury Town Trail footpath.
The Cotswold Canals Trust is a British registered charity that aims to protect and restore the Stroudwater Navigation and the Thames and Severn Canal. Formed in 1972, the organisation has a goal to restore navigability on the two waterways between Saul Junction and the River Thames. Since then, it has overseen restoration of the waterways, with many bridges, locks, and cuttings being rebuilt and reinstated.
The Herefordshire and Gloucestershire Canal Trust is a British organisation whose main aim is the restoration of the Herefordshire and Gloucestershire Canal. It was formed as a canal society in 1983, and became a Trust in 1992.
Malswick is a village in the civil parish of Newent, in the Forest of Dean district, in the county of Gloucestershire, England. It contains the ground for the Newent FC.