Droitwich Canal

Last updated

Droitwich Canals
Hanbury locks.jpg
One of the Hanbury locks
Specifications
Maximum boat length 71 ft 6 in (21.79 m)
(originally 64 ft 0 in or 19.51 m)
Maximum boat beam 7 ft 0 in (2.13 m)
(originally 14 ft 6 in or 4.42 m)
Locks14
StatusNavigable
Navigation authority Canal and River Trust
History
Original ownerSir George Duckett
Principal engineerJames Brindley
Date of act1768
Date completed1771, 1854
Date closed1939
Date restored2010 (Barge Canal)
Geography
Start pointHanbury
End pointClaines
Connects toWorcester and Birmingham Canal, River Severn
Droitwich Canal
BSicon uSTRq.svg
BSicon uSTRq.svg
BSicon uFABZq+lr.svg
Worcester and Birmingham Canal
BSicon uSKRZ-Yu.svg
Westfields Bridge
BSicon uLOCKSu.svg
1-3
Hanbury Locks (3)
BSicon uENDE.svg
Start of new section
BSicon uSTR+l.svg
BSicon uABZmgr +g.svg
BSicon uSKRZ-Yu.svg
BSicon gSTR.svg
new bridge to rugby club
BSicon uSTAIRu.svg
BSicon gSTR.svg
4-5
new double lock
BSicon uSTR.svg
BSicon ugLOCKSu.svg
4-5
Old locks (2)
BSicon uFGATEu.svg
BSicon gSTR.svg
6
new lock
BSicon uSKRZ-Eu.svg
BSicon gSTR.svg
new footbridge
BSicon uSKRZ-Bu.svg
BSicon DRBq.svg
M5 motorway
BSicon uexSTR+r.svg
BSicon uSKRZ-Yu.svg
BSicon gSKRZ-Yu.svg
Bromsgrove Road B4065
BSicon uexSKRZ-Eu.svg
BSicon uSTR.svg
BSicon gSTR.svg
BSicon uxWEIRg.svg
BSicon uFGATEu.svg
BSicon gSTR.svg
7
new lock and weir
BSicon uexSTRl.svg
BSicon ueABZg+r.svg
BSicon gSTR.svg
Junction with River Salwarpe
BSicon uSTR.svg
BSicon gSTR.svg
canalised River Salwarpe
BSicon uSTR.svg
BSicon ugFGATEu.svg
6
old lock
BSicon ugABZg+l.svg
BSicon gSTRr.svg
BSicon uexSTR+l.svg
BSicon ueABZgr.svg
Junction with Barge Canal
BSicon uxWEIRg.svg
BSicon uSTOPLOCK.svg
Barge Lock
BSicon uexSTR.svg
BSicon uddSTRl.svg
Netherwich Basin
BSicon uexSTR.svg
BSicon uSKRZ-Yu.svg
Netherwich Bridge
BSicon uxmKRZu.svg
BSicon umKRZu.svg
BSicon STR+r.svg
Railway bridge
BSicon uexSKRZ-Yu.svg
BSicon uSTR.svg
BSicon STR.svg
Netherwich Bridge(River)
BSicon uxmKRZu.svg
BSicon umKRZu.svg
BSicon ABZql.svg
railway
BSicon uexSKRZ-Yu.svg
BSicon uSKRZ-Yu.svg
Salwarpe Road bridge
BSicon uexSKRZ-Yu.svg
BSicon uSKRZ-Yu.svg
Siding Lane bridge
BSicon uexSTR.svg
BSicon uddSTRr.svg
Chewson Basin
BSicon uexSKRZ-Yu.svg
BSicon uSKRZ-Yu.svg
Ombersley Way bridge
BSicon uexSKRZ-Au.svg
BSicon uSKRZ-Au.svg
A38 Roman Way bridge
BSicon uexSKRZ-Yu.svg
BSicon uSKRZ-Yu.svg
Salwarpe bridge
BSicon uexSKRZ-Yu.svg
BSicon uSTR.svg
Porters Mill bridge II(River)
BSicon uexSTR.svg
BSicon uFGATEu.svg
8
Ladywood Lock
BSicon uexSTR.svg
BSicon uSKRZ-Yu.svg
Ladywood bridge
BSicon uexSTR.svg
BSicon uLOCKSu.svg
4-7
Porters Mill Locks (4)
BSicon uexSKRZ-Yu.svg
BSicon uSKRZ-Yu.svg
Porters Mill bridge
BSicon uexSTR.svg
BSicon uFGATEu.svg
3
Mildenham Lock
BSicon uexSTR.svg
BSicon uSKRZ-Yu.svg
Mildenham bridge
BSicon uexSTR.svg
BSicon uSTR.svg
BSicon uWHRF.svg
BSicon uSTR.svg
Hawford Mill House
BSicon uSKRZ-Au.svg
BSicon uSKRZ-Au.svg
A449 crossing
BSicon uSTR.svg
BSicon uLOCKSu.svg
1-2
Locks (2)
BSicon uSTR.svg
BSicon uSTR.svg
BSicon uFABZqlr.svg
BSicon uFABZqlr.svg
BSicon uSTRq.svg
River Severn

The Droitwich Canal is a synthesis of two canals in Worcestershire, England; the Droitwich Barge Canal and the Droitwich Junction Canal. The Barge Canal is a broad canal which opened in 1771 linking Droitwich Spa to the River Severn at Hawford Bottom Lock, Claines. The Droitwich Junction Canal is a narrow canal, opened in 1854, which linked Droitwich to the Worcester and Birmingham Canal. Both were built to carry salt, and were abandoned in 1939. They have been the subject of a restoration plan since 1973, and the Barge Canal was officially reopened in 2010, while the Junction Canal reopened in July 2011. Following the opening of the canal, ownership transferred to the newly created Canal and River Trust

Contents

History

Droitwich has been an important centre for the production of salt, obtained from natural brine springs, since before Roman times. In order to get the product to market, an act of Parliament (the Rivers Stour and Salwarpe Navigation Act 1662) was obtained in 1662 to authorise improvements to the River Salwarpe, but the work was not completed, being abandoned in 1675. [1] The improvements involved six locks on the river, of which five had been built when the scheme failed. Another act of Parliament,[ which? ] obtained in the 1670s, authorised improvements to the Salwarpe and the River Stour, and although the promoters spent £4,000 on the scheme, another bill was put before Parliament in 1693, and a fourth attempt was made in 1703, but this was opposed by owners of the salt works. In 1747, Simon Wood again proposed making the river navigable, and in 1755 there was a scheme to construct a pipeline to carry the brine to Hawford on the River Severn, but both schemes foundered. [2]

With salt production increasing, Droitwich Council asked James Brindley the canal engineer responsible for the Bridgewater Canal to survey a route from the town to the River Severn. This he did in 1767, and the following year an act of Parliament, the Hawford-Droitwich Canal Act 1768, was obtained to authorise the construction. [3] This created The Company of Proprietors of the Droitwich Canal Navigation, who had powers to raise £33,400 by issuing shares, and an additional £20,000 if required. [4] Although Brindley was officially "Inspector of the Works", he was busy building the Trent and Mersey Canal at the time, and so the contractor responsible for building the locks was sent by John Priddey, the resident engineer, to work with and be taught by Brindley. A working capital of £13,400 was raised by issuing 134 shares, mostly bought by local people, and construction started on 27 June 1768. As work proceeded, a further 66 shares were issued, raising another £6,600, and a loan of £3,500 was taken out, making the total cost of the project £23,500. [5]

The canal was constructed as a broad canal, capable of taking Severn Trows which were 14.5 feet (4.4 m) wide and 64 feet (20 m) long. [6] Like most of Brindley's canals, it was a contour canal, following the contours as much as possible, to reduce the number of embankments and cuttings required, although there was an awkward bend near Salwarpe church, as the obvious route to the north of the building was specifically excluded by the act of Parliament.[ which? ] [5] The canal was 5.7 miles (9.2 km) long, and included eight locks, with a total fall of 56.5 feet (17.2 m). Because of the presence of brine springs, the water was salty, and did not support populations of fresh-water fish. [4]

The official opening was on 12 March 1771, and the canal was a commercial success. [7] The first dividend was paid in 1775 and by 1777 the £100 shares were trading at £160. A proposal in 1784 to link to the Stourbridge Canal caused disagreement among the shareholders, but the bill to construct the new canal and amalgamate the two companies failed. After the event, the company changed its rules on proxy voting, since it felt that some of those who had voted for amalgamation had not been shareholders, and therefore had not upheld the interests of the canal. [8]

Operation

With the prospect of the Worcester and Birmingham Canal causing the profitability of the canal to suffer, the company negotiated a clause in the enabling act of Parliament[ which? ] for the new enterprise, that would guarantee a 5 per cent dividend on Droitwich shares. The agreement was made in March 1790, and as dividends had never been as high as 5 per cent, they started to claim the difference immediately, even though the new canal was not yet built. A claim was made every year, although the Worcester and Birmingham eventually declined to make payments, on the basis that the Droitwich was not encouraging trade sufficiently. The case went to court in 1808, and they had to pay. By November 1810, the Worcester and Birmingham took over the management of the canal, although little seems to have changed, for after an amalgamation attempt in 1821, which was abandoned when the landowner, Lord Somers, objected, the Droitwich company noted that the Worcester and Birmingham had often attempted to meddle in the management of the canal. The repeal of a tax on salt in 1822 and 1825 resulted in the company being able to pay 5 per cent dividends from the late 1820s out of revenue, and only a few claims to honour the guarantee were made subsequently. [9]

The fortunes of the canal started to decline after 1830, when a source of brine was discovered at Stoke Prior, a village to the north east of Droitwich. Much of this was carried overland to the Worcester and Birmingham, where it was taken northwards, but tolls for its carriage on the River Severn were also negotiated so that the price of the product in Gloucester and Bristol was competitive with that using the Droitwich Canal. [10] The coming of the railways took further trade away, although it particularly affected salt from Stoke Prior, and in order to eliminate the overland carriage of both salt and coal, an act of Parliament[ which? ] was obtained in 1852 for the construction of the Droitwich Junction Canal, to connect the barge canal to Hanbury Wharf on the Worcester and Birmingham. The company who built it was in theory independent, but the intent was that the Worcester and Birmingham would lease it once it was finished, at a rate which would pay a 5 per cent dividend. They also leased the barge canal from 1853 for 21 years. [11]

In order to make it easier to compete with the railways, the locks on the barge canal were lengthened, so that coal could be carried up the River Severn and through both canals without having to be transhipped to shorter boats. This work was completed by mid-1854, and the Junction Canal was opened in late 1854. [11] Built as a narrow canal, suitable for boats which were 7 feet (2.1 m) wide, it was one of the last canals to be built in the Canal Mania era. [7] It was 1.75 miles (2.82 km) long and included another six locks, the final one of which connected the canal to the River Salwarpe. After 160 yards (150 m) on the river, the original sluice through which the barge canal was supplied with water had been converted to a wide lock, which enabled boats from the barge canal to use the river to reach a salt works situated above Chapel Bridge. The Barge Lock was 75 by 15 feet (22.9 by 4.6 m), and had four sets of gates, so that it could be used whatever the level of the river. Subsidence beneath it was a problem, as it had to be rebuilt in 1875/6 and 1903, the first time to raise it by 9 feet (2.7 m) and the second to raise it another 5 feet (1.5 m). [12] The main cargo on both canals was always salt.

Decline

With their financial position worsening, the Worcester and Birmingham Canal received an offer from three railway contractors to buy the canal and the Junction Canal, to convert them into railways. The canal company accepted the offer, but when a bill was submitted to Parliament in 1866, it was defeated, as was a second attempt the following year. [13] In September 1873, the Worcester and Birmingham Canal received an offer from the Sharpness New Docks Company to take over the canal and both Droitwich Canals. An act of Parliament[ which? ] was obtained to authorise the takeover in 1874, and the new company became the Sharpness New Docks & Gloucester & Birmingham Navigation Company. They set to work improving the Worcester and Birmingham route, but soon realised that the canal was not profitable. Despite this, they dredged 73,000 tons of mud from the Droitwich Canals in 1881, and altered the upper cills of the locks in 1888-9, to give a navigable depth of 6 feet (1.8 m). The locks were then 77 by 15 feet (23.5 by 4.6 m), and could accommodate boats of 115 tons. By 1906, the costs of maintenance on both canals exceeded the income, and they gradually decayed. [14] Finally, an act of Parliament[ which? ] authorising abandonment was obtained in July 1939. The last boat to use the barge canal had done so in 1916, [3] while the Junction Canal had not seen any traffic since 1928. [1]

Restoration

Excavation of the canal bed at Salwarpe during WRG Summer Work Camp, 1978 Droitwich canal restoration.jpg
Excavation of the canal bed at Salwarpe during WRG Summer Work Camp, 1978

The problem of what to do with the canals was regularly debated by Droitwich Borough Council in 1963, and a campaign for their restoration was started by Max Sinclair, who suggested that restoration could be completed in under two years. The council realised the potential amenity value of the canal, and the concept was aired in the Worcester Evening News, which carried an illustrated article on 14 June 1966. [15] A restoration group was formed in 1969, as part of a national drive by the Inland Waterways Association called Safeguarding Britain's Waterways, [16] which led to the formation in 1973 of the Droitwich Canals Trust, a limited company with local authority support, which began to work towards the restoration of the canal. [1] On 27–28 October 1973 The Droitwich Dig, organized by the Waterway Recovery Group, gathered together the largest number of volunteers then ever assembled at a restoration site. [17] In 1975, the canal was one of thirteen to benefit from the Job Creation Scheme, set up by the Manpower Services Commission, which provided paid workers to work on restoration and maintenance. [18]

Funding came from various sources. These included £200,000 from Wychavon District Council in 1980, which funded work in Vines Park, including a mooring basin, while a new swing bridge was funded by an award from Shell. [19] The following year, the Manpower Services Commission provided 15 workers with a budget of £19,000 for materials. [20] The section of the barge canal through Vines Park was opened in October 1986, enabling the Trust's trip-boat to provide longer trips. [21] An engineering feasibility study was carried out in 1994, which concluded that restoration was certainly possible, and would bring with it economic benefits to the region. [1] It was presented to a packed meeting, at which the problems of passing beneath the A449 at Hawford and of ensuring an adequate water supply were identified. The scheme had the support of the local authorities, who were keen to identify sources of funding, without which the restoration was unlikely to be completed. [22]

In 2002, British Waterways held their Unlocked and Unlimited conference, which identified that completion of the Droitwich scheme would require some £9.5 million. [23] Two years later, the Heritage Lottery Fund awarded £4.6 million for the project, with other funding provided by Advantage West Midlands and the local councils. As part of this, British Waterways took over the lease of the canals from the Droitwich Canal Trust. [24] A planning application for the restoration was submitted by British Waterways on behalf of the Droitwich Canals Restoration Partnership in April 2007, [25] by which time a total of £10.5 million had been promised, some of which was dependent on match funding, and the Restoration Partnership needed to raise £1 million in order to release the other funding. [26]

The new double lock needed to get under the M5 motorway during construction Droitwich Canal locks under construction.jpg
The new double lock needed to get under the M5 motorway during construction

The project was planned to take two years, with both of the Droitwich Canals completely restored and reopened in 2009. Although the majority of the 7-mile (11 km) length of the canals was still in existence, a 550-yard (500 m) stretch between the M5 motorway and Hanbury Locks had to be completely rebuilt. The existing culvert for the Body Brook has been used to allow the canal to pass under the motorway. [27]

The Barge Canal and the Junction Canal have been connected together by canalising a 600-yard (550 m) stretch of the River Salwarpe through the centre of Droitwich. The course of the river has been made wider and deeper, and a weir has been constructed adjacent to the new lock 7, to maintain the water levels. [27] In order to minimise the mixing of canal water with river water, a pipeline has been built under the towpath, running from just above lock 7 to just below the Barge Lock. The river improvements were to be partially funded by a Section 106 agreement, as part of a housing development along the river bank, but the withdrawal of the developer from the scheme resulted in delays, [28] which put back the full opening of the canal. The Droitwich Barge Canal opened officially on 11 September 2010, [29] and the whole canal was completed by mid-2011, with the official opening held on 1 July. [30]

Map

Map of the Droitwich Canal Droitwich Canal map.png
Map of the Droitwich Canal

Points of interest

See also

Bibliography

Related Research Articles

<span class="mw-page-title-main">Calder and Hebble Navigation</span> Inland waterway in West Yorkshire, England

The Calder and Hebble Navigation is a broad inland waterway, with locks and bridge holes that are suitable for 14-foot-wide (4.3 m) boats, in West Yorkshire, England. Construction to improve the River Calder and the River Hebble began in 1759, and the initial scheme, which included 5.7 miles (9.2 km) of new cuts, was completed in 1770 and has remained navigable since it was opened. Significant improvements were made, including the Salterhebble branch to Halifax, opened in 1828, and ever-longer cuts to bypass river sections. Trade was assisted by the opening of the Rochdale Canal in 1804, which provided a through route from Sowerby Bridge to Manchester. There were plans to abandon the river sections completely in the 1830s, but these were modified as the needs of mill owners and other riparian landowners were recognised.

<span class="mw-page-title-main">River Avon, Warwickshire</span> River in central England

The River Avon, also in central England flows generally southwestwards and is a major left-bank and easternmost tributary of the River Severn. It is also known as the Warwickshire Avon or Shakespeare's Avon, to distinguish it from several other rivers of the same name in the United Kingdom.

<span class="mw-page-title-main">Stratford-upon-Avon Canal</span> United Kingdom legislation

The Stratford-upon-Avon Canal is a canal in the south Midlands of England. The canal, which was built between 1793 and 1816, runs for 25.5 miles (41.0 km) in total, and consists of two sections. The dividing line is at Kingswood Junction, which gives access to the Grand Union Canal. Following acquisition by a railway company in 1856, it gradually declined, the southern section being un-navigable by 1945, and the northern section little better.

<span class="mw-page-title-main">Thames and Severn Canal</span> Canal in Gloucestershire in the south-west of England

The Thames and Severn Canal is a canal in Gloucestershire in the south-west of England, which was completed in 1789. It was conceived as part of a cargo route from Bristol and the Midlands to London, linking England's two largest rivers for better trade. The route climbs the steep Cotswold escarpment through the Golden Valley, tunnels underneath the summit of the Cotswold Edge, and emerges near the source of the Thames.

<span class="mw-page-title-main">Staffordshire and Worcestershire Canal</span> Canal in the West Midlands, England

The Staffordshire and Worcestershire Canal is a navigable narrow canal in Staffordshire and Worcestershire in the English Midlands. It is 46 miles (74 km) long, linking the River Severn at Stourport in Worcestershire with the Trent and Mersey Canal at Haywood Junction by Great Haywood.

<span class="mw-page-title-main">Wyrley and Essington Canal</span> Narrow canal in the Midlands, England

The Wyrley and Essington Canal, known locally as "the Curly Wyrley", is a canal in the English Midlands. As built it ran from Wolverhampton to Huddlesford Junction near Lichfield, with a number of branches: some parts are currently derelict. Pending planned restoration to Huddlesford, the navigable mainline now terminates at Ogley Junction near Brownhills. In 2008 it was designated a Local Nature Reserve.

<span class="mw-page-title-main">Chester Canal</span> English canal linking the south Cheshire town of Nantwich with the River Dee at Chester

The Chester Canal was an English canal linking the south Cheshire town of Nantwich with the River Dee at Chester. It was intended to link Chester to Middlewich, with a branch to Nantwich, but the Trent and Mersey Canal were unco-operative about a junction at Middlewich, and so the route to Nantwich was opened in 1779. There were also difficulties negotiating with the River Dee Company, and with no possibility of through traffic, the canal was uneconomic. Part of it was closed in 1787, when Beeston staircase locks collapsed, and there was no money to fund repairs. When the Ellesmere Canal was proposed in 1790, the company saw it as a ray of hope, and somehow managed to keep the struggling canal open. The Ellesmere Canal provided a link to the River Mersey at Ellesmere Port from 1797, and the fortunes of the Chester Canal began to improve.

<span class="mw-page-title-main">Lichfield Canal</span> English canal under restoration

The Lichfield Canal, as it is now known, was historically a part of the Wyrley and Essington Canal, being the section of that canal from Ogley Junction at Brownhills on the northern Birmingham Canal Navigations to Huddlesford Junction, east of Lichfield, on the Coventry Canal, a length of 7 miles (11.3 km). The branch was abandoned in 1955, along with several other branches of the Wyrley and Essington, and much of it was filled in.

<span class="mw-page-title-main">Caldon Canal</span> United Kingdom legislation

Caldon Canal is a branch of the Trent and Mersey Canal which opened in 1779. It runs 18 miles (29 km) from Etruria, Stoke-on-Trent, to Froghall, Staffordshire. The canal has 17 locks and the 76-yard (69 m) Froghall Tunnel.

<span class="mw-page-title-main">Montgomery Canal</span> Canal in Shropshire, England, and Powys, Wales

The Montgomery Canal, known colloquially as "The Monty", is a partially restored canal in eastern Powys and northwest Shropshire. The canal runs 33 miles (53 km) from the Llangollen Canal at Frankton Junction to Newtown via Llanymynech and Welshpool and crosses the England–Wales border.

<span class="mw-page-title-main">Rochdale Canal</span> Trans-Pennine navigable channel in northern England

The Rochdale Canal is in Northern England, between Manchester and Sowerby Bridge, part of the connected system of the canals of Great Britain. Its name refers to the town of Rochdale through which it passes.

<span class="mw-page-title-main">Shropshire Union Railways and Canal Company</span> United Kingdom legislation

The Shropshire Union Railways and Canal Company was a Company in England, formed in 1846, which managed several canals and railways. It intended to convert a number of canals to railways, but was leased by the London and North Western Railway (LNWR) from 1847, and although they built one railway in their own right, the LNWR were keen that they did not build any more. They continued to act as a semi-autonomous body, managing the canals under their control, and were critical of the LNWR for not using the powers which the Shropshire Union Company had obtained to achieve domination of the markets in Shropshire and Cheshire by building more railways.

<span class="mw-page-title-main">River Salwarpe</span> River in Worcestershire, England

The River Salwarpe is a 20.4 miles (32.8 km) long river in Worcestershire, England. It is a left bank tributary of the River Severn, which it joins near Hawford.

<span class="mw-page-title-main">Stourbridge Canal</span> Canal in England

The Stourbridge Canal is a canal in the West Midlands of England. It links the Staffordshire and Worcestershire Canal with the Dudley Canal, and hence, via the Birmingham Canal Navigations, to Birmingham and the Black Country.

Andrew Yarranton (1619–1684) was an important English engineer in the 17th century who was responsible for making several rivers into navigable waterways.

<span class="mw-page-title-main">Pocklington Canal</span> Canal in the East Riding of Yorkshire, England

The Pocklington Canal is a broad canal which runs for 9.5 miles (15.3 km) through nine locks from the Canal Head near Pocklington in the East Riding of Yorkshire, England, to the River Derwent which it joins near East Cottingwith. Most of it lies within a designated Site of Special Scientific Interest.

<span class="mw-page-title-main">Dudley Canal</span> Canal in the West Midlands, England

The Dudley Canal is a canal passing through Dudley in the West Midlands of England. The canal is part of the English and Welsh network of connected navigable inland waterways and forms part of the popular Stourport Ring narrowboat cruising route.

<span class="mw-page-title-main">Stroudwater Navigation</span> Canal in Gloucestershire, England

The Stroudwater Navigation is a canal in Gloucestershire, England which linked Stroud to the River Severn. It was authorised in 1776, although part had already been built, as the proprietors believed that an Act of Parliament obtained in 1730 gave them the necessary powers. Opened in 1779, it was a commercial success, its main cargo being coal. It was 8 miles (13 km) in length and had a rise of 102 ft 5 in (31.22 m) through 12 locks. Following the opening of the Thames and Severn Canal in 1789, it formed part of a through route from Bristol to London, although much of its trade vanished when the Kennet and Avon Canal provided a more direct route in 1810. Despite competition from the railways, the canal continued to pay dividends to shareholders until 1922, and was not finally abandoned until 1954.

<span class="mw-page-title-main">Horseley Fields Junction</span>

Horseley Fields Junction is a canal junction at the western limit of the Wyrley and Essington Canal where it meets the BCN Main Line, at Horseley Fields east of Wolverhampton, in the West Midlands, England.

The Droitwich Canals Trust is an English limited company created in 1973 to work towards the restoration of the Droitwich Canal. From 2001 it worked as part of a larger group, the Droitwich Canals Restoration Partnership, and in 2004, following a successful application for a grant of £4.6 million from the Heritage Lottery Fund surrendered its lease on the canal to British Waterways, who then managed the restoration through to the reopening of the canals in 2011.

References

  1. 1 2 3 4 Cumberlidge 2009 , pp. 115–117
  2. Hadfield 1985, pp. 59–60.
  3. 1 2 "History of the Canals". British Waterways. Archived from the original on 5 January 2009.
  4. 1 2 Priestley 1831 , pp. 204–205
  5. 1 2 Hadfield 1985 , pp. 60–61
  6. Hadfield 1985 , pp. 322–323
  7. 1 2 "History". Droitwich Canals Trust. Archived from the original on 12 October 2007.
  8. Hadfield 1985, pp. 61–62.
  9. Hadfield 1985, pp. 133–135.
  10. Hadfield 1985, p. 135.
  11. 1 2 Hadfield 1985 , pp. 270–271
  12. Hadfield 1985, pp. 271–272.
  13. Hadfield 1985, p. 273.
  14. Hadfield 1985, pp. 274–275.
  15. Squires 2008, pp. 51, 61.
  16. Squires 2008, p. 69.
  17. Shill 2011, pp. 177–178.
  18. Squires 2008, pp. 87–88.
  19. Squires 2008 , pp. 105–106
  20. Squires 2008 , p. 110
  21. Squires 2008, p. 118.
  22. Squires 2008 , p. 135
  23. Squires 2008 , p. 154
  24. Squires 2008 , p. 165
  25. "Find Out More About The Planning Application for the Restoration of Droitwich Canals". British Waterways Newsroom. 24 May 2007. Archived from the original on 5 October 2007.
  26. "Droitwich Canals Restoration". British Waterways. Archived from the original on 5 October 2007.
  27. 1 2 "Restoration of the Droitwich Canals Non Technical Summary" (PDF). British waterways. Archived from the original (PDF) on 24 September 2010. Retrieved 1 July 2008.
  28. "Droitwich delay". Waterways World. 38 (6): 45. June 2009. ISSN   0309-1422.
  29. "Good and bad news on the Droitwich Canals". Waterways (229): 16–17. 2010.
  30. Fairhurst 2011, pp. 1, 76–78.