Loop line (Chongqing Rail Transit)

Last updated
Loop line
CRT Loop Line Train on Gaojiahuayuan Rail Bridge.jpg
A Loop line train running on Gaojiahuayuan Bridge
Overview
Other name(s)Line 0
Native name重庆轨道交通环线
StatusOperational
Line number0
Locale Chongqing, China
Stations33
Service
Type Rapid transit
System Chongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
Depot(s)Majiayan, Tushan, Sigongli
History
Opened28 December 2018;6 years ago (2018-12-28)
Technical
Line length50.93 km (31.65 miles)
Number of tracks2
CharacterUnderground and elevated
Track gauge 1,435 mm (4 ft 8+12 in)
Electrification 1500  V   DC overhead line
Operating speed90 km/h (56 mph)
Route map

Contents

Honghudonglu
BSicon utkSTRc2.svg
BSicon utpkBHF3+l.svg
BSicon utABZq+r.svg
BSicon utkBHF2+r.svg
BSicon XPLTa.svg
BSicon utkSTRc3.svg
Min'an Ave.
4
Dongbu Park
BSicon utpkBHF+1.svg
BSicon utABZl+xl.svg
BSicon utXBHF-Lq.svg
BSicon utSTRq.svg
BSicon utkSTR+4.svg
BSicon POINTERf@f.svg
BSicon utCONTfq.svg
BSicon POINTERf@g.svg
5 6
Ranjiaba
BSicon utCONTgq.svg
BSicon utTBHFt.svg
BSicon utSTR+r.svg
BSicon uextLSTR.svg
BSicon utSTR+l.svg
BSicon utINTq.svg
BSicon utINT.svg
BSicon utCONTfq.svg
Chongqing N. Station
S. Square
China Railways.svg 3 10
BSicon POINTERg@g.svg
BSicon utSTR.svg
BSicon MFADEf.svg
BSicon utLSTR.svg
BSicon uextLSTR.svg
BSicon MFADEf.svg
BSicon utLSTR.svg
BSicon utBHF.svg
Yulu
Sports Park
BSicon utpBHF.svg
BSicon uextLSTR.svg
BSicon uhtBHFe@f.svg
Wulidian
6 9
Nanqiaosi
BSicon utpBHF.svg
BSicon uextLSTR.svg
BSicon WASSER+l.svg
BSicon uhKRZW.svg
BSicon WCONTgeq.svg
Yudaishan
BSicon uextCONTgq.svg
BSicon MASKc.svg
BSicon utpBHF.svg
BSicon uextSTRq.svg
BSicon uextLSTRq.svg
BSicon uextLSTRr.svg
BSicon WASSER.svg
BSicon uhtBHFa@g.svg
Danzishi
BSicon POINTERg@g.svg
BSicon uhtSTRe.svg
BSicon WASSER.svg
BSicon utBHF.svg
Tushan
BSicon WCONTfaq.svg
BSicon uhKRZW.svg
BSicon WASSERq.svg
BSicon WASSERq.svg
BSicon WABZgr.svg
BSicon utABZg+l.svg
BSicon uKDSTCCeq.svg
Tushan depot
Chongqing University
BSicon uhtSTRa@g.svg
BSicon utpBHF.svg
BSicon WASSER.svg
BSicon utBHF.svg
Renji
1 9 China Railways.svg
Shapingba
BSicon utINT.svg
BSicon WASSER.svg
BSicon utBHF.svg
Shangxinjie
6
Tianxingqiao
BSicon utpBHF.svg
BSicon WASSER.svg
BSicon utBHF.svg
Shanghao
Majiayan depot
BSicon utABZg+l.svg
BSicon uKDSTCCeq.svg
BSicon WASSER.svg
BSicon uhtBHFe@g.svg
Haitangxi
Chongqing Library
BSicon utBHF.svg
BSicon WASSER.svg
BSicon uhBHF.svg
Luojiaba
Fengmingshan
BSicon utpBHF.svg
BSicon WASSER+l.svg
BSicon WASSERr.svg
BSicon uhABZgl.svg
BSicon lhSTRe@gq.svg
BSicon uKDSTeq.svg
Sigongli depot
Shangqiao
BSicon utBHF.svg
BSicon MFADEg.svg
BSicon utLSTR.svg
BSicon WASSER.svg
BSicon lhSTRe@g.svg
BSicon utBHFa@f.svg
Sigongli
3
BSicon utKRWgl.svg
BSicon utKRWg+r.svg
BSicon WASSER.svg
BSicon MFADEg.svg
BSicon utLSTR.svg
BSicon utkABZg2.svg
BSicon POINTERf@f.svg
5 China Railways.svg
Chongqing W.
BSicon utXINT-L.svg
BSicon utXINT-R.svg
BSicon WASSER.svg
BSicon utSTRl.svg
BSicon .svg
BSicon utkSTRc1.svg
BSicon utTBHFxt.svg
BSicon MASKrr.svg
BSicon ulCONTf@Fq.svg
BSicon utkABZq+4.svg
Nanhu
BSicon utCONTgq.svg
BSicon utKRZt.svg
BSicon utSTRr.svg
BSicon WASSER.svg
BSicon utKBHFe.svg
BSicon uhtBHFe@f.svg
Haixialu
Hualong
BSicon utBHF.svg
BSicon WASSERl.svg
BSicon WASSERq.svg
BSicon uhKRZW.svg
BSicon WASSER+r.svg
Erlang
BSicon utBHF.svg
BSicon uhtSTRa.svg
BSicon WCONTge.svg
Caiyunhu
BSicon utkBHF2.svg
BSicon utkBHF3.svg
Xiejiawan
2
Chenjiaping
BSicon utkSTRc1.svg
BSicon utkBHFl+4.svg
BSicon utSTRq.svg
BSicon utkBHFr+1.svg
BSicon utkSTRc4.svg
Olympic Sports Center
18

The Loop line of Chongqing Rail Transit is a rapid transit loop line in Chongqing, China. [1] The line is also known as Line 0.

The metro line serves three major railway stations in Chongqing: Chongqing North railway station, Shapingba railway station, and Chongqing West railway station. [2]

Interior of a Loop line train Chongqing Metro Loop Line - Train's Interior View.jpg
Interior of a Loop line train

History

The line began construction on October 28, 2013. [3]

The northeastern section was opened on December 28, 2018. The southern section with the Egongyan Rail Transit Bridge opened on December 30, 2019. [4] The remaining section opened on January 20, 2021.

Opening timeline

SegmentCommencementLengthStation(s)Name
Chongqing Library Haixialu28 December 201833.7 km (20.94 mi) [5] 17Northeastern Section
Min'an Ave.11 January 2019infill station1
Luojiaba & Danzishi1 July 2019infill stations2
Nanqiaosi15 December 2019infill station1
Haixialu Erlang30 December 2019 [4] 9.5 km (5.90 mi) [6] 5Southern section
Chongqing Library Chongqing West Railway Station Erlang20 January 20217.6 km (4.72 mi) [7] 4Remaining section
Tianxingqiao & Renji4 February 2021infill stations2
Shanghao7 October 2023infill station1

Stations

Service
routes
Station
Station nameConnectionsDistance
km
Location
ELEnglishChinese
↑ Loop towards Hualong
Through-service to/from Tiaodeng via Line 5
CRT SB W Huan .svg
CRT SB W 0.svgCRT SB W 1.svg
Chongqing West Station 重庆西站      Line 5 China Railways.svg CXW 1.650.9 Shapingba
CRT SB W Huan .svg
CRT SB W 0.svgCRT SB W 2.svg
Shangqiao 上桥2.02.0
CRT SB W Huan .svg
CRT SB W 0.svgCRT SB W 3.svg
Fengmingshan 凤鸣山1.13.1
CRT SB W Huan .svg
CRT SB W 0.svgCRT SB W 4.svg
Chongqing Library 重庆图书馆1.24.3
CRT SB W Huan .svg
CRT SB W 0.svgCRT SB W 5.svg
Tianxingqiao 天星桥1.15.4
CRT SB W Huan .svg
CRT SB W 0.svgCRT SB W 6.svg
Shapingba 沙坪坝      Line 1       Line 9   27  
China Railways.svg CYW
1.67.0
CRT SB W Huan .svg
CRT SB W 0.svgCRT SB W 7.svg
Chongqing University [8] 重庆大学 [8] 1.58.5
CRT SB W Huan .svg
CRT SB W 0.svgCRT SB W 8.svg
Yudaishan 玉带山  4  2.010.5 Jiangbei
CRT SB W Huan .svg
CRT SB W 0.svgCRT SB W 9.svg
Nanqiaosi 南桥寺1.712.2
CRT SB W Huan .svg
CRT SB W 1.svgCRT SB W 0.svg
Sports Park 体育公园1.213.4 Yubei
CRT SB W Huan .svg
CRT SB W 1.svgCRT SB W 1.svg
Ranjiaba 冉家坝      Line 5       Line 6 1.114.5
CRT SB W Huan .svg
CRT SB W 1.svgCRT SB W 2.svg
Dongbu Park 动步公园1.015.5
CRT SB W Huan .svg
CRT SB W 1.svgCRT SB W 3.svg
Honghudonglu 洪湖东路0.916.4
CRT SB W Huan .svg
CRT SB W 1.svgCRT SB W 4.svg
Min'an Ave. 民安大道      Line 4 1.618.0
Through-service to/from Tangjiatuo via Line 4
CRT SB W Huan .svg
CRT SB W 1.svgCRT SB W 5.svg
Chongqing N. Station S. Square [a] 重庆北站南广场      Line 3       Line 10
  YW   China Railways.svg CUW
2.120.1 Yubei
CRT SB W Huan .svg
CRT SB W 1.svgCRT SB W 6.svg
Yulu 渝鲁2.122.2 Jiangbei
CRT SB W Huan .svg
CRT SB W 1.svgCRT SB W 7.svg
Wulidian 五里店      Line 6       Line 9 1.523.7
CRT SB W Huan .svg
CRT SB W 1.svgCRT SB W 8.svg
Danzishi 弹子石2.626.3 Nan'an
CRT SB W Huan .svg
CRT SB W 1.svgCRT SB W 9.svg
Tushan 涂山1.627.9
CRT SB W Huan .svg
CRT SB W 2.svgCRT SB W 0.svg
Renji 仁济1.329.2
CRT SB W Huan .svg
CRT SB W 2.svgCRT SB W 1.svg
Shangxinjie 上新街      Line 6 1.030.2
CRT SB W Huan .svg
CRT SB W 2.svgCRT SB W 2.svg
Shanghao 上浩1.131.3
CRT SB W Huan .svg
CRT SB W 2.svgCRT SB W 3.svg
Haitangxi 海棠溪1.532.8
CRT SB W Huan .svg
CRT SB W 2.svgCRT SB W 4.svg
Luojiaba 罗家坝1.033.8
CRT SB W Huan .svg
CRT SB W 2.svgCRT SB W 5.svg
Sigongli 四公里      Line 3 1.134.9
CRT SB W Huan .svg
CRT SB W 2.svgCRT SB W 6.svg
Nanhu 南湖      Line 10 2.036.9
CRT SB W Huan .svg
CRT SB W 2.svgCRT SB W 7.svg
Haixialu 海峡路1.138.0
CRT SB W Huan .svg
CRT SB W 2.svgCRT SB W 8.svg
Xiejiawan 谢家湾      Line 2 2.640.6 Jiulongpo
CRT SB W Huan .svg
CRT SB W 2.svgCRT SB W 9.svg
Olympic Sports Center 奥体中心      Line 18 1.942.5
CRT SB W Huan .svg
CRT SB W 3.svgCRT SB W 0.svg
Chenjiaping 陈家坪1.343.8
CRT SB W Huan .svg
CRT SB W 3.svgCRT SB W 1.svg
Caiyunhu 彩云湖2.045.8
CRT SB W Huan .svg
CRT SB W 3.svgCRT SB W 2.svg
Erlang 二郎1.747.5
CRT SB W Huan .svg
CRT SB W 3.svgCRT SB W 3.svg
Hualong 华龙1.749.2
↓ Loop towards Chongqing West
  1. The former translation is South Square of Chongqingbei Railway Station, which has been replaced since the opening of Line 10's station

Accident

On January 8, 2019, a train accident occurred in the tunnel between Haixialu and Nanhu where a train (000141-000146) struck an unsecured and improperly opened civil defense blast door. As a result, one person was killed and three people were injured. [9] Two cars (000141 and 000142) have been out of service ever since the incident and stored in CRRC Chongqing Changchun Vehicle separately.

References

  1. "Construction progress of Chongqing Metro Loop line". www.cqmetro.cn.
  2. "轨道交通4号线、5号线、10号线和环线 明年部分线路有望建成通车". May 17, 2016.
  3. "招标公告 - 重庆城市交通开发投资(集团)有限公司". www.cqjtkt.cn. Retrieved 2021-01-20.
  4. 1 2 "重庆又有两段轨道开通:1号线尖璧段、环线西南半环". 2019-12-30.
  5. "重庆轨道交通环线东北半环、4号线一期开通试运营". 2018-12-29.
  6. "好消息!环线海峡路至二郎段进入不载客试运行阶段". 2019-09-18. Archived from the original on November 13, 2019.
  7. "重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告". 2020-08-21. Archived from the original on 2020-08-30.
  8. 1 2 "重庆轨道交通4座车站于12月1日更名". 2019-11-30.
  9. "The train accident on Chongqing Metro Loop Line".