Reading Southern railway station

Last updated

Reading Southern
Reading station 1865.jpg
A view of stations at Reading, circa 1865–70, with the SER station on the left, and the GWR station at higher level on the right
General information
Location Reading, Reading
England
Coordinates 51°27′30″N0°58′12″W / 51.4582°N 0.9701°W / 51.4582; -0.9701
Grid reference SU716737
Platforms4
Other information
StatusDisused
History
Original company South Eastern Railway
Pre-grouping South Eastern and Chatham Railway
Post-grouping Southern Railway
Key dates
4 July 1849 (1849-07-04)Temporary station opened
30 August 1855Permanent station opened (as Reading)
9 July 1856LSWR services commence
1 January 1939Electrified
26 September 1949Renamed Reading South
11 September 1961Renamed Reading Southern
6 September 1965Closed to passengers
September 1970Closed to goods

Reading Southern railway station is a former railway station in Reading, Berkshire, England, located to the south of Reading General station on the Great Western main line.

Contents

It was opened in 1855 by the South Eastern Railway's route from Redhill, connecting Reading with south coast towns like Brighton and Dover. It also became the terminus of the outer suburban Waterloo to Reading line from London Waterloo station. The station closed to passengers in 1965 when services were diverted to the former Great Western station, and the site was later cleared.

History

Construction and early years

The original route of the South Eastern Railway (SER) was from London Bridge station to Dover, which took a route through Redhill so that several companies could share the same lines and engineering (including a substantial tunnel) through the North Downs. [1] [2] The line from Reading to Redhill was built by the Reading, Guildford and Reigate Railway (RG&RR), and was opened in 1849: the section from Reading to Farnborough was opened on 4 July 1849, [3] [4] with the last section being opened on 15 October. [5] [6] From the start, the RG&RR was worked by the SER, [3] which leased it from 16 July 1846, [4] and absorbed it in 1852. [7] [3] When the first section of line opened, the SER trains served a temporary station north of Reading's Forbury Road before moving into a permanent terminal, about 275 metres (300 yd) west, on 30 August 1855. [8]

Reading had been served by the Great Western Railway (GWR) since 1840. The competing 1855 SER station was west of Vastern Road, on the corner of Blagrave Street and Station Road, adjacent to but south-east of the GWR station, [9] and at a lower level.

The Staines, Wokingham & Woking Junction Railway (SW&WJR) opened a line between the existing London to Windsor line station of Staines in Middlesex (today in northern Surrey) and Wokingham in Berkshire on 9 July 1856; the SW&WJR was worked by the London and South Western Railway (LSWR), and they were authorised to run over the SER into Reading. [10] [11] In this way Reading gained a service into London Waterloo station. The SW&WJR was absorbed by the LSWR in 1878. [11]

The original station did not last long, since it was destroyed by fire in 1859 after being struck by lightning. [12] A replacement was built, which had two platform faces; it was enlarged in 1896 by the provision of two more faces following the resiting of the locomotive shed. [12]

At the opening, there were four trains a day to Redhill (then known as Reigate Junction), two of which continued to Tonbridge; a through service to London Bridge began in 1852, and in 1853, two more were added. [4] [13]

The middle period

A 1909 Railway Clearing House map of railways in the vicinity of Reading Southern (shown here as S.E.& C. STA.) Bere Alston, Reading & Wokingham RJD 64.jpg
A 1909 Railway Clearing House map of railways in the vicinity of Reading Southern (shown here as S.E.& C. STA.)

In 1899 the South Eastern Railway handed over its operations to a new organisation co-owned with the London, Chatham and Dover Railway (LCDR), which traded as the South Eastern and Chatham Railway (SE&CR); the line and station continued to be owned and maintained by the SER. [14] In 1923, the LSWR and SER amalgamated, together with other railways including the LCDR (and thus the SE&CR), to form the Southern Railway (SR), which assumed complete control of Reading station and its approaches. [15]

In 1900, there were ten trains each weekday from Waterloo to Reading; by 1914 there were 14, and in 1922, 18. [16] The services tended to be irregular, until the electrification of the inner suburban lines from Waterloo during 1915–16 brought a clock-face pattern to those services, in order to make it easy for people who did not understand timetables; the steam-hauled services, such as those to Reading, had to fit in (there were eight electric trains per hour on the Reading line as far as Barnes) and so became more regular. [17] [18]

During the Dunkirk evacuation (27 May-4 June 1940), 293 special trains arrived at Reading from the Channel ports, most of which were handed over to the GWR. [19]

After the War, there was only one train from Reading to London via the SER route, the 7.27am to London Bridge, which arrived at 9.49, and the 5.25pm return, arriving back at Reading at 7.59. Three coaches sufficed between Reading and Redhill; but by 1960, six were required. The locomotive was normally a Schools class 4-4-0 based at Redhill. [20]

At Nationalisation, the Southern Railway effectively became the Southern Region of British Railways, [21] and things continued more or less as before; but the station (originally named simply Reading) was renamed Reading South on 26 September 1949, [8] to distinguish it from the adjacent Western Region (ex-GWR) station (which became Reading General at the same time). [22]

Later years and closure

Reading Southern station, with U class 2-6-0 No. 31616 from Redhill 1962 Reading Southern station, with steam train from Redhill geograph-2638092-by-Ben-Brooksbank.jpg
Reading Southern station, with U class 2-6-0 No. 31616 from Redhill 1962
The 1989 concourse of Reading railway station now occupies the site of the SER station Reading railway station MMB 01.jpg
The 1989 concourse of Reading railway station now occupies the site of the SER station

Reading South was renamed again on 11 September 1961, becoming Reading Southern. [8] The station remained independent of Reading General for several years following Nationalisation, but was transferred to Western Region control in March 1965; within a few months the two stations shared a common station manager. Soon the new management decided to spend £250,000 on improvements at Reading General, which included works to divert the Waterloo and Guildford services into the latter station, which would allow the Southern station to be closed. [23] [24]

In the station's final arrangement, there were four platforms; [9] [25] east of Vastern Road were a locomotive depot on the north side of the line, and a goods shed and sidings on the south side. [26]

The passenger station was closed on 6 September 1965, [8] with services being diverted into Reading General; most (including all the electric services) then used a newly built platform 4A at the latter station, [12] which was long enough for an eight-coach train. [24] It was intended that the non-electric (Guildford line) services would use the older platforms at Reading General; [24] but in practice, these used platform 4A as well. [23] Freight continued to be handled until September 1970, when all goods services were withdrawn except for the Huntley & Palmers biscuit traffic, which lasted until April 1979. [12]

After demolition the site of the passenger station was used as a car park for Reading General. In 1989 a new concourse for Reading station was built on the site, and no trace now remains of the former SER station.

Connections between the SER and GWR routes

The first connection, 71 chains (1,400 m) in length, was laid in from some sidings on the north side of the GWR line, burrowing under that line, connecting with the SER line facing east; none of it was owned by the SER: the LSWR owned the easternmost 9 chains (180 m) and the GWR the remainder. It connected into the GWR main line to the west of the station, and since there were no platforms on the connection, it was primarily used for goods trains, being first used on 1 December 1858. [10]

A second connection was built to the west of the first one, and was opened on 17 December 1899. This was quite steep. [25]

A third connection to the east of the previous two was opened on 26 May 1941, and like the second allowed trains stopping in the GWR station to run to or from the SER line. [25]

When the SER station closed in 1965, the connection built in 1899 was relaid to allow the services over the former SER line to run into the newly built Platform 4A at Reading General. [25]

Locomotive depot

The yard and turntable at the approach to Reading South in 1952 Approaches to Reading South, 1952 - geograph.org.uk - 4825560.jpg
The yard and turntable at the approach to Reading South in 1952

The SER built an engine shed adjacent to the station in 1852. It was replaced by another structure in 1875, and re-roofed in the early 1950s. Like the station, it closed in 1965. [27]

The 1875 depot was constructed on the north side of the line, situated to the east of Vastern Road between the SER and GWR lines. It had a brick-built shed, with three tracks, one of which was used by the LSWR. [28] The 45-foot (14 m) turntable was replaced in 1926 by one of 65 feet (20 m) diameter. [29] On 15 October 1898, the SER had 22 locomotives allocated to Reading. [30] Normally, about twenty locomotives were based at Reading; the allocation fell from 22 to 17 upon electrification in 1939. [28] Locomotive classes allocated in 1950 were mostly ex-SECR types: they included eight 2-6-0s of the SR U class; seven 4-4-0s, mostly of the SECR D class; and two 0-6-0T shunting engines of the SECR R1 class. The duties of the two tank engines included piloting the station, shunting the goods yard and banking goods trains up to Earley. [31] Following Nationalisation, the code 70E was allotted to Reading depot in 1950, which it retained until 1959, when it became a sub-shed of Basingstoke. [32] The depot was reduced in importance in May 1954, when most of the locomotives were transferred away leaving just two shunting engines, but complete closure did not occur until January 1965. [28] [32]

Electrification

A 2-BIL unit. Trains of this type were built for Reading-Waterloo services BR Class 401 2-BIL EMU no. 2090, London Waterloo, 22 November 1986.jpg
A 2-BIL unit. Trains of this type were built for Reading-Waterloo services

Since 1903 the Southern Railway and its constituents had pursued a policy of electrification, which began with the routes closest to the London termini and gradually worked outwards. [33] On the LSWR's Waterloo to Reading Line, electric trains had reached Wandsworth Town on 25 October 1915 and Twickenham on 30 January 1916; Hounslow was reached (the Hounslow Loop Line) on 12 March 1916. [34] The policy was continued by the Southern Railway from 1923, [35] and on 6 July 1930, electrification was extended to Windsor, which included the Reading line as far as Staines. [36] Electric trains reached Virginia Water on 3 January 1937, [37] and in that year, several electrification schemes were proposed by the Southern Railway, which included the route from Virginia Water to Reading. [38] As part of these works, new berthing sidings were provided at Reading. [39] The electric service from Waterloo to Reading was introduced on 1 January 1939; [40] [41] [39] trains were every 20 minutes at peak times and every 30 minutes off-peak and on Sundays. [40] [41] Most trains ran non-stop between Waterloo and Staines, [41] and on the outward journey they divided at Ascot (with one portion continuing to Guildford via Aldershot), whilst on the London-bound trip, the two portions would be combined again at Ascot. [40] The total journey time from Waterloo to Reading was reduced from 90 minutes to 75. [40] [41]

New electric trains were built for these services, which consisted of two-coach units; up to four units could be coupled to make a train of up to eight coaches. [40] Each coach of a unit had the seating in compartments, flanked by a driving cab at one end and a lavatory at the other, and there was a side corridor (although there were no gangway connections between the coaches); this was to allow the passengers access to the lavatory. One of the coaches had both first- and third-class compartments, and seated 24 in first-class and 32 in third; the other coach had only third-class, seating 52, but also had a brake section for the guard and luggage, together with the traction motors. [42] [43] The units were known as the "2-BIL" type. [44]

The electric trains bore headcodes to inform both passengers and staff of the route, origin and destination of the train, but not necessarily the direction. Several were used: for example, in March 1939, trains running between Waterloo and Reading bore number 27 if running via Brentford, or 28 if running via Richmond. [45] The main codes remained unchanged for several years but there were occasional amendments particularly for special trains; in the 1950s, specials between Reading and Ascot were no. 18, [46] and in 1961, specials between Reading and Bognor or Littlehampton were no. 41 if running via Ascot, Aldershot, Guildford and Havant; or 42 if via Chertsey, Worplesdon and Havant. [47] If the train was equipped to show only letters as headcodes instead of numbers, letter L was used for all services between Reading and Ascot or Waterloo, sometimes with two dots or a bar above the letter to denote different destinations or routes. [46]

The sidings at Reading were used to stable electric trains overnight and at off-peak hours; for example, in Summer 1955, six 2-BIL units would be left in the sidings overnight. [48]

Dieselisation

A "tadpole" unit, narrow end toward camera. This is at platform 4B (now platform 5) of the present Reading railway station; the car park on the left occupies the site of Reading Southern railway station. Diesel-electric unit at Reading - geograph.org.uk - 531938.jpg
A "tadpole" unit, narrow end toward camera. This is at platform 4B (now platform 5) of the present Reading railway station; the car park on the left occupies the site of Reading Southern railway station.

Unlike the line to Waterloo via Bracknell, the North Downs Line to Redhill was not electrified beyond Wokingham, apart from short stretches shared with other routes. The first Beeching report recommended curtailing the passenger service at Guildford and the closure of all stations between Shalford and Betchworth inclusive. [49] [50] The second Beeching report recommended that the whole of the North Downs Line should be developed as a trunk route for freight services. [51] The passenger service along the entire line was however reprieved, provided that costs could be reduced. The steam-hauled services were to be withdrawn, but money was not available for new Diesel trains. Instead, in 1964, six three-car trains were provided by putting together spare coaches from elsewhere on the network: twelve came from disbanded 6-S units on the Hastings line, six of which had Diesel engines and driving cabs; there were also six driving trailers from 2-EPB electric trains available. One coach of each type was coupled together to form a three-car unit; these were officially designated the 3-R units, but were popularly known as "tadpoles" because the former EMU driving trailer was noticeably wider than the two Hastings coaches. [52] [53]

The Diesel service was introduced between Reading and Tonbridge on 4 January 1965. The Redhill line timetable was totally recast; there was no longer a London service, and most services now ran all the way to Tonbridge. The service was second-class only, with a normal off-peak service interval of 60 minutes. Most trains consisted of one "tadpole" unit, but a few services were operated using BRCW Type 3 Diesel locomotives hauling three ordinary coaches. [54] [55]

Accidents

On 12 September 1855, a light engine (i.e. an engine running alone, without a train) was sent from Reading to Guildford on the down line, even though it was to travel in the up direction. After running for about a mile, it collided with the 4.40 pm service from London Bridge to Reading, which was running correctly on the down line. The driver of the light engine and four passengers were killed; ten more were seriously injured, and three of those died later in hospital. [56] [57] [58]

Routes

Preceding station Disused railways Following station
Earley   Southern Railway
South Eastern Railway
 Terminus

See also

Notes

  1. Nock 1971, pp. 12–13.
  2. Waters 1990, p. 19.
  3. 1 2 3 Kidner 1982, p. 6.
  4. 1 2 3 Waters 1990, p. 20.
  5. Dendy Marshall & Kidner 1963, p. 289.
  6. Bradley 1985, p. 5.
  7. Nock 1971, p. 20.
  8. 1 2 3 4 Butt 1995, p. 195.
  9. 1 2 Godfrey 1994.
  10. 1 2 Kidner 1982, p. 7.
  11. 1 2 Matthews 2006, p. 32.
  12. 1 2 3 4 Matthews 2006, p. 30.
  13. Kidner 1982, p. 46.
  14. Dendy Marshall & Kidner 1963, p. 355.
  15. Dendy Marshall & Kidner 1963, p. 391.
  16. Faulkner & Williams 1988, p. 208.
  17. Moody 1958, p. 16.
  18. Faulkner & Williams 1988, p. 169.
  19. Kidner 1982, p. 25.
  20. Kidner 1982, pp. 52, 54, 55.
  21. Dendy Marshall & Kidner 1963, p. 456.
  22. Matthews 2006, pp. 29, 30.
  23. 1 2 Kidner 1982, p. 27.
  24. 1 2 3 Cooke 1965b, Reading General to take Southern's trains, p. 357.
  25. 1 2 3 4 Kidner 1982, p. 20.
  26. Kidner 1982, p. 19.
  27. Griffiths & Smith 1999, p. 40.
  28. 1 2 3 Hawkins & Reeve 1979, p. 68.
  29. Waters 1990, p. 91.
  30. Bradley 1985, p. 224.
  31. Bradley 1985, p. 201.
  32. 1 2 Bolger 1983, p. 15.
  33. Moody 1958, pp. 1, 4, 6, 13, 19, 22, 42, 48.
  34. Moody 1958, p. 14.
  35. Moody 1958, pp. 22, 42.
  36. Moody 1958, p. 42.
  37. Moody 1958, p. 65.
  38. Moody 1958, pp. 63–64.
  39. 1 2 Kidner 1982, p. 51.
  40. 1 2 3 4 5 Willox 1939, Southern Electrification at Reading, p. 151.
  41. 1 2 3 4 Moody 1958, p. 75.
  42. Moody 1958, pp. 101–102.
  43. Waterer 1998, pp. 66, 68, 80.
  44. Moody 1958, p. 101.
  45. Waterer 1998, p. 55.
  46. 1 2 Waterer 1998, p. 45.
  47. Bailey 1999, p. 40.
  48. Waterer 1998, p. 78.
  49. Beeching 1963a, pp. 107, 110–113, 119.
  50. Beeching 1963b, map 9.
  51. Beeching 1965, pp. 74–80.
  52. Haresnape 1986, pp. 26–28.
  53. Kidner 1982, p. 64,71.
  54. Cooke 1965a, Reading-Tonbridge line dieselisation, p. 51.
  55. Kidner 1982, pp. 56, 63.
  56. Tyler 1855.
  57. Bradley 1985, pp. 71–72.
  58. Waters 1990, pp. 20–21.

Related Research Articles

<span class="mw-page-title-main">London and South Western Railway</span> British pre-grouping railway company

The London and South Western Railway was a railway company in England from 1838 to 1922. Originating as the London and Southampton Railway, its network extended to Dorchester and Weymouth, to Salisbury, Exeter and Plymouth, and to Padstow, Ilfracombe and Bude. It developed a network of routes in Hampshire, Surrey and Berkshire, including Portsmouth and Reading.

<span class="mw-page-title-main">Southern Railway (UK)</span> British "Big 4" railway company, active 1923–1947

The Southern Railway (SR), sometimes shortened to 'Southern', was a British railway company established in the 1923 Grouping. It linked London with the Channel ports, South West England, South coast resorts and Kent. The railway was formed by the amalgamation of several smaller railway companies, the largest of which were the London and South Western Railway (LSWR), the London, Brighton and South Coast Railway (LB&SCR) and the South Eastern and Chatham Railway (SE&CR). The construction of what was to become the Southern Railway began in 1838 with the opening of the London and Southampton Railway, which was renamed the London & South Western Railway.

<span class="mw-page-title-main">Earley railway station</span> Railway station serving Earley, Berkshire, England

Earley railway station serves the Berkshire town of Earley, England. It is 66 miles 1 chain down the line from London Charing Cross via Redhill. It is on the Waterloo to Reading Line, and forms the last stop before the terminus of the line at Reading.

<span class="mw-page-title-main">Raynes Park railway station</span> National Rail station in London, England

Raynes Park railway station serves the district of Raynes Park in the London Borough of Merton. It is 8 miles 51 chains (13.9 km) south-west of London Waterloo and is situated between Wimbledon and New Malden on the South West Main Line. The next station along on the Mole Valley branch line is Motspur Park.

<span class="mw-page-title-main">Wokingham railway station</span> Railway station serving the town of Wokingham, Berkshire, England

Wokingham railway station serves the market town of Wokingham in Berkshire, England. It is 62 miles 8 chains down the line from London Charing Cross via Redhill. It is at the junction of the Waterloo–Reading line with the North Downs Line.

<span class="mw-page-title-main">Guildford railway station</span> Railway station in Surrey, England

Guildford railway station is at one of three main railway junctions on the Portsmouth Direct Line and serves the town of Guildford in Surrey, England. It is 30 miles 27 chains down the line from London Waterloo via Woking.

<span class="mw-page-title-main">North Downs Line</span> Railway line in southern England

The North Downs Line is a railway line in South East England. It runs for 41 miles 40 chains (66.8 km) from Reading in Berkshire to Redhill in Surrey. It is named after the North Downs, a range of chalk hills that runs parallel to the eastern part of the route. The name was introduced in 1989 by Network SouthEast, the then operator. The North Downs Line serves the settlements in the Blackwater Valley as well as the towns of Guildford, Dorking and Reigate. It acts as an orbital route around the south and southwest of London and has direct connections to the Great Western Main Line at Reading, the Waterloo-Reading line at Wokingham, the Alton line at Ash, the Portsmouth Direct Line at Guildford and the Brighton Main Line at Redhill.

<span class="mw-page-title-main">Redhill railway station</span> Railway station in Surrey, England

Redhill railway station serves the town of Redhill, Surrey, England. The station is a major interchange point on the Brighton Main Line, 22 miles 40 chains (36.2 km) measured from London Charing Cross. It is managed by Southern, and is also served by Thameslink and Great Western Railway.

<span class="mw-page-title-main">South Eastern Main Line</span> Major long-distance railway line in south-east England

The South Eastern Main Line is a major long-distance railway route in South East England, UK, one of the three main routes crossing the county of Kent, going via Sevenoaks, Tonbridge, Ashford and Folkestone to Dover. The other routes are the Chatham Main Line which runs along the north Kent coast to Ramsgate or Dover via Chatham and High Speed 1 which runs through the centre of Kent to the coast at Folkestone where it joins the Channel Tunnel.

<span class="mw-page-title-main">LSWR M7 class</span> Class of 105 two-cylinder 0-4-4T locomotives

The LSWR M7 class is a class of 0-4-4T passenger tank locomotive built between 1897 and 1911. The class was designed by Dugald Drummond for use on the intensive London network of the London and South Western Railway (LSWR), and performed well in such tasks. Because of their utility, 105 were built and the class went through several modifications over five production batches. For this reason there were detail variations such as frame length. Many of the class were fitted with push-pull operation gear that enabled efficient use on branch line duties without the need to change to the other end of its train at the end of a journey.

The Southern Region was a region of British Railways from 1948 until 1992 when railways were re-privatised. The region ceased to be an operating unit in its own right in the 1980s. The region covered south London, southern England and the south coast, including the busy commuter belt areas of Kent, Sussex and Surrey. The region was largely based upon the former Southern Railway area.

<span class="mw-page-title-main">Redhill–Tonbridge line</span> Railway line in South East England

The Redhill–Tonbridge line is a 19-mile-56-chain (31.70 km) railway line in South East England. It runs from the Brighton Main Line at Redhill in Surrey to the South Eastern Main Line at Tonbridge in Kent. There are five intermediate stations: Nutfield, Godstone, Edenbridge, Penshurst and Leigh. All passenger services run as all-stations shuttles between Redhill and Tonbridge, and are operated by Southern using Class 377 electric multiple units.

<span class="mw-page-title-main">New Guildford line</span>

The New Guildford line, presently operated by South Western Railway, is a commuter line between London Waterloo and Guildford. It branches off the South West Main Line at Hampton Court Junction, just south-west of Surbiton. On timetables, trains on this route are advertised as going to Guildford via Cobham.

<span class="mw-page-title-main">Shepperton branch line</span> Railway line in southeast England

The Shepperton branch line is a 6 mi 51 ch (10.7 km) railway branch line in Surrey and Greater London, England. It runs from its western terminus at Shepperton to a triangular junction with the Kingston loop line east of Fulwell. There are intermediate stations at Upper Halliford, Sunbury and Hampton. The branch also serves a dedicated station at Kempton Park racecourse. All six stations are managed by South Western Railway, which operates all passenger trains. Most services run between Shepperton and London Waterloo via Kingston, but during peak periods some run via Twickenham.

<span class="mw-page-title-main">St Leonards West Marina railway station</span> Disused railway station in East Sussex, England

St Leonards West Marina is a disused railway station in the Bopeep area of the borough of Hastings, East Sussex. Opened by the Brighton, Lewes and Hastings Railway in 1846, it was the first permanent station to serve the area and became part of a feud between two rival railway companies over access to nearby Hastings. Although not very convenient for local services, the station became an important goods rail-head and the location of a Motive Power Depot for steam locomotives working non electrified services, including those to London. The station was closed in 1967 and the buildings subsequently demolished, although in 2023 the down platform could still be seen.

<span class="mw-page-title-main">LSWR suburban lines</span>

This article deals with the development of the London suburban railway lines of the London and South Western Railway (LSWR). For the wider view of the LSWR in general, see London and South Western Railway.

<span class="mw-page-title-main">Portsmouth and Ryde Joint Railway</span>

The Portsmouth and Ryde Joint Railway was a group of three railway lines in Southern England that were jointly owned and operated by the London and South Western Railway and the London, Brighton and South Coast Railway. The main line was between Cosham and Portsmouth Harbour; there was a branch from Fratton to East Southsea; and a line between Ryde Pier Head and Ryde St John's Road. The last-named section was isolated from the others, being on the Isle of Wight. The first section of line opened in 1847 and the last in 1885; the Southsea branch closed in 1914 but all of the other routes have since been electrified and remain open.

<span class="mw-page-title-main">Electrification of the London and South Western Railway</span> Electrification of a railway

The electrification of the LSWR refers to the installation of electric traction on the London and South Western Railway surface network, and its successor the Western Section of the Southern Railway, in England. The LSWR started a programme of electrification in response to rising costs and loss of traffic to street tramways; the first installation was to Kingston, Richmond, Hounslow, Hampton Court and Shepperton, starting in 1917. The third rail DC system was used, as it was assessed to be considerably cheaper to install and maintain than the overhead systems then in use. The rolling stock was constructed by the conversion of relatively new coaches built for suburban steam-hauled operation. The LSWR generated its own electric power at a new power station near Wimbledon. A frequent regular-interval timetable was implemented and the system was a considerable success.

<span class="mw-page-title-main">Windsor lines of the London and South Western Railway</span> Railways in south-west London, England

The Windsor lines of the London and South Western Railway ran from Waterloo to Windsor via Richmond, with a loop via Hounslow. They started as the Richmond Railway, a simple independent branch line, but they developed a distinct identity and had their own approach to Waterloo alongside the Main Lines, and a distinct section of Waterloo station. The Richmond Railway was extended to Windsor by the Windsor, Staines, and South Western Railway; the company built a loop line via Hounslow in addition. Both independent companies were absorbed into the LSWR.

<span class="mw-page-title-main">Ascot lines of the London and South Western Railway</span>

The Ascot lines of the London and South Western Railway were formed of a line from Staines to Wokingham, and another from Ascot to Aldershot East Junction. The London and South Western Railway was operating trains from London to Staines and Windsor in 1850. An independent but friendly railway company, the Staines, Woking and Wokingham Junction Railway built a line from Staines to Wokingham, where it connected with the Reading, Guildford and Reigate Junction Railway. The Staines company had running powers giving it access to Reading. It never built the Woking part of the network in its title. The opening of the line in 1856 gave the LSWR the opportunity to run throughout from London to Reading

References

Further reading