Royal Border Bridge

Last updated

Royal Border Bridge
Berwick-upon-Tweed, The Royal Border Bridge - geograph.org.uk - 2941068.jpg
Royal Border Bridge, showing 20 of the bridge's 28 arches.
Coordinates 55°46′19″N2°00′50″W / 55.772°N 2.014°W / 55.772; -2.014 Coordinates: 55°46′19″N2°00′50″W / 55.772°N 2.014°W / 55.772; -2.014
Carries Railway
Crosses River Tweed
LocaleNorthumberland
Heritage statusGrade I listed
Characteristics
MaterialBrick, faced with stone
Total length659 metres (2,162 ft)
No. of spans28
History
Designer Robert Stephenson
Construction start1847
Construction end1850
Location
Royal Border Bridge

The Royal Border Bridge spans the River Tweed between Berwick-upon-Tweed and Tweedmouth in Northumberland, England. It is a Grade I listed railway viaduct built between 1847 and 1850, when it was opened by Queen Victoria. It was designed by Robert Stephenson (son of railway pioneer George Stephenson). It was built for the York, Newcastle and Berwick Railway and is still in regular use today, as part of the East Coast Main Line. Despite its name, the bridge does not in fact span the border between England and Scotland, which is approximately three miles further north.

Contents

The bridge is 659 metres (2,162 ft) long and constructed in stone except for brick soffits to the arches. It has 28 arches, each spanning 60 feet (18 m). The railway is carried 37 metres (121 ft) above the river level. [1] During 1989, it was electrified as a part of the wider East Coast Main Line electrification scheme. [2] Between 1993 and 1996, the structure underwent significant repair work for the first time in a Railtrack-led project, which was partially funded by English Heritage.

Construction

The Royal Border Bridge has its origins in the ambitions of Newcastle and Berwick Railway (N&BR) company, which was formed in 1845 under the control of the prolific railway financier and politician George Hudson. [3] Almost immediately following its founding, the N&BR's proposed line was authorised by an Act of Parliament and construction work had commenced by July 1845. While much of the line was completed within two years of this date, work upon several major structures, including the Royal Border Bridge, had barely begun. [3]

In order to construct the line along the surveyed route, the completion of several major structures, such as the High Level Bridge in Newcastle and the Royal Border Bridge itself, was necessary to traverse terrain features. In the case of the Royal Border Bridge, it was required to take the line over the River Tweed at a site close to the town of Berwick-upon-Tweed, Northumberland. [3] During 1847, Hudson was instrumental in the merger of the N&BR with another of his business interests, the York and Newcastle Railway (Y&NR) to form the York, Newcastle and Berwick Railway (YN&BR). This combined entity sought to complete a continuous line between the British capital cities of London and Edinburgh. [3]

The company's chief engineer, and thus the individual most crucial to the completion of the desired line, was the noted railway engineer Robert Stephenson, who was the son of the railway pioneer George Stephenson. [3] Regardless of Stephenson's presence at the YN&BR, the majority of the planning and engineering was undertaken by the civil engineer Thomas Elliot Harrison, albeit this work was performed under Stephenson's supervision. In particular, Stephenson typically played a hands-on role in the design of the key bridges along the envisioned route, although some of the detailed work was commonly performed by other figures as well. [3]

The viaduct, which is constructed on a gentle curve, was a conventional masonry structure. [2] It consists of 28 arches, 15 of which being over land to the south of the River Tweed and 13 over the river itself; these were set out in two groups separated by a stop pier. [3] Masonry is used throughout the structure, which is complete with brickwork soffits that form the arches' undersides, and covered by stone cladding. The greatest height of the structure is 38.4 metres, which is located at the deepest point of the riverbed below. [3] Possessing a total length of 658 metres, each of the bridge's over-arch spans measures 18.6 metres. The contract for the bridge's construction pertained to a one-mile length of the route; the non-masonry sections consist of earth embankments. [3]

On 15 May 1847, the foundation stone for what would become the Royal Border Bridge, which was then simply referred to as the Tweed Viaduct, was laid. [2] The Cumberland-based construction firm McKay & Blackstock were appointed to built the structure, while the civil engineer George Barclay Bruce, a former apprentice of Stephenson's, was selected to serve as the resident engineer, being responsible overseeing the day-to-day work at the site. [2] Reportedly, the construction of the Royal Border Bridge consumed 8 million cubic feet (227,000 cubic metres) of stone; the inner part of the arches alone required 2.5 million bricks. [2] Many of the same techniques that had been employed in the construction of Newcastle's High Level Bridge were shared with this structure as well. At the height of construction activity, the workforce is believed to have involved upwards of 2,700 men. [2]

During the designing of the structure, particular attention was paid to the foundations of the bridge. [3] Firmly anchoring the bridge involved the driving of many piles into the bedrock, which could be reached only by going through roughly 12 metres of dense gravel above; this task was considerably aided by the application of a patented Nasmyth steam-powered pile driver. In order to control and effectively drain away water at the site, several deep cofferdams were constructed which, along with several steam-driven pumps, worked together to keep out the water. [3] [2]

The first elements of the structure to be completed were the 15 land arches, along with the stop pier; during the construction of the remaining arches, this functioned as a buttress. [3] The river piers were deliberately shaped at water level in such a manner that sheets of ice flowing in the river would be broken up on contact with the bridge; this process was aided by the embedding of several iron bars into the masonry for greater strength. This feature was covered by later alterations to the piers, which were performed as a part of measures made to accommodate for an extra rail track. [3]

Operations

While the permanent structure was still under construction, several temporary timber viaducts were deployed and used by early train services, as well as by construction-related traffic. [3] In this fashion, the overall route could be opened without having to wait for the completion of the Royal Border Bridge, somewhat alleviating pressure from investors. This decision proved beneficial as, while the permanent structure had been intended to be completed in July 1849, it was not ready to carry rail traffic until March 1850. [2] On 29 August 1850, the bridge was officially opened in a ceremony officiated by the reigning monarch, Queen Victoria, and Prince Albert; it was at this event that the Queen consented for the structure to be formally named as the Royal Border Bridge. [3] [2]

During 1989, as a part of the East Coast Main Line electrification program, the structure was modified by British Rail to accommodate the installation of electrification gantries. [2] As a consequence of the Royal Border Bridge having been recognised with Grade 1 listed status, the overhead line infrastructure used was specially designed for a reduced visual impact on the bridge and had to be reviewed and approved by the Royal Fine Art Commission prior to its installation. The installation allows for electric traction to traverse the bridge. [2]

After having stood for 143 years as a major part of the East Coast Main Line, the Royal Border Bridge underwent significant maintenance for the first time during 1993. The restoration program, which was largely focused upon repairs to the 15 land based arches, was undertaken as a joint project between the newly founded railway infrastructure maintenance firm Railtrack and English Heritage. [2]

During early 2010, plans were mooted for the installation of a night-time illumination scheme upon the Royal Border Bridge; at the time, this measure was promoted as being a commemoration of the 150th anniversary of the death of Robert Stephenson. [4] Originally meant to be operational by November 2010, weather conditions, particularly ice, damaged underwater cables, delaying the illumination and preventing some lights from functioning. In January 2012, Northumberland County Council filed its application for a permanent lighting system to be installed. [5] During 2016, the bridge was fitted with colour-changing lights; the installation being completed in time for the structure's 160th anniversary. [6] [7]

Royal Border Bridge Panorama.jpg
Royal Border Bridge with 25 of the 28 arches in view
Royal Border Bridge 2009-01-18.jpg
Royal Border Bridge with 27 of the 28 arches in view
Berwick-upon-Tweed Royal Border Bridge.jpg
A panorama from up-river, showing all 28 arches of the Royal Border Bridge over the River Tweed
LNER Train crosses Royal Border Bridge, Berwick.jpg
A Virgin Trains East Coast Service crosses Royal Border Bridge, Berwick upon Tweed

Related Research Articles

<span class="mw-page-title-main">High Level Bridge, River Tyne</span> Road-rail bridge in Tyneside, England

The High Level Bridge is a road and railway bridge spanning the River Tyne between Newcastle upon Tyne and Gateshead in North East England. It is considered the most notable historical engineering work in the city. It was built by the Hawks family from 5,050 tons of iron. George Hawks, Mayor of Gateshead, drove in the last key of the structure on 7 June 1849, and the bridge was officially opened by Queen Victoria later that year.

<span class="mw-page-title-main">Berwick Bridge</span> Bridge in Northumberland

Berwick Bridge, also known as the Old Bridge, spans the River Tweed in Berwick-upon-Tweed, Northumberland, England. The current structure is a Grade I listed stone bridge built between 1611 and 1624.

<span class="mw-page-title-main">Royal Tweed Bridge</span> Bridge in Northumberland

The Royal Tweed Bridge is a road bridge in Berwick-upon-Tweed, Northumberland, England crossing the River Tweed. It was intended to divert traffic from the 17th century Berwick Bridge, and until the 1980s it formed part of the A1 road, the main route from London to Edinburgh. However, the construction of the A1 River Tweed Bridge to the west of Berwick has since reduced the Royal Tweed Bridge's importance.

<span class="mw-page-title-main">Berwick-upon-Tweed railway station</span> Railway station in Northumberland, England

Berwick-upon-Tweed is a railway station on the East Coast Main Line, which runs between London King's Cross and Edinburgh Waverley. The station, situated 67 miles (108 km) north-west of Newcastle, serves the border town of Berwick-upon-Tweed in Northumberland, England. It is owned by Network Rail and managed by London North Eastern Railway.

<span class="mw-page-title-main">Sankey Viaduct</span> Bridge

The Sankey Viaduct is a railway viaduct in North West England. It is a designated Grade I listed building and has been described as being "the earliest major railway viaduct in the world".

<span class="mw-page-title-main">King Edward VII Bridge</span> Bridge in Tyneside

The King Edward VII Bridge is a railway bridge spanning the River Tyne between Newcastle upon Tyne and Gateshead, in North East England. It is a Grade II listed structure. The King Edward VII bridge has been described as “Britain’s last great railway bridge”.

<span class="mw-page-title-main">Newcastle and North Shields Railway</span> Former English railway

The Newcastle & North Shields Railway opened in June 1839 from a temporary terminus in Carliol Square in Newcastle upon Tyne to North Shields. The railway was absorbed by the Newcastle & Berwick Railway in November 1844. The Newcastle & Berwick Railway was itself absorbed by the York, Newcastle and Berwick Railway, and this became part of the North Eastern Railway in 1854.

<span class="mw-page-title-main">Landore Viaduct</span>

The Landore viaduct is a railway viaduct over the Swansea valley and the River Tawe at Landore in south Wales. It provides a link between Swansea city center and the West Wales Line to the South Wales Main Line. The valley crossing provides a panoramic view of Landore, Kilvey Hill, the Liberty Stadium and the Swansea Enterprise Park.

John and Benjamin Green were a father and son who worked in partnership as architects in North East England during the early nineteenth century. John, the father was a civil engineer as well as an architect. Although they did carry out some commissions separately, they were given joint credit for many of their projects, and it is difficult to attribute much of their work to a single individual. In general, John Green worked on civil engineering projects, such as road and rail bridges, whereas Benjamin worked on projects that were more purely architectural. Their work was predominantly church and railway architecture, with a sprinkling of public buildings that includes their masterpiece, Newcastle's Theatre Royal.

<span class="mw-page-title-main">Monkwearmouth Railway Bridge</span> Bridge in Wearside

Monkwearmouth Railway Bridge is a railway bridge built in 1879, crossing the River Wear at Sunderland and Monkwearmouth. The bridge lies adjacent to and upstream of the Wearmouth Road Bridge.

<span class="mw-page-title-main">Victoria Viaduct</span> Bridge in Wearside

Victoria Viaduct, originally known as the Victoria Bridge, is a stone arch rail viaduct spanning the River Wear about 1 mile (1.6 km) south-east of Washington in North East England. It was built as part of the Durham Junction Railway under the supervision of Thomas Elliot Harrison.

<span class="mw-page-title-main">Tweedmouth railway station</span> Disused railway station in Northumberland, England

Tweedmouth railway station was a railway station which served the Tweedmouth area of Berwick-on-Tweed in Northumberland, England. It was located on the East Coast Main Line. As well as a railway station for passengers, it was also the main service yard and goods yard between Newcastle upon Tyne and Edinburgh. Also Tweedmouth station was the terminus for the Tweed Valley Railway line, which connected the East Coast Main Line with the Waverley Line at Newtown St. Boswells. The station lies to the south of the Royal Border Bridge.

The Duns Branch and the Berwickshire Railway together formed a through railway route from Reston, near Berwick-upon-Tweed, to St Boswells in the Scottish Borders. The line was promoted in two stages. The first was from Reston on the Edinburgh to Berwick main line to Duns ; it opened by the North British Railway in 1849.

<span class="mw-page-title-main">Neidpath Viaduct</span> Bridge in Neidpath, Borders

Neidpath Viaduct, occasionally known as the Queen's Bridge, consists of eight stone skew arches and was built to carry the Symington to Peebles branch line of the Caledonian Railway over the River Tweed to the south-west of Neidpath Castle. Now closed to rail traffic the bridge is used as a footpath.

<span class="mw-page-title-main">Kielder Viaduct</span> Bridge in Northumberland

Kielder Viaduct consists of seven semi-circular masonry skew arches and was built in 1862 by the North British Railway to carry the Border Counties Line across marshy land, which following flooding to create Kielder Water, became the place where Deadwater Burn joins Bakethin Reservoir. Now closed to rail traffic, the bridge is currently used as a footpath.

<span class="mw-page-title-main">York, Newcastle and Berwick Railway</span> Former English railway company

The York, Newcastle and Berwick Railway (YN&BR) was an English railway company formed in 1847 by the amalgamation of the York and Newcastle Railway and the Newcastle and Berwick Railway. Both companies were part of the group of business interests controlled by George Hudson, the so-called Railway King. In collaboration with the York and North Midland Railway and other lines he controlled, he planned that the YN&BR would form the major part of a continuous railway between London and Edinburgh. At this stage the London terminal was Euston Square and the route was through Normanton. This was the genesis of the East Coast Main Line, but much remained to be done before the present-day route was formed, and the London terminus was altered to King's Cross.

<span class="mw-page-title-main">River Irwell Railway Bridge</span> Bridge in Manchester, England

The River Irwell Railway Bridge was built for the Liverpool & Manchester Railway (L&MR), the world's first passenger railway which used only steam locomotives and operated as a scheduled service, near Water Street in Manchester, England. The stone railway bridge, built in 1830 by George Stephenson, was part of Liverpool Road railway station. The bridge was designated a Grade I listed building on 20 June 1988.

<span class="mw-page-title-main">Woodroad Viaduct</span>

The Woodroad Viaduct, also known as Bank Viaduct or Templand Viaduct, is a viaduct carrying the Glasgow South Western Line over the Lugar Water at Cumnock in East Ayrshire, Scotland, United Kingdom. Since April 1971, it has been recognised as being a category A listed building.

<span class="mw-page-title-main">Lambley Viaduct</span> Bridge in Northumberland

Lambley Viaduct is a stone bridge across the River South Tyne at Lambley in Northumberland. Formerly a railway bridge, it remains open to pedestrians but one end of the viaduct has been fenced off.

<span class="mw-page-title-main">Wolverton Viaduct</span> Bridge in Milton Keynes, England

Wolverton Viaduct is a railway bridge carrying the West Coast Main Line over the River Great Ouse to the north of Wolverton, part of the City of Milton Keynes, in south-eastern England. Built in 1837 for the London and Birmingham Railway under the supervision of Robert Stephenson, it is one of the largest and most notable structures on the route and is a grade II listed building.

References

  1. Bruce, George Barclay (1851). "Description of the Royal Border Bridge over the River Tweed, on the York, Newcastle and Berwick Railway". Minutes of Proceedings of the Institution of Civil Engineers . 10: 219–44.
  2. 1 2 3 4 5 6 7 8 9 10 11 12 "Royal Border Bridge". Network Rail Virtual Archive. Retrieved 14 April 2013.
  3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 "Royal Border Bridge." engineering-timelines.com, Retrieved: 25 May 2018.
  4. Black, David. "Royal Border Bridge plan lights up tourism hopes." thejournal.co.uk, 4 January 2010.
  5. Daniel, Brian. "Berwick Royal Border Bridge illumination plans submitted." thejournal.co.uk, 6 January 2012.
  6. "Royal Border Bridge Illuminations." visitberwick.com, Retrieved: 25 May 2018.
  7. "Royal Border Bridge Lighting Installation." can.ltd.uk, June 2016.