Scotia Place

Last updated

Scotia Place
Scotia Place.jpg
Scotia Place
Former namesCalgary Event Centre (planning/construction)
Location Calgary, Alberta
Coordinates 51°02′23″N114°03′08″W / 51.03972°N 114.05222°W / 51.03972; -114.05222 (Scotia Place)
Public transit BSicon TRAM.svg CT Red.svg Victoria Park / Stampede
OwnerCity of Calgary
Operator Calgary Sports and Entertainment Corporation
Executive suites52
Capacity Hockey: 18,400 [1]
Construction
Broke groundJuly 22, 2024
Construction costDistrict improvements:$296.9 million
Event Centre Block:$926.4 million
Total:$1.223 billion [2]
Architect Dialog
HOK
Structural engineerEntuitive
Thornton Tomasetti
Main contractors
  • CANA
  • Mortensen
Tenants
Proposed:
Calgary Flames (NHL)
Calgary Wranglers (AHL)
Calgary Hitmen (WHL)
Calgary Roughnecks (NLL)

Scotia Place is an under-construction arena complex in Calgary, Alberta, Canada. It is intended to replace the Scotiabank Saddledome, home of the Calgary Flames of the National Hockey League. [3] Construction began following the groundbreaking on July 22, 2024. [4]

Contents

History

CalgaryNEXT

Scotia Place replaced a 2015 plan called CalgaryNEXT, which would have replaced both the Scotiabank Saddledome and McMahon Stadium for Calgary's professional hockey and Canadian football teams. That proposal included two buildings: a 19,000–20,000 seat events centre [5] to serve as the new home arena of two hockey clubs, the National Hockey League's Calgary Flames, and the Calgary Hitmen of the Western Hockey League, [6] as well as the Calgary Roughnecks lacrosse team; and a 40,000-seat football stadium and fieldhouse [5] for the Canadian Football League's Calgary Stampeders and serve as a public training and activity space. The complex, originally planned to be located in West Village along the Bow River [5] [7] as a "hub of pro and amateur sporting activity." [5]

Immediate reactions to the CalgaryNEXT proposal from local politicians were mixed; they[ who? ] supported the plan to redevelop the West Village area, but many – including Mayor Naheed Nenshi – expressed concern at the proposal, [8] which would potentially have the city initially fund between $440 and $690 million of the projected cost which promoters claimed would be recouped over a long period of time. As part of the proposal, the facilities would be owned by the city and managed by the privately owned Calgary Sports and Entertainment Corporation (CSEC) - thus exempting the land from property taxes - but with the city not receiving any share of the profits.[ citation needed ]

Originally projected as costing $890 million, [5] [7] based on a City of Calgary report released in April 2016 it was estimated that CalgaryNEXT would cost approximately $1.8 billion, with taxpayers paying up to two-thirds of the total. [9] [10]

In April 2017, the Calgary city council voted unanimously to instead support an alternate plan located near the Saddledome. [11]

New proposal

On September 12, 2017, Flames president and chief executive officer Ken King stated that the team was no longer pursuing the CalgaryNEXT arena, as "we've been working for a long time trying to come up with a formula that really works to replace this building and we really put our best foot forward and I’ve come to the conclusion sadly and I'm very disappointed that I don't think we can make a deal that works for us". [12] Mayor Nenshi subsequently proposed a partnership wherein portions of the cost of "plan B" would be covered by the city, and the rest covered by the team ownership and user surcharges. King objected to this proposal. [13]

On July 30, 2019, the Calgary city council approved a $550 million new Event Centre. The new arena was to be located to the north of the Saddledome in the Victoria Park neighbourhood. Construction on the building would have begun in 2021, and have a capacity of around 19,000. Plans for the Event Centre also included the possibility of a smaller arena to replace the Stampede Corral.[ citation needed ] The city of Calgary would have owned the Event Centre while CSEC would have been responsible for the facility's operation and maintenance, keeping all revenue under a 35-year lease agreement, which included a non-relocation clause for the Flames during that period. Had the project went through, The Saddledome would have been demolished after the new arena opened. [14]

On April 14, 2021, the deal for the new arena was put on hold by Calgary city council over budget concerns. [15]

On July 26, 2021, the city announced the cost of the arena had gone from $550 million to $608.5 million. The arena was planned to utilize an "inverted bowl" design which may not have been feasible on the selected piece of land and posed accessibility concerns.[ citation needed ] As the project progressed further into design work, other potential problems were uncovered, resulting in cost overruns. To address these overruns, it was announced that both the City of Calgary and Calgary Sports and Entertainment Corporation would each be putting forward an additional $12.5 million, a clause agreed on in the deal signed in 2019. [16] The Calgary Sports and Entertainment Corporation then agreed to cover any potential future overruns. [16] Additionally, the city announced as part of the updated deal with CSEC that the Calgary Municipal Land Corp (CMLC). would be removed as project manager and replaced with an organization of CSEC's choosing. [16]

On December 22, 2021, the current mayor of Calgary Jyoti Gondek shared on social media that CSEC was pulling out of the deal, citing disagreements in new costs that the city wanted CSEC to cover a portion of. [17] These overruns included infrastructure costs of $12.1 million and climate mitigation costs of $4 million, with the city offering to cover $6.4 million of the total, leaving $9.7 million to be paid by CSEC. [17] These costs were not previously identified as project costs by CMLC or the City nor were they included in the $608.5 million budget from July 2021. [17] Despite this, CSEC stated their intention on remaining in the Saddledome. [17]

Final deal

On April 25, 2023, a press conference was held in regards to an update surrounding the Calgary Events Centre. It was announced that an updated project on the same site, now estimated to cost $1.22 billion, would be moving forward. A planned arena, indoor rink, and indoor and outdoor plazas. [18] The city is to pay $537.3 million up front, with the Flames ownership paying a total of $748.3 million over 35 years (estimated to be $356 million in 2024 dollars) and the province of Alberta paying $330 million over three years to cover a community rink, some infrastructure costs and the demolition of the Saddledome. [19] [20]

On October 5, 2023, the City of Calgary, Province of Alberta, and CSEC announced that they had finalized agreements for the new event centre and district improvements. [3] [21]

On July 22, 2024, the design and final name of the arena, Scotia Place, was announced at a groundbreaking ceremony, with construction beginning shortly after. [4]

Related Research Articles

<span class="mw-page-title-main">1988 Winter Olympics</span> Multi-sport event in Calgary, Canada

The 1988 Winter Olympics, officially known as the XV Olympic Winter Games and commonly known as Calgary 1988, were a multi-sport event held from February 13 to 28, 1988, with Calgary, Alberta as the main host city. This marks the most recent time that two consecutive Olympic Games were hosted in North America .. It was the first Winter Olympic Games to be held for 15 days, like the counterpart Summer Olympic Games. The majority of the events took place in Calgary itself. However, the snow events were shared by Nakiska ski resort in Kananaskis Country at the west of the city and the Canmore Nordic Centre Provincial Park in the town of Canmore.

<span class="mw-page-title-main">Scotiabank Saddledome</span> Multi-use indoor arena in Calgary, Alberta

Scotiabank Saddledome is a multi-use indoor arena in Calgary, Alberta, Canada. Located in Stampede Park in the southeast end of downtown Calgary, the Saddledome was built in 1983 to replace the Stampede Corral as the home of the Calgary Flames of the National Hockey League, and to host ice hockey and figure skating at the 1988 Winter Olympics.

<span class="mw-page-title-main">Northlands Coliseum</span> Indoor arena in Edmonton, Alberta, Canada

Northlands Coliseum is a defunct indoor arena in Edmonton, Alberta, on the north side of Northlands. It was used for sports events and concerts, and was home to the Edmonton Oilers of the World Hockey Association (WHA) and National Hockey League (NHL), and the Edmonton Oil Kings of the Western Hockey League (WHL). The arena opened in 1974, and was later known as Edmonton Coliseum, Skyreach Centre, and Rexall Place, before returning to the Northlands Coliseum name in summer 2016.

<span class="mw-page-title-main">Richmond Olympic Oval</span>

The Richmond Olympic Oval is an indoor multi-sports arena in the Canadian city of Richmond, British Columbia. The oval was built for the 2010 Winter Olympics and was originally configured with a speed skating rink. The venue has since been reconfigured and now serves as a community multi-sport park and includes two ice hockey rinks, two running tracks, a climbing wall, a rowing tank and a flexible area which can be used for, among other sports, basketball, volleyball, indoor soccer and table tennis.

<span class="mw-page-title-main">1983–84 Calgary Flames season</span> NHL team season

The 1983–84 Calgary Flames season was the fourth season in Calgary and 12th for the Flames franchise in the National Hockey League. The Flames finished in second place in the Smythe Division, earning a first round playoff match-up against the Vancouver Canucks. Calgary defeated Vancouver in four games to face the top team in the NHL, the Edmonton Oilers. The Flames took the series to the maximum seven games, ultimately falling to the Oilers in the seventh game by a 7–4 score.

Pengrowth Energy Corporation was a Canadian oil and natural gas company based in Calgary, Alberta. Established in 1988 by Calgary entrepreneur James S Kinnear, it was one of the largest of the Canadian royalty trusts ("Canroys"), with a market capitalization of US$4.12 billion at the end of 2007. Its assets were approximately evenly distributed between oil and natural gas.

The National Hockey League (NHL) has undergone several rounds of expansion and other organizational changes during its history to reach its current thirty-two active teams: twenty-five in the United States, and seven in Canada. The newest additions to the league are the Seattle Kraken in 2021 and the Utah Hockey Club in 2024. The league has also relocated several franchises, most recently in 2011 when the former Atlanta Thrashers became the second and current incarnation of the Winnipeg Jets.

The 2010–11 NHL season was the 94th season of operation of the National Hockey League (NHL). The Boston Bruins defeated the Vancouver Canucks in the Stanley Cup Finals four games to three, being the sixth Cup win in Bruins' franchise history. For the fourth consecutive season, the season started with games in Europe. The 58th All-Star Game was held at RBC Center in Raleigh, North Carolina, home arena of the Carolina Hurricanes, on January 30, 2011.

<span class="mw-page-title-main">Naheed Nenshi</span> Leader of the Alberta NDP since 2024 and Mayor of Calgary from 2010 to 2021

Naheed Kurban Nenshi is a Canadian politician who has been serving as the leader of the Alberta New Democratic Party since being elected to the post on June 22, 2024. He was the 36th mayor of Calgary, Alberta, serving from 2010 to 2021.

<span class="mw-page-title-main">James S. Kinnear</span>

James S. Kinnear is a Canadian entrepreneur and philanthropist. Kinnear was born in Toronto, Ontario, and grew up in Montreal and Toronto.

<span class="mw-page-title-main">Bids for the 1988 Winter Olympics</span>

The selection process for the 1988 Winter Olympics consisted of three bids, and saw Calgary, Alberta, Canada, be selected ahead of Falun, Sweden, and Cortina d'Ampezzo, Italy. The selection was made at the 84th International Olympic Committee (IOC) Session in Baden-Baden, West Germany, on 30 September 1981.

<span class="mw-page-title-main">Rogers Place</span> Multi-use indoor arena in Alberta, Canada

Rogers Place is a multi-use indoor arena in Edmonton, Alberta, Canada. Construction started in March 2014, and the building officially opened on September 8, 2016. The arena has a seating capacity of 18,347 as a hockey venue and 20,734 as a concert venue.

<span class="mw-page-title-main">Place Bell</span> Arena in Laval, Quebec, Canada

Place Bell is a multi-purpose arena in Laval, Quebec, Canada. The complex includes a 10,000-seat main arena, which is the home of the Laval Rocket of the American Hockey League (AHL), and two smaller community ice rinks, one of which has Olympic-size ice. The arena was also home to Les Canadiennes de Montréal for the final season of play in the Canadian Women's Hockey League (CWHL). The arena is hosting select games for Montreal of the Professional Women's Hockey League (PWHL) during the inaugural 2023–24 season.

<span class="mw-page-title-main">New Highmark Stadium</span> Future stadium of the Buffalo Bills

Highmark Stadium is an American football stadium that is under construction in Orchard Park, New York. It will replace the Bills' existing stadium of the same name and is expected to open in time for the 2026 NFL season.

YTL Arena Bristol is a proposed 19,000-capacity indoor arena, to be located at the former Filton Airfield’s Brabazon hangar.

The 2013–14 Calgary Flames season was the 34th season in City of Calgary and 42nd for the Flames franchise in the National Hockey League (NHL). It was the first season of a rebuilding phase, and the first full year following the departure of long-time captain Jarome Iginla and goaltender Miikka Kiprusoff. Mark Giordano replaced Iginla as team captain. The Flames also began the year in a new division as they returned to the Pacific Division following a league-wide realignment. Change continued into the playing season as new team president Brian Burke fired general manager Jay Feaster on December 12, 2013, and assumed the role himself on an interim basis.

The Calgary Sports and Entertainment Corporation (CSEC) is a privately owned professional sports and entertainment company based in Calgary, Alberta, Canada formed in 2012 and owned by N. Murray Edwards, Alvin Libin, Allan Markin, Jeffrey McCaig, Clay Riddell, and Byron Seaman.

The Green Line, also known as Route 203 is an expansion of the light rail (LRT) network in Calgary, Alberta. The Green Line will run between Calgary's north-central and southeastern boundaries, connecting with the Red Line and Blue Line in the city's downtown. The Green Line is the largest public infrastructure project in Calgary's history and will be the first rail line in the city to operate low-floor trains. When completed, the full vision of the Green Line will comprise of 29 stations spanning 46 kilometres (29 mi). This will bring the total number of CTrain stations in Calgary to 74.

Calgary 2026 was an unsuccessful bid for the 2026 Winter Olympics by the city of Calgary, Alberta and the Canadian Olympic Committee. Calgary previously hosted the 1988 Winter Olympics. The bid was withdrawn after a local referendum in which 56.4% of Calgary voters rejected the bid.

<span class="mw-page-title-main">Jyoti Gondek</span> Canadian politician (born 1969)

Prabhjote Kaur "Jyoti" Gondek is a Canadian politician serving as the 37th and current mayor of Calgary since October 25, 2021.

References

  1. Toombs, Aryn. "Ground broken on new Calgary Event Centre, design revealed" . Retrieved July 22, 2024.
  2. "Event Centre Agreements and Financial Contribution". The City of Calgary. Retrieved March 25, 2024.
  3. 1 2 Krause, Darren (October 5, 2023). "Final agreements signed for a new Calgary Event Centre". Livewire Calgary. Retrieved October 22, 2023.
  4. 1 2 Graveland, Bill (July 22, 2024). "Scotia Place name unveiled as work begins on new $800M arena for Calgary Flames". Global News. The Canadian Press. Retrieved July 27, 2024.
  5. 1 2 3 4 5 Wes Gilbertson (August 18, 2015). "No question Calgary pro sports venues are out-of-date". Calgary Sun. Archived from the original on September 6, 2015. Retrieved August 27, 2015.
  6. Lambert, Taylor (August 19, 2015). "New Calgary arena proposal nothing short of brazen". Calgary Herald. Retrieved January 13, 2016.
  7. 1 2 Howell, Trevor (January 12, 2016). "War of words over Flames' CalgaryNEXT proposal not 'useful,' says city manager". Calgary Herald of the Postmedia Network. Retrieved January 13, 2016.
  8. "Statement from Mayor Naheed Nenshi regarding the "CalgaryNext"". Office of the Mayor, City of Calgary. August 18, 2015. Retrieved August 27, 2015.
  9. Howell, Trevor (April 21, 2016). "Flames' CalgaryNEXT proposal could cost $1.8 billion, double original estimate, says city report". Calgary Herald . Retrieved May 19, 2017.
  10. Pike, Helen (December 23, 2016), "Using CalgaryNEXT as part of Olympic bid detrimental to city's chances: Nenshi", Metro, archived from the original on December 24, 2016, retrieved December 23, 2016
  11. Fletcher, Robson (April 24, 2017). "CalgaryNext on life support as council votes unanimously in favour of 'Plan B' near Saddledome". CBC News . Retrieved July 31, 2019.
  12. "King says Flames are no longer pursuing new arena". TSN. September 12, 2017. Retrieved September 13, 2017.
  13. Rumbolt, Ryan (September 15, 2017). "Calgary Flames CEO says city's arena proposal would leave team footing full bill". CBC News. Retrieved September 28, 2017.
  14. "Event Centre". City of Calgary. July 19, 2019. Retrieved July 28, 2021.
  15. Anderson, Drew (April 14, 2021). "Calgary Flames arena deal paused over budget concerns". CBC News. Retrieved April 27, 2021.
  16. 1 2 3 MacVicar, Adam (July 26, 2021). "Calgary events centre: City and CSEC to each cover $12.5M in cost overruns, CMLC out". Global News. Retrieved July 27, 2021.
  17. 1 2 3 4 Smith, Madeline (December 22, 2021). "Calgary Flames owners walk away from arena deal". Calgary Herald. Retrieved December 26, 2021.
  18. "Agreements announced to further develop the Rivers District, anchored by a modern event centre". Agreements announced to further develop the Rivers District, anchored by a modern event centre. Retrieved April 25, 2023.
  19. "Braid: New arena deal is costlier than the original, with province paying for infrastructure and Saddledome demolition". calgaryherald. Retrieved April 25, 2023.
  20. "Scotia Place: Frequently Asked Questions". City of Calgary. Retrieved July 27, 2024.
  21. Development, Planning &. "Calgary's Event Centre and Culture + Entertainment District improvements". City of Calgary. Retrieved October 26, 2023.