South Side Elevated Railroad | |||
---|---|---|---|
Overview | |||
Locale | Chicago, Illinois | ||
Service | |||
Type | Rapid transit | ||
Services | Jackson Park Englewood Normal Park Kenwood Union Stock Yards | ||
Operator(s) | Chicago and South Side Rapid Transit Railroad Company (1892–1897) South Side Elevated Railroad (1897–1924) | ||
History | |||
Opened | June 6, 1892 | ||
Closed | 1924 (merged into Chicago Rapid Transit Company) | ||
Technical | |||
Line length | 1903: 10.7 miles (17.2 km) [1] | ||
Track length | 1903: 19.4 miles (31.2 km) [1] | ||
Character | Elevated | ||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge [2] | ||
Minimum radius | 90 ft (27.43 m) | ||
Electrification | Third rail, 600 V DC | ||
|
The South Side Elevated Railroad (originally Chicago and South Side Rapid Transit Railroad) was the first elevated rapid transit line in Chicago, Illinois. The line ran from downtown Chicago to Jackson Park, with branches to Englewood, Normal Park, Kenwood, and the Union Stock Yards. The first 3.6 miles (5.8 km) of the line opened on June 6, 1892. [3] Much of its route is still used today as part of the Green Line of the Chicago "L" system.
The Chicago and South Side Rapid Transit Railroad Company was incorporated on January 4, 1888, [4] and secured a franchise from the City of Chicago on March 26 of that year to construct an elevated railroad between Van Buren Street and 39th Street (Pershing Road). [5] The franchise required the company to build along a right of way immediately adjacent and parallel to one of the alleys from Van Buren Street to 37th Street, [5] rapidly earning the line the nickname of the "alley L". [6] [7]
In April 1892, the city authorized the extension of the line as far south as 71st street. A further extension along 63rd Street was passed in April 1893. The total cost of construction was estimated at $6,750,000. [5]
A 6-car train carrying 300 guests made the inaugural run along first section of the line—running between a station at 39th Street and the Congress Terminal downtown—on May 27, 1892, [8] and the line opened to the public ten days later. [9] Initially the 3.6-mile (5.8 km) journey from 39th street to downtown took 14 minutes and cost 5¢. [3] The line was gradually extended over the following months, with the route reaching Jackson Park on May 12, 1893 to provide service to the World's Columbian Exposition. [3]
Rolling stock on the line included 46 Forney-type (0-4-4T) steam locomotives that were built at the Baldwin Locomotive Works in Philadelphia, and 180 46-foot (14.02 m)-long wooden passenger cars. [3] [10] The first 20 locomotives were delivered coupled into a single train in April 1892. [11]
The South Side Elevated railroad provided 24-hour service, a major advantage when compared to Chicago's cable railroads, which required daily overnight shutdown for cable maintenance. [12] After midnight, two trains ran on the line, providing service every 20 minutes. In contrast, rush-hour service required 18 trains to maintain a schedule with a 3-minute headway. [12]
When the World's Columbian Exposition closed, lack of development along the southern portion of the route led to plummeting passenger numbers. The Chicago and South Side Rapid Transit Railroad Company went into receivership in 1895 and was sold under foreclosure in September 1896 for $4,100,100. [13] The South Side Elevated Railroad was formed to take over the route in 1897. [3]
Service was extended into the newly built Union Loop in October 1897 connecting the South Side Elevated Railroad with the Lake Street Elevated Railroad, the Metropolitan West Side Elevated Railroad, and (after 1900) the Northwestern Elevated Railroad. [10]
These other companies used third rail electrification to power their trains, so the South Side Elevated Railroad enlisted Frank Julian Sprague to convert its rolling stock to electrical power. Sprague used his previously untested system of multiple-unit train control (MU), where multiple self-powered cars could be linked together and controlled by a single person, making the South Side Elevated Railroad the first in the world to use MU operation. [3] [10]
As ridership increased, the South Side Elevated Railroad constructed additional branches. A 3-mile (4.8 km) branch to Englewood opened in stages between 1905 and 1907. The short 0.9-mile (1.4 km) Normal Park branch opened in 1907. [14] Branches to Kenwood and the Union Stock Yards—both running on tracks owned by the Chicago Junction Railroad—opened in 1907 and 1908 respectively. [15] [16]
In 1913, Chicago's four elevated railroad companies came together to form the Chicago Elevated Railways Collateral Trust establishing crosstown services for the first time. In 1924 all four companies were formally united to form the Chicago Rapid Transit Company. [17] The Chicago Transit Authority took over the assets of the CRT in 1947. The Normal Park branch closed in 1954 [18] and the Kenwood and Stock Yards branches were abandoned in 1957. [19] [20] Most of the rest of the route of the South Side Elevated Railroad continues in service as part of the CTA's Green Line.
The Chicago "L" is the rapid transit system serving the city of Chicago and some of its surrounding suburbs in the U.S. state of Illinois. Operated by the Chicago Transit Authority (CTA), it is the fourth-largest rapid transit system in the United States in terms of total route length, at 102.8 miles (165.4 km) long as of 2014, and the third-busiest rapid transit system in the United States. In 2016, the "L" had 1,492 rail cars, eight different routes, and 145 train stations. In 2023, the system had 117,447,000 rides, or about 350,900 per weekday in the first quarter of 2024.
The Red Line is a rapid transit line in Chicago, run by the Chicago Transit Authority (CTA) as part of the Chicago "L" system. It is the busiest line on the "L" system, with an average of 93,457 passengers boarding each weekday in 2022. The route is 26 miles (42 km) long with a total of 33 stations. It runs elevated from the Howard station in the Rogers Park neighborhood on the North Side, through a subway on the Near North Side, Downtown, and the South Loop, and then through the Dan Ryan Expressway median to 95th/Dan Ryan in the Roseland neighborhood on the South Side.
The Green Line is a rapid transit line in Chicago, Illinois, operated by the Chicago Transit Authority (CTA) as part of the Chicago "L" system. It is the only completely elevated route in the "L" system. All other routes may have various combinations of elevated, subway, street level, or freeway median sections.
51st is a station on the Chicago Transit Authority's "L" system, located in Chicago, Illinois and serving the Green Line. It is situated at 319 E 51st Street, three blocks east of State Street. It opened on August 28, 1892.
The Metropolitan West Side Elevated Railroad was the third elevated rapid transit line to be built in Chicago, Illinois. It was the first of Chicago’s elevated lines to be electrically powered. The main line ran from downtown Chicago to Marshfield Avenue, with branches to Logan Square, Humboldt Park, Garfield Park, and Douglas Park. Portions of the system are still operated as sections of the Blue Line and the Pink Line.
The Northwestern Elevated Railroad was the last of the privately constructed rapid transit lines to be built in Chicago. The line ran from the Loop in downtown Chicago north to Wilson Avenue in Chicago's Uptown neighborhood with a branch to Ravenswood and Albany Park that left the main line at Clark Street. The Ravenswood line is now operated as the Brown Line, while the Main Line is used by the Purple and Red Lines.
29th was a rapid transit station on the Chicago "L"'s South Side main line. Originally constructed by the South Side Elevated Railroad company, it was one of the original ten stations opened on the Chicago "L", beginning service on June 6, 1892. The South Side Elevated Railroad merged operations with three other companies to form Chicago Elevated Railways (CER) in 1911, before merging outright with them in 1924 to form the Chicago Rapid Transit Company (CRT). Public ownership came to the "L" in 1947 with the Chicago Transit Authority (CTA).
The Kenwood branch was a rapid transit line which was part of the Chicago 'L' system from 1907 to 1957. The branch served the Kenwood neighborhood of Chicago and consisted of six elevated stations. It opened on September 20, 1907 and closed on December 1, 1957.
The Metropolitan main line was a rapid transit line of the Chicago "L" system from 1895 to 1958. It ran west from downtown to a junction at Marshfield station. At this point the Garfield Park branch continued westward, while the Douglas Park branch turned south, and the Logan Square branch turned north with the Humboldt Park branch branching from it. In addition to serving the Chicago "L", its tracks and those of the Garfield Park branch also carried the Chicago Aurora and Elgin Railroad, an interurban that served Chicago's western suburbs, between 1905 and 1953.
The South Side Elevated is a branch of the Chicago "L" system in Chicago, Illinois that is served by the Green Line. It has on average 12,509 passengers, counting branch divisions, boarding each weekday as of February 2013, according to the Chicago Transit Authority. The branch is 6.5 miles (10.5 km) long with a total of 8 stations, and runs from the Near South Side to the Washington Park neighborhood of Chicago.
Roosevelt is an "L" station on the CTA's Red, Green, and Orange Lines, located between the Chicago Loop and the Near South Side in Chicago, Illinois. It is situated at 1167 S State Street, just north of Roosevelt Road. The station is also the closest "L" station to the Museum Campus of Chicago and Soldier Field, which are about 1⁄2 mile (800 m) to the east. The Museum Campus/11th Street Metra station is also about 1⁄3 mile (500 m) to the east.
The Stock Yards branch was a rapid transit line which was part of the Chicago 'L' system from 1908 to 1957. The branch served the Union Stock Yards and the Canaryville neighborhood of Chicago and consisted of eight elevated stations. It opened on April 8, 1908, and closed on October 6, 1957.
The Logan Square branch was an elevated rapid transit line of the Chicago "L", where it was one of the branches of the Metropolitan West Side Elevated Railroad. Diverging north from the Metropolitan's main line west of Marshfield station, it opened in 1895 and served Chicago's Logan Square and West Town neighborhoods. North of Damen station, the Humboldt Park branch diverged from the Logan Square branch, going west to serve Humboldt Park. The original Logan Square branch was separated into several sections in 1951, some of which remain in revenue service as of 2023.
The Lake Street Transfer station was a rapid transit station on the Chicago "L", serving as a transfer station between its Lake Street Elevated Railroad and the Logan Square branch of its Metropolitan West Side Elevated Railroad. Located where the Logan Square branch crossed over the Lake Street Elevated, it was in service from 1913 to 1951, when it was rendered obsolete by the opening of the Dearborn Street subway.
Marshfield was a rapid transit station on the Chicago "L" in service between 1895 and 1954. Constructed by the Metropolitan West Side Elevated Railroad, it was the westernmost station of the Metropolitan's main line, which then diverged into three branches. Marshfield was also served by the Aurora Elgin and Chicago Railway (AE&C) and its descendant the Chicago Aurora and Elgin Railroad (CA&E), an interurban, between 1905 and 1953.
Laflin was a rapid transit station operated by the Chicago "L"'s Metropolitan West Side Elevated Railroad and located on its main line. The station existed from 1895 to 1951, when it was closed due to low ridership. The entire main line would soon be demolished for construction of the Eisenhower Expressway and its Congress Line, and the niche served by the Laflin would be filled by an entrance on the new line's Racine station.
Grand was a rapid transit station on the Chicago "L"'s Logan Square branch, one of the several branches of the Metropolitan West Side Elevated Railroad. Located on Grand Avenue, the station was constructed by the Metropolitan in the early 1890s and began service on May 6, 1895.
St. Louis was a rapid transit station on the Chicago "L" between 1895 and 1953. It was constructed by the Metropolitan West Side Elevated Railroad and served its Garfield Park branch. The Chicago Aurora and Elgin Railroad (CA&E), an interurban serving Chicago's western suburbs, also used the Garfield Park branch's tracks in 1905. To accommodate the mixing of the fast interurban and slow "L" service on a two-track line, two crossovers were installed on either side of the St. Louis station to let CA&E trains pass "L" trains in 1911.