Red Line (CTA)

Last updated

Red Line
At Chicago 2024 054.jpg
A Red Line train of 5000-series cars at Garfield station
Overview
StatusOperational
Locale Chicago, Illinois, United States
Termini
Stations33
Service
Type Rapid transit
System Chicago "L"
Operator(s) Chicago Transit Authority
Depot(s) Howard Yard, 98th Yard
Rolling stock 5000-series
8-car trains (typical, maximum)
Daily ridership114,598 (avg. weekday 2024)
History
OpenedOldest section: May 31, 1900;125 years ago (1900-05-31)
Current operation: February 21, 1993;32 years ago (1993-02-21)
Technical
Line length21.8 mi (35.1 km)
Character Embankment, elevated, subway, and expressway median
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification Third rail,  600 V DC
Route map
Red Line (CTA) Red Line highlighted in red
BSicon hCONTg violet.svg
BSicon CCONTgq yellow.svg
BSicon lCSTReq.svg
BSicon STRq yellow.svg
BSicon lhMSTR.svg
BSicon STR violet.svg
BSicon lDSTRaq.svg
BSicon STR+r yellow.svg
BSicon lDSTR+r.svg
BSicon GRZal.svg
BSicon STR violet+GRZq.svg
BSicon lDSTR.svg
BSicon STR yellow+GRZq.svg
BSicon lDSTR.svg
BSicon GRZq.svg
BSicon GRZer.svg
BSicon MASK-c2.svg
BSicon XBHF-L violet.svg
BSicon lINTACC.svg
BSicon lDBHF.svg
BSicon MASK-c3.svg
BSicon KXBHFe-R yellow.svg
BSicon KINTACCa red.svg
BSicon lDBHF.svg
Howard BSicon PARKING.svg
BSicon STR violet.svg
BSicon lDSTR(r).svg
BSicon BHF red.svg
BSicon lDBHF(l).svg
Jarvis
BSicon STR violet.svg
BSicon lDSTR(r).svg
BSicon BHF red.svg
BSicon lDBHF(l).svg
Morse
BSicon STR violet.svg
BSicon lDSTR(r).svg
BSicon ACC red.svg
BSicon lDBHF(l).svg
Loyola
BSicon STR violet.svg
BSicon lDSTR(r).svg
BSicon ACC red.svg
BSicon lDBHF(l).svg
Granville
BSicon STR violet.svg
BSicon lDSTR(r).svg
BSicon BHF red.svg
BSicon lDBHF(l).svg
Thorndale
BSicon STR violet.svg
BSicon lhSTR(r).svg
BSicon ACC red.svg
BSicon lhBHF(l).svg
Bryn Mawr
BSicon STR violet.svg
BSicon lhSTR(r).svg
BSicon ACC red.svg
BSicon lhBHF(l).svg
Berwyn
BSicon STR violet.svg
BSicon lhSTR(r).svg
BSicon ACC red.svg
BSicon lhBHF(l).svg
Argyle
BSicon STR violet.svg
BSicon lhSTR(r).svg
BSicon ACC red.svg
BSicon lhBHF(l).svg
Lawrence
BSicon XBHF-L violet.svg
BSicon lINTACC.svg
BSicon lhBHF(r).svg
BSicon XBHF-R red.svg
BSicon lINTACC.svg
BSicon lhBHF(l).svg
Wilson
BSicon STR violet.svg
BSicon lhSTR(r).svg
BSicon BHF red.svg
BSicon lhBHF(l).svg
Sheridan
BSicon STADIUM.svg
BSicon STR violet.svg
BSicon lhSTR(r).svg
BSicon ACC red.svg
BSicon lhBHF(l).svg
Addison
BSicon hCONTgq brown.svg
BSicon STR violet.svg
BSicon STR+r brown.svg
BSicon tSTR violet.svg
BSicon lhABZg+r(r).svg
BSicon hSTR(l) red.svg
BSicon BHF brown.svg
BSicon tXBHF-L violet.svg
BSicon lINTACC.svg
BSicon lhBHF(r).svg
BSicon XBHF-R red.svg
BSicon lINTACC.svg
BSicon lhBHF(l).svg
Belmont
BSicon BHF brown.svg
BSicon tACC violet.svg
BSicon lhBHF(r).svg
BSicon hSTR(l) red.svg
BSicon BHF brown.svg
BSicon tACC violet.svg
BSicon lhBHF(r).svg
BSicon hSTR(l) red.svg
BSicon BHF brown.svg
BSicon tXBHF-L violet.svg
BSicon lINTACC.svg
BSicon lhBHF(r).svg
BSicon XBHF-R red.svg
BSicon lINTACC.svg
BSicon lhBHF(l).svg
Fullerton
BSicon MSTR2.svg
BSicon MASKl.svg
BSicon hBHF brown.svg
BSicon tACC violet.svg
BSicon lhvSTR(l)q.svg
BSicon MASKr.svg
BSicon MSTR3.svg
BSicon htSTRa red.svg
BSicon lhvSTR(l)q.svg
BSicon tSTRl violet.svg
BSicon hSTRl brown.svg
BSicon lhMSTRq.svg
BSicon STRq brown.svg
BSicon tSTRq violet.svg
BSicon tSTR red.svg
BSicon tSTR+r violet.svg
BSicon hSTR+r brown.svg
BSicon tBHF red.svg
BSicon hLSTR brown.svg
North/​Clybourn
BSicon hCONTgq brown.svg
BSicon lhMSTRq.svg
BSicon STRq brown.svg
BSicon tSTRq violet.svg
BSicon tSTR red.svg
BSicon tSTRr violet.svg
BSicon hSTRr brown.svg
BSicon tACC red.svg
Clark/​Division
BSicon tACC red.svg
Chicago
BSicon tACC red.svg
Grand
BSicon WASSERq.svg
BSicon WASSERq.svg
BSicon tKRZW red.svg
BSicon WASSERq.svg
BSicon hCONTgq black.svg
BSicon hINTq black.svg
BSicon HUBa.svg
BSicon tSTR red.svg
BSicon hSTR+r black.svg
BSicon tCONTgq blue.svg
BSicon tSTR+r blue.svg
BSicon tINTACC red.svg
BSicon HUBe.svg
BSicon KGRZ3.svg
BSicon hLSTR black.svg
Blue to O'Hare   Pictograms-nps-airport.svg Lake
BSicon KGRZ1.svg
BSicon tINT blue.svg
BSicon exBLaq.svg
BSicon etBHF red.svg
BSicon exBLeq.svg
BSicon hLSTR black.svg
Washington
Washington
closed
BSicon tBHF blue.svg
BSicon tBHF red.svg
BSicon hLSTR black.svg
Monroe Monroe
BSicon tINTACC blue.svg
BSicon HUBaq.svg
BSicon BLaq.svg
BSicon tINTACC red.svg
BSicon HUBlg.svg
BSicon BLeq.svg
BSicon hLSTR black.svg
Jackson Jackson
BSicon hCONTgq black.svg
BSicon lhMSTRq.svg
BSicon STRq black.svg
BSicon tSTR blue.svg
BSicon hINTACCq black.svg
BSicon HUBe.svg
BSicon tSTR red.svg
BSicon STR+r orange.svg
BSicon STR green.svg
BSicon tSTR orange.svg
BSicon STRr black.svg
BSicon lhABZgr+r.svg
BSicon tCONTgq blue.svg
BSicon tSTRr blue.svg
BSicon tSTR red.svg
BSicon tSTR orange.svg
BSicon hSTR green.svg
BSicon tBHF red.svg
BSicon tSTR orange.svg
BSicon hSTR green.svg
Harrison
BSicon tINTACC-L red.svg
BSicon tINTACC-R orange.svg
BSicon hBHF green.svg
Roosevelt
BSicon htSTRe red.svg
BSicon tSTR orange.svg
BSicon hSTR green.svg
BSicon hCONTgq orange.svg
BSicon lhMSTRq.svg
BSicon STRq orange.svg
BSicon hSTR red.svg
BSicon STRr orange.svg
BSicon STR green.svg
BSicon tSTRr orange.svg
BSicon lhABZgr.svg
Orange to Midway   Pictograms-nps-airport.svg
BSicon hSTR red.svg
BSicon hCONTf green.svg
BSicon hACC red.svg
Cermak–Chinatown
BSicon RP4q.svg
BSicon hSKRZ-G4e red.svg
BSicon RP4w.svg
BSicon RP4q.svg
BSicon vRP2yRP4+r.svg
BSicon STR red.svg
I-90.svgI-94.svg I-90  / I-94
BSicon STADIUM.svg
BSicon ACC red.svg
BSicon vRP2BHF.svg
Sox–35th
BSicon ACC red.svg
BSicon vRP2BHF.svg
47th
BSicon ACC red.svg
BSicon vRP2BHF.svg
Garfield
BSicon hCONTgq green.svg
BSicon STR red.svg
BSicon MSTRq.svg
BSicon hSTRq green.svg
BSicon vRP2.svg
BSicon hCONTfq green.svg
BSicon ACC red.svg
BSicon vRP2BHF.svg
63rd
BSicon nSTRq white.svg
BSicon hCONTgq red.svg
BSicon STR red.svg
BSicon lhMSTRq.svg
BSicon STRq red.svg
BSicon nSTRq white.svg
BSicon vRP2.svg
BSicon nSTRq white.svg
BSicon hCONTfq red.svg
RI
BSicon STR red.svg
BSicon vRP2yRP4l.svg
BSicon vRP2.svg
BSicon dRP4q.svg
BSicon ACC red.svg
BSicon vRP2BHF.svg
69th
BSicon ACC red.svg
BSicon vRP2BHF.svg
79th
BSicon ACC red.svg
BSicon vRP2BHF.svg
87th
BSicon KACCxe red.svg
BSicon vRP2BHF.svg
95th/​Dan Ryan
BSicon MASKe.svg
BSicon exCONTf red.svg
BSicon vRP2.svg
BSicon vRP2yRP4l.svg
BSicon exSTR red.svg
BSicon vRP2.svg
BSicon dRP4q.svg
I-94.svg I-94
BSicon dRP4q.svg
BSicon exhSTRa@f red.svg
BSicon vRP2yRP4r.svg
BSicon exhACC red.svg
103rd
BSicon exhACC red.svg
111th
BSicon exhACC red.svg
Michigan
BSicon nSTRq white.svg
BSicon CONTgq orange.svg
BSicon nSTRq white.svg
BSicon MSTR.svg
BSicon exhSTR red.svg
BSicon STRq orange.svg
BSicon nSTRq white.svg
BSicon CONTfq orange.svg
ME
BSicon exhSTRe@g red.svg
BSicon nSTR+1 white.svg
BSicon CONT1+f maroon.svg
BSicon exKACCe red.svg
BSicon nSTR white.svg
BSicon STR maroon.svg
130th
BSicon nSTR white.svg
BSicon CONTf maroon.svg
BSicon tSTRq violet.svg
BSicon hSTRq brown.svg
Two lines
sharing tracks
BSicon STRq black.svg
BSicon lhSTRq.svg
Multiple lines
sharing tracks
BSicon BUS2.svg Bus connections at all stations except Jarvis.

The Red Line is a rapid transit line in Chicago, run by the Chicago Transit Authority (CTA) as part of the Chicago "L" system. It is the busiest line on the "L" system, with an average of 108,303 passengers boarding each weekday in 2023 [1] The route is 21.8 miles (35.1 km) long with a total of 33 stations. It runs elevated from the Howard station in the Rogers Park neighborhood on the North Side, through the State Street subway on the Near North Side, Downtown, and the South Loop, and then through the Dan Ryan Expressway median to 95th/Dan Ryan in the Roseland neighborhood on the South Side.

Contents

Like Chicago's Blue Line, the Red Line runs 24 hours a day, 365 days a year, making Chicago, New York City, and Copenhagen the only three cities in the world that operate train service 24 hours a day throughout their city limits. [2]

The CTA is planning an extension of the Red Line, adding 5.6 miles (9.0 km) and four new stations which would extend the line from 95th Street to 130th Street, making the Red Line approximately 31 miles in length with 37 stations. [3] In December 2022, the Chicago City Council approved the creation of a district that will send approximately $1 billion in tax revenue for the extension of the Red Line south of 95th Street to 130th Street. [4]

Route

Berwyn CTA 031130.jpg
Berwyn station is typical of stations on the northern section of the Red Line, seen here before renovations in 2012. The station was eventually torn down and rebuilt in 2025.
Gerald Farinas Addison CTA.jpg
Addison Station with Wrigley Field in the background
Red Line platform at Jackson.jpg
Red Line platform at Jackson in the State Street subway
Red Line.jpg
The 16th Street portal currently used by Red Line trains
20110327 48 CTA South Side L @ 13th St..jpg
During the Dan Ryan branch reconstruction, Red Line trains emerged from the State Street subway beneath 13th Street.
Redlinedanryan.jpg
A Red Line train in the median of Dan Ryan Expressway

North Side Main Line

The northern terminus of the Red Line is Howard in the Rogers Park neighborhood of Chicago, on the north side. The Red Line extends southeasterly on an elevated embankment structure about a half-mile west of the lakefront to Touhy Avenue then turns south along Glenwood Avenue to Morse station.

From there the route swings on a sweeping reverse curve to the east to Sheridan Road, adjacent to Loyola University Chicago and continues southerly parallel to Broadway to the east (in Edgewater), and follows Broadway to Leland Avenue. From here, the route transitions from concrete embankment to steel elevated structure. The "L" continues southward running adjacent the Graceland Cemetery, Irving Park Road and Sheffield Avenue from Uptown to Lincoln Park. The Brown Line (Ravenswood), joins the Red Line tracks just north of Belmont.

South of Belmont, Red, Brown and Purple Line Express trains run side-by-side on the four track North Side "L" to Armitage. Red Line trains run on the two middle tracks, only making two stops at Belmont & Fullerton and skipping Wellington, Diversey and Armitage.

Wrigley Field, home of the Chicago Cubs, is served by the Addison station. Additionally, Rate Field, home of the Chicago White Sox, is served by the Sox–35th station.

The North Side Main Line of the Red Line travels from Howard station to Armitage station.

State Street subway

After running through Armitage, the Red Line descends to a portal at Willow Street and enters the subway, turning southeast on Clybourn Avenue, east at Division Street, and south at State Street through the Loop to Roosevelt Road. South of Roosevelt Road, there is a junction, with one pair of tracks curving to the east and leaving the subway at 13th Street and connecting to the old South Side "L" at 18th and State Streets. This section was used from October 1943 until February 1993, when trains from Howard were routed to the Englewood and Jackson Park branches, today known as the south branches of the Green Line.

The 13th Street portal is now used for non-service train moves and emergency purposes. The 13th Street portal was used again for regular "L" service from May until October 2013, because Red Line trains were rerouted to the Green Line's South Side Main Line tracks and terminated at Ashland/​63rd during the five months of the Red Line South Reconstruction Project. This service was used again from April to November 2017 and July 2018 to April 2019.

The Red Line is the only Chicago "L" line that connects to all seven other "L" lines full time. The Purple Line shares the distinction only when it runs its weekday rush hour route.

Dan Ryan branch

At 13th Street, the subway swings away from State Street on a reverse curve to the southwest then rises to another portal at 16th Street adjacent Metra's Rock Island District line. The Red Line leaves at 16th Street and continues southward on an elevated structure to 24th Street. There is a stop at Cermak–Chinatown on this portion.

South of Cermak Road, the Red Line tracks enter the median strip of the Franklin Street Connector, The Red Line then tunnels beneath the expressway interchange between 28th and 30th Streets and continues the rest of the way to 95th Street in the median of the Dan Ryan Expressway (Interstate 90 & 94). Chicago pioneered using expressway medians for local "L" train lines (the other two being the Eisenhower Expressway and Kennedy Expressways, which both carry portions of the Blue Line). The Red Line follows the Dan Ryan the rest of the way to the 95th/​Dan Ryan terminal in Roseland.

The 98th Yard lies just south and east of the Dan Ryan–Bishop Ford Freeway interchange. Beyond the interchange, the Dan Ryan Expressway and Bishop Ford Freeway both continue towards the south city limits without a transit line in the median strips, but were built with wide grass medians in which future extensions of the rapid transit line remain an option. An extension to 130th Street is in its final planning stages. This extension includes three elevated stations at 103rd, 111th, and Michigan, an at-grade terminal station at 130th.

Stations along the Red Line serve important Chicago landmarks such as Rate Field and the Illinois Institute of Technology (Sox–35th), DePaul University (Fullerton), the Auditorium Building of Roosevelt University (Jackson) and Loyola University Chicago (Loyola), as well as the Magnificent Mile (Chicago), Navy Pier (Grand), Museum Campus (Roosevelt), and Chinatown (Cermak–Chinatown).

In May 2013, the branch, along with all nine stations, closed for five months to allow the replacement of the tracks and for construction crews to improve the stations on the branch. The newly reconstructed Dan Ryan branch and the nine stations reopened in October 2013. [5]

Rolling stock

Red Line train made up of 5000-series cars at Addison station CTA L 5506 at Addison station on Red Line.jpeg
Red Line train made up of 5000-series cars at Addison station

The Red Line is operated with the Bombardier-built 5000-series railcars. From 2012 until October 2013, the Red Line was operated with the 2400-series cars, during weekday rush hours, and from 1993 until 2015, the Red Line was operated with the 2600-series cars. As the 5000-series cars were delivered, the Red Line's 2600-series cars were transferred to other lines to replace the 2400-series cars. From October 2013 until April 2014, several of the Red Line's 2600-series cars were transferred over to the Purple Line as they were displaced on the Red Line by the 5000-series cars.

Beginning in June 2014, CTA began to transfer the 2600-series cars from the Red Line over to the Blue Line due to them being newer than the existing Blue Line cars. The Blue Line's older 2600-series cars were transferred to the Orange Line as an interim replacement for its 2400-series cars. Beginning in October 2014, CTA started transferring some of the Red Line's 2600-series cars to the Orange Line, replacing the Orange Line's remaining 2400-series cars until the Red Line was fully equipped with the 5000-series cars.

Operating hours and headways

Like the Blue Line, the Red Line runs 24 hours a day. On weekdays, service runs very frequently at 30 tph (trains per hour) during rush hour, and 8 tph during the midday and nighttime. On Saturdays, 6 tph in the early morning, then increase to 10–11 tph during the day, then 8 tph at night. On Sundays, service runs 6 tph early morning, then increase to 8tph minutes all day into early evening, 6 tph later at night. Between approximately midnight and 5:30 a.m., night owl service on the Red Line ranges between ten and fifteen minutes (4–6 tph). [6]

History

Red Line (CTA)
The Howard–Englewood–Jackson Park Line highlighted in gray

The oldest section of the line opened on May 31, 1900, running from the Loop to Wilson. [7] It was constructed by the Northwestern Elevated Railroad. The route was extended to Central Street in Evanston on May 16, 1908, via leased and electrified trackage belonging to the Chicago, Milwaukee and St. Paul Railway. In November 1913, the North Side "L" was through routed with the South Side "L" lines through the Loop. The ground-level section between Leland Avenue and Howard Street was elevated on a concrete embankment structure and widened to four tracks in 1922.

The State Street subway opened on October 17, 1943, providing two new tracks bypassing the Loop tracks and the portion of the North and South Side "L" lines not equipped with express tracks. By providing an express route free of the most restrictive curves on the Chicago "L" and shorter than the old line it supplemented, the subway reduced running time by as much as eleven minutes for a one-way trip. The route was placed in operation on October 17, 1943, [8] for a portion of the through north–south trains, although other trains continued to use the "L" both on through trips and on services circling the Loop and returning to the point of origin.

In August 1949, the North–South route was revised to create a more efficient routing through the Central Business District and handle the heavy volumes of passenger traffic using it. [9] [10] The Howard branch was paired with the Englewood and Jackson Park branches through the State Street subway, using the 13th Street portal and the other lines routed to the Loop "L".

The Dan Ryan Branch opened in September 1969, and was paired with the Lake Street branch to form the West-South route, almost universally referred to as the Lake–Dan Ryan route. [11] It operated over the Lake Street and Wabash Avenue sides of the Union Loop. This "interim" service was created mainly for the purpose of providing through service between the west side and the south side in anticipation of the 1968 Loop Subway Project. When the controversial subway project was cancelled in 1979, the Lake-Dan Ryan service remained and lasted for 24 years.

For much of the 20th century, the Howard–Englewood/Jackson Park route was equally compatible in terms of passenger service until the late 1960s through the 1970s. However, passenger traffic volumes began to shift on the south side lines, with more riders using the newer Dan Ryan line (which runs four miles (6 km) further south) and fewer riders on the older "L" lines. This level of ridership allowed the CTA to develop a more efficient system by combining the more heavily used rail lines together and combining the other lines together, providing increased service capacity for the routes that need it. The Red Line was created in 1993, when the CTA adopted color-coded system for all of its "L" routes.

In February 1993, a new connection opened from the State Street subway south of Roosevelt to Cermak–Chinatown. The Howard branch was paired with the Dan Ryan branch creating the current Red Line, and the Lake Street branch was paired with the Englewood and Jackson Park branches to form the Green Line. A further operational benefit of this switch was that this freed up capacity in the Loop needed for the addition of the Orange Line to Midway Airport. The former tracks used to move West-South trains from the Loop to the Dan Ryan line are still retained for non-revenue moves and service disruptions.

The Dan Ryan Branch of the Red Line underwent a rehabilitation period to improve its aging infrastructure which ended in early 2007. [12] This work included upgrading the power and signal systems, and rehabilitating the stations with improved lighting, a cleaner appearance, and new escalators and elevators. The CTA has plans to expand Red Line service to ten car trains from the current eight-car trains. [13]

Red Ahead rehabilitation

In spring 2012, the CTA started a station and track rehabilitation program dubbed "Red Ahead", [14] beginning on the North Side Main Line, which is called the "Red North" project. [15] The program monitors the full route of the Red Line, excluding the Loyola, Bryn Mawr, Sheridan, or Wilson station. [16] This also does not include stations between Wilson through Fullerton, nor the State Street subway. In May 2012, the CTA started to work on the North Side Main Line stations of the Red Line which includes Jarvis, Morse, Granville, Thorndale, Berwyn, Argyle and Lawrence. The stations are listed in order, starting at Granville, then Morse, Thorndale, Argyle, Berwyn, Lawrence and finally Jarvis. This project started in June 2012 and was completed in December 2012. This project is also part of the Red Ahead's "Red & Purple Modernization" Project. [17]

The Red & Purple Modernization Project will include a redesign of a diamond junction north of Belmont Station into a flyover for Brown Line trains. This project will decrease train backups and increase the number of trains that can cross the junction per hour. [18] The project was criticized by 2015 mayoral candidate Chuy García and local residents in the Lakeview neighborhood who organized a referendum to stop it. [19] [20] The Federal Transit Administration passed the CTA's environmental review on the flyover in January 2016 and received a $1.1 billion federal grant the following year. [21] [22] 16 properties affected by the flyover were demolished. Construction began on October 2, 2019, [23] [24] [25] and the flyover entered service on November 19, 2021. [26]

Proposed extension

Since 2006, proposals have been underway to extend the Red Line south from 95th Street. The CTA developed nine different proposed routes, one of which includes routing the Red Line down the median of the Bishop Ford Freeway and another in the median of Interstate 57. During an alternatives analysis meeting on April 11, 2007, CTA narrowed further study down to five possible routes, two for bus rapid transit and three for heavy rail (rapid) transit. The two bus routes would travel south from the 95th/Dan Ryan terminal either down Halsted Street or Michigan Avenue, while the heavy rail routes left for consideration were the Halsted and Michigan corridors (either underground or elevated) as well as the Union Pacific Railroad corridor (elevated or trench), which would traverse southeastward toward the South Shore Line. In October 2008, the CTA commissioned a $150,000 study of an extension south from 95th Street to 130th Street in the community area of Riverdale. [27]

In December 2008, at the Screen 2 presentation of the federally mandated Alternatives Analysis Study, the possible corridors and modes of transit were furthered narrowed down to either Halsted Street (bus rapid transit or elevated Heavy Rail Transit) and the Union Pacific Railroad corridor (elevated Heavy Rail Transit). [28]

In December 2009, the CTA identified the locally preferred alternative as the Union Pacific corridor. [29] A map and description of the route are found at TransitChicago.com. [29] Multiple Environmental Impact Studies will be carried out, and will determine exact alignments and design. [29] [30]

The alignment consists of a new elevated rail line between 95th/Dan Ryan and a new terminal station at 130th Street, paralleling the Union Pacific Railroad and the South Shore Line, through the Far South Side neighborhoods of Roseland, Washington Heights, West Pullman, and Riverdale. In addition to the terminal station at 130th, three new stations would be built at 103rd, 111th, and Michigan, and a new yard and shop would be built at 120th Street. [31] Basic engineering, along with an environmental impact statement, were underway by 2010. [32]

Construction was expected by the CTA to last from 2026 to 2030. [33]

Station listing

Location StationConnections
Rogers Park Howard Wheelchair symbol.svg BSicon PARKING.svg Chicago Transit Authority Logo.svg Chicago "L": Yellow Purple
Bus-logo.svg CTA Buses: 22, 97, 147, 201, 206
Bus-logo.svg Pace buses: 213, 215, 290
Jarvis
Morse Bus-logo.svg CTA Buses: 96, 155
Loyola Wheelchair symbol.svg Bus-logo.svg CTA Buses: 147, 155
Edgewater Granville Wheelchair symbol.svg Bus-logo.svg CTA Buses: 36, 136, 147, 151
Thorndale Bus-logo.svg CTA Buses: 36, 136, 147, 151
Bryn Mawr Wheelchair symbol.svg Bus-logo.svg CTA Buses: 36, 84, 136, 147, 151
Berwyn Wheelchair symbol.svg Bus-logo.svg CTA Buses: 36, 92, 136, 146, 147, 151
Uptown Argyle Wheelchair symbol.svg Bus-logo.svg CTA Buses: 36, 151
Lawrence Wheelchair symbol.svg Bus-logo.svg CTA Buses: 36, 81, 151
Wilson Wheelchair symbol.svg Chicago Transit Authority Logo.svg Chicago "L": Purple
Bus-logo.svg CTA Buses: 36, 78, 151
Lake View Sheridan Bus-logo.svg CTA Buses: X9, 80, 151
Addison Wheelchair symbol.svg Bus-logo.svg CTA Buses: 22, 152
Belmont Wheelchair symbol.svg Chicago Transit Authority Logo.svg Chicago "L": Brown Purple
Bus-logo.svg CTA Buses: 22, 77
Lincoln Park Fullerton Wheelchair symbol.svg Chicago Transit Authority Logo.svg Chicago "L": Brown Purple
Bus-logo.svg CTA Buses: 37, 74
Near North Side North/​Clybourn Bus-logo.svg CTA Buses: 8, N9, 72
Clark/​Division Wheelchair symbol.svg Bus-logo.svg CTA Buses: 22, 36, 70, 156
Chicago Wheelchair symbol.svg Bus-logo.svg CTA Buses: 36, 66
Grand Wheelchair symbol.svg Bus-logo.svg CTA Buses: 29, 36, 65
The Loop Lake Wheelchair symbol.svg Metramlogo.svg Metra:   Metra Electric (at Millennium Station)
BSicon South Shore Line.svg NICTD: South Shore Line (at Millennium Station)
Chicago Transit Authority Logo.svg Chicago "L": Blue (at Washington), Brown Green Pink Purple Orange (at State/​Lake)
Bus-logo.svg CTA Buses: 2, 6, 10, 29, 36, 62, 146, 148
Originally part of Washington. Was called Lake–Washington (1996–1997).
Washington Closed October 23, 2006
Monroe Bus-logo.svg CTA Buses: 2, 6, 10, J14, 20, 22, 24, 29, 36, 56, 60, 62, 124, 146, 147, 148, 151, 157
Jackson Wheelchair symbol.svg Chicago Transit Authority Logo.svg Chicago "L": Blue (at Jackson), Brown Pink Purple Orange (at Library)

Bus-logo.svg CTA Buses: 1, 2, 6, 7, 10, 28, 29, 36, 62, 126, 146, 147, 151

Harrison Bus-logo.svg CTA Buses: 2, 6, 10, 29, 62, 146, 148
The Loop /
Near South Side
Roosevelt Wheelchair symbol.svg Chicago Transit Authority Logo.svg Chicago "L": Orange Green
Metramlogo.svg Metra:   Metra Electric (at Museum Campus/11th Street)
BSicon South Shore Line.svg NICTD: South Shore Line (at Museum Campus/11th Street)
Bus-logo.svg CTA Buses: 1, 3, 4, X4, 12, 18, 29, 62, 130, 146, 192
Armour Square Cermak–Chinatown Wheelchair symbol.svg Bus-logo.svg CTA Buses: 21, 24, 62
Sox–35th Wheelchair symbol.svg Metramlogo.svg Metra:   Rock Island (at 35th Street)
Bus-logo.svg CTA Buses: 24, 31, 35, 39
Fuller Park 47th Wheelchair symbol.svg Bus-logo.svg CTA Buses: 15, 24, 43, 47, 51
Garfield Wheelchair symbol.svg Bus-logo.svg CTA Buses: 24, 55, 59
Englewood 63rd Wheelchair symbol.svg Bus-logo.svg CTA Buses: 24, 63
Greater Grand Crossing 69th Wheelchair symbol.svg Bus-logo.svg CTA Buses: N5, 29, 30, 67, 71, 169
Greater Grand Crossing /
Chatham
79th Wheelchair symbol.svg Bus-logo.svg CTA Buses: 8A, 24, 29, 75, 79
Chatham 87th Wheelchair symbol.svg Bus-logo.svg CTA Buses: 29, 87
Roseland 95th/​Dan Ryan Wheelchair symbol.svg Bus-logo.svg CTA Buses: 3, N4, X4, N5, N9, 29, 34, 95, 100, 103, 106, 108, 111, 112, 115, 119
Bus-logo.svg Pace buses: 352, 353, 359, 381, 395
BSicon BUS2.svg Intercity buses: Flix Logo 2016.svg FlixBus, Greyhound no dog.svg Greyhound Lines
Roseland /
Washington Heights
103rd Wheelchair symbol.svg Proposed station
Roseland 111th Wheelchair symbol.svg Proposed station
West Pullman Michigan Wheelchair symbol.svg Proposed station
Riverdale 130th Wheelchair symbol.svg Proposed station

Rail yards

There are two rail yards for the Red Line cars: Howard Yard, for the northern portion of the line and the 98th Yard for the southern portion of the line. Another yard, the 120th Yard has been proposed as part of the Red Line extension. [34]

References

  1. "Annual Ridership Report - Calendar Year 2023" (PDF). Chicago Transit Authority. January 23, 2024. Retrieved November 21, 2024.
  2. Jones, Ben (March 1, 2024). "18 of the world's best metro systems". CNN Travel.
  3. "50 years after it was promised, the South Red Line Extension is slated to get a $1.973B grant - Streetsblog Chicago". September 8, 2023.
  4. "Red Line Extension TIF Approved, Sending Nearly $1 Billion to Far South Side Project over 35 Years". December 14, 2022.
  5. "Red Line South Project Countdown until Completion Day!". Chicago Transit Authority . Retrieved October 8, 2013.
  6. "Red Line Trains schedule" (PDF). Chicago Transit Authority. Retrieved December 2, 2017.
  7. "Room For All to Ride". Chicago Daily Tribune. May 30, 1900. p. 12.
  8. Shinnick, William (October 17, 1943). "Underground – A Subway at Last!". Chicago Daily Tribune . p. C1. ProQuest   176804628.
  9. "Close 24 Elevated Stations; Skip-Stop Will Start Monday". Chicago Daily Tribune. July 31, 1949. p. 1. ProQuest   177771364.
  10. "Begin Skip-Stop Runs Monday on North, South 'L'". Chicago Daily Tribune. July 29, 1949. p. A9. ProQuest   177782763.
  11. Buck, Thomas (September 28, 1969). "Ryan Rail Service Starts Today". Chicago Tribune. p. 22. ProQuest   168926288.
  12. "Dan Ryan Red Line Rehabilitation Project". Chicago Transit Authority. March 14, 2006. Archived from the original on March 14, 2006.
  13. Chicago Transit Authority Ravenswood (Brown) Line Expansion Environmental Assessment and Section 4(f) Analysis (PDF), Chicago Transit Authority, archived from the original (PDF) on March 18, 2006
  14. "CTA Red Ahead Program". Chicago Transit Authority. Retrieved August 18, 2012.
  15. "Red Ahead: CTA Red North". Chicago Transit Authority. Retrieved August 18, 2012.
  16. "Red North – Section 2". Chicago Transit Authority. Retrieved August 18, 2012.
  17. "CTA Red & Purple Modernization project". Chicago Transit Authority. Retrieved August 18, 2012.
  18. Red and Purple Modernization: Rebuilding Vital Infrastructure For Chicago's Future (PDF), Chicago Transit Authority, April 23, 2015, archived from the original (PDF) on January 24, 2018, retrieved January 19, 2018
  19. Swartz, Tracy (March 2, 2015). "Chicago Mayoral Candidates Sound off on Transit Priorities". Chicago Tribune. Retrieved January 19, 2018.
  20. Swartz, Tracy (November 6, 2014). "Lakeview Residents Vote: CTA Hasn't 'Sufficiently Justified' Belmont Flyover". Chicago Tribune. Retrieved January 19, 2018.
  21. Greenfield, John (January 26, 2016). "The Controversial Belmont Flyover Has Federal Approval—But Still Faces Other Hurdles". Chicago Reader. Retrieved January 19, 2018.
  22. Dudek, Mitch (January 9, 2017). "Obama Sends CTA $1.1 Billion for Red Line Improvements". Chicago Sun-Times. Archived from the original on January 20, 2018. Retrieved January 19, 2018.
  23. "Chicago Transit Authority Announces Construction of Red and Purple Modernization Project Begins This Fall". www.masstransitmag.com. August 1, 2019.
  24. "Work Begins On CTA's $2 Billion Red & Purple Modernization Project". CBS Chicago. October 2, 2019.
  25. McAdams, Alexis (October 2, 2019). "Officials Break Ground on CTA Red, Purple Modernization Project". ABC7 Chicago.
  26. "CTA's new Brown Line flyover near Belmont to open to the public". Chicago Tribune. November 19, 2021.
  27. Regional Transit Authority (October 3, 2008). "RTA Funded Study Looks at the Impact of the Proposed Red Line Extension" (PDF). Archived from the original (PDF) on May 23, 2011. Retrieved October 9, 2008.
  28. Red Line Extension Alternatives Analysis Study (PDF), Chicago Transit Authority, archived from the original (PDF) on June 7, 2011, retrieved January 6, 2009
  29. 1 2 3 "About the Project: Alternatives". Red Line Extension Project. Chicago Transit Authority. Archived from the original on January 7, 2010. Retrieved December 17, 2009.
  30. "Project Schedule". Red Line Extension Project. Chicago Transit Authority. Archived from the original on January 8, 2010. Retrieved December 17, 2009.
  31. Red Ahead: Summer 2013 Newsletter (PDF), Chicago Transit Authority, archived from the original (PDF) on October 12, 2013, retrieved October 11, 2013
  32. "Red Line Extension Project". Chicago Transit Authority. Archived from the original on December 24, 2019. Retrieved February 25, 2010.
  33. https://www.transitchicago.com/-imagining-the-new-red-line-extension-rle-stations-cta-to-hold-community-meetings-to-allow-residents--riders-to-share-ideas-for-future-red-line-station-plaza-features/
  34. "Red Line Extension – Preferred Alignment". Chicago Transit Authority. Retrieved January 3, 2020.
Template:Attached KML/Red Line (CTA)
KML is from Wikidata