Chicago Aurora and Elgin Railroad

Last updated

Chicago Aurora and Elgin Railroad
Chicago Aurora and Elgin Railroad logo.png
Chicago Aurora and Elgin Railroad 1936 map.jpg
Map of the Chicago Aurora and Elgin Railroad from a 1936 public timetable folder
Overview
Headquarters Wheaton, Illinois
Locale Chicago, Illinois and western suburbs
Dates of operation19021959
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Route map

Contents

× = stations not served by CA&E
Aurora
BSicon exKBHFa.svg
BSicon exKBHFa.svg
Elgin
Illinois Avenue
BSicon exHST.svg
BSicon exHST.svg
National Street
Aurora Avenue
BSicon exHST.svg
BSicon exHST.svg
Collingbourne
Church Road
BSicon exHST.svg
BSicon exHST.svg
Renwick
Poss Road
BSicon exHST.svg
BSicon exHST.svg
Clintonville
Batavia
BSicon exSTR.svg
BSicon exKBHFa.svg
BSicon exHST.svg
St. Charles Road
Glenwood Park
BSicon exSTR.svg
BSicon exHST.svg
BSicon exBHF.svg
Wayne
Hart Road
BSicon exSTR.svg
BSicon exHST.svg
BSicon exHST.svg
Smith Road
Radant Road
BSicon exSTR.svg
BSicon exHST.svg
BSicon exHST.svg
St. Andrews
Wagner Road
BSicon exSTR.svg
BSicon exHST.svg
BSicon exHST.svg
Prince Crossing
State Road
BSicon exSTR.svg
BSicon exHST.svg
BSicon exHST.svg
Geneva Road
Bilter Road
BSicon exSTR+c2.svg
BSicon exHST3.svg
BSicon exKBHFa.svg
BSicon exSTR.svg
St. Charles
CA&E Batavia branch
Arrow Blue UpperRight 001.svg
BSicon exABZg+1.svg
BSicon exSTRc4.svg
BSicon exBHF.svg
BSicon exSTR.svg
Geneva
Batavia Junction
BSicon exHST.svg
BSicon exHST.svg
BSicon exSTR.svg
Good Templar Park
Diehl Road
BSicon exHST.svg
BSicon exHST.svg
BSicon exSTR.svg
Kirk Road
Ferry Road
BSicon exHST.svg
BSicon exHST.svg
BSicon exSTR.svg
Kautz Road
Williams Road
BSicon exHST.svg
BSicon exHST.svg
BSicon exSTR.svg
Kress Road
Warrenville
BSicon exBHF.svg
BSicon exBHF.svg
BSicon exSTR.svg
West Chicago
East Warrenville
BSicon exHST.svg
BSicon exHST.svg
BSicon exSTR.svg
High Lake
Gary Road
BSicon exHST.svg
BSicon exHST.svg
BSicon exSTR.svg
Fannette
Weisbrook Road
BSicon exHST.svg
BSicon exHST2.svg
BSicon exSTR+c3.svg
Winfield Road
Plamondon
BSicon exHST.svg
BSicon exSTRc1.svg
BSicon exABZg+4.svg
Arrow Blue UpperLeft 001.svg
CA&E Geneva branch
Chicago Golf Club
BSicon exHST.svg
BSicon exHST.svg
Geneva Junction
Emory
BSicon exHST2.svg
BSicon exSTRc3.svg
BSicon exHST.svg
Jewell Road
Chicago Avenue
BSicon exSTRc1.svg
BSicon exHST2+4.svg
BSicon exSTRc23.svg
BSicon exHST3.svg
Wesley Street
CA&E Aurora branch
Arrow Blue UpperLeft 001.svg
BSicon exSTRc1.svg
BSicon exABZ+14.svg
BSicon exSTRc4.svg
Arrow Blue UpperRight 001.svg
CA&E Elgin branch
BSicon exBHF.svg
Wheaton
BSicon exHST.svg
College Avenue
BSicon exBHF.svg
Glen Ellyn
BSicon exHST.svg
Taylor Avenue
BSicon exHST.svg
Glen Oak
BSicon exHST.svg
Green Valley
BSicon exBHF.svg
Lombard
BSicon exHST.svg
Stewart Avenue
BSicon exHST.svg
Westmore
BSicon exHST.svg
Ardmore Avenue
BSicon exBHF.svg
Villa Park
BSicon exHST.svg
Spring Road
BSicon exBHF.svg
York Street–Elmhurst
BSicon exHST.svg
Poplar Avenue
BSicon exHST.svg
Stratford Hills
Mount Carmel
BSicon exKBHFa.svg
BSicon exHST.svg
Berkeley
Oak Ridge
BSicon exHST2.svg
BSicon exSTRc3.svg
BSicon exHST.svg
Wolf Road
Harrison Street
BSicon exSTRc1.svg
BSicon exHST2+4.svg
BSicon exHST.svg
BSicon exSTRc3.svg
Garden Home
CA&E Mount Carmel branch
Arrow Blue UpperLeft 001.svg
BSicon uexSTRc2.svg
BSicon uexSTR3+l.svg
BSicon exSTRc1.svg
BSicon exABZg+4.svg
BSicon uexSTR+r.svg
Arrow Blue Left 001.svg
BSicon MFADEgq.svg
BSicon uexSTRr+1.svg
BSicon uexSTRc4.svg
BSicon exINT.svg
Bellwood
BSicon exSTR.svg
BSicon uexlBHF.svg
×
25th Avenue
BSicon exSTR.svg
BSicon uexlBHF.svg
×
17th Avenue
BSicon exSTR.svg
BSicon uexlBHF.svg
×
11th Avenue
BSicon exSTR.svg
BSicon uexlBHF.svg
×
5th Avenue
BSicon exINT.svg
BSicon exSTR.svg
BSicon uexlBHF.svg
×
Hannah
BSicon exSTR.svg
BSicon uexlBHF.svg
×
Harlem
BSicon exSTR.svg
BSicon uexlBHF.svg
×
Home
BSicon exINT.svg
Oak Park
BSicon exSTR.svg
BSicon uexlBHF.svg
×
Gunderson
BSicon exSTR.svg
BSicon uexlBHF.svg
×
Lombard
BSicon exSTR.svg
BSicon uexlBHF.svg
×
Austin
BSicon exSTR.svg
BSicon uexlBHF.svg
×
Central
BSicon lhSTRa@f.svg
BSicon exINT.svg
Laramie
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Cicero
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Kilbourn
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Tripp
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Pulaski
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Garfield Park
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
St. Louis
BSicon exhINT.svg
Kedzie
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Sacramento
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
California
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Western
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Hoyne
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Ogden
Arrow Blue Left 001.svg
BSicon MFADEgq.svg
BSicon uexhSTRq.svg
BSicon uexhSTRq.svg
BSicon exSTR.svg
BSicon lhKRZhr+lr.svg
BSicon uexABZ+lr.svg
BSicon MFADEfq.svg
BSicon uexhSTRq.svg
Arrow Blue Right 001.svg
BSicon exhINT.svg
Marshfield
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Laflin
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Racine
BSicon exSTR.svg
BSicon lhBHF.svg
BSicon uexlBHF.svg
×
Halsted
BSicon exhINT.svg
Canal
BSicon uexhSTR+l.svg
BSicon uexhSTRq.svg
BSicon exmABZgr.svg
BSicon lhABZgr.svg
BSicon MFADEf.svg
BSicon POINTERf@gq.svg
BSicon uexhSTR.svg
BSicon exhKINTe.svg
Wells Street Terminal

The Chicago Aurora and Elgin Railroad (CA&E), known colloquially as the "Roarin' Elgin" or the "Great Third Rail", was an interurban railroad that operated passenger and freight service on its line between Chicago and Aurora, Batavia, Geneva, St. Charles, and Elgin, Illinois. The railroad also operated a small branch to Mt. Carmel Cemetery in Hillside and owned a branch line to Westchester.

Wounded by the increased use of automobiles after World War II, the CA&E abruptly ended passenger service in 1957. Freight service was suspended in 1959, and the railroad was officially abandoned in 1961. Most of the right-of-way has since been converted to the Illinois Prairie Path rail trail.

The Aurora Elgin and Chicago Railway

Origin (1899–1901)

The first known attempt to create an electric railway between the metropolis of Chicago and the Fox Valley settlement of Aurora was in late 1891. By this time, passengers in Aurora and Elgin were served by steam railways. Elgin was served by the Milwaukee Road, Geneva and West Chicago served by the Chicago and North Western Railway, St. Charles served by the Chicago Great Western, and Aurora was served by the Chicago, Burlington and Quincy (CB&Q). However, it was thought that an electric line would greatly facilitate interurban travel, as there would be no freight trains to slow passenger trains. A group of investors founded the Chicago & Aurora Interurban Railway with a $1 million investment. However, the railroad was unable to secure additional funds; it failed to meet an 1893 construction deadline and effectively ceased operation thereafter. A second attempt came two years later with the Chicago, Elgin & Aurora Electric Railway. Plans called for the railroad to run through Turner (now West Chicago), Wheaton, and Glen Ellyn. Like its predecessor, the railroad failed to acquire the necessary funds for construction. Yet another group incorporated the DuPage Interurban Electric Railway in 1897, but was met with a similar fate. [1] Small electric lines opened in the 1890s that connected the municipalities of the Fox River Valley. A profitable streetcar railway stretched from Aurora north to Carpentersville. The success of this railway inspired investors to again attempt an electric connection to Chicago. A group led by F. Mahler, E. W. Moore, Henry A. Everett, Edward Dickinson, and Elmer Barrett formed independent railway lines that were projected to stretch from Aurora and Elgin to Chicago. These two companies were incorporated on February 24, 1899. The Everett-Moore group was Ohio's largest interurban railroad company and had experience administrating several lines around Cleveland, most notably the Lake Shore Electric Railway. These two companies, the Aurora, Wheaton & Chicago Railway and Elgin & Chicago Railway, were incorporated on February 24, 1899. [2]

Only one day after their founding, a second group of Cleveland-based investors, led by the Pomeroy-Mandelbaum group, incorporated the Aurora, Wheaton, & Chicago Railroad Company. Pomeroy-Mandelbaum was the second largest interurban railway company in Ohio and intended to compete against the Everett-Moore group. A meeting between the Everett-Moore syndicate and Pomeroy-Mandelbaum group occurred in either 1900 or 1901 to discuss the future of the two companies. They came to an agreement: Everett-Moore would build and maintain the railways connecting Aurora to Chicago while the Pomeroy-Mandelbaum group would control railways linking cities in the Fox River Valley (eventually consolidating as the Aurora, Elgin and Fox River Electric Company [AE&FRE]). [3] A third railway, the Batavia & Eastern Railway Company, was incorporated by the Everett-Moore group in 1901 to link the town of Batavia to the Aurora line. On March 12, 1901, all of the previously incorporated Everett-Moore companies were merged into one, renamed the Aurora, Elgin & Chicago Railway Company (AE&C). Three million dollars' worth of bonds were issued in 1901 to support track construction. [4]

Construction (1901–1902)

Construction commenced on September 18, 1900, when the AE&C started to grade its right-of-way. The AE&C received permission to cross existing track lines in February 1902, alleviating one of the largest obstacles in the railway's construction. Construction escalated following the winter months; by April, the third rail had been completed between Aurora and Wheaton. Later that month, the railway connected to the Metropolitan West Side Elevated Railroad at 52nd Avenue (modern day Laramie Avenue) in Chicago. The company operated steam locomotives on completed portions to deliver construction goods to where they were needed. Wheaton was selected as the site of the railroad's headquarters, car barn, and machine shop. $1.5 million in preferred stock was issued in April 1902 to cover unexpected costs. [5]

The AE&C station at Lombard (left), pictured in 1902. The station doubled as an electrical substation. AEC Substation.jpg
The AE&C station at Lombard (left), pictured in 1902. The station doubled as an electrical substation.

AE&C purchased a 28-acre (11 ha) lot south of Batavia and constructed a power station to provide electricity. Commercial electric power was not yet available at the time, so the railroad needed to provide its own power for the third rail. Steam boilers were fed with coal provided by the Chicago, Burlington & Quincy Railroad. On April 11, 1902, they signed a contract with General Electric to provide electrical generators, transformers, and converters for the powerhouse. The line completed a network of utility poles through the right-of-way, allowing communication and power exchange between electrical substations along the track in Aurora, Warrenville, and Lombard. A fifth station was built southeast of Wayne for the Elgin branch. The substations converted the alternating current in the power lines to a lower-voltage direct current for use in the third rail. After its completion, the power station also provided power for at least three small trolley lines and several Fox Valley communities. [6] [7]

The Cleveland Construction Company was hired to build the line. All three rails were traditional "T" design rails laid on stone ballast. Wooden railroad ties were laid 2,816 ties to the mile and separated at standard gauge. Every fifth tie was 9 feet (2.7 m) long to support the third rail. The majority of the line was a double track, with a single track running from the Chicago Golf Club to Aurora. Roadbeds for the double track were 30 feet (9.1 m) wide and were surrounded by woven wire fencing. The third rail was usually placed on the inner sides of the double track, providing safety for residents and employees. The third rail was interrupted at railroad crossings, where a cable was placed underground to carry the current across the 75-foot (23 m) gap. [8] [9]

The first inspection trip of the 34.5-mile (55.5 km) line was held on May 16, 1902. the train departed from 52nd Avenue to Aurora, then traversed the AE&FRE south to Yorkville then north to Dundee. AE&C management announced later that evening that they planned on opening the line on July 1. The AE&FRE announced soon afterward that it would offer express transfer service from Fox Valley communities to the AE&C. On May 17, the AE&C tested the powerhouse in Batavia and found several problems with its performance. Heavy rains in June stalled construction and washed out some completed roadbed. The opening date was pushed to July 12, but delays in rolling stock production further stalled it to August. [10]

Poor investments forced the Everett-Moore syndicate to sell its shares in the AE&C in mid-1902. The company had formed a telephone company, but struggled to compete with the Bell Telephone Company. In addition, one of their construction companies went bankrupt, spurring a credit crisis in Cleveland. Creditors demanded pay, and the Everett-Moore group sold off several assets, including their shares of the railroad company totaling $200,000. The Pomeroy-Mandelbaum group still held a large share in the company and became leaders in its operation. [11]

The G. C. Kuhlman Car Company was tasked with providing thirty passenger cars but, for unknown reasons, the deal fell through. An order was placed with the Niles Car and Manufacturing Company in March 1902 for ten cars. Niles Cars were in such high demand that the company was unable to fulfill the full order, but did deliver the AE&C's first six cars on July 29, 1902. The cars were 74,325 pounds (33,713 kg) with four 125 horsepower (93 kW) motors and 36-inch (910 mm) wheels. They were described as "miniature Pullmans" and could seat forty-six or fifty-two passengers. Another twenty cars were ordered from the John Stephenson Car Company and would arrive after the railway was opened. [12] [13]

Car 10 during an inspection on August 4, 1902. The first ten cars were assigned even numbers from 10 to 28. AEC Inspection.jpg
Car 10 during an inspection on August 4, 1902. The first ten cars were assigned even numbers from 10 to 28.

One final problem for the AE&C was finding enough qualified motormen to run the trains. The company found none in the immediate area and had to recruit sixteen men from Dayton, Ohio. Another inspection tour occurred on August 4, from Wheaton to 52nd Avenue. A Niles Car was pulled by a steam locomotive along the track to ensure that none of the curves were too sharp for the intended rolling stock. Original plans called for the third rail to guide the car, but the company experienced many electrical problems along its power lines. By the time the third rail was functioning properly, two hundred and fifty utility poles had burned to the ground due to faulty insulators. A final inspection took place on August 21 from Wheaton to Elmhurst. Although problems with the utility poles were noted, the inspection was otherwise considered a success. For the next three days, engineers tested the line from Aurora to Wheaton so that they would have a familiarity with the track. [14]

Early service

Map of the Aurora Elgin and Chicago RR c 1912 Map of the Aurora Elgin and Chicago RR c 1912.png
Map of the Aurora Elgin and Chicago RR c 1912

Despite a malfunctioning power system, a group of nearly-untrained motormen, and only six pieces of operational rolling stock, the Aurora branch of the Chicago Aurora and Elgin Railroad opened on August 25, 1902. Fares were 25 cents one-way and 45 cents round-trip. Passengers who wanted to enter The Loop had to transfer to the Metropolitan West Side Elevated at 52nd Avenue for an additional five cents. Service began at 5:33am and concluded at 11:33pm, with trains running every thirty minutes. Terminals were opened to the public at 52nd Avenue, Austin Avenue (in Chicago), Oak Park, Harlem Avenue (in Forest Park), Maywood, Bellwood, Wolf Road (in Hillside), South Elmhurst, Secker Road (in Villa Park), Lombard, Glen Ellyn, College Avenue (in Wheaton), Wheaton, Gary Road (in Wheaton), Chicago Golf Grounds, Warrenville, Ferry Road (in Warrenville), Eola Junction (in Aurora), and Aurora. [15] [16] A one-way trip from Aurora to Chicago was seventy-five minutes. The final four cars from the Niles Car Company arrived on September 5 and were put into service seven days later. The original train schedules posted at stations showed service on the Batavia branch. However, actual service did not begin until the last week of September 1902. The Batavia branch met the Aurora branch at Eola Junction. Even when opened, the Batavia branch experienced little traffic and may have been primarily used as convenient transport for railroad officials to the Batavia powerhouse. [17] [18]

Car 12, pictured southwest of Wheaton on October 22, 1902. Note that the trains ran on a single track on this portion of the line. AEC Train.jpg
Car 12, pictured southwest of Wheaton on October 22, 1902. Note that the trains ran on a single track on this portion of the line.

The AE&C issued promotional leaflets to citizens of Fox Valley cities and towns. They also sent these pamphlets to settlements west of Aurora, hoping that people would take a steam train to Aurora and then transfer to the electric line. They boasted that the AE&C was the "finest electric railroad in the world." By the end of the year, the AE&C was seeing monthly earnings in excess of $16,500. In addition, the nearby Chicago, Burlington and Quincy Railroad had a dramatic decrease of passengers between Aurora and Chicago. [19]

The twenty cars from Stephenson arrived in December 1902. Fifteen cars were equipped with motors (even numbers 30–58) and five did not (odd numbers 101–109); these latter five cars were intended to only be used as trailing cars. Trailing cars would often be added or removed at Wheaton depending on the number of passengers. The Stephenson cars were almost identical in every respect to the Niles cars. These new cars reduced the travel time between Aurora and Chicago to one hour. The new cars also allowed the railroad to operate at faster speeds—one run from 52nd Avenue to Aurora averaged 65 miles per hour (105 km/h). [20]

Service to Elgin began on May 29, 1903. [21] [22] The 17.5-mile (28.2 km) branch split off from the main line at Wheaton, and allowed trains from Chicago to reach the Fox Valley city in sixty-five minutes. When opened, the AE&C was able to change its schedules to allow trains to leave 52nd Avenue every fifteen minutes, alternating between Aurora and Elgin. All trains at this point ran locally, stopping at every station. The AE&C briefly considered expanding to Mendota in late 1903, but determined that it was not worth the financial risk. Though cars primarily carried passengers, some early morning cars carried light freight. Notably, the AE&C reached a deal with the Chicago Record Herald in October 1903 to distribute the paper to the suburbs along the line. [23]

On December 1, 1909, [24] the railroad added a branch from near Wheaton to Geneva. This was extended to St Charles August 25, 1910. Most of the interurban's lines used a third rail for power collection, which was relatively unusual for interurban railroads. While third rail had become the standard for urban elevated railroad and subway systems, most interurban railroads used trolley poles to pick up power from overhead wire; the AE&C only used trolley wire where necessary, such as in the few locations where the interurban had street running.

Originally, the railroad's Chicago terminus was the 52nd Avenue station that it shared with the Garfield Park elevated railroad line of the Metropolitan West Side Elevated Railroad, and where passengers transferred between interurban and elevated trains. [25] Beginning on March 11, 1905, the interurban began operating over the Metropolitan's "L" tracks, allowing AE&C trains to directly serve downtown Chicago. At the same time, the Metropolitan's Garfield Park service was extended west of 52nd Avenue, replacing the AE&C as the provider of local service over the interurban's surface-level trackage as far west as Desplaines Avenue in Forest Park. The interurban's trains terminated at the stub-ended Wells Street Terminal, adjacent to the Loop elevated. [25] The interurban continued to use the "L" tracks through the years of Chicago Rapid Transit Company (CRT) ownership and into the Chicago Transit Authority (CTA) era. [26] [27] [28]

The Chicago Aurora and Elgin Railroad

Gold Bond of the Chicago, Aurora and Elgin Corp., issued 1 April 1922 Chicago, Aurora and Elgin Corp. 1922.jpg
Gold Bond of the Chicago, Aurora and Elgin Corp., issued 1 April 1922

World War I was tough for the AE&C, and the railroad entered bankruptcy in 1919. Having shed the Fox River Lines (an interurban which paralleled the Fox River), the reorganized company emerged from bankruptcy as the Chicago Aurora and Elgin Railroad on July 1, 1922, under the management of Dr. Thomas Conway Jr.

A branch from Bellwood to Westchester opened October 1, 1926. [29] CRT's elevated train service was extended onto the branch; the "L" company was the sole provider of passenger service on the branch and this new service replaced the CA&E's own local service on its main line east of Bellwood. [30]

CA&E public timetable dated February 2, 1936. The railroad ran enough service to fill most of a 12-page folder with train schedules. Chicago Aurora and Elgin Railroad timetable 19360202.jpg
CA&E public timetable dated February 2, 1936. The railroad ran enough service to fill most of a 12-page folder with train schedules.

Utilities magnate Samuel Insull gained control of the CA&E in 1926. Insull and his corporate interests had already taken over and improved the properties of the North Shore and South Shore Lines. Insull's plans to make similar improvements to the CA&E were scrapped as the result of the Great Depression. With the collapse of his utilities empire, Insull was forced to sell his interest in the CA&E, and the railroad was once again bankrupt by 1932. The line connecting West Chicago with Geneva and St. Charles was abandoned October 31, 1937. [31]



Postwar years of decline

The railroad was unable to exit from bankruptcy until 1946. Even though the railroad suffered from low revenue, high debt, and shortage of capital, wartime revenues and hopes for a stronger customer base in the growing west suburban region led the railroad to undertake an improvement of its service. The railroad made substantial improvements to its physical plant and acquired ten new all-steel passenger cars in 1946 and made plans for eight more, with the intention of retiring the oldest wooden cars that had been on the railroad's roster from its earliest years.[ citation needed ]

However, the postwar years saw increasing shifts of passengers away from rail traffic and into automobiles, and then the CA&E found the rug pulled from beneath the railroad. The plans for construction of the Congress Street Expressway (now known as the Eisenhower Expressway) in the early 1950s not only loomed as a source of further drain on CA&E traffic, but the right-of-way of the new highway necessitated the demolition of the CTA's Garfield Park elevated line, which the CA&E depended upon to reach its downtown terminus.[ citation needed ]

The expressway's construction plans provided a dedicated right-of-way for trains in the highway's median strip. However, during the estimated five years to complete the superhighway, both "L" and interurban trains would need to use a temporary street-level right-of-way. When the plans circulated in 1951, CA&E objected to the arrangement, citing the effects on running time and scheduling of its trains as they negotiated the streets of Chicago's busy West Side at rush hour. The railroad estimated that the delays would cost the railroad nearly a million dollars a year, to say nothing of the long-term effects of the new superhighway on the railroad's revenue. Another long-term concern was the railroad's downtown terminal; the new median strip line would have no access to Wells Street Terminal. [32] Instead, the replacement line would access the Loop through the Milwaukee-Dearborn Subway, where wood-bodied cars, which still made up a good portion of CA&E rolling stock, were prohibited.

As a compromise, the railroad gained approval to cut back its service to the Desplaines Avenue station in Forest Park the westernmost terminus of CTA Garfield Park service, after the CTA ended its unprofitable elevated train service on the CA&E's Westchester line in 1951. At the new Forest Park terminal, riders would transfer from the CA&E interurban to a CTA train to complete their commute into the city. This terminal consisted of two loop tracks (one for CA&E and one for CTA) where passengers could make a cross-platform transfer between the interurban and trains of the CTA operating over the temporary street-level trackage and presumably the eventual new median strip Congress line. [33] Unfortunately, with the change being put into effect on September 20, 1953, CA&E riders lost their one-seat ride to downtown Chicago. Within a few months of the cutback, half of the line's passengers abandoned it in favor of the parallel commuter service provided by the Chicago and North Western Railroad today operated by Metra as the Union Pacific West Line. [34] [35]

Rolling stock

Final years

Chicago Aurora and Elgin Railroad
The CA&E prior to September 1953 in gray, Milwaukee Road (Milwaukee District West Line) in orange, C&NW (Union Pacific West Line) in pink, and the Burlington Route (BNSF Line) in green, showing the intense competition between the CA&E and steam/diesel railroads even before the Congress Line began construction.

The loss of one-seat commuter service to the Loop devastated the interurban. The railroad's financial condition was already shaky, and schemes to restore downtown service faced various legal or operational obstacles. As early as 1952, the railroad had sought to substitute buses for trains, [36] and after years of financial losses, in April 1957 the Illinois Commerce Commission authorized the railroad to discontinue passenger service. [37] Passenger groups and affected municipalities sought injunctions that forced the railroad to temporarily continue service, but as soon as court rulings cleared the way, management abruptly ended passenger service, at noon on July 3, 1957. Commuters who had ridden the CA&E into the city found themselves stranded when they returned to take the train home. Freight operations continued for two more years until June 10, 1959. No trains ran after this point, but the right-of-way and rolling stock were preserved in the event that a party stepped forward to purchase the property. The official abandonment of CA&E came at 5:00pm on July 6, 1961, four years after the final passenger trains had run. The real estate became part of the Aurora Corporation of Illinois, a small conglomerate, which slowly sold off the right-of-way and other properties. [38] Portions of the right-of-way are now operated as a multi-use trail called the Illinois Prairie Path. [39]

Preservation

Car 308 in operation at the Illinois Railway Museum Illinoisrailwaymuseum308.jpg
Car 308 in operation at the Illinois Railway Museum

Besides the right-of-way, most of which has been retained as the Illinois Prairie Path, there are two depots, two combination depot/substations, and 19 pieces of rolling stock from the CA&E that still exist. [40]

Preserved Cars
NumberBuilderPhotoBuild YearLocationCar TypeStatus
458 St Louis Car Company
Chicago, Aurora, and Elgin 458 at the Fox River Trolley Museum.jpg
1945 Fox River Trolley Museum Steel Round-Side Interurban CarOperational
316 Jewett Car Company
Chicago Aurora and Elgin 316 at the Fox River Trolley Museum.jpg
1913 Fox River Trolley Museum Wood Interurban CarUndergoing Restoration
317 Jewett Car Company 1913 Fox River Trolley Museum Wood Interurban CarIn Storage
20 Niles Car Company
19680714 03 CA&E 20 Relic Trolley Museum (5791917156).jpg
1902 Fox River Trolley Museum Wood Interurban CarOperational/Out of Service for Flange Issues
11 J. G. Brill Company
Fox River and Eastern Elecric Railway line car 11 at the Fox River Trolley Museum (when it was brand new and called RELIC), South Elgin, IL in July 1966 (25970131136).jpg
1910, Rebuilt 1947 Fox River Trolley Museum Wood Interurban Box Motor/Line CarIn Storage
36 Stephenson Car Company
CA&E Class 30 36 at the Illinois Railway Museum - July 2017.jpg
1902 Illinois Railway Museum Wood Interurban CarOperational
308Niles Car Company
CA&E Class 300 308 at the Illinois Railway Museum - May 2014.jpg
1906 Illinois Railway Museum Wood Interurban CarOperational
309Hicks Car Works
(Second Car) Illinoisrailwaymuseum308.jpg
(Second Car)
1907 Illinois Railway Museum Wood Interurban CarOperational
319 Jewett Car Company
(Second Car) Chicago, Aurora & Elgin Interurban Cars.jpg
(Second Car)
1914 Illinois Railway Museum Wood Interurban CarOperational
321 Jewett Car Company
(Third Car) Illinoisrailwaymuseum308.jpg
(Third Car)
1914 Illinois Railway Museum Wood Interurban CarStatic Display
409 Pullman Standard
CA&E Class 400 No. 409 at the Illinois Railway Museum - September 2016.jpg
1923 Illinois Railway Museum Steel Interurban CarOperational
431 Cincinnati Car Company
Chicago, Aurora & Elgin Interurban -431, 1927.jpg
1927 Illinois Railway Museum Steel Interurban CarOperational
451 St Louis Car Company 1945 Illinois Railway Museum Steel Round-Side Interurban CarOperational
453 St Louis Car Company 1945 Illinois Railway Museum Steel Round-Side Interurban CarOperational
460 St Louis Car Company
CA&E 460 IRM.png
1945 Illinois Railway Museum Steel Round-Side Interurban CarOperational
315 Kuhlman Car Company 1909 Rockhill Trolley Museum Wood Interurban CarUndergoing Restoration
320 Jewett Car Company
CA&E 320 in Iowa, June 1963 - 7 Photos (26430117344).jpg
1914 Midwest Electric Railway Wood Interurban CarOperational
303Niles Car Company1906 Connecticut Trolley Museum Wood Interurban CarUndergoing Restoration
434 Cincinnati Car Company 1927 Seashore Trolley Museum Steel Interurban CarOperational

Footnotes

  1. Plachno (1989), p. 169.
  2. Plachno (1989), p. 171.
  3. Plachno (1989), p. 175.
  4. Plachno (1989), p. 177.
  5. Plachno (1989), pp. 179–189.
  6. Peffers, Hopkins Stolp (1993). Aurora-Elgin Area Street Cars and Interurbans V. 3 The Third Rail Line. American Slide-Chart Corp. pp. 164–174. ISBN   1-883461-03-0.
  7. Plachno (1989), pp. 189–191.
  8. Peffers (1993), p. 175-183.
  9. Plachno (1989).
  10. Plachno (1989), p. 187.
  11. Plachno (1989), p. 193.
  12. Peffers (1993), pp. 21–24.
  13. Plachno (1989), pp. IV-16, 195.
  14. Plachno (1989), p. 197.
  15. C.E.R.A. (1961). Bulletin 105: The Great Third Rail. Central Electric Railfans' Association. pp. iv–v.
  16. Peffers (1993), p. 17, 216-219.
  17. C.E.R.A. (1961), p. IV-12.
  18. Plachno (1989), p. 203.
  19. Plachno (1989), p. 205.
  20. Plachno (1989), pp. 207–209.
  21. "GreatThirdRail.org: Chronology".
  22. "History".
  23. Plachno (1989), pp. 213–215, 233.
  24. "GreatThirdRail.org: Chronology".
  25. 1 2 C.E.R.A. (1961), p. IV-16.
  26. Plachno (1986), p. 33–35.
  27. C.E.R.A. (1976). Chicago's Rapid Transit v. 2: Rolling Stock/1947-1976. Central Electric Railfans' Association. pp. 247–248, 255. ISBN   0-915348-15-2.
  28. Peffers (1993), pp. 108–121.
  29. "GreatThirdRail.org: Chronology".
  30. Plachno (1986), pp. 73, 77–79.
  31. "GreatThirdRail.org: Chronology".
  32. C.E.R.A. (1961), p. 61-62.
  33. C.E.R.A. (1961), p. IV-15.
  34. C.E.R.A. (1961), pp. 62–64.
  35. Plachno (1986), pp. 45–49.
  36. "Suburbs Fight to Keep C. A. & E. as Rail Line," Chicago Daily Tribune, February 13, 1952, p. B9
  37. "Aurora & Elgin Gets State's O.K. to Drop Passenger Trains," Chicago Daily Tribune, April 4, 1957, p. 5
  38. C.E.R.A. (1961), pp. 62–69.
  39. "The Illinois Prairie Path". Illinois Prairie Path. Archived from the original on November 29, 2009. Retrieved November 26, 2009.
  40. Bresse-Rodenkirk, Bob. "Lake Shore Electric Railway Auction, Updated October 02, 2009". Shore Line Interurban Historical Society. Archived from the original on October 8, 2009. Retrieved August 20, 2023.

Related Research Articles

<span class="mw-page-title-main">Chicago North Shore and Milwaukee Railroad</span> Former interurban railroad line between the Chicago Loop and downtown Milwaukee

The Chicago North Shore and Milwaukee Railroad, also known as the North Shore Line, was an interurban railroad that operated passenger and freight service over an 88.9-mile (143.1 km) route between the Chicago Loop and downtown Milwaukee, as well as an 8.6-mile (13.8 km) branch line between the villages of Lake Bluff and Mundelein, Illinois. The North Shore Line also provided streetcar, city bus and motor coach services along its interurban route.

<span class="mw-page-title-main">Fox River Trolley Museum</span> Railroad museum in South Elgin, Illinois, US

The Fox River Trolley Museum is a railroad museum in South Elgin, Illinois. Incorporated in 1961 as R.E.L.I.C., it opened in 1966 and became the Fox River Trolley Museum in 1984.

<span class="mw-page-title-main">Elgin and Belvidere Electric Company</span>

The Elgin and Belvidere Electric Company was a 36-mile (58 km) interurban line that connected Belvidere, Illinois and Elgin, Illinois. It was the central link in the interurban network connecting Freeport, Rockford, Elgin, and Chicago which included the Rockford and Interurban Railway to the west and the Chicago, Aurora and Elgin Railroad to the east. The line was operational from 1907 until 1930. In 1927, the line was extended to Rockford over a line of the Rockford and Interurban.

The Indiana Railroad (IR) was the last of the typical Midwestern United States interurban lines. It was formed in 1930–31 by combining the operations of the five major interurban systems in central Indiana into one entity. The predecessor companies came under the control of Midland Utilities, owned by Samuel Insull. His plan was to modernize the profitable routes and abandon the unprofitable ones. With the onset of the Great Depression, the Insull empire collapsed and the Indiana Railroad was left with a decaying infrastructure and little hope of overcoming the growing competition of the automobile for passenger business and the truck for freight business. The IR faced bankruptcy in 1933, and Bowman Elder was designated as the receiver to run the company. Payments on bonded debt were suspended. Elder was able to keep the system virtually intact for four years, and IR operated about 600 miles (970 km) of interurban lines throughout Indiana during this period. During the late 1930s, the routes were abandoned one by one until a 1941 wreck with fatalities south of Indianapolis put an abrupt end to the Indiana Railroad's last passenger operations.

<span class="mw-page-title-main">Oak Park station (CTA Blue Line)</span> Chicago "L" station

Oak Park is a station on the Chicago 'L' system, serving the Blue Line's Forest Park branch and Oak Park, Illinois. The station is alongside the Eisenhower Expressway between Oak Park Avenue and East Avenue, near the Oak Park Conservatory. The auxiliary entrance on East Avenue is half a block from the Oak Park Conservatory.

<span class="mw-page-title-main">Aurora, Elgin and Fox River Electric Company</span> Interurban in Illinois, United States

The Aurora, Elgin & Fox River Electric (AE&FRE), was an interurban railroad that operated freight and passenger service on its line paralleling the Fox River. It served the communities of Carpentersville, Dundee, Elgin, South Elgin, St. Charles, Geneva, Batavia, North Aurora, Aurora, Montgomery, and Yorkville in Illinois. It also operated local streetcar lines in both Aurora and Elgin.

<span class="mw-page-title-main">Metropolitan main line</span> Former rapid transit line in Chicago

The Metropolitan main line was a rapid transit line of the Chicago "L" system from 1895 to 1958. It ran west from downtown to a junction at Marshfield station. At this point the Garfield Park branch continued westward, while the Douglas Park branch turned south, and the Logan Square branch turned north with the Humboldt Park branch branching from it. In addition to serving the Chicago "L", its tracks and those of the Garfield Park branch also carried the Chicago Aurora and Elgin Railroad, an interurban that served Chicago's western suburbs, between 1905 and 1953.

<span class="mw-page-title-main">6000-series (CTA)</span> Chicago transit car

The 6000-series was a series of "L" cars built between 1950 and 1959 by the St. Louis Car Company for the Chicago Transit Authority. A total of 720 cars were produced, and remained in operation on the "L" until 1992.

The Chicago, Aurora and DeKalb Railroad was a 29-mile (47 km) interurban line which operated from 1906 to 1923 and connected the cities of Aurora and DeKalb, Illinois. The line made connections in Aurora with the Aurora, Elgin and Fox River Electric Company, the Chicago, Aurora and Elgin Railroad, and the Aurora, Plainfield and Joliet Railroad. Entry into Aurora was made via streetcar trackage of the Aurora, Elgin and Fox River Electric. Over the course of its history, the railroad used internal combustion, steam, and finally electric traction as motive power.

The Chicago Aurora and Elgin Railroad was an electric passenger railroad from Chicago west through its suburbs. The western portions were high-speed heavy lines, but access to the downtown area was on an elevated railway, part of Chicago’s “L” system. Because of the electric power and tight loading gauge, the cars were of unusual designs. One other area railroad, the “North Shore Line”, also used the “L” to enter Chicago and had similar cars.

<span class="mw-page-title-main">Marshfield station</span> Rapid transit station in Chicago, 1895–1954

Marshfield was a rapid transit station on the Chicago "L" in service between 1895 and 1954. Constructed by the Metropolitan West Side Elevated Railroad, it was the westernmost station of the Metropolitan's main line, which then diverged into three branches. Marshfield was also served by the Aurora Elgin and Chicago Railway (AE&C) and its descendant the Chicago Aurora and Elgin Railroad (CA&E), an interurban, between 1905 and 1953.

Canal was a rapid transit station located on the Metropolitan main line of the Chicago "L" that was in service from 1895 to 1958, when the entire main line was replaced by the Congress Line located in the median of the nearby Eisenhower Expressway. Starting in 1927, the interurban Chicago Aurora and Elgin Railroad (CA&E) also served the station, continuing until 1953. The station connected with Chicago's Union Station, which was one of the city's rail terminals. One of the busiest stations on the Metropolitan's routes, and of the "L" in general, it opened a second entrance on Clinton Street in 1914.

Wheaton, located in Wheaton, Illinois, was the western terminus of the Chicago Aurora and Elgin Railroad's main line, after which it split into two branches bound for Aurora and Elgin. It opened in 1902 alongside the rest of what was then called the "Aurora Elgin and Chicago Railroad" (AE&C), which at the time only extended eastward to 52nd Avenue in Chicago.

Bellwood was a station on the Chicago Aurora and Elgin Railroad (CA&E) serving Bellwood, Illinois, from 1902 to 1957. An adjacent station, serving the Westchester branch, existed for rapid transit purposes on the Chicago "L" between 1926 and 1951.

Elgin was a station on the Chicago Aurora and Elgin Railroad, where it was the western terminus of the Elgin branch. Throughout the early 20th century, it also connected with the Elgin and Belvidere Railway and Aurora, Elgin and Fox River Electric Company (AE&FRE) interurbans.

<span class="mw-page-title-main">St. Louis station (CTA Garfield Park branch)</span> Rapid transit station in Chicago, 1895–1958

St. Louis was a rapid transit station on the Chicago "L" between 1895 and 1953. It was constructed by the Metropolitan West Side Elevated Railroad and served its Garfield Park branch. The Chicago Aurora and Elgin Railroad (CA&E), an interurban serving Chicago's western suburbs, also used the Garfield Park branch's tracks in 1905. To accommodate the mixing of the fast interurban and slow "L" service on a two-track line, two crossovers were installed on either side of the St. Louis station to let CA&E trains pass "L" trains in 1911.

Kedzie was a rapid transit station on the Chicago "L", serving the Garfield Park branch of its Metropolitan West Side Elevated Railroad, from 1895 to 1958. Between 1905 and 1953, it also served the Chicago Aurora and Elgin Railroad (CA&E), an interurban using Garfield Park tracks, between 1905 and 1953.

References