Class overview | |
---|---|
Builders | ThyssenKrupp Marine Systems (TKMS) |
Operators | |
Preceded by |
|
Planned | |
On order | |
Building | 2 |
General characteristics | |
Type | Attack submarine |
Displacement | 2,500 t (2,500 long tons) [7] surfaced, 2,800 t (2,800 long tons) submerged |
Length | 73 m (239 ft 6 in) |
Beam | 10 m (32 ft 10 in) |
Draught | 7 m (23 ft 0 in) |
Propulsion |
|
Speed | > 20 knots (37 km/h; 23 mph) |
Endurance | 41 days |
Sensors and processing systems |
|
Armament |
|
The Type 212CD class (for Common Design) is a submarine class developed by ThyssenKrupp Marine Systems (TKMS) for the Norwegian and German navies. The class is derived from the Type 212 submarine class, [15] but will be significantly larger than the 212 class.
A €5.5 billion contract for development and procurement of the six submarines was placed with TKMS on 8 July 2021 [16] [17] after the German and Norwegian governments reached an agreement in principle in March. [18] This followed an extensive period of negotiation between industry and the two governments which took place after Norway had, in 2017, decided on an extensive naval partnership with Germany and TKMS for their Ula-class replacement project. [19] The Ula-class submarines were also built by TKMS/HDW.
In Kiel, a German-Norwegian Building Program Office (BPO) is to be set up and tasked with representing the two states in matters of design, construction and acceptance. Management will alternate between a German and Norwegian representative, with a third of the staff being Norwegian.[ citation needed ]
Afterwards, a Lifetime Management Program Office (LMPO) is to be established in Haakonsvern Naval Base. Management will also alternate, with a third of the staff being German. The office is to handle questions concerning maintenance and repairs of the submarines. Norway will establish maintenance facilities for both countries submarines. [20] Construction of the first submarine started in September 2023. [21] [22] [23]
According to the Norwegian Armed Forces Long-Term Plan adopted by the Norwegian Parliament on June 4, 2024, Norway will purchase two more submarines in addition to the four submarines already ordered from Germany. [24] [25]
Norwegian and German U212CD (Common Design) submarines are to be based together in Southern Norway. A Norwegian Ministry of Defence official told Janes on 7 June 2024 that a new base for the U212CD, including infrastructure, would be built at Haakonsvern, where Norway's current Ula-class submarines are already based. The new infrastructure will include pier, maintenance, and test facilities for the U212CD. [26]
In August 2024, the Norwegian Ministry of Defence announced having completed the design review of the Type 212CD programme. [27] As a result of completing the Critical Design Review (CDR), the production of the submarines will be intensified. [28] [29]
The submarines will be based on, but nearly twice the size of the current Type 212A class and features a new stealth design - the hull will be diamond-shaped to deflect emissions by the active sonars [30] common on modern anti-submarine warfare (ASW) ships.[ citation needed ]
Just like the Type 212A, the submarines will be fitted with a hydrogen fuel cell-based air-independent propulsion system, although they will receive two (MTU 4000 series) diesel engines instead of one. The overall endurance is to be increased as well. [20]
A new combat system ("ORCCA") to be developed by kta naval systems, a joint venture between TKMS' naval electronics division Atlas Elektronik and Norwegian manufacturer Kongsberg will be installed on the boats [31] and is claimed to allow the analysis of larger amounts of sensor data as well as to improve interoperability with allied forces. The first batch of German Type 212 submarines already uses the Kongsberg-developed MSI-90U Mk1+ combat system.[ citation needed ]
Two optronics masts including sensors from Hensoldt (OMS 150 and OMS 300) will be used instead of the hull-penetrating periscope of the previous U212A class for search, surveillance and attack functions. [32] [33] A Hensoldt panoramic surveillance system will be installed while Kongsberg will contribute the active SA9510S MKII Mine Avoidance and Navigation Sonar as well as echo sounders for navigation. [34]
The submarines will feature four tubes for DM2A4 heavyweight torpedoes and Germany plans to fit the IDAS air-defense missile to theirs.[ citation needed ] In December 2024 it was reported that the Bundestag passed funding for the submarine launched version of the IDAS Missile. [35]
The submarines are being procured by the Norwegian Defence Materiel Agency Forsvarsmateriell (six submarines) [36] and the German Armed Forces Procurement Agency BAAINBw (two submarines). In September 2024 it was reported that Germany and Norway are considering expanding their joint order of Type 212CD submarines. [37] It is speculated that Norway is contemplating ordering two more Type 212CD submarines, while Germany is considering four more Type 212CD submarines. [38] On 19 December 2024 it was reported that the German government had signed a contract with TKMS for the construction of four more Type 212CD submarines. [39] [40]
Name | No. | Order in class | Status | Contract | Laid down | Launched | Comm. | Notes |
---|---|---|---|---|---|---|---|---|
![]() | ||||||||
U-37 | S187 | 3rd | Under contract [41] | 30 Aug 2021 [41] | – | – | 2031 [41] | – |
U-38 | S188 | 5th | – | – | 2034 [41] | |||
U-39 | S189 | – | Under contract [3] | 19 Dec 2024 [3] | – | – | – | – |
U-40 | S190 | – | – | – | – | |||
U-41 | S191 | – | – | – | – | |||
U-42 | S192 | – | – | – | – | |||
TBD | TBD | – | Up to 3 additional expected [42] | – | – | – | – | As part of the Zielbild der Marine ab 2035 (target of the fleet from 2035), Germany plans to have a total of 6 to 9 Type 212 CD, therefore 4 to 7 additional submarines to be ordered. [42] |
TBD | TBD | – | – | – | – | – | ||
TBD | TBD | – | – | – | – | – | ||
![]() | ||||||||
TBD | TBD | 1st | Under construction [43] [44] | 30 Aug 2021 [41] | 12 Sep 2023 [43] | 2027 [45] | 2029 [41] | – |
TBD | TBD | 2nd | – | – | 2030 | |||
TBD | TBD | 4th | Under contract [41] | – | – | 2033 | ||
TBD | TBD | 6th | – | – | 2035 [46] | |||
TBD | TBD | – | Approved for order by parliament [47] | – | – | – | – | Approved in Jun 2024, waiting for order confirmation [48] |
TBD | TBD | – | – | – | – | – |