Xudabao Nuclear Power Plant | |
---|---|
![]() | |
Country | People's Republic of China |
Location | Xingcheng, Huludao, Liaoning |
Coordinates | 40°21′5″N120°32′45″E / 40.35139°N 120.54583°E |
Construction began | 28 July 2021 |
Construction cost | CN¥110 billion (US$16 billion) |
Owners | |
Operator | Liaoning Nuclear Power Company Ltd. |
Nuclear power station | |
Reactor type | CAP1000 PWR VVER-1200 PWR |
Power generation | |
Units planned | 2 × 1000 MW |
Units under const. | 2 × 1000 MW, 2 × 1200 MW |
The Xudabao Nuclear Power Plant, also known as Xudapu, is a nuclear power station under construction in Xudabao Village, Haibin County, Xingcheng, Huludao, on the coast of Liaoning province, in northeast China. It was initially planned to have six 1000-MW AP1000 or CAP1000 light water reactors, [1] but the first two to start construction were changed to VVER-1200s. [2]
China National Nuclear Corporation (CNNC) owns 70% of the project, along with Datang International Power Generation Company (20%), and State Development and Investment Corporation (10%). China Nuclear Power Engineering Company (CNPEC) is the general contractor for the project; the initial version with six AP1000s was expected to cost around CN¥110 billion (US$16 billion) back in 2016. [3]
Preliminary work on the site began in 2010, but no nuclear concrete pour was made, and works were suspended for several years after the 2011 Fukushima Daiichi nuclear disaster. In 2014, the National Nuclear Safety Administration (NNSA) granted approval for the first two units. In 2016, China Nuclear Industry 22 Construction Company (CNI22), a subsidiary of China Nuclear Engineering and Construction Corporation (CNECC) signed an EPC contract for the first two units. [3]
CNNC and Atomstroyexport signed the detailed contract for the construction of two VVER-1200s (Xudabao 3 and 4) on 7 March 2019. [2]
First concrete pour started on 28 July 2021, with Unit 3, which despite its designation is the first reactor at the site. Work on Unit 4 began in May 2022. [4] Rosatom will supply the nuclear island; the turbine generators will be supplied by China. [5] Commercial operation of both units is expected by 2028. [6]
Work on Unit 1, the first CAP1000, began in November 2023. [7] Work on Unit 2 began in July 2024. [8]
In December 2024 the reactor vessel has been installed at Xudabao 4. [9]
The Xudabao Nuclear Power Plant consists of 4 reactors currently under construction.
Unit | Type | Net capacity | Gross capacity | Construction start | Operation start (planned) | Ref. |
---|---|---|---|---|---|---|
Phase 1 | ||||||
Xudabao 3 | VVER-1200 | 1200 MW | 1274 MW | 28 July 2021 | 2027 | [10] |
Xudabao 4 | VVER-1200 | 1200 MW | 1274 MW | 19 May 2022 | 2028 | [11] |
Phase 2 | ||||||
Xudabao 1 | CAP1000 | 1000 MW | 1290 MW | 3 November 2023 | 2028 | [12] |
Xudabao 2 | CAP1000 | 1000 MW | 1290 MW | 17 July 2024 | 2029 | [13] |
State Atomic Energy Corporation Rosatom, also known as Rosatom State Nuclear Energy Corporation,, or Rosatom State Corporation, is a Russian state corporation headquartered in Moscow that specializes in nuclear energy, nuclear non-energy goods and high-tech products. It was established in 2007 and comprises more than 350 enterprises, including scientific research organizations, a nuclear weapons complex, and the world's only nuclear icebreaker fleet.
The water-water energetic reactor (WWER), or VVER is a series of pressurized water reactor designs originally developed in the Soviet Union, and now Russia, by OKB Gidropress. The idea of such a reactor was proposed at the Kurchatov Institute by Savely Moiseevich Feinberg. VVER were originally developed before the 1970s, and have been continually updated. They were one of the initial reactors developed by the USSR, the other being the infamous RBMK. As a result, the name VVER is associated with a wide variety of reactor designs spanning from generation I reactors to modern generation III+ reactor designs. Power output ranges from 70 to 1300 MWe, with designs of up to 1700 MWe in development. The first prototype VVER-210 was built at the Novovoronezh Nuclear Power Plant.
The China National Nuclear Corporation is a state-owned enterprise founded in 1955 in Beijing. CNNC's president and vice-president are appointed by the Premier of the People's Republic of China. CNNC oversees all aspects of China's civilian and military nuclear programs. According to its own mission statement, it "is a main part of the national nuclear technology industry and a leading element of national strategic nuclear forces and nuclear energy development."
The Chashma Nuclear Power Plant is a large commercial nuclear power plant located at Chashma in Mianwali, Punjab, Pakistan.
The Kursk Nuclear Power Plant is one of the three biggest nuclear power plants (NPPs) in Russia and one of the four biggest electricity producers in the country. It is located on the bank of the Seym River about 40 kilometers west of the city of Kursk, midway between it and the town of Lgov, in western Russia. The nearby city of Kurchatov was founded when construction of the plant began. The plant feeds the grid for Kursk Oblast and 19 other regions. As of 2024, the site houses two active reactors and two decommissioned older units. It also houses the partially built Kursk 5 and Kursk 6 units which had construction halted, and two new VVER designs are under construction.
China is one of the world's largest producers of nuclear power. The country ranks third in the world both in total nuclear power capacity installed and electricity generated, accounting for around one tenth of global nuclear power generated. As of February 2023, China has 55 plants with 57GW in operation, 22 under construction with 24 GW and more than 70 planned with 88GW. About 5% of electricity in the country is due to nuclear energy. These plants generated 417 TWh of electricity in 2022 This is versus the September 2022 numbers of 53 nuclear reactors, with a total capacity of 55.6 gigawatt (GW). In 2019, nuclear power had contributed 4.9% of the total Chinese electricity production, with 348.1 TWh.
Tianwan Nuclear Power Plant is a nuclear power plant (NPP) on the coast of the Yellow Sea, approximately 30 kilometers east of downtown Lianyungang, Jiangsu Province, China. The plant's owner is Jiangsu Nuclear Power Corporation, a joint venture with majority owner a subsidiary of China National Nuclear Corporation (CNNC).
The Sanmen Nuclear Power Station is a nuclear power station in Sanmen County, Zhejiang, China. Sanmen is the first implementation of the AP1000 pressurized water reactor (PWR) developed by Westinghouse Electric Company.
Novovoronezh Nuclear Power Plant II is a Russian nuclear power plant with two 1200 MW pressurized water reactors (VVER) located in Voronezh Oblast. The power plant is built on the same site as the present Novovoronezh Nuclear Power Plant.
The Rostov Nuclear Power Plant, also known as the Volgodonsk Nuclear Power Plant, is a Russian nuclear power plant located on the left bank of Tsimlyansk Reservoir in the lower stream of the Don river near Volgodonsk, Rostov Oblast.
Fangjiashan Nuclear Power Plant (方家山核电站) is a nuclear power plant in the Zhejiang province, China, bordering the Shanghai municipality. The plant consists of two 1,080 MW CPR-1000 pressurized water reactors (PWR) at a total cost of estimated 26 billion yuan.
Changjiang Nuclear Power Plant is a nuclear power plant in Tangxing Village of Haiwei Township, Changjiang Li Autonomous County in the province of Hainan. It is the first power plant of its kind in the province.
Slovakia has five operational nuclear reactors, with a combined net power capacity of 2,308 MWe, with a sixth coming on line shortly. Within the EU, Slovakia is one of the pro-nuclear Visegrád Group nations.
The Rooppur Nuclear Power Plant (Bengali: রূপপুর পারমাণবিক বিদ্যুৎকেন্দ্র) is a 2.4 GWe nuclear power plant project in Bangladesh. The nuclear power plant is being constructed at Rooppur of Ishwardi Upazila on the bank of the river Padma, about 160 km northwest of Dhaka. It will be the country's first nuclear power plant, and the first of the two units is expected to go into operation in 2025.
The Hualong One is a Chinese Generation III pressurized water nuclear reactor jointly developed by the China General Nuclear Power Group (CGN) and the China National Nuclear Corporation (CNNC). The CGN version, and its derived export version, is called HPR1000. It is commonly mistakenly referred to in media as the "ACPR1000" and "ACP1000", which are in fact earlier reactors design programs by CGN and CNNC.
The Zhangzhou Nuclear Power Plant is a nuclear power station under construction in Lieyu Town, Yunxiao County, Zhangzhou on the coast of Fujian Province, in southeast China. The plant is owned by CNNC Guodian Zhangzhou Energy Co. Ltd., established in November 2011, which is owned by China National Nuclear Corporation (51%) and China Guodian Corporation (49%). CNNC originally planned to have AP1000 light water reactors, but later changed plans to the Hualong One design.
The IPHWR-700 is an Indian pressurized heavy-water reactor designed by the NPCIL. It is a Generation III reactor developed from earlier CANDU based 220 MW and 540 MW designs. It can generate 700 MW of electricity. Currently there are two units operational, 6 units under construction and 8 more units planned, at a combined cost of ₹1.05 lakh crore (US$13 billion).
The CNP Generation II nuclear reactors were a series of nuclear reactors developed by China National Nuclear Corporation (CNNC), and are predecessors of the more current Hualong One design.
The Lianjiang Nuclear Power Plant is a nuclear reactor under construction in Cheban town, Lianjiang, Guangdong province of eastern China. It is planned to house six CAP1000 pressurized water reactors (PWRs), at a projected cost of 130 billion yuan. It will be the first Chinese nuclear plant with cooling towers, to reduce the amount of heat released into the local water.