Interstate 140 (North Carolina)

Last updated

I-140.svg NC 140.svg

Interstate 140 and North Carolina Highway 140

John Jay Burney Jr. Freeway
Interstate 140 (North Carolina)
I-140 highlighted in red, NC 140 highlighted in purple
Route information
Auxiliary route of I-40
Maintained by NCDOT
Length25.4 mi [1]  (40.9 km)
ExistedAugust 22, 2005 (August 22, 2005) [2] –present
Interstate 140
West endUS 17.svg US 17 near Winnabow
Major intersections
East endI-40.svg I-40 near Murraysville
North Carolina Highway 140
West endI-40.svg I-40 near Murraysville
East endUS 17.svg US 17 in Kirkland
Location
Country United States
State North Carolina
Counties Brunswick, New Hanover
Highway system
NC 138.svg NC 138 NC 141.svg NC 141

Interstate 140 (I-140) and North Carolina Highway 140 (NC 140) is a 25.4-mile (40.9 km) auxiliary Interstate Highway and state highway in the U.S. state of North Carolina. Officially designated the John Jay Burney Jr. Freeway, it serves as a bypass of Wilmington. The western terminus of the highway is at U.S. Route 17 (US 17) near Winnabow. It heads north in western Leland before turning to the east north of an interchange with U.S. Route 74 (US 74)/U.S. Route 76 (US 76). I-140 crosses the Cape Fear River north of Navassa and the Northeast Cape Fear River northwest of Wrightsboro. I-140 ends at Interstate 40 (I-40), and the route number changes to NC 140. NC 140 continues to the east, ending at US 17 in Kirkland.

Contents

The need for a bypass north of Wilmington was identified by the North Carolina Department of Transportation (NCDOT) in 1972. However, the first contract for construction was not awarded until 2000. In August 2005, the first segment of I-140 between I-40 and North Carolina Highway 133 (NC 133) opened. This was followed by a westward extension to U.S. Route 421 (US 421) and an eastward extension to US 17 in June 2006. US 17 was routed along the entirety of the freeway between Kirkland and US 421, running concurrently with I-140. Construction on the western segment between Winnabow and US 74/US 76 began in March 2010 and was opened in September 2014. This segment was temporarily designated as NC 140 as it lacked connection with I-140 to the east. The final segment between US 74/US 76 and US 421 began construction in 2014 and was completed in 2017. I-140 was routed along the entirety of the freeway west of I-40. Additionally, US 17 was removed from its concurrency with I-140, being rerouted through Wilmington in 2017. The remaining section between I-40 and Kirkland was subsequently renumbered as NC 140.

Route description

The western terminus of I-140 is located at a trumpet interchange with US 17 north of the community of Winnabow and southwest of Leland. The I-140 bridge crossing over US 17 at the interchange is named after Wilber E. Rabon, a former Brunswick County Commissioner. [3] I-140 begins running to the northwest, paralleling NC 87 to the east. The highway adjusts and turns to the north, running to the west of a railroad track owned by Military Ocean Terminal Sunny Point. [4] The highway meets US 74/US 76 (exit 5) at a partial cloverleaf interchange. Immediately to the north of the interchange, I-140 enters a residential area, with neighborhoods located on both sides of the highway. The highway also makes a turn to the southeast and east, bypassing both Leland and Navassa to the north. Two additional interchanges at Mount Misery Road (exit 8) and Cedar Hill Road (exit 10) are located along I-140 in Brunswick County. The Interstate crosses the Cape Fear River along the L. Bobby Brown Bridge and enters New Hanover County to the northwest of Wilmington. [5] [1]

I-140 approaching NC 133 north of Wrightsboro Int140wRoadNC-Exit17-NC133 (39245160225).jpg
I-140 approaching NC 133 north of Wrightsboro

Entering New Hanover County, I-140 crosses through an industrial area and begins a turn to the northeast. I-140 meets with US 421 (exit 14) at another partial cloverleaf interchange. Continuing past US 421, I-140 continues in a northeasterly direction, crossing the Northeast Cape Fear River on the Dan Cameron Bridge. The bridge measures 1.43 miles (2.30 km) in length with a main span of 479 feet (146 m) and 82 feet (25 m) of vertical clearance above the river, Rat Island, and adjacent marshlands. [6] Northeast of the bridge, I-140 begins a turn to the east, running alongside a General Electric/Hitachi facility. I-140 meets with NC 133 (exit 17) north of Wrightsboro while turning to the southeast. Crossing Blue Clay Road, I-140 makes another turn to the northeast but turns back to the east before crossing under US 117 and NC 132. I-140 reaches its eastern terminus at a modified cloverleaf interchange with I-40 (exit 20). The ramp between I-140 East and I-40 West uses a flyover design instead of the traditional cloverleaf design. [1]

At the I-40 interchange, the route number changes to NC 140 as the freeway continues to the east. Between I-40 and US 17, the highway runs slightly to the southeast primarily through a wooded area. An interchange is currently under construction with the proposed US 17 Byp. (Military Cutoff Road) northeast of Murraysville. The eastern terminus of NC 140 is located at a trumpet interchange with US 17 in the census-designated place of Kirkland. US 17 merges onto the road and continues as a multilane arterial highway to the northeast. [1]

History

First proposal: Raleigh to Sanford

During the 1990s, North Carolina originally proposed the I-140 designation for 32.36 miles (52.08 km) along the recently upgraded US 1 freeway between the RaleighCary line and Sanford. The American Association of State Highway and Transportation Officials (AASHTO) ultimately disapproved of the routing in their 1999 meeting. [7]

Wilmington northern bypass

The idea of constructing a northern bypass for Wilmington was initially identified by NCDOT as a need in 1972. The outer loop was viewed as a means to help relieve traffic congestion along Market Street and the Cape Fear Memorial Bridge, [8] serving as an additional crossing of the Cape Fear River and providing for better regional connectivity. [9] However, the project was not included as part of the department's construction schedule until 1989. [10] In 1991, NCDOT initiated the evaluation of a pair of proposed routes for the Northern Outer Loop. [11] The northern routing was to have been approximately 22 miles (35 km) in length; it would have resulted in the relocation of 19 homes and 19 businesses while traversing 1,247 acres (505 ha) of wetlands, nine potential hazardous waste sites, and five historic sites. [11] The southern routing was to have been approximately 20 miles (32 km) in length; it would have resulted in the relocation of 58 homes and eight businesses while traversing 2,064 acres (835 ha) of wetlands, seven potential hazardous waste sites, and eight historic sites. [11]

The I-40 interchange (pictured) was the first segment to begin construction. Interstate 140 West at Interstate 40 north of Wilmington.jpg
The I-40 interchange (pictured) was the first segment to begin construction.

In November 1994, the North Carolina Board of Transportation elected to move forward with the southern routing. [12] The initial 5.8-mile (9.3 km) link between I-40 and US 421 was originally to begin construction in 1998 and open by 2001. [12] Due to significant opposition by both local residents and officials, NCDOT unveiled a revised routing in April 1996 that located the route one mile (1.6 km) north of the initial proposal. [13] This revised "central route" was selected as the final routing by NCDOT in April 1997. [10] At the time of its announcement, the route was estimated to cost $126.5 million (equivalent to $205 million in 2021 [14] ) to complete and result in the displacement of 20 homes, eight businesses, the loss of 118 acres (48 ha) of wetlands, and the loss of 290 acres (120 ha) of farmland. [10] Planning would continue through the late 1990s, culminating with the first contract awarded for its construction in November 2000 for the I-40 interchange. [15]

In 1997, local officials initially stated that an Interstate designation was sought for the bypass. [16] In September 2002, the Federal Highway Administration announced that it would grant NCDOT's request and designate the Northern Outer Loop as Interstate 140. [17] The designation was to apply to the initial western segment constructed between I-40 and US 421 and the initial eastern segment constructed between I-40 and US 17. [17] At the time of its announcement, the designation was touted as a significant means to enhance economic development opportunities along its route in addition to potentially serving as a tie-in for moving the proposed eastern terminus of I-74 from Myrtle Beach to Wilmington. [17] Later that month, it was announced the segment east of I-40, would be named the John J. Burney Freeway after the state senator and trustee of the University of North Carolina at Wilmington. [18]

In an effort to protect scenic viewsheds for motorists utilizing the freeway, the Special Highway Overlay District of the New Hanover County Zoning Ordinance was adopted by the County Commission in June 2001. [19] Some of the restrictions of the overlay include banning the construction of billboards, limiting outdoor storage, and increasing setback requirements for structures adjacent to the roadway. [19] [20] Only nine applications for billboards along I-140 were processed and approved prior to its passage. [19]

Construction and opening

The initial $36.7-million (equivalent to $52.6 million in 2021 [14] ) contract for construction of a 6.5-mile (10.5 km) segment of the eastern leg was awarded by NCDOT to Barnhill Contracting Company in November 2003. [21] Its construction had been delayed due to several conflicts. This included the handling of stormwater runoff into Futch Creek and a slight redesign of an offramp at the Market Street interchange in Kirkland to avoid a 450-year-old oak tree. [21] [22] Construction of the eastern segment commenced on December 29, 2003. [23] As late as May 2005, NCDOT remained undecided as to whether or not to open only a portion of the road prior to completion of the elevated section due to the bridge section running behind schedule. [9] The first segment of I-140 opened to traffic on August 22, 2005. [24] Formally dedicated with Governor Mike Easley and US Representative Mike McIntyre in attendance, the 3.2-mile (5.1 km) segment was located between I-40 and NC 133 (Castle Hayne Road). [24] In November 2005, the North Carolina Board of Transportation voted unanimously to name the I-140 bridge across the Northeast Cape Fear River in honor of former Wilmington mayor and businessman Dan Cameron. [25]

The former western terminus of I-140 at US 421 northwest of Wilmington I-140 West End - Exit 14 - US17 US421 (39245161895).jpg
The former western terminus of I-140 at US 421 northwest of Wilmington

In June 2006, NCDOT announced two additional segments of the I-140 project would open by the end of the month. [26] Costing $187 million (equivalent to $245 million in 2021 [14] ) to complete, the US 17 expressway segment between Market Street and I-40 and the segment between NC 133 and US 421 both opened to traffic on June 30, 2006. [27] Concurrent with its opening, the routing of US 17 through Wilmington was also moved to the newly opened expressway; the previous routing of US 17 through Wilmington was changed to U.S. Highway 17 Business (US 17 Bus.), and the U.S. Highway 17 Truck (US 17 Truck) designation was removed from Military Cutoff Road and Oleander Drive upon the opening of the bypass, with through trucks being directed to utilize the newly constructed freeway. [27]

Brunswick County extension

Originally, the freeway was scheduled to be extended west from its current terminus at US 421 to US 74/US 76 first. [28] However, in 2009, NCDOT announced plans to complete the segment between US 17 in Winnabow and US 74/US 76 before the central segment, which would require a bridge across the Cape Fear River. [29] In response to this decision, town leaders from Navassa filed a discrimination complaint against NCDOT, claiming the town was frequently denied funding for infrastructure improvements and other projects. [30] Planning for future construction continued, and, in March 2010, NCDOT awarded an $81.7-million (equivalent to $101 million in 2021 [14] ) contract to Barnhill Contracting Company. [31] The project involved the construction of the 6.118-mile (9.846 km) segment between the US 74/US 76 intersection and US 17 south of Leland. [31] Construction of the segment began in March 2010 as a result of receiving partial funding through the American Recovery and Reinvestment Act. [31]

As part of the expansion into Brunswick County, NCDOT designed several wildlife crossings to allow the black bear and other animals to safely cross the corridor in the vicinity of the Battle Royal Natural Heritage Site. [32] The crossings included the extension of four bridges to provide some upland areas from animal crossings along water bodies and the construction of a 12-by-6-foot (3.7 by 1.8 m) wildlife tunnel just north of the US 74/US 76 interchange. [32] The section between US 17 and US 74/US 76 was opened to traffic in September 2014. [33]

A former directional sign along I-40 showing I-140 and US 17 running concurrently to the west; this designation was removed in 2017. Int40wRoadNC-Exit416AB-US17ns (39245156485).jpg
A former directional sign along I-40 showing I-140 and US 17 running concurrently to the west; this designation was removed in 2017.

With the opening of the Brunswick segment, NC 140 was routed along the entirety of the new freeway. On January 14, 2015, the Certification of Rulemaking was released, confirming the establishment of the new designation along not only the Brunswick segment but all existing and future sections of the Wilmington bypass. The justification in the paperwork for using NC 140 was it would serve as a temporary designation until the entire bypass was complete and the remaining segments could be submitted to AASHTO approval as I-140. [34] The other rationalization was to provide an alternate designation for the entire bypass if a proposal to return US 17 to the streets of Wilmington was enacted. This was prevalent as only the New Hanover segment of I-140 was concurrent with US 17. NCDOT officials in the summer of 2014 called for returning US 17 to its original routing through Wilmington on Market Street, with the exception of placing a part of it on Military Cutoff Road and Oleander Drive. This was due to traffic volume on these roads being large enough to merit a route designation. The proposal was endorsed by the Wilmington Area Transportation Advisory Committee in August 2014. [35] AASHTO's Special Committee on U.S. Route Numbering approved the request on May 14, 2015. [36] On May 17, 2017, US 17 was officially rerouted through Wilmington. [37]

On December 15, 2017, a ribbon-cutting ceremony was held for the final section of the freeway between US 74/US 76 and US 421, officially completing I-140 around Wilmington. However, this segment of road did not officially open to traffic until December 19, 2017, due to the road requiring final construction and cleanup. [38] The section costed $204 million (equivalent to $224 million in 2021 [14] ) and included two 1.4-mile-long (2.3 km) bridges over the Cape Fear River, with 300,000 short tons (270,000 long tons) of stone and 5,000,000 cubic yards (3,800,000 m3) of fill material. [39] I-140 was officially extended west to replace NC 140 between US 17 and US 74/US 76 on August 7, 2018. [40]

Future

In 2002, the North Carolina Board of Transportation appropriated $10 million for the construction of an interchange at Blue Clay Road. [41] The interchange would serve in providing better access to both Wilmington International Airport and the Cape Fear Community College North Campus. There is currently no timeline for the completion of the interchange. [26]

Construction of the US 17 Byp. (temporarily signed as NC 417)/NC 140 interchange in April 2023 Construction Work on the US 17 Byp. NC 140 Interchange 9.jpg
Construction of the US 17 Byp. (temporarily signed as NC 417)/NC 140 interchange in April 2023

An interchange is currently being constructed with the proposed Hampstead Bypass as part of the extension of Military Cutoff Road and Hampstead Bypass. Once completed, US 17 Byp. and I-140/NC 140 will form a bypass of US 17 from Winnabow to Hampstead. Construction on the Military Cutoff Road extension began in 2017, and opened to traffic on September 28, 2023. [42] [43] [44] Work is expected to begin on the Hampstead Bypass north of NC 210 in late 2020, with construction of the segment between NC 140 and NC 210 beginning in 2023. [42] Roadwork of the entire bypass is expected to be completed in 2030. [45] [46]

The proposed Cape Fear Crossing project is proposed to have its western terminus at I-140 in Brunswick County. The proposed freeway would extend east, crossing the Cape Fear River along a newly constructed bridge. The project is currently funded for right-of-way acquisition in the 2019–2029 State Transportation Improvement Plan. However, no construction funding is currently allocated to the project. Once funding is received, it would take approximately five years to complete. [47]

Exit list

CountyLocationmi [1] kmExitDestinationsNotes
Brunswick 0.00.0South plate.svg
US 17.svg
To plate.svg
NC 87.svg
US 17 south to NC 87  Shallotte, Myrtle Beach
Continuation as US 17
0.91.41North plate.svg
US 17.svg
US 17 north Wilmington, Leland
Left exit
Leland 5.69.05US 74.svgUS 76.svg US 74  / US 76  Leland, Whiteville
8.012.98Mount Misery Road
Navassa 9.915.910Cedar Hill Road Navassa
Cape Fear River 11.017.7L. Bobby Brown Bridge
New Hanover 13.121.114US 421.svg US 421  Clinton, Carolina Beach
NE Cape Fear River 14.222.9 Dan Cameron Bridge
Wrightsboro 17.027.417NC 133.svg NC 133  Castle Hayne, Burgaw
Murraysville 19.731.720I-40.svg I-40  Benson, Raleigh, Wilmington, Wrightsville Beach Eastern end of I-140 and western end of NC 140; signed as exits 20A (west) and 20B (east) from westbound NC 140; to UNC Wilmington
Kirkland 22.235.723South plate.svg
NC 417.svg
NC 417 south (Military Cutoff Road)
Opened in 2023; Future US 17 Bypass planned to extend north as Hampstead Bypass in 2025
24.839.925South plate.svg
US 17.svg
US 17 south Wilmington
25.440.9North plate.svg
US 17.svg
US 17 north New Bern, Topsail Island, Jacksonville
Road continues onto US 17
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •        Route transition
  •       Unopened

Related Research Articles

<span class="mw-page-title-main">U.S. Route 117</span> Highway in the United States

U.S. Route 117 (US 117) is a north–south United States Highway located completely within the state of North Carolina. A spur route of US 17, the highway runs for 114 miles (183 km) from the Port of Wilmington, south of downtown Wilmington, to US 301 near Wilson. From its southern terminus, US 117 runs along Shipyard Boulevard and College Road, concurrent with North Carolina Highway 132 (NC 132) through Wilmington. US 117 intersects the eastern terminus of Interstate 40 (I-40) and parallels the interstate until reaching Faison, passing through Burgaw, Wallace, and Warsaw. The highway diverges from I-40 in Faison, running north-northeast through Mount Olive, Goldsboro, and Pikeville to its northern terminus. US 117 meets the southern end of I-795 in Goldsboro, and parallels that route before reaching its northern terminus at US 301 south of Wilson.

<span class="mw-page-title-main">Interstate 295 (North Carolina)</span> Highway in North Carolina

Interstate 295 (I-295), also known as the Fayetteville Outer Loop, is a partially completed Interstate-grade planned 34-mile-long (55 km) bypass around the western side of Fayetteville, North Carolina, United States. As of August 2020, it stretches for 22 miles (35 km) from US Highway 401 (US 401) in western Fayetteville to I-95 and US 13 near Eastover. The final section between US 401 and I-95 near Parkton is being constructed in segments and is expected to be completed around 2026. A two-mile-long (3.2 km) segment from Parkton Road northeast of Parkton to Black Bridge Road south of Hope Mills is signed as North Carolina Highway 295 (NC 295). NC 295 was also used as temporary designations for the highway before I-295 was signed.

<span class="mw-page-title-main">North Carolina Highway 132</span> State highway in New Hanover County, North Carolina, US

North Carolina Highway 132 (NC 132) is a north-south North Carolina State Highway entirely in New Hanover County. The highway follows College Road for the duration of its route. The southern terminus of NC 132 begins at U.S. Route 421 (US 421) in the census-designated place of Myrtle Grove south of Wilmington. Continuing north, NC 132 continues along a major north-south artillery road in the city of Wilmington. Between Shipyard Boulevard and its northern terminus, NC 132 runs concurrently with US 117. NC 132 shares a short concurrency at the eastern terminus of Interstate 40 (I-40), before continuing north toward Castle Hayne. The northern terminus of NC 132 is located at a roundabout with US 117 and NC 133 just south of the main business district of Castle Hayne.

<span class="mw-page-title-main">Interstate 840 (North Carolina)</span> Highway in North Carolina

Interstate 840 (I-840) is a 21.9-mile (35.2 km) auxiliary Interstate Highway and state highway in the U.S. state of North Carolina. It is the northern half of the Greensboro Urban Loop beltway around the city of Greensboro. It connects I-40, I-73, and US 421 in the west with I-40, I-85, and I-785 in the east. It was completed on January 23, 2023.

<span class="mw-page-title-main">Salem Parkway (North Carolina)</span>

The Salem Parkway is an 18.5-mile-long (29.8 km) freeway in the U.S. state of North Carolina, serving the city of Winston-Salem and the town of Kernersville. It is signed as U.S. Route 421 (US 421) for its entire length, though it is also concurrent with US 158 in downtown Winston-Salem and North Carolina Highway 150 (NC 150) between Winston-Salem and Kernersville. Originally known as the East–West Expressway, it was designated as part of Interstate 40 (I-40) and opened in 1958, becoming the first section of Interstate Highway in the state. I-40 was rerouted onto a new alignment bypassing Winston-Salem and Kernersville in 1992, at which time the road was designated Interstate 40 Business, nicknamed Business 40.

<span class="mw-page-title-main">Winston-Salem Northern Beltway</span> Highway in North Carolina

The Winston-Salem Northern Beltway is a partially completed freeway loop around the city of Winston-Salem in North Carolina. The western section has been designated as North Carolina Highway 452 (NC 452), which will become I-274 when completed, and the eastern section of the beltway will be designated as North Carolina Highway 74 (NC 74), which will become part of I-74 when completed. The entire route is in Forsyth County.

<span class="mw-page-title-main">Interstate 74 in North Carolina</span> Highway in North Carolina

Interstate 74 (I-74) is a partially completed part of the Interstate Highway System that is planned to run from Davenport, Iowa, to Myrtle Beach, South Carolina. In the US state of North Carolina, I-74 currently exists in three distinct segments; from I-77 at the Virginia state line to US Highway 52 (US 52) near Mount Airy, from I-40 in Winston-Salem to US 220 near Ellerbe, and from US 74 and US 74 Business near Maxton to US 74/North Carolina Highway 41 (NC 41) near Lumberton. I-74 has an extensive concurrency with I-73 from Randleman to Ellerbe in the Piedmont. When completed, I-74 will link the cities of Mount Airy, Winston-Salem, High Point, Rockingham, Laurinburg, and Lumberton.

<span class="mw-page-title-main">Interstate 40 in North Carolina</span> Highway with its western terminus at the Tennessee state line

Interstate 40 (I-40) is a part of the Interstate Highway System that travels 2,556.61 miles (4,114.46 km) from Barstow, California, to Wilmington, North Carolina. In North Carolina, I-40 travels 420.21 miles (676.26 km) across the entirety of the state from the Tennessee state line along the Pigeon River Gorge to U.S. Route 117 (US 117) and North Carolina Highway 132 (NC 132) in Wilmington. I-40 is the longest Interstate Highway in North Carolina and is the only Interstate to completely span the state from west to east.

<span class="mw-page-title-main">Interstate 73 in North Carolina</span> Highway in North Carolina

Interstate 73 (I-73) is a partially completed Interstate Highway in the US state of North Carolina, traversing the state from south of Ellerbe to near Summerfield through Asheboro and Greensboro. When completed, it will continue south toward Myrtle Beach, South Carolina, and north to Martinsville, Virginia.

<span class="mw-page-title-main">Interstate 20 in South Carolina</span> Interstate in South Carolina

Interstate 20 (I-20) is the main east–west Interstate Highway in the state of South Carolina, linking the state with important transportation and business hubs to the north, west, and south, including Atlanta, Georgia; Charlotte, North Carolina ; Savannah, Georgia ; and Washington, D.C.. I-20 travels 141.51 miles (227.74 km) west to east, from the Georgia state line at North Augusta, through Columbia, to end at I-95 in Florence. Past I-95, the roadway continues as Interstate 20 Business for about two miles (3.2 km) to U.S. Route 76 (US 76), which goes to downtown Florence.

<span class="mw-page-title-main">U.S. Route 70 in North Carolina</span> Highway in North Carolina

U.S. Route 70 (US 70) is a part of the United States Numbered Highway System that runs from Globe, Arizona, to the Crystal Coast of the US state of North Carolina. In North Carolina, it is a major 488-mile-long (785 km) east–west highway that runs from the Tennessee border to the Atlantic Ocean. From the Tennessee state line near Paint Rock to Asheville it follows the historic Dixie Highway, running concurrently with US 25. The highway connects several major cities including Asheville, High Point, Greensboro, Durham, Raleigh, Goldsboro, and New Bern. From Beaufort on east, US 70 shares part of the Outer Banks Scenic Byway, a National Scenic Byway, before ending in the community of Atlantic, located along Core Sound.

<span class="mw-page-title-main">Interstate 795 (North Carolina)</span> Highway in North Carolina

Interstate 795 (I-795) is a 25.49-mile (41.02 km) auxiliary Interstate Highway in the US state of North Carolina. It connects the city of Goldsboro to I-95 just south of Wilson, paralleling the northern portion of US Route 117 (US 117). The road runs a five-mile (8.0 km) concurrency with US 264 and I-587 in the last section of the route. It serves as a primary freeway spur for the city of Goldsboro to the Interstate Highway System, as well part of a major cargo route for the cities of Down East, which was a part of the impetus for its designation in 2007.

<span class="mw-page-title-main">U.S. Route 1 in North Carolina</span>

U.S. Highway 1 (US 1) is a north–south United States Numbered Highway which runs along the East Coast of the U.S. between Key West, Florida, and the Canada–United States border near Fort Kent, Maine. In North Carolina, US 1 runs for 174.1 miles (280.2 km) across the central region of the state. The highway enters North Carolina from South Carolina, southwest of Rockingham. US 1 runs northeast, passing through or closely bypassing Southern Pines and Sanford in the Sandhills region. It next passes through Cary, the state capital of Raleigh, and Wake Forest. The highway continues north to Henderson, before leaving the state at the Virginia state line, near Wise. The route is mostly a multilane divided arterial road, with several freeway segments. It serves as a strategic highway, connecting the North Carolina Sandhills and Research Triangle regions northward to the Southside region.

<span class="mw-page-title-main">U.S. Route 421 in North Carolina</span> Highway in North Carolina

U.S. Route 421 (US 421) is part of the United States Numbered Highway System that runs from Fort Fisher, North Carolina to Michigan City, Indiana. In the U.S. state of North Carolina, US 421 travels 328 miles (528 km) from its southern terminus at Fort Fisher to the Tennessee state line near the community of Zionville, North Carolina. US 421 traverses the state from east to west travelling from the coastal plains to Appalachian Mountains. It provides an important connection between the cities of Wilmington, Sanford, Greensboro, Winston-Salem, and Boone. Despite being signed as north–south, much of the routing of US 421 in North Carolina runs in an east–west direction, particularly between Greensboro and the Tennessee state line. Portions of US 421 have been upgraded to freeway standards including the majority of its routing between Sanford and North Wilkesboro.

<span class="mw-page-title-main">U.S. Route 17 in North Carolina</span> Highway in North Carolina

U.S. Highway 17 (US 17) in the U.S. state of North Carolina is a north–south highway that is known as the Coastal Highway in the southeastern half of the state and the Ocean Highway in other areas. The route enters the state from South Carolina near Calabash and leaves in the vicinity of the Great Dismal Swamp National Wildlife Refuge in Virginia. Between the US 64 freeway and the Virginia state line, US 17 is a four-lane divided highway with speed limits varying between 45 mph (72 km/h) and 70 mph (110 km/h).

<span class="mw-page-title-main">U.S. Route 76 in North Carolina</span> Section of highway in North Carolina

U.S. Highway 76 (US 76) is a U.S. Highway running from Chattanooga, Tennessee to Wrightsville Beach, North Carolina. In North Carolina the highway runs for 80.4 miles (129.4 km) in the southeastern region of the state. US 76 enters the state from South Carolina south of Fair Bluff in Columbus County. Travelling in an eastward direction, US 76 meets US 74 in Chadbourn. The two highways run concurrently for 50.4 miles (81.1 km) between Chadbourn and Wilmington. US 76 runs concurrently with US 17 along much of its Wilmington routing, until once again meeting US 74. US 76 and US 74 run concurrently for 1.4 miles (2.3 km) until reaching Wrightsville Beach. US 76 reaches its eastern terminus on the south side of Wrightsville Beach, at an intersection with Water Street.

<span class="mw-page-title-main">North Carolina Highway 133</span> State highway in North Carolina, US

North Carolina Highway 133 (NC 133) is a primary state highway in the U.S. state of North Carolina. It traverses 46.6 miles (75.0 km) from Oak Island Drive in Oak Island to NC 210 in Bells Crossroads. The route serves communities such as Southport, Belville, Leland, Wilmington, and Castle Hayne. Additionally, NC 133 serves as an entry point for Military Ocean Terminal Sunny Point located to its east. Much of NC 133 runs parallel to the Cape Fear River and Brunswick River between Southport and Belville. West of Wilmington, NC 133 runs concurrently with U.S. Route 17 (US 17), US 74, and US 76. The road follows another concurrency along US 74 and US 421, west of Downtown Wilmington, and crosses into New Hanover County on the Isabel Holmes Bridge. North of Wilmington, NC 133 exits to the north, serving several suburban communities north of Wilmington. NC 133 runs concurrently with US 117 through Castle Hayne, before bearing northwest toward Bells Crossroads.

<span class="mw-page-title-main">Hampstead Bypass (North Carolina)</span> Proposed state highway in North Carolina

The Hampstead Bypass, likely to be designated as U.S. Highway 17 Bypass, is a planned route in the U.S. state of North Carolina, serving as a bypass of Ogden and Hampstead. It will consist of two sections which meet at North Carolina Highway 140 (NC 140): a limited-access extension of Military Cutoff Road, temporarily designated as North Carolina Highway 417 (NC 417), and a controlled-access portion that will serve as a bypass of Hampstead. The Military Cutoff Road extension began construction in 2017 and opened to traffic on September 28, 2023. Construction on the the first portion of the Hampstead Bypass began on March 11, 2022 and is expected to be completed in 2026. Construction on the second portion is expected to begin soon after and be completed in 2030.

<span class="mw-page-title-main">Interstate 885</span> Highway in North Carolina

Interstate 885 (I-885) and North Carolina Highway 885 (NC 885) is an 11.5-mile (18.5 km) auxiliary Interstate Highway and state highway in the U.S. state of North Carolina. It links NC 540 and I-40 to I-85 in the Durham area. The route consists of two previously preexisting segments of freeway—NC 147 to the south and US 70 to the north—connected by the East End Connector, which opened to traffic on June 30, 2022.

<span class="mw-page-title-main">Shelby Bypass</span> Highway in North Carolina

The Shelby Bypass, planned to be designated as U.S. Route 74 Bypass, is a future 18.5-mile (29.8 km) four-lane freeway bypass of the city of Shelby along U.S. Route 74 (US 74) in Cleveland County in the U.S. state of North Carolina. It will begin at a trumpet interchange with US 74 west of Shelby, running along its northern city limits, before terminating at another trumpet interchange with US 74 on the southeast city limits of Shelby. The project will also include upgrading a stretch of US 74 from the eastern Shelby Bypass interchange to the diamond interchange with U.S. Route 74 Business just west of Kings Mountain. The bypass is currently under construction in six sections and is currently expected to be fully open to traffic in 2024.

References

  1. 1 2 3 4 5 Google (September 13, 2020). "Overview map of Interstate 140 (North Carolina)" (Map). Google Maps . Google. Retrieved September 13, 2020.
  2. "Vovici EFM Report: RN-08-03 (2008-12-15)" (PDF). North Carolina Department of Transportation. December 15, 2008. Retrieved July 4, 2013.
  3. North Carolina Department of Transportation (February 6, 2014). "Board of Transportation Meeting" (PDF). North Carolina Department of Transportation. p. 1113. Archived from the original (PDF) on June 3, 2014. Retrieved October 16, 2014.
  4. Still, Johanna. "The Department of Defense wants a say in future development around MOTSU". Port City Daily. Retrieved November 6, 2020.
  5. WECT Staff (October 9, 2019). "I-140 bridge named after former Navassa mayor". Wilmington, North Carolina: WECT-TV. Retrieved November 6, 2020.
  6. "US-17 Wilmington Bypass". Miami, FL: GLF Construction Corporation. Retrieved April 26, 2010.
  7. Special Committee on U.S. Route Numbering (April 17, 1999). "Report of the Special Committee on U.S. Route Numbering to the Standing Committee on Highways" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from the original (PDF) on October 16, 2017. Retrieved July 13, 2013.
  8. State Road Maintenance Unit – Mapping & Information Section (December 9, 2009). Enlarged Municipal & Suburban Areas of New Hanover County (Map). North Carolina Department of Transportation. Sheet 3 of 6.
  9. 1 2 McGrath, Gareth (May 4, 2005). "Going up – Six months past due, the U.S. 17 Wilmington bypass bridge is still up in the air". Star-News. Wilmington, North Carolina. p. 1B.
  10. 1 2 3 Hervey, Philip (April 24, 1997). "Northern Outer Loop; Central bypass route is chosen; 20 homes in path of U.S. 17 project". Star-News. Wilmington, North Carolina. p. 1A.
  11. 1 2 3 Myers, Richard (June 11, 1994). "Northern Outer Loop; Environmental impact weighed for routes of planned roadway". Star-News. Wilmington, North Carolina. p. 2B.
  12. 1 2 Hervey, Philip (November 5, 1994). "Board of transportation; 5.8-mile link between I-40 AND U.S. 421; State favors shorter of 2 routes for Outer Loop". Star-News. Wilmington, North Carolina. p. 5B.
  13. Hervey, Philip (April 17, 1996). "Route moved; New plan for bypass brings little but groans". Star-News. Wilmington, North Carolina. p. 2B.
  14. 1 2 3 4 5 Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved January 1, 2023. United States Gross Domestic Product deflator figures follow the Measuring Worth series.
  15. McGrath, Gareth (November 3, 2000). "1st U.S. 17 Wilmington bypass contract award is today". Star-News. Wilmington, North Carolina. p. 1B.
  16. Fennell, Bettie (May 15, 1997). "Interstate status sought for bypass". Star-News. Wilmington, North Carolina. p. 2B.
  17. 1 2 3 McGrath, Gareth (September 19, 2002). "Outer Loop named Wilmington's 2nd interstate". Star-News. Wilmington, North Carolina. p. 1A.
  18. McGrath, Gareth (September 23, 2002). "Burney name goes on bypass". Star-News. Wilmington, North Carolina. p. 1B.
  19. 1 2 3 Talton, Trista (November 5, 2002). "I-140 corridor will have more scenic views – Highway overlay zone means green space is a legal priority". Star-News. Wilmington, North Carolina. p. 2B.
  20. New Hanover County Planning Department (March 2009). "Section 59.6: Special Highway Overlay District" (PDF). New Hanover County Zoning Ordinance. New Hanover County. pp. 72–73. Retrieved April 26, 2010.[ dead link ]
  21. 1 2 McGrath, Gareth (November 6, 2003). "Awarding of contract moves loop forward". Star-News. Wilmington, North Carolina. p. 1B.
  22. McGrath, Gareth (March 31, 2001). "Circling history; New highway to bypass aged tree". Star-News. Wilmington, North Carolina. p. 1A.
  23. McGrath, Gareth (December 31, 2003). "Outer loop work starts eastward - Delays end for part of U.S. 17 project". Star-News. Wilmington, North Carolina. p. 1A.
  24. 1 2 McGrath, Gareth (August 23, 2005). "First leg of I-140 is opened - road should ease area traffic". Star-News. Wilmington, North Carolina. p. 1B.
  25. Staff Report (November 3, 2005). "Bridge Named After Dan Cameron". Wilmington, North Carolina: WECT-TV. Retrieved April 25, 2010.
  26. 1 2 McGrath, Gareth (June 20, 2006). "Two sections of Outer Loop opening soon". Star-News. Wilmington, North Carolina. p. 1A. Retrieved November 6, 2020.
  27. 1 2 McGrath, Gareth (June 29, 2006). "Relief for commuters". Star-News. Wilmington, North Carolina. p. 1A. Retrieved November 6, 2020.
  28. Gannon, Patrick (July 15, 2009). "U.S. 17 bypass's Brunswick leg to be started earlier than planned". Star-News. Wilmington, North Carolina. Retrieved November 6, 2020.
  29. Gannon, Patrick (September 16, 2009). "Navassa officials feeling bypassed by road-building schedule". Star-News. Wilmington, North Carolina. Retrieved November 6, 2020.
  30. Little, Ken (October 15, 2009). "Navassa alleges DOT racial discrimination in U.S. 17 bypass schedule". Star-News. Wilmington, North Carolina. Retrieved November 6, 2020.
  31. 1 2 3 Little, Ken (March 15, 2010). "Road work keeps construction workers on job". Star News Online. Retrieved November 6, 2020.
  32. 1 2 McGrath, Gareth (November 29, 2009). "DOT to spend millions on 'critter crossings' for bears, other wildlife". Star-News. Wilmington, North Carolina. Retrieved November 6, 2020.
  33. "After weather delays, next piece of Wilmington Bypass to open soon". wwaytv3.com. Retrieved December 12, 2014.
  34. "Route Changes (2015-01-14)" (PDF). North Carolina Department of Transportation. January 14, 2015. Retrieved February 17, 2015.
  35. McGrath, Gareth (August 27, 2014). "Committee endorses proposal to reroute U.S. 17 onto Wilmington city streets". Star-News. Wilmington, North Carolina. Retrieved November 6, 2020.
  36. Special Committee on U.S. Route Numbering (May 14, 2015). "Special Committee on U.S. Route Numbering Spring 2015 Report to the Standing Committee on Highways" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from the original (PDF) on June 3, 2019. Retrieved June 2, 2015.
  37. "Route Changes (2017-05-17)" (PDF). North Carolina Department of Transportation. May 17, 2017. Retrieved June 24, 2017.
  38. Buckland, Tim (December 19, 2017). "Breaking: Last stretch of I-140 opens". Star-News. Wilmington, North Carolina. Retrieved December 19, 2017.
  39. "Briefly". News & Observer . Raleigh, North Carolina. December 21, 2017. p. 3A.
  40. "Route Changes (2018-08-07)" (PDF). North Carolina Department of Transportation. August 7, 2018. Retrieved November 6, 2020.
  41. McGrath, Gareth (September 22, 2002). "Budget includes highway project". Star-News. Wilmington, North Carolina. Retrieved April 26, 2010.
  42. 1 2 "U.S. 17 Hampstead Bypass & Military Cutoff Road Extension". North Carolina Department of Transportation. Retrieved November 6, 2020.
  43. McGrath, Gareth (August 7, 2018). "Construction begins on complicated Military Cutoff link to I-140". Star-News. Wilmington, North Carolina. Retrieved December 13, 2018.
  44. Pociask, Megan (September 28, 2023). "With opening of Military Cutoff Road extension, traffic relief coming to northern New Hanover". Wilmington Star-News. Retrieved September 28, 2023.
  45. Darrough, Mark (September 6, 2018). "Hampstead Bypass now fully funded, construction to begin soon". Port City Daily. Retrieved December 13, 2018.
  46. McGee, Kendall (March 11, 2022). "NC DOT officially breaks ground on Hampstead Bypass". www.wect.com. Retrieved September 28, 2023.
  47. "Cape Fear Crossing". North Carolina Department of Transportation. Retrieved November 6, 2020.
Template:Attached KML/Interstate 140 (North Carolina)
KML is from Wikidata