J-class submarine

Last updated

Six J class subs next to their supply ship HMAS Platypus 1919.jpg
Six J-class subs next to their supply ship HMAS Platypus in 1919
Class overview
NameJ class
Operators
In commission1916–1930
Planned8
Completed7
Cancelled1
Lost1
Scrapped6
Preserved1 (J7 is extant as a breakwater)
General characteristics (original design)
Type Submarine
Displacement
  • 1,210 tons (surfaced)
  • 1,760 tons (submerged)
Length274 ft (84 m)
Beam23 ft 1 in (7.04 m)
Draught14 ft (4.3 m)
Propulsion
  • Three shafts
  • Surfaced – 3 × 12-cylinder diesel engines (3,600 hp)
  • Submerged – 2 × battery-driven electric motors (1,350 hp)
Speed
  • 19 knots (35 km/h) (surfaced)
  • 9.5 knots (17.6 km/h) (submerged)
Range91 tons Diesel Oil for5,000 nautical miles (9,000 km) at 12.5 knots (23 km/h)
Test depth300 feet (91 m)
Complement5 officers, 40 seamen
Armament
Wreck of HMAS J7 at Sandringham Yacht Club marina HMAS J7 Submarine Sandringham Yacht Club 600 1662.JPG
Wreck of HMAS J7 at Sandringham Yacht Club marina

The J-class submarines were seven submarines developed by the Royal Navy prior to the First World War in response to claims that Germany was developing submarines that were fast enough to operate alongside surface fleets. Six were completed during mid-1916, while a seventh entered service at the end of 1917.

Contents

Although larger and more powerful than previous British submarines, the J class could not keep up with surface vessels, and operated independently during the war. Between them, the submarines sank a U-boat, and heavily damaged two battleships, with the loss of HMS J6 to friendly shelling.

Following the war, the six surviving submarines were gifted to the Royal Australian Navy (RAN). All six were paid off during the 1920s. Two were scuttled as breakwaters in Port Phillip Bay, and four were scuttled in the ship graveyard off Port Phillip heads.

Design

Shortly before the First World War, incorrect reports reached the British fleet that the Germans were planning a class of fast submarines for operation with the fleet, and British efforts turned toward provision of similar vessels. The driving requirement would be a surface speed that matched the speed of the battlefleet. In order to meet the requirement, the DNC designed a three shaft submarine that was 100-foot (30 m) longer than the E class, with electric motors confined to the two outer shafts and a hull form based on a light cruiser. [1] This resulted in a diesel-electric design that was unique within the Royal Navy.

The power requirement was 1,200 horsepower (890 kW) per diesel engine. In order to meet this power requirement, Vickers, the pre-eminent builder of submarine diesels in First World War Britain, elected to produce a 12-cylinder version of their previously successful 100 brake horsepower (75 kW) per cylinder six- and eight- cylinder engines for the D and E classes respectively. They retained the 14.5-by-15-inch (368 by 381 mm) bore and stroke of these previous engines and produced 1,200 shaft horsepower at 380 revolutions per minute. These engines eventually went into the J, L and M-class submarines. [2]

The design featured four bow tubes and two beam tubes for 18-inch (457 mm) torpedoes; they were the first British submarines to carry four bow tubes. Although designed to reach 19.5 knots (36 km/h), the boats could only practically travel at 19 knots (35 km/h), making them too slow for fleet use. The quest for fleet submarine performance turned toward the subsequent, steam powered K class. The endurance of the J class was considerably greater than previous submarines.

Eight boats were originally ordered, although two were later cancelled, while a seventh was later reordered to a slightly modified design. The first six were laid down between March and May 1915, with J7 laid down in August 1916. The six early boats were completed between April and August 1916, and J7 in November 1917. [3]

Operational history

Royal Navy

The first boat, HMS J4 was commissioned at the height of the war on 17 July 1916 and assigned to the 11th Submarine Flotilla at Blyth in Northumberland, where it was soon joined by the others. These large submarines with their high speed and formidable armament were considered prestige commands, and their early commanders included such notables as Nasmith, Boyle, and Horton. [4]

The J-class submarines took part in activities against German surface vessels and German submarines both off the Tyne and Gibraltar. On 5 November 1916, HMS J1 sighted a group of four German battleships at a range of 4,000 yards (3,700 m). The boat fired a four-torpedo salvo, of which two struck, one hitting SMS Grosser Kurfürst, while the other struck SMS Kronprinz; both enemy battleships were considerably damaged. On 7 July 1917, HMS J2, sighted a U-boat and fired a four-torpedo salvo, of which one apparently hit, sinking SM U-99. HMS J6 was sunk in error during 1918 by shelling from the Q-ship Cymric off Blyth. [5]

Royal Australian Navy

The Australian government had a strong desire to include submarines in its new navy before the outbreak of the war and ordered AE1 and AE2 of the E class. The early loss of both of these boats frustrated the submarine ambitions of the Royal Australian Navy (RAN), seeking a replacement for AE1 as early as October 1914, and setting aside 125,000 pounds in the 1915–1916 estimates for this purpose, however the pressures of wartime meant there was no spare capacity in British yards. In 1916, the manager of Cockatoo Island Dockyard sent a party of ten to study submarine construction in Britain, the party returning in 1918. Further searches for a replacement design were made, but before any progress could be made, the prospect of a gift from the Royal Navy became apparent. [6]

At the end of the war, the Royal Navy looked to consolidate its large wartime construction program by retiring older ships or ships armed with 18-in torpedoes in favour of the units of the L-class patrol and H-class coastal submarines, which were armed with 21-inch (533 mm) torpedoes.

The J class, with their older pattern torpedoes and obsolete tactical concept were surplus to requirements and offered to the Australian government as a part of the gift fleet. Australia had already ordered a submarine depot ship HMAS Platypus before the war. Commander E.C. Boyle, RN, VC was appointed as the flotilla commander and a collection of other RN loan officers, six junior RAN sub-lieutenants and RN and RAN enlisted volunteers, including a "sprinkling" of former AE2 crew members, made up the crews of the six boats. [7]

The six submarines and the depot ship left Britain on 8 April 1919, and sailed via Gibraltar, Malta, Suez, Aden, Columbo, Singapore, Thursday Island and Moreton Bay. They arrived in Sydney on 15 July 1919.

On arrival the need for a program of deep maintenance and battery replacement became urgent, given their arduous wartime service, limited maintenance, and breakdowns experienced on the voyage out. Short term repairs being made to all boats in late 1919, while J3 and J7 entered a deep refit in early 1920 that was to last more than a year, while the other four boats completed a program of peacetime exercises, cruises and port visits from their new base at Geelong, Victoria. Practice returns show that in the last quarter of 1920, the four operational boats made eighty submerged simulated attacks with 39 calculated to have hit. Management issues at Cockatoo Island delayed the refits of J3 and J7 by three months in early 1921. In March 1921, it was calculated that refit costs had reached 73,500 pounds for J3 and 110,861 pounds for J7; the Admiralty had previously advised that the annual operating costs for these boats was 28,300 pounds. [8]

In April 1921, a report to the board gave the status of the six submarines as follows: [9]

The heavy expenditure on submarines, poor materiel condition of the fleet, and general cutbacks in naval expenditures in the wake of the war made it clear about this time (mid-1921) that the flotilla would have to be reduced to reserve. A plan was drawn up in July by Boyle with three boats remaining in service (J3, J4, and J7) with three laid up in reserve (J1, J2, and J5). This plan was authorised in August, and dredging, wharf construction, and reserve crews were performed at Flinders Naval Depot. The plan was expected to save between 100,000 and 130,000 pounds per year. [10]

In early 1922, the operational boats completed exercises at Geelong and J3 and J4 participated in fleet exercises in Hobart. On 20 March, the dredging at Flinders was complete and J1, J4, and J5 were steamed around from Geelong and laid up. Shortly after, the government informed the RAN that a further 500,000 pound cut to the naval estimates would be made, leaving the Naval Board with no option but to lay up all six boats. There were a number of proposals to run on a cadre force at minimal expense with the J7, the boat in the best condition, but these proposals were not taken up. All of the boats were progressively de-stored and sold off for disposal. Four of the submarines, J1, J2, J4, and J5, were scuttled in Bass Strait, approximately 4 kilometres (2.2 nmi) west-southwest of the entrance to Port Phillip Bay, and are currently popular scuba diving sites. The remaining two submarines were scuttled as breakwaters inside Port Phillip Bay, with J3 located near Swan Island in Queenscliff. J7 was the last to go; there were more proposals to recommission her for training, and she was routinely used to provide electrical power to the naval depot. However, she was eventually disposed of in 1927,[ citation needed ] and scuttled at the Sandringham Yacht Club in 1930. [11]

Engineering heritage award

The submarines received an Engineering Heritage National Marker from Engineers Australia as part of its Engineering Heritage Recognition Program. [12]

Related Research Articles

HMS <i>J1</i> J class submarine

HMS J1 was a J-class submarine operated by the Royal Navy and the Royal Australian Navy.

HMS <i>J2</i> J class submarine

HMS J2 was a J-class submarine operated by the Royal Navy and the Royal Australian Navy.

HMS J3 was a J-class submarine operated by the Royal Navy and the Royal Australian Navy.

HMS <i>J4</i> J class submarine

HMS J4 was a J-class submarine operated by the Royal Navy and the Royal Australian Navy.

HMS <i>J5</i> 1916 J class submarine

HMS J5 was a First World War J class submarine operated by the Royal Navy and the Royal Australian Navy.

HMS <i>J7</i> Submarine of the Royal Navy

HMS J7 was a J-class submarine operated by the Royal Navy and the Royal Australian Navy.

HMS <i>Sceptre</i> (P215) UK submarine

HMS Sceptre (P215) was a third-batch S-class submarine built for the Royal Navy during World War II. Completed in April 1943, she spent the majority of her career in the North Sea, off Norway. After an uneventful patrol, the submarine participated in Operation Source, an attack on German battleships in Norway using small midget submarines to penetrate their anchorages and place explosive charges. However, the midget submarine that she was assigned to tow experienced technical difficulties and the mission was aborted. During her next four patrols, Sceptre attacked several ships, but only succeeded in severely damaging one. She was then ordered to tow the submarine X24, which was to attack a floating dry dock in Bergen. The operation, codenamed Guidance, encountered difficulties with the attacking submarine's charts, and the explosives were laid on a merchant ship close to the dock instead. The dock was damaged and the ship sunk, and X24 was towed back to England. Sceptre then conducted a patrol in the Bay of Biscay, sinking two German merchant ships, before being reassigned to tow X24 to Bergen again. The operation was a success, and the dry dock was sunk.

HMS <i>Trump</i> (P333) T class British submarine

HMS Trump was a British submarine of the third group of the T class. She was built by Vickers-Armstrongs, Barrow, and launched on 25 March 1944. So far she has been the only ship of the Royal Navy (RN) to bear the name Trump. She spent the majority of her life attached to the 4th Submarine Squadron based in Australia. She was kept in service following the war and was refitted for greater underwater performance, and was the final RN submarine to be posted in Australia, departing in January 1969. She was sold off and broken up for scrap in August 1971.

HMAS <i>Brisbane</i> (1915) Town-class light cruiser

HMAS Brisbane was a Town class light cruiser of the Royal Australian Navy (RAN). Built in Sydney between 1913 and 1916 to the Chatham subtype design, Brisbane operated in the Indian Ocean, Pacific Ocean, and Australian coastal waters during World War I.

HMAS <i>Torrens</i> (D67) River-class torpedo-boat destroyer of the Royal Australian Navy

HMAS Torrens, named for the River Torrens, was a River-class torpedo-boat destroyer of the Royal Australian Navy (RAN). The destroyer was built at Cockatoo Island Dockyard and entered service with the RAN in 1916. The destroyer was first deployed to East Asia, then the Mediterranean, where she remained for the rest of World War I. After returning to Australia, the destroyer was decommissioned, but saw use in several ports for reservist training before the decision to sell her for scrap was made. After being stripped, the destroyer was towed outside Sydney Heads, used for gunnery practice, and scuttled.

River-class torpedo-boat destroyer

The River class was a class of six torpedo-boat destroyers operated by the Royal Australian Navy (RAN). The design was based on a modified version of the British River-class destroyer, 13 of which were planned under the 1904 Naval Estimates, but were cancelled before orders were placed. The first batch of three ships was ordered for the Commonwealth Naval Forces in 1909, followed later by a second batch of three a few years later. All six vessels are named after Australian rivers.

HMAS <i>Huon</i> (D50) River-class torpedo-boat destroyer of the Royal Australian Navy

HMAS Huon (D50), named after the Huon River, was a River-class torpedo-boat destroyer of the Royal Australian Navy (RAN). Originally to be named after the River Derwent, the ship was renamed before her 1914 launch because of a naming conflict with a Royal Navy vessel.

<span class="mw-page-title-main">Royal Australian Navy Submarine Service</span> Submarine element of the Royal Australian Navy

The Royal Australian Navy Submarine Service is the submarine element of the Royal Australian Navy. The service currently forms the Navy's Submarine Force Element Group (FEG) and consists of six Collins class submarines.

HMS <i>Stratagem</i> S-class submarine of the Royal Navy

HMS Stratagem was a third-batch S-class submarine built for the Royal Navy during World War II. Completed in 1943, she made her first war patrol off Norway before she was sent to the Far East, where she conducted three war patrols. On her second, she shelled installations on a Japanese-held island. Her only success came on her last patrol, when she torpedoed and sank a Japanese oil tanker. Soon after, she was spotted by aircraft and depth charged by a destroyer. She was forced to surface, and was scuttled to prevent her capture. Ten crew members escaped the sinking submarine and were taken prisoner, of whom only three survived the war.

HMS <i>Sea Nymph</i> (P223) S-class Submarine of the Royal Navy

HMS Sea Nymph was a S-class submarine of the third batch built for the Royal Navy during World War II. Completed in July 1942, she spent the majority of her career patrolling the waters off Norway in the North Sea, then was sent to the Pacific but was forced back due to technical problems.

HMS <i>Tabard</i> (P342) British T-class submarine

HMS Tabard was a British submarine of the third group of the T class. She was built by Scotts, Greenock, and launched on 21 November 1945. So far she has been the only boat of the Royal Navy to bear the name Tabard, after the item of clothing. Having been launched after the war, she was selected, along with a number of boats of her class, to try out new streamlining techniques based on the German Type XXIII submarine. In May 1963, she was involved in a collision with HMAS Queenborough, and on 10 February 1964 she underwent exercises with HMAS Melbourne and HMAS Voyager in the hours before their collision. When she returned to the UK, she became the static training submarine at the shore establishment HMS Dolphin, until 1974 when she was sold and broken up.

HMS <i>B7</i> British B-class submarine

HMS B7 was one of 11 B-class submarines built for the Royal Navy in the first decade of the 20th century. Completed in 1906, she was initially assigned to the Home Fleet, before the boat was transferred to the Mediterranean six years later. After the First World War began in 1914, B7 played a minor role in the Dardanelles Campaign. The boat was transferred to the Adriatic Sea in 1916 to support Italian forces against the Austro-Hungarian Navy. She was converted into a patrol boat in 1917 and was sold for scrap in 1919.

HMS <i>B8</i> British B-class submarine

HMS B8 was one of 11 B-class submarines built for the Royal Navy in the first decade of the 20th century. Completed in 1906, she was initially assigned to the Home Fleet, before the boat was transferred to the Mediterranean six years later. After the First World War began in 1914, B8 played a minor role in the Dardanelles Campaign. The boat was transferred to the Adriatic Sea in 1916 to support Italian forces against the Austro-Hungarian Navy. She was converted into a patrol boat in 1917 and was sold for scrap in 1919.

HMS <i>B9</i> British B-class submarine

HMS B9 was one of 11 B-class submarines built for the Royal Navy in the first decade of the 20th century. Completed in 1906, she was initially assigned to the Home Fleet, before the boat was transferred to the Mediterranean six years later. After the First World War began in 1914, B9 played a minor role in the Dardanelles Campaign. The boat was transferred to the Adriatic Sea in 1916 to support Italian forces against the Austro-Hungarian Navy. She was converted into a patrol boat in 1917 and was sold for scrap in 1919.

<span class="mw-page-title-main">Samsung Galaxy J series</span> Discontinued line of Android smartphones

The Samsung Galaxy Jseries is a discontinued line of entry-level 32-bit Android smartphones produced by the South Korean company Samsung Electronics, first introduced in 2015 and focused on emerging markets. This series is a part of Samsung Galaxy series, preceding the current Galaxy M Series and placed below the mid-range Galaxy A Series.

References

Notes

  1. Brown, p. 124
  2. Cummins, p. 201
  3. Akermann, p. 160
  4. Akermann, p. 160
  5. Akermann, p. 162
  6. Jeremy, p. 9
  7. White, p. 38
  8. White, p. 107
  9. White, p. 107
  10. White, p. 110
  11. Callanan, Tim (25 September 2021). "As the spotlight falls on Australia's new submarines, this one is ageing quietly at a Melbourne marina". ABC News . Retrieved 26 September 2021.
  12. "J class Submarine -". Engineers Australia. Retrieved 2 May 2020.

Sources