Location | City Mall, Christchurch, New Zealand |
---|---|
Coordinates | 43°31′59.77″S172°38′6.27″E / 43.5332694°S 172.6350750°E |
Address | Cashel Street |
Opening date | 29 October 2011 |
Closing date | 31 January 2018 |
Developer | Restart The Heart Trust |
Number of tenants | c. 50 |
Container Mall (originally called Re:START) was a temporary mall built from shipping containers in Christchurch Central City, New Zealand. It was a response to the 22 February 2011 Christchurch earthquake, which destroyed most buildings in City Mall (Cashel and High Streets), and resulted in the central city being cordoned off from public access while buildings were being demolished. Initially considered a short-term response to the lack of permanent buildings, Re:START was popular with locals and tourists alike and remained open for business until January 2018.
City Mall was the main shopping area in central Christchurch. The pedestrian mall was made up of two blocks of Cashel Street (from Oxford Terrace to High Street), and one block of High Street (from Cashel Street to Hereford Street). The central city including buildings in City Mall suffered some damage in the 4 September 2010 Canterbury earthquake. Although lower in magnitude, the 2010 Boxing Day earthquake was more damaging as the epicentre was directly located under the central city. [1] It was the 22 February 2011 Christchurch earthquake that all but devastated the city centre, when many of the building façades of the historic buildings in the mall collapsed. [2]
In April 2011, it was announced that part of Cashel Street was to reopen on 29 October 2011. The date was set just prior to Cup and Show Week, where the Canterbury A&P Show is held in the week that coincides with the provincial anniversary day. [3] The initiative was driven by the Restart The Heart Trust, which was set up for the purpose of getting retail back into the central city. The Restart The Heart Trust was given an interest-free loan of $3.36 million by the Christchurch Earthquake Appeal Trust. [4] [5] Temporary shops made from shipping containers were fitted out as retail premises, to accommodate 27 shops branded as Re:START. [6] Ballantynes, Christchurch's remaining department store, also reopened and is the retail anchor. Prime Minister John Key officiated at the opening ceremony. [7]
The original proponent of the concept, Paul Lonsdale of the Central City Business Association, became the manager of the mall initiative. [8] Lonsdale and others initially claimed that it was the world first pop-up mall, [9] [10] but there were already container malls in other places, for example Cholula (Mexico) and Bishkek (Kyrgyzstan). Organisers of the Christchurch mall project were threatened with legal action by organisers of a similar project in London (Boxpark) that was yet to open. [11] Shipping containers were chosen because they were "strong & re-locatable" (the mall was developed while Christchurch still experienced strong aftershocks, e.g. the June 2011 earthquake), and due to agreements with land owners, it may be necessary to relocate the mall to make way for building reconstruction. The initial 27 tenants were given six-months contracts. [6]
Re:START was opened on Saturday, 29 October 2011 by the mayor, Bob Parker, and the prime minister, John Key, with the latter calling the project "incredibly funky". [12] An estimated 10,000 visitors came to the opening, with one retailer describing it as having a "carnival atmosphere". [13] Access to Re:START was from the western end of City Mall, with much of the central city still cordoned off, including Colombo Street; it was not until 30 June 2013 that the central city cordons were removed. [14] The initial layout saw about two-thirds of the shops north of Cashel Street opposite Ballantynes, and the remainder south of Cashel Street to the west of Ballantynes. [15]
In December 2013, it was announced that by April 2014, Re:START may have to close, which evoked a strong reaction by the public and stakeholders for it to be retained. [16] The lease on the northern part of the mall was about to expire, with most of the land owned by Lichfield Holdings, and a building project was about to start. [5] A month later, it was reported that negotiations were under way for a relocation of the northern part of the mall. [5] In February 2014, the Christchurch newspaper The Press announced that the northern part of the mall was to shift west, to be adjacent to the part that is located south of Cashel Street. [17] The Earthquake Recovery Minister, Gerry Brownlee, announced in March 2014 that the Crown had given a $1.27 million grant to the Restart The Heart Trust for relocation onto land partially owned by the Crown and partially in private hands. [18] It took 10 days to relocate the northern part of the mall, [19] and Brownlee opened the relocated part on 13 June 2014. [15]
In 2012, Christchurch's earthquake recovery was given a boost when international travel guide Lonely Planet included it in its list of 'top 10 cities to visit' in 2013, with Re:START listed as "most bizarre sight". [20]
Re:START manager Lonsdale gained a high profile through this initiative and was one of two main contenders for the Christchurch mayoralty in the October 2013 local elections. Beaten by former Labour Party MP Lianne Dalziel for the mayoralty, Lonsdale was successful as a Christchurch City Councillor. [21]
With closure of the mall pending, the Re:Start the Heart Trust wound up in 2017 and the assets were sold to Riverside Ltd, a development company led by Richard Peebles. The container mall closed on Wednesday, 31 January 2018, with the various tenants dispersing to other locations throughout the city centre. [22] Riverside Ltd bought land in that area from The Crown to achieve half a hectare (5000 square metres), which is the minimum development size for the city mall area. They planned to place five buildings on the site bounded by Cashel Street, Oxford Terrace, and Lichfield Street, including a 7-day indoor farmers' market. The cost of this development is NZ$80 million. [23]
TheArts Centre Te Matatiki Toi Ora is a hub for arts, culture, education, creativity and entrepreneurship in Christchurch, New Zealand. It is located in the Gothic Revival former Canterbury College, Christchurch Boys' High School and Christchurch Girls' High School buildings, many of which were designed by Benjamin Mountfort. The centre is a national landmark and taonga as it is home to New Zealand's largest collection of category one heritage buildings with 21 of the 23 buildings covered by Heritage New Zealand listings.
Twinkle Toes is the largest excavator in the Southern Hemisphere. It was used in Christchurch to demolish tall buildings following the 2010 and 2011 earthquakes before moving to Wellington following the 2016 Kaikōura earthquake.
Christchurch Central City or Christchurch City Centre is the geographical centre and the heart of Christchurch, New Zealand. It is defined as the area within the Four Avenues and thus includes the densely built up central city, some less dense surrounding areas of residential, educational and industrial usage, and green space including Hagley Park, the Christchurch Botanic Gardens and the Barbadoes Street Cemetery.
The Bus Exchange was the main public transport facility in the central city of Christchurch, New Zealand. Part of it was indoor and featured airport-style lounges. The Bus Exchange opened in November 2000 and closed due to the February 2011 Christchurch earthquake, which damaged the building beyond repair. The replacement facility, the Bus Interchange, opened across the other side of Lichfield Street in May 2015.
Colombo Street is a main road of the city of Christchurch, New Zealand. It runs south-north through the centre of Christchurch with a break at Cathedral Square. As with many other central Christchurch streets, it is named for a colonial Anglican bishopric, Colombo, Sri Lanka in what at the time was known as Ceylon. Parts of the street which run through Sydenham were known as Addison Street during the 1880s, and some parts were known as Colombo Road.
The Hotel Grand Chancellor was a major four-star hotel in the centre of Christchurch in New Zealand, one of eleven Hotel Grand Chancellor establishments across Australia and New Zealand. The hotel was located at 161 Cashel Street, close to the city's City Mall central shopping precinct.
The Bridge of Remembrance is one of two main war memorials in Christchurch, New Zealand. It is dedicated to those who died in World War I, and serves as a memorial for those who participated in two World Wars as well as subsequent conflicts in Borneo, Korea, Malaya, and Vietnam. Owned by Christchurch City Council, it is located on the Cashel Street Bridge at the head of City Mall. The Bridge of Remembrance was repaired and strengthened following the 2011 Christchurch earthquake and was reopened with a rededication ceremony held on Anzac Day in 2016.
St Paul's Church was a heritage-listed former Presbyterian church in Cashel Street, Christchurch. Built in 1877, the church was registered by the New Zealand Historic Places Trust as a Category I heritage building. Following the February 2011 Christchurch earthquake, the building was removed from the heritage list and demolished.
The Guthrey Centre at 126 Cashel Street, Christchurch Central City, originally the offices of Andersons Foundry and later 'Andersons Ltd, was a Category I heritage building registered by the New Zealand Historic Places Trust. The building was demolished following severe damage from the February 2011 Christchurch earthquake.
Peter Jamieson Beaven was a New Zealand architect based in Christchurch, who lived for his last few months in Blenheim. He was a co-founder of New Zealand's first heritage lobby group, the Civic Trust.
City Mall is the main pedestrian mall in the central city of Christchurch, New Zealand, comprising two sections of Cashel Street plus the Bridge of Remembrance and one section of High Street. It is also known colloquially as Cashel Mall. The Bridge of Remembrance was pedestrianised in 1976. The main mall was closed to traffic on 11 January 1982 and formally reopened as a pedestrian mall on 7 August, but it was not until 1992 that the entire mall was paved. The mall was redeveloped between 2006 and 2009, and track was installed for an expansion of the heritage tram network.
J Ballantyne and Company Ltd, trading as Ballantynes is a Christchurch, New Zealand-based department store operator. Established in 1854, it is New Zealand's oldest department store. Ballantynes is also a member of the Intercontinental Group of Department Stores. Alongside their flagship store in Christchurch Central City, stores also operate in Timaru and Invercargill.
TheTrinity Church or Trinity Congregational Church designed by Benjamin Mountfort, later called the State Trinity Centre, is a Category I heritage building listed with Heritage New Zealand. Damaged in the 2010 Canterbury earthquake and red-stickered after the February 2011 Christchurch earthquake, the building was threatened with demolition like most other central city heritage buildings. In June 2012, it was announced that the building would be saved, repaired and earthquake strengthened. The building, post its church status, has housed some commercial operations, including the State Trinity Centre; 'The Octagon' (2006–2010); and later, following earthquake repairs, a business called 'The Church Brew Pub' (2023–present).
The Central City Red Zone, also known as the CBD Red Zone, was a public exclusion zone in the Christchurch Central City implemented after the 22 February 2011 Christchurch earthquake. After February 2013, it was officially renamed the CBD Rebuild Zone by government agencies, but remained known as the Red Zone. It gradually shrank in size and the last cordons were removed on 30 June 2013, 859 days after the earthquake.
Antony Thomas Gough is a New Zealand businessman and property developer based in Christchurch. The grandson of Tracy Thomas Gough, who founded Gough, Gough and Hamer, Gough is considered to be one of the city's most influential businessmen. He is the developer of The Terrace, a major commercial development in Christchurch's retail district and part of the city's reconstruction programme following the 2011 earthquake.
An earthquake occurred in Christchurch on 14 February 2016 at 1:13 p.m. local time and initially recorded as 5.9 on the Richter scale, but subsequently reviewed as 5.7. Often referred to as the Valentine's Day earthquake, it was centred in the sea off New Brighton at a depth of 15 kilometres (9.3 mi). It was the first large earthquake that the Christchurch area had experienced since May 2012, and it was part of the earthquake sequence that started with the 4 September 2010 Canterbury earthquake.
Shand's Emporium, previously known as Gee's, is a historic building in the central city of Christchurch, New Zealand. One of the oldest commercial buildings to remain from the time Christchurch was founded, it was relocated in June 2015 from its original location in Hereford Street to Manchester Street, where it is placed adjacent to another heritage building, The Octagon.
East Lake is an open water course under consideration in Christchurch, New Zealand. The facility, located within the residential red zone adjacent to the Avon River, would be suitable for international rowing regattas. The facility is estimated at NZ$160m to construct.
The Christchurch Central Recovery Plan, often referred to as the Blueprint, is the plan developed by the Fifth National Government of New Zealand for the recovery of the Christchurch Central City from a series of earthquakes, in particular the February 2011 Christchurch earthquake. The Canterbury Earthquake Response and Recovery Act 2010 required the Christchurch City Council to develop a recovery plan for the central city. The plan, known as Share an Idea, was presented to the Minister for Canterbury Earthquake Recovery, Gerry Brownlee, in December 2011. Brownlee rejected the city council's plan, established the Canterbury Earthquake Recovery Authority (CERA), and tasked that organisation with developing a plan based on the city council's draft. The Christchurch Central Recovery Plan was published in July 2012 and defined 17 anchor projects. All projects where a timeline was specified were to have been finished by 2017; none of the 17 projects have been delivered on time and some have not even been started yet.