This article relies largely or entirely on a single source .(January 2016) |
St Bedes Junction rail crash | |
---|---|
Details | |
Date | 17 December 1915 07:20 |
Location | St Bedes Junction near Jarrow |
Coordinates | 54°58′27″N1°27′53″W / 54.9742°N 1.4646°W |
Country | England |
Line | North Eastern Railway |
Cause | Signalman's error |
Statistics | |
Trains | 3 |
Deaths | 19 |
Injured | 81 |
List of UK rail accidents by year |
The accident at St Bedes Junction was one of several serious accidents in 1915. It featured a double collision and fire fuelled by gas, characteristics shared by a much worse accident that year at Quintinshill. There were also similarities in that a signalman was unaware of the presence of a train near his signal box and rules were not observed. The accident is sometimes referred to as the Jarrow railway disaster as there was no station at Bede and Jarrow was then the nearest place of importance.
St. Bedes Junction lay opposite the up (westbound) platform at Bede Metro Station. [1] When the Tyne and Wear Metro was created, it used the former up line through Jarrow and the new station site at Bede. The former down (eastbound) line was used for freight access to sidings and became known as the Jarrow branch. The Metro along this section was single track with passing loops. St. Bedes Junction thus became a point of divergence rather than a junction but the line to Tyne Dock Bottom was retained to serve the Simonside Wagon Works. The wagon works remained open as late as 1987 but has subsequently closed and the track lifted as far back as the siding serving Jarrow Shell (UK). The Metro may already have used the redundant track bed to extend its double track section. The junction coordinates are 54.9742°N, 1.4646°W.
Another point of divergence, once a junction, lies between Jarrow and Bede Metro stations and this serves Jarrow Shell (UK). It is easily mistaken for the site of St. Bedes Junction. [2] Its coordinates are 54.9773°N, 1.4824°W. Jarrow and Bede Metro stations lie on what was the North Eastern Railway line between Newcastle upon Tyne and South Shields. Jarrow was rebuilt for Metro operation and Bede was a completely new station. Both have two platforms, those at Bede are staggered and placed either side of a rail over road bridge. The Jarrow branch passes to the north of the platforms at Jarrow and is not served by them. A similar arrangement existed at Bede until the branch was lifted.
In 1981, the Railway Magazine had a map showing the full extent of the planned Tyne and Wear Metro system. This map includes the planned track layout through Jarrow. In particular, you can see the separation of freight tracks from those of the Metro, the single-track sections and passing loops at stations. The branch to Tyne Dock Bottom is shown commencing at a new station, Bede, and a short branch near Jarrow serves Jarrow Shell (UK).
Further changes are due in the area as NEXUS, the operator of the Tyne and Wear Metro has launched Metro Flow, a project to reinstate dual tracking on the remaining sections of single line near Jarrow. This scheme will see dual use with both Metro and freight trains using the same tracks. The formation of the Jarrow branch will provide the track bed for the additional running line. This scheme has the potential to introduce additional junctions to the Metro.
The scene around St. Bedes Junction and Tyne Dock is much changed today with new roads and industrial buildings nearby. Sidings once connected to the railway have been removed as the land was repurposed. In 2022, it is still possible to make out parts of the now disused and overgrown branch near Bede station as it curves towards the dock. A disused rail over road bridge, once used for the Jarrow branch, remains in place just north of the bridge carrying the Metro tracks.
From St. Bedes junction, a mineral line descended on a gradient of 1 in 100 to Tyne Dock Bottom. On 17 December 1915, in the early morning in fog, a goods train ran out onto the main line past St Bedes signal box having been banked in the rear up the incline by a six-coupled tank engine. The banking engine, uncoupled, dropped away from the goods train and came to a stand on the up main line, but was not seen by the signalman. Shortly afterwards, the signalman accepted the 07:05 passenger train from South Shields to Newcastle on the up line and the 06:58 empty stock train from Hebburn to South Shields which was travelling at about 10 mph (16 km/h). [3] The passenger train collided with the rear of the banking engine at 30 mph (48 km/h), telescoping the two leading coaches. Almost immediately the empty stock train collided with the wreckage, killing the fireman. A subsequent enquiry suggested that 18 people lost their lives instantaneously during the collision. The gas-lit passenger coaches were then consumed by fire. 81 people were injured. [2] [4] [5] [6]
The signalman's failure to notice that the goods train had been banked was the primary cause of the disaster but also at fault was the driver of the banking engine who stood for 17 minutes before obeying Rule 55 and sending his fireman back to the signal box, by which time it was too late to avert the accident. The continued use of gas-lighting also contributed to the severity of the accident and a circular was sent to all railway companies stressing the importance of replacing gas with electric lighting. It was some years before this was put into practice, however. [2]
Jarrow is a town in South Tyneside in the county of Tyne and Wear, England. It is on the south bank of the River Tyne, about 3 miles (4.8 km) from the east coast. The 2011 census area classed Hebburn and The Boldons as part of the town, it had a population of 43,431. It is home to the southern portal of the Tyne Tunnel and 5 mi (8.0 km) east of Newcastle upon Tyne.
The Quintinshill rail disaster was a multi-train rail crash which occurred on 22 May 1915 outside the Quintinshill signal box near Gretna Green in Dumfriesshire, Scotland. It resulted in the deaths of over 200 people and remains the worst rail disaster in British history.
The North Eastern Railway (NER) was an English railway company. It was incorporated in 1854 by the combination of several existing railway companies. Later, it was amalgamated with other railways to form the London and North Eastern Railway at the Grouping in 1923. Its main line survives to the present day as part of the East Coast Main Line between London and Edinburgh.
The Hawes Junction rail crash occurred at 5.49 am on 24 December 1910, just north of Lunds Viaduct between Hawes Junction and Aisgill on the Midland Railway's Settle and Carlisle main line in the North Riding of Yorkshire, England. It was caused when a busy signalman, Alfred Sutton, forgot about a pair of light engines waiting at his down (northbound) starting signal to return to their shed at Carlisle. They were still waiting there when the signalman set the road for the down Scotch express. When the signal cleared, the light engines set off in front of the express into the same block section. Since the light engines were travelling at low speed from a stand at Hawes Junction, and the following express was travelling at high speed, a collision was inevitable. The express caught the light engines just after Moorcock Tunnel near Aisgill summit in Mallerstang and was almost wholly derailed.
The Charfield railway disaster was a fatal train crash which occurred on 13 October 1928 in the village of Charfield in the English county of Gloucestershire. The London, Midland and Scottish Railway (LMS) Leeds to Bristol night mail train failed to stop at the signals protecting the down refuge siding at Charfield railway station. The weather was misty, but there was not a sufficiently thick fog for the signalman at Charfield to employ fog signalmen. A freight train was in the process of being shunted from the down main line to the siding, and another train of empty goods wagons was passing through the station from the Bristol (up) direction.
Preston railway station in Preston, Lancashire, England, is an interchange railway station on the West Coast Main Line, half-way between London Euston and Glasgow Central. It is served by Avanti West Coast, Northern Trains and TransPennine Express services, plus Caledonian Sleeper overnight services between London and Scotland. It is also served by the Calder Valley line to Leeds and York, and by branch lines to Blackpool, Ormskirk, and Colne.
Pelaw is a Tyne and Wear Metro station, serving the suburbs of Bill Quay, Pelaw and Wardley, Gateshead in Tyne and Wear, England. It joined the network on 15 September 1985.
The Winwick rail crash took place at Winwick Junction, near Warrington on the London, Midland and Scottish Railway, on 28 September 1934. Two trains collided, resulting in 11 deaths and 19 injured.
The Glasgow and Paisley Joint Railway was the section of railway line between Glasgow Bridge Street railway station and Paisley, in the west of Scotland. It was constructed and operated jointly by two competing railway companies as the stem of their lines to Greenock and Ayr respectively, and it opened in 1840. The Joint Committee, which controlled the line, built a branch to Govan and later to Cessnock Dock, and then Prince's Dock.
Bede is a Tyne and Wear Metro station, serving the town of Jarrow, South Tyneside in Tyne and Wear, England. It joined the network on 24 March 1984, following the opening of the fifth phase of the network, between Heworth and South Shields.
Jarrow is a Tyne and Wear Metro station, serving the town of Jarrow, South Tyneside in Tyne and Wear, England. It joined the network on 24 March 1984, following the opening of the fifth phase of the network, between Heworth and South Shields.
The Riverside Branch was a 6+1⁄2-mile (10.5 km) double-track branch line, which ran between Riverside Junction in Heaton and Percy Main West Junction in Percy Main.
The Kirtlebridge rail crash took place in 1872 at Kirtlebridge railway station in Dumfriesshire. An express passenger train ran into a goods train that was shunting; 11 people lost their lives immediately, and one further person succumbed later. The cause was a failure to communicate between the station master in charge of the shunting operation, and the signalman. There was not full interlocking of the points, and the block system of signalling was not in use.
The Brandling Junction Railway was an early railway in County Durham, England. It took over the Tanfield Waggonway of 1725 that was built to bring coal from Tanfield to staiths on the River Tyne at Dunston. The Brandling Junction Railway itself opened in stages from 1839, running from Gateshead to Wearmouth and South Shields. Wearmouth was regarded at the time as the "Sunderland" terminal.
Sources
Citations