Clapham Junction rail crash

Last updated

Clapham Junction rail crash
Clapham Junction 1988 incident 2 geograph-3149688-by-Ben-Brooksbank.jpg
View of the crash site and clean up operations the day after the collision
Details
Date12 December 1988;35 years ago (1988-12-12)
08:10
Locationnear Clapham Junction, London, England
CountryUnited Kingdom
Line South West Main Line
Operator Network SouthEast
CauseUnprotected wrong-side failure
Statistics
Trains4
Deaths35
Injured69 serious, 415 minor, 484 total
List of UK rail accidents by year

The Clapham Junction rail crash occurred on the morning of 12 December 1988, when a crowded British Rail passenger train crashed into the rear of another train that had stopped at a signal just south of Clapham Junction railway station in London, England, and subsequently sideswiped an empty train travelling in the opposite direction. A total of 35 people died in the collision, while 484 were injured. [1]

Contents

The collision was the result of a signal failure caused by a wiring fault. New wiring had been installed, but the old wiring had been left in place and not adequately secured. An independent inquiry chaired by Anthony Hidden, QC found that the signalling technician responsible had not been told that his working practices were wrong, and his work had not been inspected by an independent person. He had also performed the work during his 13th consecutive seven-day workweek. Hidden was critical of the health and safety culture within British Rail at the time, and his recommendations included ensuring that work was independently inspected and that a senior project manager be made responsible for all aspects of any major, safety-critical project such as re-signalling work.

British Rail was fined £250,000 for violations of health and safety law in connection with the incident.

Collisions

On 12 December 1988 the 07:18 from Basingstoke to London Waterloo, a crowded 12-car train made up of four-car 4VEP electric multiple units 3033, 3119 and 3005, was approaching Clapham Junction when the driver saw the signal ahead of him change from green ("proceed") to red ("danger"). Unable to stop at the signal, he stopped his train at the next signal and then reported to the signal box by means of a line-side telephone. He was told there was nothing wrong with the signal. Shortly after 08:10, [2] [3] the following train, the 06:30 from Bournemouth, made up of 4REP unit 2003 and 4TC units 8027 and 8015, collided with the Basingstoke train. A third train, carrying no passengers and comprising 4VEP units 3004 and 3425, was passing on the adjacent line in the other direction and collided with the wreckage immediately after the initial impact. The driver of a fourth train, coasting with no traction current, saw the other trains and managed to come to a stop behind the other two and the signal that should have protected them, which was showing a yellow "proceed with caution" aspect instead of a red "danger" aspect. [3] [4]

Casualties

As a result of the collisions, 35 people died, and 69 were seriously injured. Another 415 sustained minor injuries. [5] Twenty-two of the people killed were from Dorset and the New Forest, including the train driver John Rolls who was from Bournemouth. [6]

Emergency response

The driver of the Basingstoke train was off his train and standing by the line-side telephone when his train was pushed forward several feet by the collision. He picked up the receiver and spoke to the signalman, informing him of the collision and asking him to call the emergency services. The signalman immediately switched all the signals he could to 'danger', and signalled to the adjacent signal boxes he had an obstruction on the line. He had no control over automatic signals, however, and was not able to stop the fourth train. He then called the Clapham Junction station manager and asked him to call the emergency services. [7] The crash had tripped the high-voltage feed to the traction current. The operator in the nearby Raynes Park electrical control room suspected there had been a derailment and re-configured the supply so that the nearby Wimbledon line trains could still run. [8]

Pupils and teachers from the adjacent Emanuel School, who were first on the scene of the disaster, [9] were later commended for their service by Prime Minister Margaret Thatcher. [10] Rescue was hampered because the railway was in a cutting, with a metal fence at the top and a wall at the bottom of a wooded slope. [11] The last casualty was taken to hospital at 13:04 and the last body was removed at 15:45. [5]

Investigations

An initial internal investigation showed that a wiring fault meant that the signal would not show a red danger aspect when the track circuit immediately in front of the signal was occupied. [12] Work associated with the Waterloo Area Resignalling Scheme meant new wiring had been installed, [13] but the old wiring had been left connected at one end, and loose and uninsulated at the other. [12]

An independent inquiry was chaired by Anthony Hidden, QC for the Department for Transport. His eventual report included 93 recommendations, for changes to the working practices of both British Rail and the emergency services. [14]

A 1978 British Rail Southern Region report had concluded that due to the age of the equipment the re-signalling was needed by 1986. However, approval was given in 1984 after a report of three wrong-side signal failures. [15] The re-signalling project had been planned assuming more people were available, but employees felt that the programme was inflexible and that they were under pressure to get the work done. [16] Installation and testing was carried out at weekend during voluntary overtime, the technician having worked a seven-day week for the previous 13 weeks. [17] The re-wiring had been done a few weeks previously, but the fault had only developed the previous day when equipment had been moved and the loose and uninsulated wire had created a false feed to a relay.

The signalling technician who had done the work had not cut back, insulated, nor tied back the loose wire and his work had not been supervised, nor inspected by an independent person as was required. [18] In particular, a wire count that would have identified that a wire had not been removed was not carried out. [19] There had been inadequate training, assessment, supervision and testing and, with a lack of understanding of the risks of signalling failure, these were not monitored effectively. [20]

Memorial at the site of the crash, 2012 Clapham Junction Memorial 2.JPG
Memorial at the site of the crash, 2012

Critical of the health and safety culture within British Rail at the time, [20] Hidden recommended that unused signal wires needed to be cut back and insulated, and that a testing plan be in place, with the inspection and testing being done by an independent person. Signal technicians needed to attend refresher courses every five years, and testers needed to be trained and certified. Management was to ensure that no one was working high levels of overtime, [21] and a senior project manager made responsible for all aspects of the project. [22] Unprotected wrong side signal failures – where the failure permitted a train to go beyond where it was permitted – had to be reported to the Railway Inspectorate. [23] Cab radios, linking driver and signalman, were recommended, [24] as was the installation of address system on existing trains that were not expected to be withdrawn within five years. [25]

Legacy

Testing was mandated on British Rail signalling work [26] and the hours of work of employees involved in safety-critical work was limited. [27] Although British Rail was fined £250,000 (equivalent to £678,000in 2023 [28] ) for breaches of the Health and Safety at Work etc. Act 1974, [29] there was no prosecution for manslaughter. In 1996 the collision was one of the events cited by the Law Commission as reason for new laws on manslaughter, resulting in the Corporate Manslaughter and Corporate Homicide Act 2007. [30]

A memorial marking the location of the crash site is at the top of the cutting above the railway on Spencer Park, Battersea. [31]

The Basingstoke train stopped at the next signal after the faulty signal, in accordance with the rule book. Railway historian Adrian Vaughan suggests this may not be the best way of handling faulty signals. If the Basingstoke train had carried on to the signal following the next signal, the crash would not have happened because the Bournemouth train would have stopped at the signal where the crash occurred. As of 1999, the rule book had not been changed. [32]

In 2017, a Rail Accident Investigation Branch report into a serious irregularity at Cardiff Central on 29 December 2016 revealed that some of the lessons from the Clapham Junction crash appeared to have been forgotten. In that incident, a pair of redundant points had been left in an unsafe condition and undetectable by the signalling system. The alertness of a driver prevented a serious incident. Excessive working hours, cancellation of route-proving trains and lack of detailed planning were identified as contributory factors to the incident. [33] A year later, a report into a collision at London Waterloo highlighted similar circumstances, saying that "some of the lessons from the 1988 Clapham Junction accident are fading from the railway industry's collective memory". [34]

Related Research Articles

The Ladbroke Grove rail crash was a rail accident which occurred on 5 October 1999 at Ladbroke Grove in London, England, when two passenger trains collided almost head-on after one of them had passed a signal at danger. With 31 people killed and 417 injured, it was one of the worst rail accidents in 20th-century British history.

<span class="mw-page-title-main">Quintinshill rail disaster</span> 1915 railway accident in Scotland

The Quintinshill rail disaster was a multi-train rail crash which occurred on 22 May 1915 outside the Quintinshill signal box near Gretna Green in Dumfriesshire, Scotland. It resulted in the deaths of over 200 people and remains the worst rail disaster in British history.

<span class="mw-page-title-main">Southall rail crash</span> 1997 high-speed rail crash near London

The Southall rail crash occurred on 19 September 1997, on the Great Western Main Line at Southall, West London. An InterCity 125 high speed passenger train (HST) failed to slow down in response to warning signals and collided with a freight train crossing its path, causing seven deaths and 139 injuries.

<span class="mw-page-title-main">Colwich railway accident</span> 1986 rail crash at Colwich Junction, England

The Colwich rail crash occurred on the evening of Friday 19 September 1986 at Colwich Junction, Staffordshire, England. It was significant in that it was a high-speed collision between two packed express trains. One driver was killed, but no passengers died because of the great strength of the rolling stock involved, which included Mk1, Mk2 and Mk3 coaches.

A wrong-side failure describes a failure condition in a piece of railway signalling equipment that results in an unsafe state. A typical example would be a signal showing a 'proceed' aspect when it should be showing a 'stop' or 'danger' aspect, resulting in a "false clear".

The Purley station rail crash was a train collision that occurred just to the north of Purley railway station in the London Borough of Croydon on Saturday 4 March 1989, leaving five dead and 88 injured. The collision was caused by the driver of one of the trains passing a signal at danger; he pleaded guilty to manslaughter and was sentenced to 12 months in prison plus six months suspended, although this was reduced to four months upon appeal, and in 2007 overturned. The Department of Transport report noted that the signal had a high incidence of being passed at danger and recommended that an automatic train protection system should be introduced without delay and in the interim a repeater for the signal that had been passed be installed.

<span class="mw-page-title-main">1892 Thirsk rail crash</span> Train crash on the North Eastern Railway on 2 November 1892

The 1892 Thirsk rail crash happened at Manor House signal box on 2 November 1892, on the North Eastern Railway about 3 miles (4.8 km) north of Thirsk railway station in the North Riding of Yorkshire, England.

The Winwick rail crash took place at Winwick Junction, near Warrington on the London, Midland and Scottish Railway, on 28 September 1934. Two trains collided, resulting in 11 deaths and 19 injured.

<span class="mw-page-title-main">Clayton Tunnel rail crash</span> 1861 railway accident near Brighton, England

The Clayton Tunnel rail crash occurred on Sunday 25 August 1861, five miles (8 km) from Brighton on the south coast of England. At the time it was the worst accident on the British railway system. A train ran into the back of another inside the tunnel, killing 23 and injuring 176 passengers.

<span class="mw-page-title-main">1913 Ais Gill rail accident</span> Train crash in Cumbria, England

The Ais Gill rail accident occurred on the Settle–Carlisle line in Northwest England on 2 September 1913. Two long trains were both ascending a steep gradient with some difficulty, because their engines generated barely enough power to carry the load. When the first train stopped to build up steam pressure, the driver and fireman of the second train were distracted by maintenance routines, and failed to observe the warning signals. The collision wrecked several carriages, which were then engulfed by flammable gas, killing 16 people and injuring 38.

<span class="mw-page-title-main">Lewisham rail crash</span> 1957 train wreck in Lewisham, London, England

On the evening of 4 December 1957, two trains crashed in dense fog on the South Eastern Main Line near Lewisham in south-east London, causing the deaths of 90 people and injuring 173. An electric train to Hayes had stopped at a signal under a rail bridge, and the following steam train to Ramsgate crashed into it, destroying a carriage and causing the bridge to collapse onto the steam train. The bridge had to be completely removed; it was over a week before the lines under the bridge were reopened, and another month before the bridge was rebuilt and traffic allowed over it.

Two rail accidents have occurred near Castlecary, Scotland. One of these was in 1937 and one in 1968. Both events involved rear-end collisions, and caused the deaths of 35 and 2 people respectively.

<span class="mw-page-title-main">Glasgow Bellgrove rail accident</span> Railway crash at Bellgrove, Glasgow, Scotland, in 1989

The Bellgrove rail accident occurred on 6 March 1989 when two passenger trains collided near Bellgrove station, Glasgow, United Kingdom. Two people were killed and 53 were injured. The cause was driver error, with a signal being passed at danger. The layout of a junction was a contributory factor.

<span class="mw-page-title-main">Watford rail crash</span> 1996 rail crash in England

In the early evening of 8 August 1996, a Class 321 passenger train operated by Network SouthEast travelling from London Euston on the West Coast Main Line Down Slow line at around 110 km/h (68 mph) passed a signal at danger. Having applied the brakes it eventually stopped 203 m (222 yd) past the signal and was traversing the junction between the Down Slow line and the Up Fast line. An empty Class 321 coaching stock train approaching at roughly 80 km/h (50 mph) collided with the stationary passenger train approximately 700 m south of Watford Junction whilst progressing across the connections from the Up Slow line to the Up Fast line.

On 21 July 1991, two commuter trains crashed just west of Newton railway station in Cambuslang, near Glasgow, Scotland. The junction had been remodelled in the month previous to the crash.

There was a rail crash near Welwyn Garden City railway station in Hertfordshire, England, in 1935 which killed fourteen people, and another in 1957 with one fatality.

The Connington South rail crash occurred on 5 March 1967 on the East Coast Main Line near the village of Conington, Huntingdonshire, England. Five passengers were killed and 18 were injured.

<span class="mw-page-title-main">Cowden rail crash</span> 1994 collision in Kent, England

The Cowden rail crash occurred on 15 October 1994, near Cowden Station in Kent (UK), when two trains collided head-on, killing five and injuring 13, after one of them had passed a signal at danger and entered a single-line section. The cause was due to a collective of issues; the AWS being inoperative, the signal was dirty and the light intensity was low, and there were no trap points to prevent a train wrongly entering a section against the signal.

The Wrawby Junction rail crash was a train crash which occurred on 9 December 1983, at Wrawby Junction, near Barnetby station, North Lincolnshire, England.

References

Notes

  1. Hidden 1989, pp. iv, 1, 4.
  2. "On This Day, 12 December – 1988: 35 dead in Clapham rail collision". BBC.
  3. 1 2 McCrickard, John P (6 October 2016). "January 1988 to December 1988". Network South East Railway Society. Archived from the original on 28 June 2018. Retrieved 26 June 2018.
  4. Hidden 1989, pp. 23–25.
  5. 1 2 Hidden 1989, p. 5.
  6. ""I will never forget" - remembering the Clapham rail disaster 25 years on". Bournemouth Echo. 12 December 2013. Retrieved 9 December 2023.
  7. Hidden 1989, p. 27.
  8. Hidden 1989, p. 28.
  9. Hidden 1989, p. 35.
  10. "House of Commons PQs". Margaret Thatcher Foundation. 13 December 1988.
  11. Hidden 1989, p. 42.
  12. 1 2 Hidden 1989, p. 51.
  13. Hidden 1989, pp. 147–151.
  14. Hidden 1989, p. 167-175.
  15. Vaughan 2000, p. 78.
  16. Hidden 1989, p. 165.
  17. Hidden 1989, pp. 148–149.
  18. Hidden 1989, pp. 147–152.
  19. Hidden 1989, p. 62.
  20. 1 2 Hartley 2001, p. 23.
  21. Hidden 1989, pp. 166–167.
  22. Hidden 1989, corrections.
  23. Hidden 1989, pp. 120, 169.
  24. Hidden 1989, p. 171.
  25. Hidden 1989, p. 174.
  26. Vaughan 2000, p. 82.
  27. "Changes in Working Hours – Safety Critical Work" (PDF). Railway Group Standards. August 1996. p. 6. Archived from the original (PDF) on 12 August 2014. Retrieved 12 October 2012.
  28. UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth . Retrieved 7 May 2024.
  29. Hartley 2001, p. 24.
  30. "Legislating the Criminal Code: Involuntary Manslaughter" (PDF). The Law Commission. 4 March 1996. Archived from the original (PDF) on 28 August 2012. Retrieved 12 October 2012.
  31. "Clapham Junction train crash memorial". geograph.org.uk. Robin Webster. Retrieved 12 October 2012.
  32. Vaughan 2000, p. 84.
  33. "Serious irregularity at Cardiff East Junction 29 December 2016" (PDF). Rail Accident Investigation Branch. Retrieved 30 October 2017.
  34. "Collision at London Waterloo – 15 August 2017" (PDF). Rail Accident Investigation Branch. November 2018. pp. 46–50. Retrieved 19 November 2018.

Bibliography

Further reading

51°27′26″N0°10′28″W / 51.4571°N 0.1744°W / 51.4571; -0.1744