USS T-3

Last updated

USS T-3 (SS-61).jpg
USS T-3 being inspected by Assistant Secretary of the Navy Theodore Douglas Robinson and his family on 23 December 1925.
History
US flag 48 stars.svgUnited States
NameUSS AA-3
Builder Fore River Shipyard [1]
Laid down21 May 1917 [1]
Launched24 May 1919 [1]
Commissioned7 December 1920 [1]
Decommissioned11 November 1922
RenamedT-3 22 September 1920
Recommissioned1 October 1925
Decommissioned14 July 1927
Stricken19 September 1930 [1]
FateScrapped 1931 [1]
General characteristics
Class and type AA-1-class diesel-electric submarine
Displacement
  • 1,107  tons (1,125  t) surfaced
  • 1,482 tons (1,506 t) submerged [1]
Length268 ft 9 in (81.92 m) [1]
Beam22 ft 10 in (6.96 m) [1]
Draft14 ft 2 in (4.32 m) mean [1]
Propulsion
Speed
  • 20 knots (37 km/h; 23 mph) surfaced
  • 10.5 knots (19.4 km/h; 12.1 mph) submerged [1]
Range3,000 nmi (5,600 km; 3,500 mi) at 14 kn (26 km/h; 16 mph) on 23,602–24,092 USgal (89,412–91,268 liters) oil fuel [4]
Test depth150 ft (46 m) [1]
Complement4 officers, 5 chief petty officers, 45 enlisted [4]
Armament

USS T-3 (SS-61/SF-3) was an AA-1-class submarine in the service of the United States Navy originally named AA-3.

She was laid down as AA-3 on 21 May 1917 at the Fore River Shipbuilding Company yard in Quincy, Massachusetts, by the Electric Boat Co. of New York, launched on 24 May 1919, sponsored by Mrs. Lilian Terhune Jordan, redesignated SF-3 on 17 July 1920, renamed T-3 on 22 September 1920, and commissioned on 7 December 1920 at the Boston Navy Yard.

The second of three ships in a program to construct long-range reconnaissance submarines to operate with the surface fleet, T-3 joined T-1 in Submarine Division 15, Atlantic Fleet, soon after commissioning. She operated with that division – later to include T-2 – conducting maneuvers with the Atlantic Fleet until the fall of 1922. By that time, flaws in the design and construction of the T-boats – particularly in their propulsion plants – caused them to perform poorly. The decision was made to retire all three to the reserve fleet, and T-3 was the first to go. On 11 November 1922, she was decommissioned at Hampton Roads, Virginia, and berthed at the submarine base there. Later, she was moved to Philadelphia.

However, T-3's active service did not end there. At the time of the T-boats' decommissioning, the idea of testing German-produced diesel engines in one of them had been bantered about in Navy circles. T-1 had originally been designated for this purpose, but funds were not then available. In 1925, when money was forthcoming, it was T-3 that came out of mothballs for the tests. On 1 October 1925, T-3 was recommissioned at Philadelphia. For the following 21 months, she tested her newly installed 3,000 horsepower (2,200 kW) M.A.N. diesel engines for the Bureau of Engineering. Early in the summer of 1927, she completed the tests and, on 14 July 1927, was placed out of commission at Philadelphia. After a little over three years of inactivity, her name was stricken from the Navy List on 19 September 1930. Her hulk was broken up, and the materials were sold for scrap on 20 November 1930.

See also

Related Research Articles

<i>Gato</i>-class submarine US Navy fleet submarine class

The Gato class of submarines was built for the United States Navy and launched in 1941–1943; they were the first mass-production U.S. submarine class of World War II. Together with their near-sisters the Balao and Tench classes, their design formed the majority of the United States Navy's World War II submarine fleet. Named after the lead ship of the class, USS Gato, the Gatos and their successors formed the core of the submarine service that was largely responsible for the destruction of the Japanese merchant marine and a large portion of the Imperial Japanese Navy in World War II. Gato's name comes from a species of small catshark. Like most other U.S. Navy submarines of the period, boats of the Gato class were given the names of marine creatures. In some references, the Gatos are combined with their successors, especially the Balao class.

USS <i>Dolphin</i> (SS-169) "V-boat" class submarine

USS Dolphin (SF-10/SC-3/SS-169), a submarine and one of the "V-boats", was the sixth ship of the United States Navy to be named for that aquatic mammal. She also bore the name V-7 and the classifications SF-10 and SC-3 prior to her commissioning. She was launched on 6 March 1932 by the Portsmouth Navy Yard, sponsored by Mrs. E.D. Toland, and commissioned on 1 June 1932.

USS <i>Barracuda</i> (SS-163) Submarine of the United States

USS Barracuda (SF-4/SS-163), lead ship of her class and first of the "V-boats," was the second ship of the United States Navy to be named for the barracuda.

USS <i>Bonita</i> (SS-165) Submarine of the United States

USS Bonita (SF-6/SS-165), a Barracuda-class submarine and one of the "V-boats," was the third ship of the United States Navy to be named for the bonito. Her keel was laid down by the Portsmouth Navy Yard. She was launched on 9 June 1925 as V-3 (SF-6), sponsored by Mrs. L.R. DeSteiguer, wife of Rear Admiral DeSteiguer, and commissioned on 22 May 1926, Lieutenant Commander Charles A. Lockwood, Jr. in command. Like her sisters, Bonita was designed to meet the fleet submarine requirement of 21 knots (39 km/h) surface speed for operating with contemporary battleships.

V-boat Group of U.S. Navy submarines and classes derived from them

The V-boats were a group of nine United States Navy submarines built between World War I and World War II from 1921 to 1934 under authorization as the "fleet boat" program.

USS <i>Bass</i> (SS-164) Submarine of the United States

USS Bass (SF-5/SS-164), a Barracuda-class submarine and one of the "V-boats", was the first ship of the United States Navy to be named for the bass.

USS <i>Cachalot</i> (SS-170) Submarine of the United States

USS Cachalot (SC-4/SS-170), a United States Navy submarine and the lead ship of her class, known as the "V-boats", was the only ship of the United States Navy to be named for the sperm whale. Her keel was laid down by the Portsmouth Navy Yard. She was launched on 19 October 1933 as V-8 (SC-4) sponsored by Miss K. D. Kempff, and commissioned on 1 December 1933 with Lieutenant Commander Merril Comstock in command. Cachalot was the first submarine to have the Torpedo Data Computer, Arma Corporation's Mark 1, installed.

USS <i>Cuttlefish</i> (SS-171) Submarine of the United States

USS Cuttlefish (SC-5/SS-171), a Cachalot-class submarine and one of the "V-boats," was the second ship of the United States Navy to be named for the cuttlefish. Her keel was laid down by Electric Boat Company in Groton, Connecticut. She was launched on 21 November 1933 sponsored by Mrs. B. S. Bullard, and commissioned on 8 June 1934, Lieutenant Commander Charles W. "Gin" Styer in command. Cuttlefish was the first submarine built entirely at Electric Boat's facility in Groton, Connecticut; construction of previous Electric Boat designs had been subcontracted to other shipyards, notably Fore River Shipbuilding of Quincy, Massachusetts. Four Peruvian R-class submarines had previously been finished in Groton, using material from cancelled S-boats salvaged from Fore River.

<i>Tambor</i>-class submarine US Navy submarine class of World War II

The Tambor-class submarine was a United States Navy submarine design, used primarily during World War II. They were the USN's first fully successful fleet submarine, and began the war close to the fighting. Six of the class were in Hawaiian waters or the Central Pacific on 7 December 1941, with Tautog at Pearl Harbor during the attack. They went on to see hard service; seven of the twelve boats in the class were sunk before the survivors were withdrawn from front-line service in early 1945; this was the highest percentage lost of any US submarine class. Tautog was credited with sinking 26 ships, the largest number of ships sunk by a US submarine in World War II. The Tambors attained the top speed of 21 knots (39 km/h) and range of 11,000 nautical miles (20,000 km) of the preceding Sargo class, and improvements included six bow torpedo tubes, a more reliable full diesel-electric propulsion plant, and improved combat efficiency with key personnel and equipment relocated to the conning tower. In some references, the Tambors are called the "T Class", and SS-206 through SS-211 are sometimes called the "Gar class".

USS <i>T-1</i> (SS-52) Submarine of the United States

The first USS T-1 (SS-52/SF-1) was an AA-1-class submarine in the service of the United States Navy; T-1 was also known as Schley and AA-1.

USS <i>T-2</i> (SS-60) Submarine of the United States

USS T-2 (SS-60) was an AA-1-class submarine built for the United States Navy during World War I.

<i>AA-1</i>-class submarine Class of three experimental submarines of the United States Navy,

The AA-1 class was a class of three experimental submarines of the United States Navy, built toward the end of World War I, between 1916 and 1919, intended to produce a high-speed fleet submarine. The design was not a success and none of the submarines saw active service. However, the lessons learned were applied to the design of the later V-boats. The class was later renamed as the T class.

<i>Salmon</i>-class submarine US Navy submarine class of World War II

The United States Navy Salmon-class submarines were an important developmental step in the design of the "fleet submarine" concept during the 1930s. An incremental improvement over the previous Porpoise class, they were the first US submarine class to achieve 21 knots with a reliable propulsion plant, allowing them to operate with the Standard-type battleships of the surface fleet. Also, their 11,000 nautical miles (20,000 km) unrefueled range would allow them to operate in Japanese home waters. These rugged and dependable boats provided yeoman service during World War II, along with their immediate successors, the similar Sargo class. In some references, the Salmons and Sargos are called the "New S Class", 1st and 2nd Groups.

USS <i>E-1</i> (SS-24) Submarine of the United States

USS E-1 (SS-24) was an E-class submarine of the United States Navy. Originally named Skipjack, the boat was launched on 27 May 1911 by the Fore River Shipyard, Quincy, Massachusetts; sponsored by Mrs. D. R. Battles; renamed E-1 on 17 November 1911; and commissioned on 14 February 1912, Lieutenant Chester W. Nimitz in command. She was the first American submarine to be powered by diesel engines.

USS <i>Biddle</i> (DD-151) Wickes-class destroyer

USS Biddle (DD–151) was a Wickes-class destroyer in the United States Navy during World War II, later reclassified AG-114. She was the second ship named for Captain Nicholas Biddle.

USS <i>Salem</i> (CL-3) Chester-class cruiser

USS Salem (CS-3/CL-3), Scout Cruiser No. 3, was a Chester-class scout cruiser of the United States Navy. She was the first Navy ship named for the city of Salem, Massachusetts.

USS <i>Camden</i> (AS-6) Cargo ship of the United States Navy

USS Camden (AS-6) was the first ship of the United States Navy to bear the name Camden, after Camden, New Jersey the city that lies on the Delaware River across from Philadelphia, Pennsylvania.

USS Semmes (DD-189/AG-24) was a Clemson-class destroyer in the United States Navy during World War II. She was the first Navy ship named for Commander (USN), Rear Admiral (CSN), Brigadier General (CSA) Raphael Semmes (1809–1877).

USS <i>Fulton</i> (AS-1) Gunboat of the United States Navy

USS Fulton (AS-1) was constructed as a submarine tender in 1914, but later was converted into a gunboat and redesignated PG-49.

The G-class submarines were a class of four United States Navy submarines. While the four G boats were nominally all of a class, they differed enough in significant details that they are sometimes considered to be four unique boats, each in a class by herself. They were the result of agitation for competition in submarine design; all previous US submarines were designed by Electric Boat. G-1, G-2, and G-3 were designed by Simon Lake of the Lake Torpedo Boat Company, while G-4 was designed by American Laurenti. G-1 was built by Newport News, G-2 and G-3 by Lake, and G-4 by Cramp.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 Bauer, K. Jack; Roberts, Stephen S. (1991), Register of Ships of the U.S. Navy, 1775–1990: Major Combatants, Westport, CT: Greenwood Press, ISBN   0-313-26202-0
  2. Alden, John D., Commander, USN (retired). The Fleet Submarine in the U.S. Navy (Annapolis, MD: Naval Institute Press, 1979), p.210-1.
  3. Alden, p.210-1.
  4. 1 2 3 Alden, p. 22.

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships .The entry can be found here.