Wheeling and Lake Erie Railway (1916–1988)

Last updated
Wheeling and Lake Erie Railway
Wheeling and Lake Erie Railway (1916-1988)
Overview
Reporting mark WLE
Locale Ohio, Pennsylvania, and West Virginia
Dates of operation18771988
Successor Nickel Plate Road
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge

The Wheeling and Lake Erie Railway( reporting mark WLE) was a Class I railroad mostly within the U.S. state of Ohio. It was leased to the New York, Chicago and St. Louis Railroad (Nickel Plate Road) in 1949, and merged into the Norfolk and Western Railway in 1988. A new regional railroad reused the Wheeling and Lake Erie Railway name in 1990 when it acquired most of the former W&LE from the N&W.

Contents

At the end of 1944, W&LE operated 507 miles of road and 1003 miles of track; that year it reported 2371 million net ton-miles of revenue freight and 0.002 million passenger-miles.

History

An advertisement for the then-Wabash-controlled Wheeling and Lake Erie Railroad from a book published in Toledo, Ohio in 1905 Year book - photo flashes showing Toledo's phenomenal progress, thriving industries and wonderful resources - DPLA - ac95c5ef8efd2394c21e2b6edcd01d94 (page 8) (cropped).jpg
An advertisement for the then-Wabash-controlled Wheeling and Lake Erie Railroad from a book published in Toledo, Ohio in 1905

The Wheeling & Lake Erie's story begins with two different systems; one carrying the same name and another as a narrow-gauge linking Cleveland with Zanesville.  

The first W&LE was incorporated on March 10, 1871 as the Wheeling & Lake Erie Rail Road Company. It was the vision of Joel Wood who believed a profitable enterprise lay in the transportation of coal from eastern Ohio mines to Lake Erie ports. The line was to be standard-gauge (4 feet, 8 1/2 inches) featuring grades no worse than 0.947% (or 50 feet to the mile). The initial leg would link Wheeling and Sandusky while the ultimate goal was Toledo. Wood's idea was sound but, unfortunately, ill-timed.  To attain funding he tried to procure monetary support from major cities along the route. At first, Wheeling promised $300,000 but a disgruntled taxpayer was successful in having the ordinance rescinded in 1871.   Then, the Panic of 1873 ended any hopes of either Sandusky or Toledo providing assistance. In the end, Wood's proposal only saw a bit of grading completed (including three tunnels) between Navarre and Martins Ferry (across the Ohio River from Wheeling). As the W&LE lay mired in uncertainty he was ousted by fellow associates who wanted to scrap the original plans in a favor of a three-foot, narrow-gauge system. These gained widespread popularity after the Denver & Rio Grande successfully demonstrated their viability in the 1870's as a cheaper alternative to their standard-gauge counterparts. The belief was that such a national network would yield greater returns on investment.  This new undertaking began at the northern end when W&LE officials acquired the defunct Milan Canal's tow path.  

With a right-of-way ready for rails the first 12.5 miles between Huron and Norwalk opened during June 1877.   While more grading was completed around New London and to the south (totaling 37 miles), the original W&LE was an utter failure.  Before shutting down in late 1879 the group was successful in converting the Huron-Norwalk segment to standard-gauge. In the meantime, another much more successful three-footer, which went on to become part of the modern W&LE, had been launched nearby.  It too, however, got off to a shaky start.  

It was promoted by General E.R. Eckley who had similar ambitions to Joel Wood.  He incorporated the Ohio & Toledo Rail Road (O&T) on May 7, 1872 to move coal from eastern Ohio mines to Lake Erie. Instead of building from the Wheeling area, however, this pike would sought a point slightly north at Wellsville, Ohio. With insufficient capital and an insistence to utilize shoddy construction standards his entire plan may have ended at the drawing board if it were not for the moribund 4-foot, 10-inch Carrollton & Oneida Railroad (C&O). Built to even poorer standards than the typical narrow-gauge, the C&O, with a history tracing back to 1837, linked its namesake towns along a 10-mile line laid with strap-iron rail. At Oneida, it interchanged with the Cleveland & Pittsburgh (a PRR subsidiary).  During its brief time in service it was a hopeless failure. The operation was so bad, in fact, it was returned to its creditors in 1859 and deemed unsafe for steam locomotives. With no capital it limped along for the next seven years as a local, mule-powered operation.  On February 26, 1866 it was reorganized as the Carrollton & Oneida whereupon some capital improvements allowed steam-powered service to return. Things remained this way until Carrollton sold the railroad to Eckley for $1 on July 15, 1873.  He integrated it into his O&T system and made further upgrades, such as laying solid iron T-rail (3-foot gauge) and extending service to Minerva during 1874.  

After giving up on a Toledo route the general decided upon a Youngstown connection where interchange could be established with another narrow-gauge, the Painesville & Youngstown. Following yet another change of heart, Eckley scrapped the Youngstown idea and, instead, would aim for Painesville. Incorporated as the Painesville, Canton & Bridgeport Narrow Gauge Rail Road on January 12, 1875 it began construction from Chagrin Falls. Without the necessary funding, Eckley managed only to reach Solon (5.15 miles) by November 1877 before money ran out. His venture then passed into Dr. Norman Smith's hands who incorporated the Youngstown & Connotton Valley (Y&CV) on August 29, 1877. Eckley initially remained president but after a dispute broke out between the two (regarding the northern terminus) the O&T was sold to creditor Cleveland Iron Company. It then awarded Smith the property in 1878 and Eckley's involvement ended.  Just a year later, on October 20, 1879, Smith renamed the company as the Conotton Valley Railroad (CVRR) and completed an extension of the old O&T to Canton in early May 1880. His greatest achievement, from an historical perspective, was acquiring solid financial backing for the venture through a Massachusetts syndicate which aimed to develop the CVRR into one of Ohio's most successful narrow-gauges.

To a greater extent they actually accomplished this feat, pouring some $2.6 million into the railroad and completing the entirety of the future Wheeling & Lake Erie's Cleveland - Zanesville corridor. Upon arriving, they quickly scrapped the Painesville idea and instead sought a direct entry into Cleveland.  Construction began on July 5, 1880 and passenger service into downtown Cleveland was inaugurated on February 21, 1882. As George Hilton points out in his book, "American Narrow Gauge Railroads," while this was ongoing the railroad built a short, 8.7-mile extension south of Carrollton to reach coal mines in the Sherrodsville area that opened on January 1, 1882 (it was later abandoned in 1936).

With a well-built right-of-way now capable of supporting relatively heavy traffic the CVRR next focused on a line due south from Canton. What was built as the Connotton Valley & Straitsville Railroad would extend to New Straitsville via Zanesville and Coshocton in pursuit of the Perry County coalfields. Work got underway in June 1882 and had reached Coshocton (114.7 miles) almost exactly one year later in June 1883. The group attempted to gather financing for the final push into Zanesville but managed only to secure around $300,000, less than half the amount needed (this money was later used to construct a beautiful, two-story passenger terminal in Cleveland which opened on August 29, 1883).  

Despite relatively strong business (in 1884 it carried 456,627 passengers, moved 192,400 tons of coal, and handled 41,668 tons of other freight) the company's heavy debt resulted in receivership during June 1883. On May 9, 1885 it was reorganized as the Cleveland & Canton Railroad (C&C) and eventually managed to raise $1.7 million to convert the entire property to standard-gauge, a process completed on November 18, 1888. The C&C finished the 29-mile line to Zanesville but never made it into Perry County.  

Another name change took place in 1892 as the Cleveland, Canton & Southern Railroad (CC&S) but it was again in receivership within a year.  The Wheeling & Lake Erie went on to purchase the CC&S for $3.85 million on August 5, 1899. Gould, arguably the most hated man in America at the time, had big ambitions in which the W&LE would play a vital role.  By the 1880's his aspirations for a true, coast-to-coast transcontinental railroad was nearing reality.  The Wabash was the Midwestern component of this network and from its eastern terminus at Toledo offered a potential connection with the W&LE. The latter's charter stipulated it could build from that point towards the Ohio River in a southeasterly direction. Using the W&LE, Gould would connect it with the New York, Pennsylvania & Ohio (Erie) at Creston for through service into Youngstown.   He then only needed 70 miles of new construction to reach the Pennsylvania-controlled Allegheny Valley Railroad. This system ran across the Keystone State and connected with the Central Railroad of New Jersey, another Gould interest.  

During late 1880, he formally acquired the defunct W&LE and by early 1881 things got underway.  Actual construction commenced east and west of Creston and by November 1881 the line was finished from Massillon to Norwalk/Huron. It eventually completed a route connecting Pittsburgh, PA (Rook) and Toledo, Ohio. Most freight traffic on the line was coal and iron ore, with general merchandise also making up a significant portion.

Service from Huron to Massillion, Ohio was opened on January 9, 1882 and new lines were constructed that eventually reached the Ohio River and Toledo. The WLE also developed new docks on Lake Erie at Huron that opened May 21, 1884 when the first cargo of iron ore was received. In 1880 another 3-foot narrow gauge line, the Connotton Valley Railway, was formed; building north from Canton, Ohio to Cleveland and then south to Coshocton, Ohio and Zanesville. The Connotton Valley became the Cleveland, Canton & Southern Railroad and was converted to standard gauge in one day on November 18, 1888. The Cleveland, Canton & Southern Railroad joined the WLE in 1899 after its purchase at a foreclosure sale, becoming WLE's Cleveland Division.

At its height, the W&LE ran from the Pittsburgh region (through a connection with the Wabash-Pittsburgh Terminal, later the Pittsburgh and West Virginia Railway) to Lake Erie at Huron and Toledo. However, the mainlines of the WLE never reached outside Ohio's borders - Pennsylvania access was only via the Pittsburgh and West Virginia. It also ran from Cleveland to Zanesville, with the lines crossing at Harmon, just east of Brewster, Ohio, which became the location of WLE's corporate headquarters and locomotive shops. Brewster began serving as headquarters of the Wheeling and Lake Erie Railway in 1914. With two busy main stems crossing on the map of Ohio; the road's nickname for many years was "The Iron Cross." Ironically, the mainline of the W&LE never actually reached Wheeling, West Virginia. However, a branch between Steubenville, Ohio and Martins Ferry was completed in 1891, which led to an indirect connection to Wheeling via a subsidiary, the Wheeling Bridge and Terminal Company.

The W&LE began producing locomotives at its Brewster, Ohio shops in 1910, and boasted one of the finest locomotive producing facilities in the country. Over the years, the W&LE built and rolled boilers and erected fifty of their own steam engines, a feat never tried by many larger and more famous railroads. The Wheeling & Lake Erie was jokingly called the "Wailing and Leg Weary" but, after several early financial embarrassments, finally found prosperity in its later life.

Passenger service ended in 1940 just before the start of World War II.

Nickel Plate Road, Norfolk and Western, and Norfolk Southern Ownership (1949–1998)

In 1949, the New York, Chicago, & St. Louis Railroad, or Nickel Plate Road (NKP) as it was known, leased the W&LE. The W&LE was operated as the "Wheeling and Lake Erie District" of the NKP. In 1964, the Nickel Plate combined with the Norfolk and Western Railway (N&W), bringing the W&LE into N&W and, after the N&W-Southern Railway merger, Norfolk Southern. [1] Throughout this period, the railroad generally remained unchanged.

In 1988, the W&LE was finally consolidated into the Norfolk and Western on September 20. The New York Stock Exchange removed the trading stock the following Friday, the 23rd.

Wheeling and Lake Erie Railway (1990–Present)

In 1990, many lines were sold by Norfolk Southern to the newly-founded Wheeling and Lake Erie Railway. It has since become a Class II railroad, and the largest railroad based in the state of Ohio.

The railroad's Brewster, Ohio, yards in 1910. Wheeling and Lake Erie yards Brewster Ohio 1910.JPG
The railroad's Brewster, Ohio, yards in 1910.

Related Research Articles

<span class="mw-page-title-main">Huron River (Ohio)</span> River in the United States

The Huron River is a 14.9-mile-long (24.0 km) waterway in the north central Ohio in the United States. The watershed drains large portions of Erie County and Huron County, the northeast corners of Seneca County and Crawford County, and northern portions of Richland County.

The Lake Shore and Michigan Southern Railway, established in 1833, and sometimes referred to as the Lake Shore, was a major part of the New York Central Railroad's Water Level Route from Buffalo, New York, to Chicago, Illinois, primarily along the south shore of Lake Erie and across northern Indiana. The line's trackage remains a major rail transportation corridor used by Amtrak passenger trains and several freight lines; in 1998, its ownership was split at Cleveland, Ohio, between CSX Transportation to the east and Norfolk Southern Railway in the west.

The Wheeling and Lake Erie Railway is a Class II regional railroad that provides freight service, mainly in the areas of Northern Ohio and Western Pennsylvania. It took its name from the former Wheeling and Lake Erie Railway, most of which it bought from the Norfolk and Western Railway in 1990.

<span class="mw-page-title-main">Akron, Canton and Youngstown Railroad</span> Class I railroad which operated in Ohio

The Akron, Canton and Youngstown Railroad was a Class I railroad which operated in the state of Ohio. The company was founded in 1907 and opened its mainline between Mogadore and Akron, Ohio in 1912. Later reclassified as a short-line railroad, the company was bought by the Norfolk and Western Railway in 1964 and merged in 1982. Despite the name, the company served neither Canton nor Youngstown.

<span class="mw-page-title-main">Pittsburgh and West Virginia Railway</span> Company and former railroad in the United States

The Pittsburgh and West Virginia Railway was a railroad in the Pittsburgh, Pennsylvania, and Wheeling, West Virginia, areas. Originally built as the Wabash Pittsburgh Terminal Railway, a Pittsburgh extension of George J. Gould's Wabash Railroad, the venture entered receivership in 1908, and the line was cut loose. An extension completed in 1931 connected it to the Western Maryland Railway at Connellsville, Pennsylvania, forming part of the Alphabet Route, a coalition of independent lines between the Northeastern United States and the Midwest. It was leased by the Norfolk and Western Railway in 1964 in conjunction with the N&W acquiring several other sections of the former Alphabet Route but was leased to the new spinoff Wheeling and Lake Erie Railway in 1990, just months before the N&W was merged into the Norfolk Southern Railway.

In addition to streetcar lines, the Van Sweringen Brothers of Cleveland, Ohio owned a vast network of steam railroads.

<span class="mw-page-title-main">Cleveland railroad history</span>

Cleveland has been and continues to be deeply rooted in railroad history.

<span class="mw-page-title-main">New Castle Subdivision</span> Railway line in Pennsylvania and Ohio

The New Castle Subdivision is a railroad line owned and operated by CSX Transportation in the U.S. states of Pennsylvania and Ohio. The line runs from New Castle, Pennsylvania west through Youngstown and Akron to Greenwich, Ohio along a former Baltimore and Ohio Railroad line. Its east end is near Mahoningtown, at the west end of the New Castle Terminal Subdivision. Its west end is at the Willard Terminal Subdivision, just east of the Greenwich Subdivision junction at Greenwich. It junctions with the Newton Falls Subdivision at Newton Falls, Ohio, and the CL&W Subdivision at Sterling, Ohio.

<span class="mw-page-title-main">Port of Cleveland</span> Port in United States

The Port of Cleveland is a bulk freight and container shipping port at the mouth of the Cuyahoga River on Lake Erie in Cleveland, Ohio, United States. It is the third-largest port in the Great Lakes and the fourth-largest Great Lakes port by annual tonnage. Over 20,000 jobs and $3.5 billion in annual economic activity are tied to the roughly 13 million tons of cargo that move through Cleveland Harbor each year.

<span class="mw-page-title-main">Columbus and Ohio River Railroad</span> Railroad in Ohio, United States

The Columbus & Ohio River Railroad is a railroad in the U.S. state of Ohio owned by Genesee & Wyoming Inc.

<span class="mw-page-title-main">Cleveland, Painesville and Ashtabula Railroad (1848–1869)</span> 19th-century American railroad

The Cleveland, Painesville and Ashtabula Railroad (CP&A), also known informally as the Cleveland and Erie Railroad, the Cleveland and Buffalo Railroad, and the Lake Shore Railroad, was a railway which ran from Cleveland, Ohio, to the Ohio-Pennsylvania border. Founded in 1848, the line opened in 1852. The railroad completed the rail link between Buffalo, New York, and Chicago, Illinois.

The Jamestown and Franklin Railroad (J&F) was a shortline railroad which operated in the U.S. states of Ohio and Pennsylvania. Established in 1862, its main line ran from Jamestown, Pennsylvania, to Oil City, Pennsylvania. A branch line connected Jamestown with Ashtabula, Ohio. The railroad leased itself to the Lake Shore and Michigan Southern Railway in 1864 for 20 years. A 1909 consolidation with three other railroads created the Jamestown, Franklin and Clearfield Railroad, and ended the J&F's existence.

The Valley Railway was a shortline railroad which operated between the city of Cleveland and small town of Zoarville in the state of Ohio in the United States. The railroad was founded in 1871, but the first segment of track did not open until 1880 and the line was not completed until 1884. The Baltimore and Ohio Railroad (B&O) obtained a controlling interest in the Valley Railway in 1890. The railroad went bankrupt in 1895, at which time it was reorganized as The Cleveland Terminal and Valley Railroad Company (CT&V). The B&O took over operation of the CT&V in 1909, and the company was merged with the B&O in 1915.

<span class="mw-page-title-main">Cleveland and Mahoning Valley Railroad</span> Shortline railroad in Ohio, U.S.

The Cleveland and Mahoning Valley Railroad (C&MV) was a shortline railroad operating in the state of Ohio in the United States. Originally known as the Cleveland and Mahoning Railroad (C&M), it was chartered in 1848. Construction of the line began in 1853 and was completed in 1857. After an 1872 merger with two small railroads, the corporate name was changed to "Cleveland and Mahoning Valley Railroad". The railroad leased itself to the Atlantic and Great Western Railway in 1863. The C&MV suffered financial instability, and in 1880 its stock was sold to a company based in London in the United Kingdom. A series of leases and ownership changes left the C&MV in the hands of the Erie Railroad in 1896. The CM&V's corporate identity ended in 1942 after the Erie Railroad completed purchasing the railroad's outstanding stock from the British investors.

References

  1. Historical Guide to North American Railroads, Kalmbach Publishing, WI. ISBN   0890240728

General references