X1 Michigan Towers | |
---|---|
![]() The first tower under construction, February 2025 | |
![]() | |
Former names | X1 MediaCityUK Phase II [1] |
General information | |
Status | Building 3: under construction |
Type | Residential |
Location | Salford Quays, Greater Manchester, England |
Address | Michigan Avenue |
Coordinates | 53°28′30″N2°17′37″W / 53.47488°N 2.29364°W |
Construction started | Building 3: 2024 [2] |
Completed | Building 3: 2026 [3] |
Owner | X1 Developments |
Height | Building 3: 109 m (358 ft) |
Technical details | |
Floor count | Building 1: 14 Building 2: 31 Building 3: 34 Building 4: 46 |
Design and construction | |
Architect(s) | Jeffrey Bell Architects [4] |
Other designers | Gillespies (landscape) [5] |
Main contractor | Vermont Construction [3] |
Website | |
Developer website |
X1 Michigan Towers is a residential development under construction in Salford Quays, Greater Manchester, England. When fully built, the scheme will comprise just over 1,300 homes across a cluster of four buildings ranging from 14 to 46 storeys.
At 109 metres (358 ft) tall once complete, Building 3 will be the fifth-tallest in Salford and the joint 19th-tallest in Greater Manchester alongside Oxygen Towers.
An outline planning application was originally submitted to Salford City Council by landowner Peel Land and Property in 2019 for a residential-led development comprising residential use and/or co-living accommodation and/or student accommodation. Outline approval was granted in October of that year. [6] With an option to build up to a maximum of 162 m (531 ft) or 46 storeys, [7] the full scale of the development was to be determined more completely at reserved matters stage. [4]
After acquiring the site from Peel, developer X1 submitted a reserved matters application in 2020 for 1,314 homes across four buildings. [8] Planning approval was obtained in July 2020. [9]
The construction of Building 3 (109 m (358 ft)) commenced in 2024 [2] and is expected to be completed in 2026. [3] The full scheme is anticipated to be built over the course of seven years, [2] or 2031 (estimate). The tallest tower will reportedly form the third phase; [10] the timescale for which has yet to be publicised.
Broadway tram stop on the Eccles Line of the Metrolink system is located close to X1 Michigan Towers. [2]