Loran-C

Last updated

A Loran-C receiver for use on merchant ships Loran C Navigator.jpg
A Loran-C receiver for use on merchant ships
Loran-C sound as received on an AM receiver at 100 kHz

Loran-C is a hyperbolic radio navigation system that allows a receiver to determine its position by listening to low frequency radio signals that are transmitted by fixed land-based radio beacons. Loran-C combined two different techniques to provide a signal that was both long-range and highly accurate, features that had been incompatible. Its disadvantage was the expense of the equipment needed to interpret the signals, which meant that Loran-C was used primarily by militaries after it was introduced in 1957.

Contents

By the 1970s, the cost, weight and size of electronics needed to implement Loran-C had been dramatically reduced because of the introduction of solid-state electronics and, from the mid-1970s, early microcontrollers to process the signal. Low-cost and easy-to-use Loran-C units became common from the late 1970s, especially in the early 1980s, and the earlier LORAN [lower-alpha 1] system was discontinued in favor of installing more Loran-C stations around the world. Loran-C became one of the most common and widely-used navigation systems for large areas of North America, Europe, Japan and the entire Atlantic and Pacific areas. The Soviet Union operated a nearly identical system, CHAYKA.

The introduction of civilian satellite navigation in the 1990s led to a rapid drop-off in Loran-C use. Discussions about the future of Loran-C began in the 1990s; several turn-off dates were announced and then cancelled. In 2010, the US and Canadian systems were shut down, along with Loran-C/CHAYKA stations that were shared with Russia. [2] [3] Several other chains remained active; some were upgraded for continued use. At the end of 2015, navigation chains in most of Europe were turned off. [4] In December 2015 in the United States, there was also renewed discussion of funding an eLoran system, [5] and NIST offered to fund development of a microchip-sized eLoran receiver for distribution of timing signals. [6]

The National Timing Resilience and Security Act of 2017, proposed resurrecting Loran as a backup for the United States in case of a GPS outage caused by space weather or attack. [7] [8]

History

Loran-A

The original LORAN was proposed in 1940 by Alfred Lee Loomis at a meeting of the U.S. Army's Microwave Committee. The Army Air Corps were interested in the concept for aircraft navigation, and after some discussion they returned a requirement for a system offering accuracy of about 1 mile (1.6 km) at a range of 200 miles (320 km), and a maximum range as great as 500 miles (800 km) for high-flying aircraft. The Microwave Committee, by this time organized into what would become the MIT Radiation Laboratory, took up development as Project 3. During the initial meetings, a member of the UK liaison team, Taffy Bowen, mentioned that he was aware the British were also working on a similar concept, but had no information on its performance. [9]

The development team, led by Loomis, made rapid progress on the transmitter design and tested several systems during 1940 before settling on a 3 MHz design. Extensive signal-strength measurements were made by mounting a conventional radio receiver in a station wagon and driving around the eastern states. [10] However, the custom receiver design and its associated cathode-ray tube displays proved to be a bigger problem. In spite of several efforts to design around the problem, instability in the display prevented accurate measurements as the output shifted back and forth on the face of the oscilloscope. [11]

By this time the team had become much more familiar with the British Gee system, and were aware of their related work on "strobes", a time base generator that produced well-positioned "pips" on the display that could be used for accurate measurement. This meant that inaccuracy of the positioning on the display had no effect: any inaccuracy in the position of the signal was also in the strobe, so the two remained aligned. The Project 3 team met with the Gee team in 1941, and immediately adopted this solution. This meeting also revealed that Project 3 and Gee called for almost identical systems, with similar performance, range and accuracy, but Gee had already completed basic development and was entering into initial production, making Project 3 superfluous. [12]

In response, the Project 3 team told the Army Air Force to adopt Gee, and instead, at the behest of the British team, realigned their efforts to provide long-range navigation on the oceans where Gee was not useful. This led to United States Navy interest, and a series of experiments quickly demonstrated that systems using the basic Gee concept, but operating at a lower frequency around 2 MHz would offer reasonable accuracy on the order of a few miles over distances on the order of 1,250 miles (2,010 km), at least at night when signals of this frequency range were able to skip off the ionosphere. [12] Rapid development followed, and a system covering the western Atlantic was operational in 1943. Additional stations followed, first covering the European side of the Atlantic, and then a large expansion in the Pacific. By the end of the war, there were 72 operational LORAN stations and as many as 75,000 receivers.

In 1958 the operation of the LORAN system was handed over to the United States Coast Guard, which renamed the system "Loran-A", the lower-case name being introduced at that time. [13]

LF LORAN

There are two ways to implement the timing measurements needed for a hyperbolic navigation system, pulse timing systems like Gee and LORAN, and phase-timing systems like the Decca Navigator System. [14]

The former requires sharp pulses of signal, and their accuracy is generally limited to how rapidly the pulses can be turned on and off, which is a function of the carrier frequency. There is an ambiguity in the signal; the same measurements can be valid at two locations relative to the broadcasters, but in normal operation, they are hundreds of kilometres apart, so one possibility can be eliminated. [14]

The second system uses constant signals ("continuous wave") and takes measurements by comparing the phase of two signals. This system is easy to use even at very low frequencies. However, its signal is ambiguous over the distance of a wavelength, meaning there are hundreds of locations that will return the same signal. Decca referred to these ambiguous locations as cells. This demands some other navigation method to be used in conjunction to pick which cell the receiver is within, and then using the phase measurements to place the receiver accurately within the cell. [14]

Numerous efforts were made to provide some sort of secondary low-accuracy system that could be used with a phase-comparison system like Decca in order to resolve the ambiguity. Among the many methods was a directional broadcast system known as POPI, and a variety of systems combining pulse-timing for low-accuracy navigation and then using phase-comparison for fine adjustment. Decca themselves had set aside one frequency, "9f", for testing this combined-signal concept, but did not have the chance to do so until much later. Similar concepts were also used in the experimental Navarho system in the United States. [15]

It was known from the start of the LORAN project that the same CRT displays that showed the LORAN pulses could, when suitably magnified, also show the individual waves of the intermediate frequency. This meant that pulse-matching could be used to get a rough fix, and then the operator could gain additional timing accuracy by lining up the individual waves within the pulse, like Decca. This could either be used to greatly increase the accuracy of LORAN, or alternately, offer similar accuracy using much lower carrier frequencies, and thus greatly extend the effective range. This would require the transmitter stations to be synchronized both in time and phase, but much of this problem had already been solved by Decca engineers. [14]

The long-range option was of considerable interest to the Coast Guard, who set up an experimental system known as LF LORAN in 1945. This operated at much lower frequencies than the original LORAN, at 180 kHz, and required very long balloon-borne antennas. Testing was carried out throughout the year, including several long-distance flights as far as Brazil. The experimental system was then sent to Canada where it was used during Operation Muskox in the Arctic. Accuracy was found to be 150 feet (46 m) at 750 miles (1,210 km), a significant advance over LORAN. With the ending of Muskox, it was decided to keep the system running under what became known as "Operation Musk Calf", run by a group consisting of the United States Air Force, Royal Canadian Air Force, Royal Canadian Navy and the UK Royal Corps of Signals. The system ran until September 1947. [16]

This led to another major test series, this time by the newly-formed United States Air Force, known as Operation Beetle. Beetle was located in the far north, on the Canada-Alaska border, and used new guy-stayed 625 feet (191 m) steel towers, replacing the earlier system's balloon-lofted cable antennas. The system became operational in 1948 and ran for two years until February 1950. Unfortunately, the stations proved poorly sited, as the radio transmission over the permafrost was much shorter than expected and synchronization of the signals between the stations using ground waves proved impossible. The tests also showed that the system was extremely difficult to use in practice; it was easy for the operator to select the wrong sections of the waveforms on their display, leading to significant real-world inaccuracy. [16]

CYCLAN and Whyn

In 1946 the Rome Air Development Center sent out contracts for longer-ranged and more-accurate navigation systems that would be used for long-range bombing navigation. As the United States Army Air Forces were moving towards smaller crews, only three in the Boeing B-47 Stratojet for instance, a high degree of automation was desired. Two contracts were accepted; Sperry Gyroscope proposed the CYCLAN system (CYCLe matching LorAN) which was broadly similar to LF LORAN but with additional automation, and Sylvania proposed Whyn using continuous wave navigation like Decca, but with additional coding using frequency modulation. In spite of great efforts, Whyn could never be made to work, and was abandoned. [17]

CYCLAN operated by sending the same LF LORAN-like signals on two frequencies, LF LORAN's 180 kHz and again on 200 kHz. The associated equipment would look for a rising amplitude that indicated the start of the signal pulse, and then use sampling gates to extract the carrier phase. Using two receivers solved the problem of mis-aligning the pulses, because the phases would only align properly between the two copies of the signal when the same pulses were being compared. None of this was trivial; using the era's tube-based electronics, the experimental CYCLAN system filled much of a semi-trailer. [18]

CYCLAN proved highly successful, so much so that it became increasingly clear that the problems that led the engineers to use two frequencies were simply not as bad as expected. It appeared that a system using a single frequency would work just as well, given the right electronics. This was especially good news, as the 200 kHz frequency was interfering with existing broadcasts, and had to be moved to 160 kHz during testing. [19]

Through this period the issue of radio spectrum use was becoming a major concern, and had led to international efforts to decide on a frequency band suitable for long-range navigation. This process eventually settled on the band from 90 to 100 kHz. CYCLAN appeared to suggest that accuracy at even lower frequencies was not a problem, and the only real concern was the expense of the equipment involved. [19]

Cytac

The success of the CYCLAN system led to a further contract with Sperry in 1952 for a new system with the twin goals of working in the 100 kHz range while being equally accurate, less complex and less expensive. These goals would normally be contradictory, but the CYCLAN system gave all involved the confidence that these could be met. The resulting system was known as Cytac. [20]

To solve the complexity problem, a new circuit was developed to properly time the sampling of the signal. This consisted of a circuit to extract the envelope of the pulse, another to extract the derivative of the envelope, and finally another that subtracted the derivative from the envelope. The result of this final operation would become negative during a very specific and stable part of the rising edge of the pulse, and this zero-crossing was used to trigger a very short-time sampling gate. This system replaced the complex system of clocks used in CYCLAN. By simply measuring the time between the zero-crossings of the master and secondary, pulse-timing was extracted. [21]

The output of the envelope sampler was also sent to a phase-shifter that adjusted the output of a local clock that locked to the master carrier using a phase-locked loop. This retained the phase of the master signal long enough for the secondary signal to arrive. Gating on the secondary signal was then compared to this master signal in a phase detector, and a varying voltage was produced depending on the difference in phase. This voltage represented the fine-positioning measurement. [21]

The system was generally successful during testing through 1953, but there were concerns raised about the signal power at long range and the possibility of jamming. This led to further modifications of the basic signal. The first was to broadcast a series of pulses instead of just one, broadcasting more energy during a given time and improving the ability of the receivers to tune in a useful signal. They also added a fixed 45° phase shift to every pulse, so simple continuous-wave jamming signals could be identified and rejected. [22]

The Cytac system underwent an enormous series of tests across the United States and offshore. Given the potential accuracy of the system, even minor changes to the groundwave synchronization were found to cause errors that could be eliminated — issues such as the number of rivers the signal crossed caused predictable delays that could be measured and then factored into navigation solutions. This led to a series of correction contours that could be added to the received signal to adjust for these concerns, and these were printed on the Cytac charts. Using prominent features on dams as target points, a series of tests demonstrated that the uncorrected signals provided accuracy on the order of 100 yards, while adding the correction contour adjustments reduced this to the order of ten yards. [23]

Loran-B and -C

It was at this moment that the United States Air Force, having taken over these efforts while moving from the United States Army Air Forces, dropped their interest in the project. Although the reasons are not well recorded, it appears the idea of a fully automated bombing system using radio aids was no longer considered possible. [20] The AAF had been involved in missions covering about 1000 km (the distance from London to Berlin) and the Cytac system would work well at these ranges, but as the mission changed to trans-polar missions of 5,000 km or more, even Cytac did not offer the range and accuracy needed. They turned their attention to the use of inertial platforms and Doppler radar systems, cancelling work on Cytac as well as a competing system known as Navarho. [24]

Around this period the United States Navy began work on a similar system using combined pulse and phase comparison, but based on the existing LORAN frequency of 200 kHz. By this time the United States Navy had handed operational control of the LORAN system to the Coast Guard, and it was assumed the same arrangement would be true for any new system as well. Thus, the United States Coast Guard was given the choice of naming the systems, and decided to rename the existing system Loran-A, and the new system Loran-B. [1]

With Cytac fully developed and its test system on the east coast of the United States mothballed, the United States Navy also decided to re-commission Cytac for tests in the long-range role. An extensive series of tests across the Atlantic were carried out by the USCGC Androscoggin starting in April 1956. Meanwhile, Loran-B proved to have serious problems keeping their transmitters in phase, and that work was abandoned. [lower-alpha 2] Minor changes were made to the Cytac systems to further simplify it, including a reduction in the pulse-chain spacing from 1200 to 1000 μs, the pulse rate changed to 20  pps to match the existing Loran-A system, and the phase-shifting between pulses to an alternating 0, 180-degree shift instead of 45 degrees at every pulse within the chain. [25]

The result was Loran-C. Testing of the new system was intensive, and over-water flights around Bermuda demonstrated that 50% of fixes lay within a circle of 260 ft (79 m) radius, [26] a dramatic improvement over the original Loran-A, meeting the accuracy of the Gee system, but at much greater range. The first chain was set up using the original experimental Cytac system, and a second one in the Mediterranean in 1957. Further chains covering the North Atlantic and large areas of the Pacific followed. At the time global charts were printed with shaded sections representing the area where a 3-mile (4.8 km) accurate fix could be obtained under most operational conditions. Loran-C operated in the 90 to 110 kHz frequency range.

Improving systems

Loran-C had originally been designed to be highly automated, allowing the system to be operated more rapidly than the original LORAN's multi-minute measurement. It was also operated in "chains" of linked stations, allowing a fix to be made by simultaneously comparing two secondaries to a single master. The downside of this approach was that the required electronic equipment, built using 1950s-era tube technology, was very large. Looking for companies with knowledge of seaborne, multi-channel phase-comparison electronics led, ironically, to Decca, who built the AN/SPN-31, the first widely used Loran-C receiver. The AN/SPN-31 weighed over 100 pounds (45 kg) and had 52 controls. [27]

Airborne units followed, and an adapted AN/SPN-31 was tested in an Avro Vulcan in 1963. By the mid-1960s, units with some transistorization were becoming more common, and a chain was set up in Vietnam to support the United States' war efforts there. A number of commercial airline operators experimented with the system as well, using it for navigation on the great circle route between North America and Europe. However, inertial platforms ultimately became more common in this role. [27]

In 1969, Decca sued the United States Navy for patent infringement, producing ample documentation of their work on the basic concept as early as 1944, along with the "missing" 9f frequency [lower-alpha 3] at 98 kHz that had been set aside for experiments using this system. Decca won the initial suit, but the judgement was overturned on appeal when the Navy claimed "wartime expediency". [28]

Loran-D and -F

When Loran-C became widespread, the United States Air Force once again became interested in using it as a guidance system. They proposed a new system layered on top of Loran-C to provide even higher accuracy, using the Loran-C fix as the coarse guidance signal in much the same way that Loran-C extracted coarse location from pulse timing to remove the ambiguity in the fine measurement. To provide an extra-fine guidance signal, Loran-D interleaved another train of eight pulses immediately after the signals from one of the existing Loran-C stations, folding the two signals together. This technique became known as "Supernumary Interpulse Modulation" (SIM). These were broadcast from low-power portable transmitters, offering relatively short-range service of high accuracy. [29]

Loran-D was used only experimentally during war-games in the 1960s from a transmitter set in the UK. The system was also used in a limited fashion during the Vietnam War, combined with the Pave Spot laser designator system, a combination known as Pave Nail. Using mobile transmitters, the AN/ARN-92 LORAN navigation receiver could achieve accuracy on the order of 60 feet (18 m), which the Spot laser improved to about 20 feet (6.1 m). [29] The SIM concept later became a system for sending additional data. [30] [31]

At about the same time, Motorola proposed a new system using pseudo-random pulse-chains. This mechanism ensures that no two chains within a given period (on the order of many seconds) will have the same pattern, making it easy to determine if the signal is a groundwave from a recent transmission or a multi-hop signal from a previous one. The system, Multi-User Tactical Navigation Systems (MUTNS) was used briefly but it was found that Loran-D met the same requirements but had the added advantage of being a standard Loran-C signal as well. Although MUTNS was unrelated to the Loran systems, it was sometimes referred to as Loran-F. [32]

Decline

In spite of its many advantages, the high cost of implementing a Loran-C receiver made it uneconomical for many users. Additionally, as military users upgraded from Loran-A to Loran-C, large numbers of surplus Loran-A receivers were dumped on the market. This made Loran-A popular in spite of being less accurate and fairly difficult to operate. By the early 1970s the introduction of integrated circuits combining a complete radio receiver began to greatly reduce the complexity of Loran-A measurements, and fully automated units the size of a stereo receiver became common. For those users requiring higher accuracy, Decca had considerable success with their Decca Navigator system, and produced units that combined both receivers, using Loran to eliminate the ambiguities in Decca.

The same rapid development of microelectronics that made Loran-A so easy to operate worked equally well on the Loran-C signals, and the obvious desire to have a long-range system that could also provide enough accuracy for lake and harbour navigation led to the "opening" of the Loran-C system to public use in 1974. Civilian receivers quickly followed, and dual-system A/C receivers were also common for a time. The switch from A to C was extremely rapid, due largely to rapidly falling prices which led to many users' first receiver being Loran-C. By the late 1970s the Coast Guard decided to turn off Loran-A, in favour of adding additional Loran-C stations to cover gaps is its coverage. The original Loran-A network was shut down in 1979 and 1980, with a few units used in the Pacific for some time. Given the widespread availability of Loran-A charts, many Loran-C receivers included a system for converting coordinates between A and C units.

One of the reasons for Loran-C's opening to the public was the move from Loran to new forms of navigation, including inertial navigation systems, Transit and OMEGA, meant that the security of Loran was no longer as stringent as it was as a primary form of navigation. As these newer systems gave way to GPS through the 1980s and 90s, this process repeated itself, but this time the military was able to separate GPS's signals in such a way that it could provide both secure military and insecure civilian signals at the same time. GPS was more difficult to receive and decode, but by the 1990s the required electronics were already as small and inexpensive as Loran-C, leading to rapid adoption that has become largely universal.

Loran-C in the 21st century

Although Loran-C was largely redundant by 2000, it has not universally disappeared as of 2014 due to a number of concerns. One is that the GPS system can be jammed through a variety of means. Although the same is true of Loran-C, the transmitters are close-at-hand and can be adjusted if necessary. More importantly, there are effects that might cause the GPS system to become unusable over wide areas, notably space weather events and potential EMP events. Loran, located entirely under the atmosphere, offers more resilience to these issues. There has been considerable debate about the relative merits of keeping the Loran-C system operational as a result of such considerations.

In November 2009, the United States Coast Guard announced that Loran-C was not needed by the U.S. for maritime navigation. This decision left the fate of LORAN and eLoran in the United States to the Secretary of the Department of Homeland Security. [33] Per a subsequent announcement, the US Coast Guard, in accordance with the DHS Appropriations Act, terminated the transmission of all U.S. Loran-C signals on 8 February 2010. [2] On 1 August 2010 the U.S. transmission of the Russian American signal was terminated, [2] and on 3 August 2010 all Canadian signals were shut down by the USCG and the CCG. [2] [3]

The European Union had decided that the potential security advantages of Loran are worthy not only of keeping the system operational, but upgrading it and adding new stations. This is part of the wider Eurofix system which combines GPS, Galileo and nine Loran stations into a single integrated system.

In 2014, Norway and France both announced that all of their remaining transmitters, which make up a significant part of the Eurofix system, would be shut down on 31 December 2015. [34] The two remaining transmitters in Europe (Anthorn, UK and Sylt, Germany) would no longer be able to sustain a positioning and navigation Loran service, with the result that the UK announced its trial eLoran service would be discontinued from the same date. [35]

Description

Hyperbolic navigation

A crude diagram of the LORAN principle--the difference between the time of reception of synchronized signals from radio stations A and B is constant along each hyperbolic curve; when demarcated on a map, such curves are known as "TD lines". "TD" stands for "Time Difference". Crude LORAN diagram.svg
A crude diagram of the LORAN principle—the difference between the time of reception of synchronized signals from radio stations A and B is constant along each hyperbolic curve; when demarcated on a map, such curves are known as "TD lines". "TD" stands for "Time Difference".

In conventional navigation, measuring one's location, or taking a fix, is accomplished by taking two measurements against well known locations. In optical systems this is typically accomplished by measuring the angle to two landmarks, and then drawing lines on a nautical chart at those angles, producing an intersection that reveals the ship's location. Radio methods can also use the same concept with the aid of a radio direction finder, but due to the nature of radio propagation, such instruments are subject to significant errors, especially at night. More accurate radio navigation can be made using pulse timing or phase comparison techniques, which rely on the time-of-flight of the signals. In comparison to angle measurements, these remain fairly steady over time, and most of the effects that change these values are fixed objects like rivers and lakes that can be accounted for on charts.

Timing systems can reveal the absolute distance to an object, as is the case in radar. The problem in the navigational case is that the receiver has to know when the original signal was sent. In theory, one could synchronize an accurate clock to the signal before leaving port, and then use that to compare the timing of the signal during the voyage. However, in the 1940s no suitable system was available that could hold an accurate signal over the time span of an operational mission.

Instead, radio navigation systems adopted the multilateration concept which is based on the difference in times (or phase) instead of the absolute time. The basic idea is that it is relatively easy to synchronize two ground stations, using a signal shared over a phone line for instance, so one can be sure that the signals received were sent at exactly the same time. They will not be received at exactly the same time, however, as the receiver will receive the signal from the closer station first. Timing the difference between two signals can be easily accomplished, first by physically measuring them on a cathode-ray tube, or simple electronics in the case of phase comparison.

The difference in signal timing does not reveal the location by itself. Instead, it determines a series of locations where that timing is possible. For instance, if the two stations are 300 km apart and the receiver measures no difference in the two signals, that implies that the receiver is somewhere along a line equidistant between the two. If the signal from one is received exactly 100 μs after, then the receiver is 30 kilometres (19 mi) closer to one station than the other. Plotting all the locations where one station is 30 km closer than the other produces a curved line. Taking a fix is accomplished by making two such measurements with different pairs of stations, and then looking up both curves on a navigational chart. The curves are known as lines of position or LOP. [36]

In practice, radio navigation systems normally use a chain of three or four stations, all synchronized to a master signal that is broadcast from one of the stations. The others, the secondaries, are positioned so their LOPs cross at acute angles, which increases the accuracy of the fix. So for instance, a given chain might have four stations with the master in the center, allowing a receiver to pick the signals from two secondaries that are currently as close to right angles as possible given their current location. Modern systems, which know the locations of all the broadcasters, can automate which stations to pick.

LORAN method

LORAN pulse Loran pulse.svg
LORAN pulse

In the case of LORAN, one station remains constant in each application of the principle, the primary, being paired up separately with two other secondary stations. Given two secondary stations, the time difference (TD) between the primary and first secondary identifies one curve, and the time difference between the primary and second secondary identifies another curve, the intersections of which will determine a geographic point in relation to the position of the three stations. These curves are referred to as TD lines. [37]

In practice, LORAN is implemented in integrated regional arrays, or chains, consisting of one primary station and at least two (but often more) secondary stations, with a uniform group repetition interval (GRI) defined in microseconds. The amount of time before transmitting the next set of pulses is defined by the distance between the start of transmission of primary to the next start of transmission of primary signal.

The secondary stations receive this pulse signal from the primary, then wait a preset number of milliseconds, known as the secondary coding delay , to transmit a response signal. In a given chain, each secondary's coding delay is different, allowing for separate identification of each secondary's signal. (In practice, however, modern LORAN receivers do not rely on this for secondary identification.)[ citation needed ]

LORAN chains (GRIs)

LORAN Station Malone, Malone, Florida Great Lakes chain (GRI 8970)/Southeast U.S. chain (GRI 7980) LORAN Station Malone-Outside-Large.jpg
LORAN Station Malone, Malone, Florida Great Lakes chain (GRI 8970)/Southeast U.S. chain (GRI 7980)

Every LORAN chain in the world uses a unique Group Repetition Interval, the number of which, when multiplied by ten, gives how many microseconds pass between pulses from a given station in the chain. In practice, the delays in many, but not all, chains are multiples of 100 microseconds. LORAN chains are often referred to by this designation, e.g., GRI 9960, the designation for the LORAN chain serving the Northeastern United States.[ citation needed ]

Due to the nature of hyperbolic curves, a particular combination of a primary and two secondary stations can possibly result in a "grid" where the grid lines intersect at shallow angles. For ideal positional accuracy, it is desirable to operate on a navigational grid where the grid lines are closer to right angles (orthogonal) to each other. As the receiver travels through a chain, a certain selection of secondaries whose TD lines initially formed a near-orthogonal grid can become a grid that is significantly skewed. As a result, the selection of one or both secondaries should be changed so that the TD lines of the new combination are closer to right angles. [38] In practice, nearly all chains provide at least three, and as many as five, secondaries. [39]

LORAN charts

This nautical chart of New York Harbor includes LORAN-A TD lines. Note that the printed lines do not extend into inland waterway areas. New York Harbor Nautical Chart.jpg
This nautical chart of New York Harbor includes LORAN-A TD lines. Note that the printed lines do not extend into inland waterway areas.

Where available, common marine nautical charts include visible representations of TD lines at regular intervals over water areas. The TD lines representing a given primary-secondary pairing are printed with distinct colors, and note the specific time difference indicated by each line. On a nautical chart, the denotation for each Line of Position from a receiver, relative to axis and color, can be found at the bottom of the chart. The color on official charts for stations and the timed-lines of position follow no specific conformance for the purpose of the International Hydrographic Organization (IHO). However, local chart producers may color these in a specific conformance to their standard. Always consult the chart notes, administrations Chart1 reference, and information given on the chart for the most accurate information regarding surveys, datum, and reliability.

There are three major factors when considering signal delay and propagation in relation to LORAN-C:

  1. Primary Phase Factor (PF) – This allows for the fact that the speed of the propagated signal in the atmosphere is slightly lower than in a vacuum.
  2. Secondary Phase Factor (SF) – This allows for the fact that the speed of propagation of the signal is slowed when traveling over the seawater because of the greater conductivity of seawater compared to land.
  3. Additional Secondary Factors (ASF) – Because LORAN-C transmitters are mainly land based, the signal will travel partly over land and partly over seawater. ASF may be treated as land and water segments, each with a uniform conductivity depending on whether the path is over land or water.

The chart notes should indicate whether ASF corrections have been made (Canadian Hydrographic Service (CHS) charts, for example, include them). Otherwise, the appropriate correction factors must be obtained before use.

Due to interference and propagation issues suffered from land features and artificial structures such as tall buildings, the accuracy of the LORAN signal can be degraded considerably in inland areas (see Limitations). As a result, nautical charts will not show TD lines in those areas, to prevent reliance on LORAN-C for navigation.

Traditional LORAN receivers display the time difference between each pairing of the primary and one of the two selected secondary stations, which is then used to find the appropriate TD line on the chart. Modern LORAN receivers display latitude and longitude coordinates instead of time differences, and, with the advent of time difference comparison and electronics, provide improved accuracy and better position fixing, allowing the observer to plot their position on a nautical chart more easily. When using such coordinates, the datum used by the receiver (usually WGS84) must match that of the chart, or manual conversion calculations must be performed before the coordinates can be used.

Timing and synchronization

Cesium atomic clocks LORAN Station Malone-Cesiums-Large.jpg
Cesium atomic clocks

Each LORAN station is equipped with a suite of specialized equipment to generate the precisely timed signals used to modulate / drive the transmitting equipment. Up to three commercial cesium atomic clocks are used to generate 5 MHz and pulse per second (or 1 Hz) signals that are used by timing equipment to generate the various GRI-dependent drive signals for the transmitting equipment.

While each U.S.-operated LORAN station is supposed to be synchronized to within 100 ns of Coordinated Universal Time (UTC), the actual accuracy achieved as of 1994 was within 500 ns. [40]

Transmitters and antennas

LORAN transmitter bank LORAN Station Malone-Transmitter Middle-Large.jpg
LORAN transmitter bank

LORAN-C transmitters operate at peak powers of 100–4,000 kilowatts, comparable to longwave broadcasting stations. Most use 190–220 metre tall mast radiators, insulated from ground. The masts are inductively lengthened and fed by a loading coil (see: electrical length). A well known-example of a station using such an antenna is Rantum. Free-standing tower radiators in this height range are also used[ clarification needed ]. Carolina Beach uses a free-standing antenna tower. Some LORAN-C transmitters with output powers of 1,000 kW and higher used extremely tall 412-metre mast radiators (see below). Other high power LORAN-C stations, like George, used four T-antennas mounted on four guyed masts arranged in a square.

All LORAN-C antennas are designed to radiate an omnidirectional pattern. Unlike longwave broadcasting stations, LORAN-C stations cannot use backup antennas because the exact position of the antenna is a part of the navigation calculation. The slightly different physical location of a backup antenna would produce Lines of Position different from those of the primary antenna.

Limitations

LORAN suffers from electronic effects of weather and the ionospheric effects of sunrise and sunset. The most accurate signal is the groundwave that follows the Earth's surface, ideally over seawater. At night the indirect skywave, bent back to the surface by the ionosphere, is a problem as multiple signals may arrive via different paths (multipath interference). The ionosphere's reaction to sunrise and sunset accounts for the particular disturbance during those periods. Geomagnetic storms have serious effects, as with any radio based system.

LORAN uses ground-based transmitters that only cover certain regions. Coverage is quite good in North America, Europe, and the Pacific Rim.

The absolute accuracy of LORAN-C varies from 0.10 to 0.25  nmi (185 to 463 m). Repeatable accuracy is much greater, typically from 60 to 300  ft (18 to 91 m). [41]

LORAN Data Channel (LDC)

LORAN Data Channel (LDC) is a project underway between the FAA and United States Coast Guard to send low bit rate data using the LORAN system. Messages to be sent include station identification, absolute time, and position correction messages. In 2001, data similar to Wide Area Augmentation System (WAAS) GPS correction messages were sent as part of a test of the Alaskan LORAN chain. As of November 2005, test messages using LDC were being broadcast from several U.S. LORAN stations. [42]

In recent years, LORAN-C has been used in Europe to send differential GPS and other messages, employing a similar method of transmission known as EUROFIX. [43]

A system called SPS (Saudi Positioning System), similar to EUROFIX, is in use in Saudi Arabia. [44] GPS differential corrections and GPS integrity information are added to the LORAN signal. A combined GPS/LORAN receiver is used, and if a GPS fix is not available it automatically switches over to LORAN.

Future

As LORAN systems are maintained and operated by governments, their continued existence is subject to public policy. With the evolution of other electronic navigation systems, such as satellite navigation systems, funding for existing systems is not always assured.

Critics, who have called for the elimination of the system, state that the LORAN system has too few users, lacks cost-effectiveness, and that Global Navigation Satellite System (GNSS) signals are superior to LORAN.[ citation needed ] Supporters of continued and improved LORAN operation note that LORAN uses a strong signal, which is difficult to jam, and that LORAN is an independent, dissimilar, and complementary system to other forms of electronic navigation, which helps ensure availability of navigation signals. [45] [46]

On 26 February 2009, the U.S. Office of Management and Budget released the first blueprint for the Fiscal Year 2010 budget. [47] This document identified the LORAN-C system as "outdated" and supported its termination at an estimated savings of $36 million in 2010 and $190 million over five years.

On 21 April 2009 the U.S. Senate Committee on Commerce, Science and Transportation and the Committee on Homeland Security and Governmental Affairs released inputs to the FY 2010 Concurrent Budget Resolution with backing for the continued support for the LORAN system, acknowledging the investment already made in infrastructure upgrades and recognizing the studies performed and multi-departmental conclusion that eLoran is the best backup to GPS.

Senator Jay Rockefeller, Chairman of the Committee on Commerce, Science and Transportation, wrote that the committee recognized the priority in "Maintaining LORAN-C while transitioning to eLORAN" as means of enhancing the national security, marine safety and environmental protection missions of the Coast Guard.

Senator Collins, the ranking member on the Committee on Homeland Security and Governmental Affairs wrote that the President's budget overview proposal to terminate the LORAN-C system is inconsistent with the recent investments, recognized studies and the mission of the U.S. Coast Guard. The committee also recognizes the $160 million investment already made toward upgrading the LORAN-C system to support the full deployment of eLoran.

Further, the Committees also recognize the many studies which evaluated GPS backup systems and concluded both the need to back up GPS and identified eLoran as the best and most viable backup. "This proposal is inconsistent with the recently released (January 2009) Federal Radionavigation Plan (FRP), which was jointly prepared by DHS and the Departments of Defense (DOD) and Transportation (DOT). The FRP proposed the eLoran program to serve as a Position, Navigation and Timing (PNT) backup to GPS (Global Positioning System)."

On 7 May 2009, President Barack Obama proposed cutting funding (approx. $35 million/year) for LORAN, citing its redundancy alongside GPS. [48] In regard to the pending Congressional bill, H.R. 2892, it was subsequently announced that "[t]he Administration supports the Committee's aim to achieve an orderly termination through a phased decommissioning beginning in January 2010, and the requirement that certifications be provided to document that the LORAN-C termination will not impair maritime safety or the development of possible GPS backup capabilities or needs." [49]

Also on 7 May 2009, the U.S. General Accounting Office (GAO), the investigative arm of Congress, released a report citing the very real potential for the GPS system to degrade or fail in light of program delays which have resulted in scheduled GPS satellite launches slipping by up to three years. [50]

On 12 May 2009 the March 2007 Independent Assessment Team (IAT) report on LORAN was released to the public. In its report the ITA stated that it "unanimously recommends that the U.S. government complete the eLoran upgrade and commit to eLoran as the national backup to GPS for 20 years." The release of the report followed an extensive Freedom of Information Act (FOIA) battle waged by industry representatives against the federal government. Originally completed 20 March 2007 and presented to the co-sponsoring Department of Transportation and Department of Homeland Security (DHS) Executive Committees, the report carefully considered existing navigation systems, including GPS. The unanimous recommendation for keeping the LORAN system and upgrading to eLoran was based on the team's conclusion that LORAN is operational, deployed and sufficiently accurate to supplement GPS. The team also concluded that the cost to decommission the LORAN system would exceed the cost of deploying eLoran, thus negating any stated savings as offered by the Obama administration and revealing the vulnerability of the U.S. to GPS disruption. [51]

In November 2009, the U.S. Coast Guard announced that the LORAN-C stations under its control would be closed down for budgetary reasons after 4 January 2010 provided the Secretary of the Department of Homeland Security certified that LORAN is not needed as a backup for GPS. [52]

On 7 January 2010, Homeland Security published a notice of the permanent discontinuation of LORAN-C operation. Effective 2000 UTC 8 February 2010, the United States Coast Guard terminated all operation and broadcast of LORAN-C signals in the United States. The United States Coast Guard transmission of the Russian American CHAYKA signal was terminated on 1 August 2010. The transmission of Canadian LORAN-C signals was terminated on 3 August 2010. [53]

United Kingdom eLoran implementation

On 31 May 2007, the UK Department for Transport (DfT), via the general lighthouse authorities, awarded a 15-year contract to provide a state-of-the-art Enhanced LORAN service to improve the safety of mariners in the UK and Western Europe. The service contract was to operate in two phases, with development work and further focus for European agreement on eLoran service provision from 2007 through 2010, and full operation of the eLoran service from 2010 through 2022. The first eLoran transmitter was situated at Anthorn Radio Station Cumbria, UK, and was operated by Babcock International (previously Babcock Communications). [54]

The UK government granted approval for seven differential eLoran ship-positioning technology stations to be built along the south and east coasts of the UK to help counter the threat of jamming of global positioning systems. They were set to reach initial operational capability by summer 2014. [55] The general lighthouse authorities of the UK and Ireland announced 31 October 2014 the initial operational capability of UK maritime eLoran. Seven differential reference stations provided additional position, navigation, and timing (PNT) information via low-frequency pulses to ships fitted with eLoran receivers. The service was to help ensure they could navigate safely in the event of GPS failure in one of the busiest shipping regions in the world, with expected annual traffic of 200,000 vessels by 2020. [56]

Despite these plans, in light of the decision by France and Norway to cease Loran transmissions on 31 December 2015, the UK announced at the start of that month that its eLoran service would be discontinued on the same day. [57] However to allow for further research and PNT development, the eLoran timing signal is still active from the government facility in Anthorn. [58]

List of LORAN-C transmitters

Map of LORAN stations. Loranstationscrkl.jpg
Map of LORAN stations.

A list of LORAN-C transmitters. Stations with an antenna tower taller than 300 metres (984 feet) are shown in bold.

StationCountryChainCoordinatesRemarks
AfifSaudi ArabiaSaudi Arabia South (GRI 7030)
Saudi Arabia North (GRI 8830)
23°48′36.66″N42°51′18.17″E / 23.8101833°N 42.8550472°E / 23.8101833; 42.8550472 (Afif – 7030-X / 8830-M) 400 kW
Al KhamasinSaudi ArabiaSaudi Arabia South (GRI 7030)
Saudi Arabia North (GRI 8830)
20°28′2.34″N44°34′51.9″E / 20.4673167°N 44.581083°E / 20.4673167; 44.581083 (Al Khamasin – 7030-M / 8830-X) dismantled
Al MuwassamSaudi ArabiaSaudi Arabia South (GRI 7030)
Saudi Arabia North (GRI 8830)
16°25′56.87″N42°48′6.21″E / 16.4324639°N 42.8017250°E / 16.4324639; 42.8017250 (Al Muwassam – 7030-Z / 8830-Z) dismantled
Angissoq Greenlandshut down 59°59′17.348″N45°10′26.91″W / 59.98815222°N 45.1741417°W / 59.98815222; -45.1741417 (Angissq – shut down) shut down 31 December 1994; used a 411.48 metre tower until 27 July 1964, demolished
Anthorn United KingdomLessay (GRI 6731) 54°54′41.949″N3°16′42.58″W / 54.91165250°N 3.2784944°W / 54.91165250; -3.2784944 (Anthorn – 6731-Y) Master and Slave on 9 January 2016. Replacement for transmitter Rugby [59] eLoran timing signal remains active. [58]
Ash Shaykh HumaydSaudi ArabiaSaudi Arabia South (GRI 7030)
Saudi Arabia North (GRI 8830)
28°9′15.87″N34°45′41.36″E / 28.1544083°N 34.7614889°E / 28.1544083; 34.7614889 (Ash Shaykh Humayd – 7030-Y / 8830-Y)
Attu IslandUnited StatesNorth Pacific (GRI 9990)
Russian-American (GRI 5980)
shut down
52°49′44″N173°10′49.7″E / 52.82889°N 173.180472°E / 52.82889; 173.180472 (Attu – 5980-W / 9990-X) demolished August 2010
BalasoreIndiaCalcutta (GRI 5543) 21°29′11.02″N86°55′9.66″E / 21.4863944°N 86.9193500°E / 21.4863944; 86.9193500 (Balasore - 5543-M)
BarrigadaGuamshut down 13°27′50.16″N144°49′33.4″E / 13.4639333°N 144.825944°E / 13.4639333; 144.825944 (Barrigada - shut down) demolished
BaudetteUnited Statesshut down

North Central U.S. (GRI 8290)Great Lakes (GRI 8970)

48°36′49.947″N94°33′17.91″W / 48.61387417°N 94.5549750°W / 48.61387417; -94.5549750 (Baudette - 8290-W / 8970-Y) dismantled
Berlevåg, Finnmark NorwayBø (GRI 7001)
shut down
70°50′43.07″N29°12′16.04″E / 70.8452972°N 29.2044556°E / 70.8452972; 29.2044556 (Berlevåg - shut down) shut down 31 December 2015
BilimoraIndiaBombay (GRI 6042) 20°45′42.036″N73°2′14.48″E / 20.76167667°N 73.0373556°E / 20.76167667; 73.0373556 (Bilimora - 6042-X)
Boise CityUnited Statesshut down

Great Lakes (GRI 8970)
South Central U.S. (GRI 9610)

36°30′20.75″N102°53′59.4″W / 36.5057639°N 102.899833°W / 36.5057639; -102.899833 (Boise City - 8970-Z / 9610-M)
Bø, Vesterålen NorwayBø (GRI 7001)
Eiði (GRI 9007)
shut down
68°38′6.216″N14°27′47.35″E / 68.63506000°N 14.4631528°E / 68.63506000; 14.4631528 (Bø - 7001-M / 9007-X) shut down 31 December 2015, demolished October 2016.
Cambridge Bay Canadashut down 69°6′52.840″N105°0′55.95″W / 69.11467778°N 105.0155417°W / 69.11467778; -105.0155417 (Cambridge Bay - shut down) shut down; free-standing lattice tower still in use for a non-directional beacon, demolished
Cape Race Canadashut down

Canadian East Coast (GRI 5930)
Newfoundland East Coast (GRI 7270)

46°46′32.74″N53°10′28.66″W / 46.7757611°N 53.1746278°W / 46.7757611; -53.1746278 (Cape Race - 5930-Y / 7270-W) used a 411.48 metre tall tower until 2 February 1993, now uses a 260.3 metre tall tower. The latter however, was shut down in 2012. Demolished
Caribou, MaineUnited Statesshut down

Canadian East Coast (GRI 5930)
Northeast U.S. (GRI 9960)

46°48′27.305″N67°55′37.15″W / 46.80758472°N 67.9269861°W / 46.80758472; -67.9269861 (Caribou - 5930-M / 9960-W) demolished
Carolina Beach United Statesshut down

Southeast U.S. (GRI 7980)
Northeast US (GRI 9960)

34°3′46.208″N77°54′46.10″W / 34.06283556°N 77.9128056°W / 34.06283556; -77.9128056 (Carolina Beach - 7980-Z / 9960-Y) demolished
ChongzuoChinaChina South Sea (GRI 6780) 22°32′35.8″N107°13′19″E / 22.543278°N 107.22194°E / 22.543278; 107.22194 (Chongzuo - 6780-Y)
Comfort CoveCanadashut down

Newfoundland East Coast (GRI 7270)

49°19′53.65″N54°51′43.2″W / 49.3315694°N 54.862000°W / 49.3315694; -54.862000 (Comfort Cove - 7270-M) demolished
DanaUnited Statesshut down

Great Lakes (GRI 8970)
Northeast US (GRI 9960)

39°51′7.64″N87°29′10.71″W / 39.8521222°N 87.4863083°W / 39.8521222; -87.4863083 (Dana - 8970-M / 9960-Z)
DhrangadhraIndiaBombay (GRI 6042) 23°0′16.2″N71°31′37.64″E / 23.004500°N 71.5271222°E / 23.004500; 71.5271222 (Dhrangadhra - 6042-M)
Diamond HarborIndiaCalcutta (GRI 5543) 22°10′20.42″N88°12′15.8″E / 22.1723389°N 88.204389°E / 22.1723389; 88.204389 (Diamond Harbor - 5543-W)
Eiði Faroe Islandsshut down

Eiði (GRI 9007)

62°17′59.69″N7°4′25.59″W / 62.2999139°N 7.0737750°W / 62.2999139; -7.0737750 (Eiði - 9007-M) demolished
Estaca de Vares SpainNATO "C"

shut down

43°47′11″N7°40′45″W / 43.786348°N 7.679095°W / 43.786348; -7.679095
Estartit SpainMediterranean Sea (GRI 7990)
shut down
42°3′36.63″N3°12′16.08″E / 42.0601750°N 3.2044667°E / 42.0601750; 3.2044667 (Estartit - shut down) demolished
Fallon United Statesshut down

U.S. West Coast (GRI 9940)

39°33′6.77″N118°49′55.6″W / 39.5518806°N 118.832111°W / 39.5518806; -118.832111 (Fallon - 9940-M)
Fox HarbourCanadashut down

Canadian East Coast (GRI 5930)
Newfoundland East Coast (GRI 7270)

52°22′35.29″N55°42′28.68″W / 52.3764694°N 55.7079667°W / 52.3764694; -55.7079667 (Fox Harbour - 5930-Z / 7270-X) demolished
GeorgeUnited Statesshut down

Canadian West Coast (GRI 5990)
U.S. West Coast (GRI 9940)

47°3′48.096″N119°44′38.97″W / 47.06336000°N 119.7441583°W / 47.06336000; -119.7441583 (George - 5990-Y / 9940-W)
GesashiJapanshut down

North West Pacific (GRI 8930)
East Asia (GRI 9930)

26°36′25.09″N128°8′56.94″E / 26.6069694°N 128.1491500°E / 26.6069694; 128.1491500 (Gesashi - 8930-W / 9930-X) demolished
Gillette United Statesshut down

North Central U.S. (GRI 8290)
South Central U.S. (GRI 9610)

44°0′11.21″N105°37′24″W / 44.0031139°N 105.62333°W / 44.0031139; -105.62333 (Gillette - 8290-X / 9610-V)
Grangeville United Statesshut down

Southeast U.S. (GRI 7980)
South Central U.S. (GRI 9610)

30°43′33.24″N90°49′43.01″W / 30.7259000°N 90.8286139°W / 30.7259000; -90.8286139 (Grangeville - 7980-W / 9610-Z) dismantled
Havre United Statesshut down

North Central U.S. (GRI 8290)

48°44′38.58″N109°58′53.3″W / 48.7440500°N 109.981472°W / 48.7440500; -109.981472 (Havre - 8290-M)
Hellissandur Icelandshut down 64°54′14.793″N23°54′47.83″W / 64.90410917°N 23.9132861°W / 64.90410917; -23.9132861 (Hellissandur - shut down) shut down 31 December 1994; 411.48 metre tall tower now used for RÚV longwave broadcast on 189 kHz
Helong ChinaChina North Sea (GRI 7430) 42°43′11″N129°6′27.07″E / 42.71972°N 129.1075194°E / 42.71972; 129.1075194 (Helong - 7430-Y)
Hexian ChinaChina South Sea (GRI 6780) 23°58′3.21″N111°43′9.78″E / 23.9675583°N 111.7193833°E / 23.9675583; 111.7193833 (Hexian - 6780-M)
Iwo Jima Japanshut down 24°48′26.262″N141°19′34.76″E / 24.80729500°N 141.3263222°E / 24.80729500; 141.3263222 (Iwo Jima - shut down) shut down September 1993; dismantled; used a 411.48 metre tall tower
Jan Mayen NorwayBø (GRI 7001)
Ejde (GRI 9007)
shut down
70°54′51.478″N8°43′56.52″W / 70.91429944°N 8.7323667°W / 70.91429944; -8.7323667 (Jan Mayen - 7001-X / 9007-W) shut down 31 December 2015; demolished October 2017.
Johnston Island United Statesshut down 16°44′43.82″N169°30′30.9″W / 16.7455056°N 169.508583°W / 16.7455056; -169.508583 (Johnston Island - shut down) shut down, demolished
Jupiter United Statesshut down

Southeast U.S. (GRI 7980)

27°1′58.49″N80°6′52.83″W / 27.0329139°N 80.1146750°W / 27.0329139; -80.1146750 (Jupiter - 7980-Y) demolished
Kargaburun TurkeyMediterranean Sea (GRI 7990)
shut down
40°58′20.51″N27°52′1.89″E / 40.9723639°N 27.8671917°E / 40.9723639; 27.8671917 (Kargaburan - shut down) demolished
Kwang JuSouth KoreaEast Asia (GRI 9930) 35°2′23.69″N126°32′27.2″E / 35.0399139°N 126.540889°E / 35.0399139; 126.540889 (Kwang Ju - 9930-W)
Lampedusa ItalyMediterranean Sea (GRI 7990)
shut down
35°31′22.11″N12°31′31.06″E / 35.5228083°N 12.5252944°E / 35.5228083; 12.5252944 (Lampedusa - shut down) shut down
Las CrucesUnited Statesshut down

South Central U.S. (GRI 9610)

32°4′18.1″N106°52′4.32″W / 32.071694°N 106.8678667°W / 32.071694; -106.8678667 (Las Cruces - 9610-X)
LessayFranceLessay (GRI 6731)
Sylt (GRI 7499)
shut down
49°8′55.27″N1°30′17.03″W / 49.1486861°N 1.5047306°W / 49.1486861; -1.5047306 (Lessay - 6731-M / 7499-X) shut down 31 December 2015, demolished
Loop HeadIrelandLessay (GRI 6731)
Eiði (GRI 9007)
never built
never built250 kW [ citation needed ]; never built
Malone United Statesshut down

Southeast U.S. (GRI 7980)
Great Lakes (GRI 8970)

30°59′38.87″N85°10′8.71″W / 30.9941306°N 85.1690861°W / 30.9941306; -85.1690861 (Malone - 7980-M / 8970-W) dismantled
MiddletownUnited Statesshut down

U.S. West Coast (GRI 9940)

38°46′57.12″N122°29′43.9″W / 38.7825333°N 122.495528°W / 38.7825333; -122.495528 (Middletown - 9940-X) demolished
Minami-Tori-shima Japanshut down

North West Pacific (GRI 8930)

24°17′8.79″N153°58′52.2″E / 24.2857750°N 153.981167°E / 24.2857750; 153.981167 (Minamitorishima - 8930-X) used a 411.48 metre tall tower until 1985

demolished

Nantucket United Statesshut down

Canadian East Coast (GRI 5930)
Northeast U.S. (GRI 9960)

41°15′12.42″N69°58′38.73″W / 41.2534500°N 69.9774250°W / 41.2534500; -69.9774250 (Nantucket - 5930-X / 9960-X) demolished
Narrow CapeUnited Statesshut down

 0)
North Pacific (GRI 9990)

57°26′20.5″N152°22′10.2″W / 57.439028°N 152.369500°W / 57.439028; -152.369500 (Narrow Cape - 7960-X / 9990-Z)
NiijimaJapanshut down

North West Pacific (GRI 8930)
East Asia (GRI 9930)

34°24′12.06″N139°16′19.4″E / 34.4033500°N 139.272056°E / 34.4033500; 139.272056 (Niijima - 8930-M / 9930-Y) demolished
PatapurIndiaCalcutta (GRI 5543) 20°26′50.627″N85°49′38.67″E / 20.44739639°N 85.8274083°E / 20.44739639; 85.8274083 (Patapur - 5543-X)
PohangSouth KoreaNorth West Pacific (GRI 8930)
East Asia (GRI 9930)
36°11′5.33″N129°20′27.4″E / 36.1848139°N 129.340944°E / 36.1848139; 129.340944 (Pohang - 8930-Z / 9930-M)
Port Clarence United StatesGulf of Alaska (GRI 7960)
North Pacific (GRI 9990)
shut down
65°14′40.372″N166°53′11.996″W / 65.24454778°N 166.88666556°W / 65.24454778; -166.88666556 (Port Clarence - 7960-Z / 9990-Y) demolished 28 April 2010; used a 411.48 metre tall tower [60]
Port HardyCanadashut down

Canadian West Coast (GRI 5990)

50°36′29.830″N127°21′28.48″W / 50.60828611°N 127.3579111°W / 50.60828611; -127.3579111 (Port Hardy - 5990-Z) demolished
Rantum (Sylt) GermanyLessay (GRI 6731)
Sylt (GRI 7499 )
shut down
54°48′29.94″N8°17′36.9″E / 54.8083167°N 8.293583°E / 54.8083167; 8.293583 (Sylt - 6731-Z / 7499-M) shut down 31 Dec 2015
RaymondvilleUnited Statesshut down

Southeast U.S. (GRI 7980)
South Central U.S. (GRI 9610)

26°31′55.17″N97°49′59.52″W / 26.5319917°N 97.8332000°W / 26.5319917; -97.8332000 (Raymondville - 7980-X / 9610-Y) dismantled
RaopingChinaChina South Sea (GRI 6780)
China East Sea (GRI 8390)
23°43′26.02″N116°53′44.7″E / 23.7238944°N 116.895750°E / 23.7238944; 116.895750 (Raoping - 6780-X / 8390-X)
RongchengChinaChina North Sea (GRI 7430)
China East Sea (GRI 8390)
37°03′51.765″N122°19′25.95″E / 37.06437917°N 122.3238750°E / 37.06437917; 122.3238750 (Rongcheng - 7430-M / 8390-Y)
Rugby United KingdomExperimental (GRI 6731)
shut down
52°21′57.893″N1°11′27.39″W / 52.36608139°N 1.1909417°W / 52.36608139; -1.1909417 (Rugby - shut down) shut down July 2007, demolished
Saint Paul United Statesshut down

North Pacific (GRI 9990)

57°9′12.35″N170°15′6.06″W / 57.1534306°N 170.2516833°W / 57.1534306; -170.2516833 (Saint Paul - 9990-M) demolished
Salwa Saudi ArabiaSaudi Arabia South (GRI 7030)
Saudi Arabia North (GRI 8830)
24°50′1.46″N50°34′12.54″E / 24.8337389°N 50.5701500°E / 24.8337389; 50.5701500 (Salwa - 7030-W / 8830-W)
Searchlight United Statesshut down

South Central U.S. (GRI 9610)
U.S. West Coast (GRI 9940)

35°19′18.305″N114°48′16.88″W / 35.32175139°N 114.8046889°W / 35.32175139; -114.8046889 (Searchlight - 9610-W / 9940-Y) demolished
Sellia MarinaItalyMediterranean Sea (GRI 7990)
shut down
38°52′20.72″N16°43′6.27″E / 38.8724222°N 16.7184083°E / 38.8724222; 16.7184083 (Sellia Marina - shut down) shut down
Seneca United Statesshut down

Great Lakes (GRI 8970)
Northeast U.S. (GRI 9960)

42°42′50.716″N76°49′33.30″W / 42.71408778°N 76.8259167°W / 42.71408778; -76.8259167 (Seneca - 8970-X / 9960-M) dismantled
Shoal CoveUnited Statesshut down

Canadian West Coast (GRI 5990)
Gulf of Alaska (GRI 7960)

55°26′20.940″N131°15′19.09″W / 55.43915000°N 131.2553028°W / 55.43915000; -131.2553028 (Shoal Cove - 5990-X / 7960-Y) dismantled
SoustonsFranceLessay (GRI 6731)
shut down
43°44′23.21″N1°22′49.63″W / 43.7397806°N 1.3804528°W / 43.7397806; -1.3804528 (Soustons - 6731-X) shut down 31 December 2015, demolished
TokUnited Statesshut down

Gulf of Alaska (GRI 7960)

63°19′42.884″N142°48′31.34″W / 63.32857889°N 142.8087056°W / 63.32857889; -142.8087056 (Tok - 7960-M) demolished
TokachibutoJapanshut down

Eastern Russia Chayka (GRI 7950)
North West Pacific (GRI 8930)

42°44′37.2″N143°43′10.5″E / 42.743667°N 143.719583°E / 42.743667; 143.719583 (Tokachibuto - 8930-Y) dismantled
Upolo PointUnited Statesshut down 20°14′51.12″N155°53′4.34″W / 20.2475333°N 155.8845389°W / 20.2475333; -155.8845389 (Upolo Point - shut down) shut down
Værlandet NorwaySylt (GRI 7499)
Ejde (GRI 9007)
shut down
61°17′49.49″N4°41′47.05″E / 61.2970806°N 4.6964028°E / 61.2970806; 4.6964028 (Værlandet - 7499-Y / 9007-Y) shut down 31 December 2015; demolished 19 Sep 2017
VeravalIndiaBombay (GRI 6042) 20°57′09.316″N70°20′11.73″E / 20.95258778°N 70.3365917°E / 20.95258778; 70.3365917 (Veraval - 6042-W)
Williams LakeCanadashut down

Canadian West Coast (GRI 5990)
North Central U.S. (GRI 8290)

51°57′58.78″N122°22′1.55″W / 51.9663278°N 122.3670972°W / 51.9663278; -122.3670972 (Williams Lake - 5990-M / 8290-Y) dismantled
XuanchengChinaChina North Sea (GRI 7430)
China East Sea (GRI 8390)
31°4′8.3″N118°53′8.78″E / 31.068972°N 118.8857722°E / 31.068972; 118.8857722 (Xuancheng - 7430-X / 8390-M)
YapFederated States of Micronesiashut down 9°32′44.76″N138°9′53.48″E / 9.5457667°N 138.1648556°E / 9.5457667; 138.1648556 (Yap - Shut down) shut down 1987; demolished; used a 304.8 metre tower

See also

Notes

  1. The original system was known as LORAN, a short-form for LOng RAnge Navigation. Operation of the system, and the newly-introduced Loran-C system, were handed to the Coast Guard in 1958. The name of the original system was retroactively changed to Loran-A and used lowercase naming from then onward. Nevertheless, many documents refer to both in all uppercase, including some Coast Guard materials. [1]
  2. Very little information on Loran-B is available in the public record, and any reasons for its failure even less so.
  3. Blanchard uses 7f and 9f on different pages.

Related Research Articles

<span class="mw-page-title-main">Decca Navigator System</span>

The Decca Navigator System was a hyperbolic radio navigation system that allowed ships and aircraft to determine their position by using radio signals from a dedicated system of static radio transmitters. The system used phase comparison between pairs of low frequency signals between 70 and 129 kHz, as opposed to pulse timing systems like Gee and LORAN. This made it much easier to design receivers using 1940s electronics, and operation was simplified by giving a direct readout of Decca coordinates without the complexity of a cathode-ray tube and highly skilled operator.

<span class="mw-page-title-main">Global Positioning System</span> American satellite-based radio navigation service

The Global Positioning System (GPS), originally Navstar GPS, is a satellite-based radio navigation system owned by the United States Space Force and operated by Mission Delta 31. It is one of the global navigation satellite systems (GNSS) that provide geolocation and time information to a GPS receiver anywhere on or near the Earth where there is an unobstructed line of sight to four or more GPS satellites. It does not require the user to transmit any data, and operates independently of any telephone or Internet reception, though these technologies can enhance the usefulness of the GPS positioning information. It provides critical positioning capabilities to military, civil, and commercial users around the world. Although the United States government created, controls and maintains the GPS system, it is freely accessible to anyone with a GPS receiver.

<span class="mw-page-title-main">Radar</span> Object detection system using radio waves

Radar is a system that uses radio waves to determine the distance (ranging), direction, and radial velocity of objects relative to the site. It is a radiodetermination method used to detect and track aircraft, ships, spacecraft, guided missiles, motor vehicles, map weather formations, and terrain.

Time and frequency transfer is a scheme where multiple sites share a precise reference time or frequency. The technique is commonly used for creating and distributing standard time scales such as International Atomic Time (TAI). Time transfer solves problems such as astronomical observatories correlating observed flashes or other phenomena with each other, as well as cell phone towers coordinating handoffs as a phone moves from one cell to another.

<span class="mw-page-title-main">Radio navigation</span> Use of radio-frequency electromagnetic waves to determine position on the Earths surface

Radio navigation or radionavigation is the application of radio waves to determine a position of an object on the Earth, either the vessel or an obstruction. Like radiolocation, it is a type of radiodetermination.

<span class="mw-page-title-main">Radio clock</span> Type of clock which self-synchronizes its time using dedicated radio transmitters

A radio clock or radio-controlled clock (RCC), and often colloquially referred to as an "atomic clock", is a type of quartz clock or watch that is automatically synchronized to a time code transmitted by a radio transmitter connected to a time standard such as an atomic clock. Such a clock may be synchronized to the time sent by a single transmitter, such as many national or regional time transmitters, or may use the multiple transmitters used by satellite navigation systems such as Global Positioning System. Such systems may be used to automatically set clocks or for any purpose where accurate time is needed. Radio clocks may include any feature available for a clock, such as alarm function, display of ambient temperature and humidity, broadcast radio reception, etc.

<span class="mw-page-title-main">Omega (navigation system)</span> First global radio navigation system for aircraft

OMEGA was the first global-range radio navigation system, operated by the United States in cooperation with six partner nations. It was a hyperbolic navigation system, enabling ships and aircraft to determine their position by receiving very low frequency (VLF) radio signals in the range 10 to 14 kHz, transmitted by a global network of eight fixed terrestrial radio beacons, using a navigation receiver unit. It became operational around 1971 and was shut down in 1997 in favour of the Global Positioning System.

<span class="mw-page-title-main">VHF omnidirectional range</span> Aviation navigation system

Very High Frequency Omnidirectional Range Station (VOR) is a type of short-range VHF radio navigation system for aircraft, enabling aircraft with a VOR receiver to determine the azimuth, referenced to magnetic north, between the aircraft to/from fixed VOR ground radio beacons. VOR and the first DME(1950) system to provide the slant range distance, were developed in the United States as part of a U.S. civil/military programm for Aeronautical Navigation Aids in 1945. Deployment of VOR and DME(1950) began in 1949 by the U.S. CAA. ICAO standardized VOR and DME(1950) in 1950 in ICAO Annex ed.1. Frequencies for the use of VOR are standardized in the very high frequency (VHF) band between 108.00 and 117.95 MHz Chapter 3, Table A. To improve azimuth accuracy of VOR even under difficult siting conditions, Doppler VOR (DVOR) was developed in the 1960s. VOR is according to ICAO rules a primary means navigation system for commercial and general aviation, (D)VOR are gradually decommissioned and replaced by DME-DME RNAV 7.2.3 and satellite based navigation systems such as GPS in the early 21st century. In 2000 there were about 3,000 VOR stations operating around the world, including 1,033 in the US, but by 2013 the number in the US had been reduced to 967. The United States is decommissioning approximately half of its VOR stations and other legacy navigation aids as part of a move to performance-based navigation, while still retaining a "Minimum Operational Network" of VOR stations as a backup to GPS. In 2015, the UK planned to reduce the number of stations from 44 to 19 by 2020.

<span class="mw-page-title-main">Gee (navigation)</span> Radio navigation system

Gee, sometimes written GEE, was a radio-navigation system used by the Royal Air Force during World War II. It measured the time delay between two radio signals to produce a fix, with accuracy on the order of a few hundred metres at ranges up to about 350 miles (560 km). It was the first hyperbolic navigation system to be used operationally, entering service with RAF Bomber Command in 1942.

<span class="mw-page-title-main">Distance measuring equipment</span> Radio navigation technology used in aviation

In aviation, distance measuring equipment (DME) is a radio navigation technology that measures the slant range (distance) between an aircraft and a ground station by timing the propagation delay of radio signals in the frequency band between 960 and 1215 megahertz (MHz). Line-of-visibility between the aircraft and ground station is required. An interrogator (airborne) initiates an exchange by transmitting a pulse pair, on an assigned 'channel', to the transponder ground station. The channel assignment specifies the carrier frequency and the spacing between the pulses. After a known delay, the transponder replies by transmitting a pulse pair on a frequency that is offset from the interrogation frequency by 63 MHz and having specified separation.

<span class="mw-page-title-main">Direction finding</span> Measurement of the direction from which a received signal was transmitted

Direction finding (DF), or radio direction finding (RDF), is the use of radio waves to determine the direction to a radio source. The source may be a cooperating radio transmitter or may be an inadvertant source, a naturally-occurring radio source, or an illicit or enemy system. Radio direction finding differs from radar in that only the direction is determined by any one receiver; a radar system usually also gives a distance to the object of interest, as well as direction. By triangulation, the location of a radio source can be determined by measuring its direction from two or more locations. Radio direction finding is used in radio navigation for ships and aircraft, to locate emergency transmitters for search and rescue, for tracking wildlife, and to locate illegal or interfering transmitters. During the Second World War, radio direction finding was used by both sides to locate and direct aircraft, surface ships, and submarines.

<span class="mw-page-title-main">Tactical air navigation system</span> Military navigation system

A tactical air navigation system, commonly referred to by the acronym TACAN, is a navigation system initially designed for naval aircraft to acquire moving landing platforms and later expanded for use by other military aircraft. It provides the user with bearing and distance to a ground or ship-borne station. It is, from an end-user perspective, a more accurate version of the VOR/DME system that provides bearing and range information for civil aviation. The DME portion of the TACAN system is available for civil use; at VORTAC facilities where a VOR is combined with a TACAN, civil aircraft can receive VOR/DME readings. Aircraft equipped with TACAN avionics can use this system for enroute navigation as well as non-precision approaches to landing fields. However, a TACAN-only equipped aircraft cannot receive bearing information from a VOR-only station.

Gee-H, sometimes written G-H or GEE-H, was a radio navigation system developed by Britain during the Second World War to aid RAF Bomber Command. The name refers to the system's use of the earlier Gee equipment, as well as its use of the "H principle" or "twin-range principle" of location determination. Its official name was AMES Type 100.

<span class="mw-page-title-main">Satellite navigation</span> Use of satellite signals for geo-spatial positioning

A satellite navigation or satnav system is a system that uses satellites to provide autonomous geopositioning. A satellite navigation system with global coverage is termed global navigation satellite system (GNSS). As of 2024, four global systems are operational: the United States's Global Positioning System (GPS), Russia's Global Navigation Satellite System (GLONASS), China's BeiDou Navigation Satellite System (BDS), and the European Union's Galileo.

<span class="mw-page-title-main">Differential GPS</span> Enhancement to the Global Positioning System providing improved accuracy

Differential Global Positioning Systems (DGPSs) supplement and enhance the positional data available from global navigation satellite systems (GNSSs). A DGPS can increase accuracy of positional data by about a thousandfold, from approximately 15 metres (49 ft) to 1–3 centimetres.

Pseudo-range multilateration, often simply multilateration (MLAT) when in context, is a technique for determining the position of an unknown point, such as a vehicle, based on measurement of biased times of flight (TOFs) of energy waves traveling between the vehicle and multiple stations at known locations. TOFs are biased by synchronization errors in the difference between times of arrival (TOA) and times of transmission (TOT): TOF=TOA-TOT. Pseudo-ranges (PRs) are TOFs multiplied by the wave propagation speed: PR=TOF ⋅ s. In general, the stations' clocks are assumed synchronized but the vehicle's clock is desynchronized.

Time of arrival is the absolute time instant when a radio signal emanating from a transmitter reaches a remote receiver. The time span elapsed since the time of transmission is the time of flight . Time difference of arrival (TDOA) is the difference between TOAs.

<span class="mw-page-title-main">Hyperbolic navigation</span> Class of obsolete radio navigation systems

Hyperbolic navigation is a class of radio navigation systems in which a navigation receiver instrument is used to determine location based on the difference in timing of radio waves received from radio navigation beacon transmitters.

Sonne was a radio navigation system developed in Germany during World War II. It was developed from an earlier experimental system known as Elektra, and therefore the system is also known as Elektra-sonnen. When the British learned of the system they started using it as well, under the name Consol, meaning "by the sun".

<span class="mw-page-title-main">LORAN</span> Radio navigation system

LORAN was a hyperbolic radio navigation system developed in the United States during World War II. It was similar to the UK's Gee system but operated at lower frequencies in order to provide an improved range up to 1,500 miles (2,400 km) with an accuracy of tens of miles. It was first used for ship convoys crossing the Atlantic Ocean, and then by long-range patrol aircraft, but found its main use on the ships and aircraft operating in the Pacific theater during World War II.

References

Citations

  1. 1 2 Hefley 1972, p. xi..
  2. 1 2 3 4 "LORAN-C General Information". United States Coast Guard . Retrieved 4 August 2010.
  3. 1 2 "Termination of the Loran-C Service". notmar.gc.ca. Archived from the original on 20 November 2013. Retrieved 4 August 2010. (for access click on "I have read..." and "Accept")
  4. "Loran off air in most of Europe move to commercial possible". Resilient Navigation and Timing Foundation. 4 January 2016.
  5. Divis, Dee Ann (10 December 2015). "PNT ExCom Backs eLoran as a Step to Full GPS Backup System". Inside GNSS (January/February 2016).
  6. "Will fund eLoran on a chip — NIST". Resilient Navigation and Timing Foundation. 11 February 2016.
  7. Martin, Aaron (19 December 2017). "Senate bill would require establishment of land-based alternative to GPS satellite timing signals". Homeland Preparedness News. Archived from the original on 15 January 2018.
  8. "Coast Guard Authorization Act of 2017".
  9. Halford, Davidson & Waldschmitt 1948, p. 19.
  10. Halford, Davidson and Waldschmitt, "History of LORAN" Archived 23 September 2016 at the Wayback Machine , MIT Radiation Laboratory, pp. 19-23.
  11. Blanchard 1991, pp. 305–306.
  12. 1 2 Halford, Davidson & Waldschmitt 1948, p. 22.
  13. Hefley 1972, p. xi.
  14. 1 2 3 4 Blanchard 1991, pp. 302–303.
  15. Blanchard 1991, p. 302.
  16. 1 2 Hefley 1972, p. 16.
  17. Hefley 1972, pp. 19–20.
  18. Hefley 1972, pp. 20–21.
  19. 1 2 Hefley 1972, pp. 23–24.
  20. 1 2 Hefley 1972, pp. 25.
  21. 1 2 Hefley 1972, pp. 26.
  22. Hefley 1972, pp. 33.
  23. Hefley 1972, pp. 58.
  24. Gil McElroy, "Loran-C History" Archived 1 May 2017 at the Wayback Machine
  25. Hefley 1972, pp. 72.
  26. Hefley 1972, pp. 78.
  27. 1 2 Blanchard 1991, p. 310.
  28. Blanchard 1991, p. 311.
  29. 1 2 George Galdorisi and Thomas Phillips, "Leave No Man Behind", MBI Publishing, 2009, pg. 391.
  30. James Caffery, "Wireless Location in CDMA Cellular Radio Systems", Springer, 2000, pg. 5.
  31. Darrel Whitcomb, "PAVE NAIL: there at the beginning of the precision weapons revolutions" Archived 30 May 2014 at the Wayback Machine
  32. "Proceedings of the Eleventh Annual Technical Symposium", pg. 7.
  33. "Senate committee letter". Archived from the original on 12 December 2009.
  34. http://kartverket.no/efs-documents/editions/2015/efs01-2015.pdf, page 26
  35. "27-15 Enhanced Loran discontinued". Notice to Mariners. Trinity House. 1 December 2015.
  36. Appleyard, S.F.; Linford, R.S.; Yarwood, P.J. (1988). Marine Electronic Navigation (2nd ed.). Routledge & Kegan Paul. pp. 77–83. ISBN   0-7102-1271-2.
  37. "The American Practical Navigator, An Epitome of Navigation, page 173". Archived from the original on 1 December 2009.
  38. Hefley, Gifford (1972). The Development of Loran-C Navigation and Timing (NBS Monograph 129). US Dept of Commerce National Bureau of Standards. p. 12. LCCN   72-600267.
  39. AC 90-92 Guidelines for the Operational Use of Loran-C Navigation System Outside of the US National Airspace System (NAS) (2012 cancelled ed.). US Dept of Transportation FAA. 1993. p. 2.
  40. "Chapter 2 ̣– LORAN-C Transmissions" (PDF). Specification of the Transmitted LORAN-C Signal / COMDTINST M16562.4A. U.S. Coast Guard. 1994. pp. 6, 7. Retrieved 4 September 2012.
  41. COMDTPUB P16562.6, "LORAN-C Users Handbook", 1992
  42. Enterprise, I. D. G. (7 February 2005). Computerworld. IDG Enterprise.
  43. International Aerospace Abstracts. Technical Information Service, American Institute of Aeronautics and Astronautics. 1990.
  44. "A New Navigation Positioning System run by Saudi Ports Authority". Saudi Ports Authority. 2006. Archived from the original on 10 February 2011. Retrieved 21 January 2011.
  45. "Enhanced Loran (eloran) Definition Document" (PDF). International Loran Association. 16 October 2007. Archived from the original (PDF) on 2 September 2009. Retrieved 18 July 2010.
  46. "GPS back-up 'needs more research' ". BBC Online, 20 June 2008, Retrieved 5 October 2010
  47. Office of Management and Budget. (www.budget.gov), "A New Era of Responsibility Renewing America's Promise" The FY 2010 Budget, Department of Homeland Security Section, page 72
  48. "Obama: Budget cuts add up to 'real money'".
  49. "H.R. 2892--Department of Homeland Security Appropriations Act, 2010". C-SPAN.org. 8 July 2009. Archived from the original on 23 July 2012. Retrieved 10 August 2009.
  50. Office, U. S. Government Accountability (7 May 2009). "Global Positioning System: Significant Challenges in Sustaining and Upgrading Widely Used Capabilities" (GAO-09-670T) via www.gao.gov.{{cite journal}}: Cite journal requires |journal= (help)
  51. "Loran Study Finally Unleashed: Says Keep It, Best Option - GPS System Integration Design & Test". Archived from the original on 29 May 2009. Retrieved 27 May 2009.
  52. "USCG LORAN Program Manager release, Nov. 2009". 31 May 2007. Retrieved 28 November 2009.
  53. "LORAN-C General Information". www.navcen.uscg.gov.
  54. "The GLAs award a 15-year eLoran contract to Babcock Communications". Trinity House. 31 May 2007. Archived from the original on 19 March 2011. Retrieved 27 May 2010.
  55. Nautilus International Newspaper August 2013
  56. GPS World. December 2014.
  57. "Notice To Mariners". Trinity House. 1 December 2015. Archived from the original on 4 March 2016. Retrieved 30 December 2015.
  58. 1 2 "With new space program, UK continues march to more holistic PNT". GPS World. 25 September 2020. Retrieved 17 November 2021.
  59. "Electronic Position Fixing System" (PDF). Admiralty Notices to Mariners (26/07). United Kingdom Hydrographic Office. 28 June 2007. Archived from the original (PDF) on 24 June 2008. Retrieved 19 January 2008.
  60. "LORAN station Port Clarence tower demolition video". Coast Guard News. 1 May 2010.

Bibliography