Nickey line

Last updated

Nickey line
Heath Park Halt, with RCTS Rail Tour geograph-2789179-by-Ben-Brooksbank.jpg
Heath Park Halt in 1958
Overview
StatusDismantled, partly re-purposed as cycle track (rail trail)
Owner Midland Railway; British Rail
Locale Hertfordshire, England, UK
Termini
Stations9
Service
Type Local rail
System National Rail
Rolling stock Midland Railway Johnson 0-6-0, LMS Fowler 2-6-2T, LMS Ivatt Class 4
History
Opened1877
Closed1979
Technical
Line length9 miles (14 km)
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Route map
Nickey Line map.png

The Nickey line (also known as the Harpenden to Hemel Hempstead branch railway) is a disused railway that once linked the towns of Hemel Hempstead [1] and, initially, Luton but later Harpenden [2] via Redbourn, in Hertfordshire, England. The course of most of the railway has been redeveloped as a cycle and walking path, and is part of the Oxford to Welwyn Garden City route of the National Cycle Network. It is approximately nine miles (14 km) long.

Contents

Origin of the name

The origin of the nickname the "Nickey line" is shrouded in obscurity. Suggestions include being named after the parish of St Nicholas in Harpenden, through which it runs; Hemel's connection with Nicholas Breakspear; the knickerbockers worn by the navvies who constructed the line; or "down the nick", a slang term of engine drivers which meant "to run out of steam" and may have been applicable on the line's difficult inclines. [3]

The spelling of the line's name is recorded as appearing as "Nickey" on signs and tickets for special trains and in the local press; when the line was converted to a cycle path, the signs which were erected omitted the "e" in the legend "Nicky Line Footpath and Cycleway". [3] The line is commemorated in the modern Marlowes pedestrianisation scheme by a children's playground train and a sign labelled "Nicky Line Halt", though no such named station ever existed.

Another possible origin for the name "Nickey line" is that the navvies who constructed the line gave it the nickname as the steep climb from the old A6 road (now the A1081) in Harpenden up to the Roundwood Halt is a 1 in 37 gradient, the same as the 3.2 km (2 mi) railway incline called the "Lickey Incline" south of Birmingham.[ citation needed ]

The local paper notes that the engines themselves were referred to as "Puffing Annies" by locals, as the climb from the town centre up through Highfield was steep, and the engines created much steam and smoke ascending this incline. Older generations in Hemel still refer to the line as the "Puffing Annie", rather than the Nickey line.

History

Early proposals

In 1837 the London and Birmingham Railway opened the first stretch of the main line from London Euston to Birmingham Curzon Street railway station as far as Hemel Hempstead (today's West Coast Main Line), with the line fully opened as far as Birmingham in 1838. [4] The L&BR's construction had been delayed for several years by vigorous lobbying by a number of powerful and well-connected local landowners, including the eminent surgeon Sir Astley Cooper of Gadebridge House, who were all keen to protect their estates from invasion by the "iron horse". Their campaign was successful and the main line was routed along the River Bulbourne instead of the River Gade, skirting around the edge of Hemel Hempstead. As a result, the railway station serving Hemel Hempstead was built one mile outside the town centre at Boxmoor; Boxmoor and Hemel Hempstead railway station (today's Hemel Hempstead railway station) opened in 1837. [5]

The first proposal for a more convenient rail link for the townspeople of Hemel Hempstead was presented in 1862 by John Grover. His proposal was for a short spur from the main line at Boxmoor, following the route of the River Gade to the lower end of the (old) town at Bury Mill End. At the same meeting, another (more ambitious) proposal was put forward by a Mr Stocken and a Mr Stallon, extending the line to Redbourn to link to the Great Northern Railway at Harpenden. [6] However, Grover's design found a sponsor and following an act of Parliament in 1863 the Hemel Hempsted [notes 1] and London & North Western Railway Company (HH&L&NWR) was formed to construct and operate the line. However, no construction work was undertaken due to difficulties with local landowners and problems agreeing the connection to the main line at Boxmoor, and after a number of years of stagnation the earlier proposals were re-examined.

By 1865, the Midland Railway was developing its route out of London St Pancras, opening up new interchange possibilities to the north of Hemel Hempstead. A new railway scheme was put forward by engineers G.W. Hemans and A. Ormsby which followed the original HH&L&NWR plan as far as Hemel but involved tunnelling under Highfield to connect to the MR at Harpenden, with an option to extend (via another tunnel) to Harpenden East on the GNR's Hertford, Luton & Dunstable branch. The tunnelling proposals proved to be prohibitively expensive, and further opposition from landowners resulted in the scheme being rejected by Parliament in 1865. With the assistance of Grover, the plans were revised and resubmitted for Parliamentary approval which was obtained in 1866. The railway company had meanwhile already commenced construction work in anticipation of approval. The new line was to follow the route authorised in 1863 through Hemel Hempstead and Redbourn, before curving north around Harpenden, crossing the turnpike road (A1081) and passing under the Midland line to connect with the GNR at Harpenden East, with provision for a spur to connect to the MR line north of Harpenden Central. [7]

Construction & opening

Hemel Hempsted (Midland) railway station, with the Midland Hotel in the background Hemel Hempsted (Midland) railway station.jpg
Hemel Hempsted (Midland) railway station, with the Midland Hotel in the background
The Midland Hotel today; the grassed area covers the original bridge over the former line Midlandhotelhemel.jpg
The Midland Hotel today; the grassed area covers the original bridge over the former line

Construction proceeded extremely slowly, the lower spur from Boxmoor to Hemel Hempstead only being completed by 1871, though the connection to Boxmoor was via an awkward turntable arrangement. Eventually, the HH&L&NWR company ran into financial difficulties and it was the Midland Railway that came to the rescue, financing completion of the line and agreeing to operate it once it was built. At this time the transporting of goods and coal was the primary driving factor in the development of railways rather than commuter rail. The thriving hat making industry in Luton created demand for a transport link with the straw plait trade that existed in Hemel and, as a result, the initial connection with the MR at Harpenden headed north towards Luton rather than south towards London. Passengers travelling on this route changed trains at Chiltern Green to reach London. The connection to the GNR's line at Harpenden East was never achieved. [8]

The line was finally opened on 16 July 1877 to great fanfare with celebrations led by Berkhamsted Rifle Corps Band. A special train was laid on from Hemel to Luton and champagne receptions were held in Luton and Hemel town halls. Church bells were rung and a banner hung across Alexandra Road in Hemel proclaimed "Success to the Hemel Hemptead and Midland Railway Company". [9]

1898 map of Boxmoor railway station and goods yard; the Nickey line and gasworks can be seen on the right Boxmoor railway station 1898.png
1898 map of Boxmoor railway station and goods yard; the Nickey line and gasworks can be seen on the right

When it opened, the new line did not extend as far as Boxmoor, but terminated in Hemel Hempstead. Relations between the Hemel Hempstead Company and the LNWR (which had absorbed the London and Birmingham Railway in 1846) were difficult. The LNWR regarded the Hemel Hemptead and Midland Railway route to St Pancras as a threat to their service into Euston. Because of this intense rivalry, the two companies could not reach an agreement to connect the Nickey line to the LNWR main line. [10] Instead, the southern terminus for the Hemel line was originally Hemel Hempsted [notes 1] (known locally as the Midland Station), and this served as the main passenger facility within the town. This railway station stood at the junction of Midland Road and Adeyfield Road, opposite the Midland Hotel; today the site is occupied by a modern housing development, although the hotel still exists.

The section of line south of this remained disused until 1880, when the Midland Railway opened the line to provide coal trains to the Duckhall gasworks near to Boxmoor. [11] A connection was constructed as far as the LNWR sidings at Boxmoor; the Nickey line ran along a cutting, rising up to the main line level and under the northernmost arch of the Roughdown Road bridge. Midland Railway trespass notice was affixed to this bridge, indicating the limit of extent of the company's property. For a few years, the Nickey Line was connected to the Boxmoor goods yard via a turntable, but the LNWR removed it in 1897, severing the connection with the main line. [12]

Rivalry between the LNWR and the Midland Railway grew intense in the 1880s. On one occasion, when a Midland Railway locomotive entered the LNWR siding at Boxmoor, the track was lifted by angry LNWR workers to prevent it from completing it journey. [10] The LNWR began to operate a regular horse bus service to transport passengers from the town centre to the main line station at Boxmoor, where they could take trains to London Euston. These passengers were able to reach London St Pancras more quickly via the Hemel Hempstead Company's line. Competition increased further when the Hemel Hempstead Motor Car Company started to run a motor bus service to Boxmoor, and this was later taken on by the LNWR in place of its equestrian service. [13] In 1906 the Midland Railway extended passenger services along the Nickey line as far as Heath Park Halt, a high-level railway station which was located on a viaduct extending across Marlowes, close to the present-day site of the former Kodak headquarters building. [11] Additional halts were built on the line at Beaumont's Halt and Godwin's Halt. [14]

Eventually the straw plait trade declined and the need for goods trains gave way to passenger demand; local businessmen wanted a fast route into London without having to go via Luton, and in order to help the line pay its way the junction at Harpenden was realigned in 1888 so that it headed south instead of north, and passengers now changed trains at Harpenden Junction. [10] [14]

Grouping

After the First World War, Britain's railway companies were failing commercially and making losses, and in 1923 the railways were merged into the "Big Four" in the Grouping of the British railway companies. Former competitors Midland and LNWR were absorbed into the London, Midland and Scottish Railway (LMS); the Nickey line and the neighbouring main lines at Boxmoor and Harpenden all became part of the same organisation. A new railway station was opened at Roundwood Halt in 1927. [14]

Ro-Railer trials

The LMS also inherited the bus service which the LNWR had been running from into Hemel town centre; rather than transfer passenger traffic to the Nickey line, the LMS instead decided to extend the bus service to run from Boxmoor to Harpenden, duplicating the railway route which it then reduced to two trains per day. [14]

In 1930, the LMS experimented with new transport technology in an attempt to reduce costs and to rationalise its bus and rail operation through Hemel Hempstead. The Nickey line was used to trial a hybrid road–rail vehicle system called the "Ro-Railer", a bus that could travel on both roads and railways. [15] [16] [17] The experiment was short-lived and did not catch on. [18]

Decline and closure

Passenger demand was never high and further declined during the inter-war years. The rivalry between the Midland and LNWR Railway companies had ensured that the line ultimately failed to serve the people of Hemel Hempstead in the most useful way possible, and the bus service continued under the LMS had shifted passenger demand away from the railway and onto the road. By the end of 1946 the only regular rail passengers on the Harpenden service were six schoolchildren. The LMS also moved its main goods operation from Hemel Hempstead to Boxmoor, and it was only the demand for coal supplies to the Duckhall gasworks that kept the Nickey line operational. [19] During the harsh winter of 1946–47 a national coal shortage hit the British economy [20] and passenger trains were "temporarily" suspended. As it turned out, the service was never to be re-instated and the last passenger service on the Nickey line ran on 16 June 1947. [21]

In 1948 the nationalisation of the railways was enacted; the LMS and other railway companies were absorbed into the new state-owned corporation British Railways. Goods traffic continued to decline on the Nickey line and in 1959 the stretch of track between Hemel Hempsted railway station and the Duckhall gasworks was taken over by the Hemel Hempstead New Town Development Corporation. Hemel had been designated for redevelopment as a New Town in post-Second World War regeneration and plans were in place to demolish the viaduct crossing the lower end of Marlowes, severing the Nickey line link with the Midland Main Line. In order to maintain the supply of coal to the gasworks, new track was laid at Boxmoor joining the Nickey line to the West Coast Main Line via a siding. The connection of the Nickey line to the former LNWR line, which had so long been a bone of contention among competing railway companies, was finally achieved. It was not to last long; this service ran for all of six months in 1959 before the gasworks shut down and the link was closed. A year later on 2 July 1960, the Marlowes railway viaduct was demolished and the removal of the Nickey Line had begun. Many people turned out to witness the demolition of this local landmark, and the event was well recorded in photographs. [22]

The closure of the remaining parts of the line continued in stages; Hemel Hempsted railway station closed in 1963, followed by Godwin's Halt in 1964, cuttings were filled in and commercial buildings and housing estates were built on the former railway land. The line between Cupid Green (north of Godwin's Halt) and Harpenden survived for some more years however, having been leased by British Rail in 1968 to the Hemelite concrete company who continued to use the line privately to transport raw materials for manufacturing building blocks via Harpenden to their works at Claydale. [23] Hemelite's goods operations continued on this line until British Rail decided that the branch line should close. The junction with the Midland Main Line at Harpenden Junction was severed on 1 July 1979. The last journey on the line was made by a Hemelite Drewry locomotive, which was taken off the tracks at Redbourn and transported by lorry to work on the Yorkshire Dales Railway. [24] Track lifting was undertaken in 1982 with the following year the trackbed being converted into a public footpath.

It is notable that prior to Hemel Hempstead being chosen as the site for a new town, Redbourn was also considered. Had this occurred then the Nickey line would have been significantly upgraded to provide a link between the West Coast Main Line at Hemel Hempstead and a new railway station at Redbourn.[ citation needed ]

Cycle and walking path

The course of most of the railway has been redeveloped as a cycle and walking path by St Albans District Council and Dacorum Borough Council. It was opened in 1985, as the 'Nicky Line', though later corrected to the 'Nickey Line'. [25] [26] It is part of Route 57 of the National Cycle Network (the Oxford to Welwyn Garden City route) and is approximately eight miles (14 km) long. [26]

The route

Nickey line
BSicon CONTgq.svg
BSicon eABZq+lr.svg
BSicon dBHFq.svg
BSicon dCONTfq.svg
Harpenden
BSicon exHST.svg
Roundwood Halt
BSicon exBHF.svg
Redbourn
BSicon dWASSERq.svg
BSicon exWBRUCKE1.svg
BSicon dWASSERq.svg
BSicon exBUE.svg
Beaumont Lane level crossing
BSicon exHST.svg
Beaumont's Halt
BSicon exnENDEaq.svg
BSicon exABZgnr.svg
Owen's Siding
BSicon RBe.svg
BSicon exSKRZ-Bu.svg
BSicon RBw.svg
M1 motorway bridge
BSicon exPSLl.svg
Claydale Siding
BSicon exnENDEaq.svg
BSicon exABZg+nr.svg
Godwin's Siding
BSicon exHST.svg
Godwin's Halt
BSicon exBHF.svg
Hemel Hempsted
BSicon exhSTRae.svg
Marlowes viaduct
BSicon exKDSTaq.svg
BSicon exABZg+r.svg
Heath Park Goods Depot
BSicon exHST.svg
Heath Park Halt
BSicon dSTRq azure.svg
BSicon lMKRZo.svg
BSicon exSTR.svg
BSicon STRq azure.svg
BSicon dSTRq azure.svg
BSicon dWASSERq.svg
BSicon exWBRUCKE1.svg
BSicon dWASSERq.svg
BSicon dRP4q.svg
BSicon exSKRZ-G4o.svg
BSicon dRP4q.svg
A41 road bridge
BSicon exENDEe.svg
Duckhall Gasworks siding
BSicon dCONTgq.svg
BSicon BHFq.svg
BSicon STRq.svg
BSicon dCONTfq.svg
Boxmoor
The Nickey Line path looking north-east at Roundwood Halt Nicky Line Halt - geograph.org.uk - 155676.jpg
The Nickey Line path looking north-east at Roundwood Halt

Since much redevelopment of the town took place subsequent to its closure, the course of the lower part of the line is nowadays hard to follow. The course of the connection from Boxmoor is discernible in places; the gasholders at Duckhall are still present and the boundaries delineate the curve of the original trackbed. The abutment of the bridge that crossed the A41 is still present on the northern side, followed by a few hundred yards of heavily wooded embankment which still have one or two remaining sleepers. Remains of the brick-built bridges crossing the Bulbourne and Grand Union Canal are indistinct but discernible, but the remainder of the embankment to Heath Park has been levelled and landscaped as a public park and cricket pitches. From Heath Park the line went roughly to the site of the present day "Magic Roundabout", where it crossed the lower end of Marlowes over a viaduct. From there it followed a course roughly where the modern day Maynard Road runs (an unsurfaced car park locates a 200 m section of the former railway), through the site of Hemel Hempstead Hospital (the hospital existed when the railway was active, but was far smaller – the line passed to its east), through the housing developments of Concorde Drive (the former Hemel Hempstead (Midland) Station), to cross under Midland Road next to the Midland Hotel. From this point the course of the line is easier to follow as much of it still exists as footpaths. The Midland Road bridge is still extant, though now largely buried. The line can be easily traced across Keen's Fields, to cross Queensway on a high-level brick arch bridge which is still complete. From there the line tracks through Highfield and the course follows a well-maintained path all the way up to Cupid Green. This part of the line once again becomes obscured by modern developments, such as a car dealership and a modern industrial estate. Here once stood "Godwin's Halt", a very minor railway station named for a former landowner of the area. The original bridge at Godwins Halt remains, though again largely filled in. It carries a footpath between Highfield and Pennine Way, which is a lane predating the redevelopment of Hemel Hempstead new town.

The line becomes easier to follow a few hundred yards further on, since this part of the line was open until 1979. From here the line crosses largely open country, roughly parallel with the main Redbourn road. Most bridges are still intact and have been maintained as part of the cycle route. The modern Redbourn Bypass, built in the 1980s, cuts across the route several times and there are no separate bridges. The wrought iron bridge carrying the line across the A5 at Redbourn remains intact. This bridge is of a type identical to those originally crossing the Bulbourne and the canal at Boxmoor. There was once a railway station at Redbourn just beyond this point but very little evidence of this remains – the site is marked with an information board today. The route then crosses more open countryside, including fields belonging to the Rothamsted Experimental Station, to Harpenden, where it crosses over the main London road on a brick arch bridge, to connect with the Midland Main Line. The course of the original connection towards Luton is also discernible.

Stations

The full list of stations on the route is:

StationLocationOpenedClosed to passengersFully closed
Harpenden 51°48′53″N0°21′06″W / 51.814852°N 0.351577°W / 51.814852; -0.351577 1868--
Roundwood Halt192719471979
Redbourn 51°47′47″N0°23′27″W / 51.796457°N 0.390966°W / 51.796457; -0.390966 187719471979
Beaumont's Halt 51°47′21″N0°24′33″W / 51.789181°N 0.409038°W / 51.789181; -0.409038 190519471979
Godwin's Halt 51°46′04″N0°27′07″W / 51.767723°N 0.451897°W / 51.767723; -0.451897 190519471964
Hemel Hempsted (Midland Railway) 51°45′21″N0°28′00″W / 51.755748°N 0.466565°W / 51.755748; -0.466565 187719471963
Heath Park Halt 51°44′40″N0°28′31″W / 51.74458°N 0.475351°W / 51.74458; -0.475351 190519471959
Gasworks Siding 51°44′26″N0°28′42″W / 51.740468°N 0.478261°W / 51.740468; -0.478261 1880-1959
Boxmoor (goods) 51°44′31″N0°29′19″W / 51.741936°N 0.488508°W / 51.741936; -0.488508 1959†--

† Nickey line goods service for 6 months only

Heath Park Halt was the terminus for passenger services. It opened on 9 August 1905. Passenger services were withdrawn 16 June 1947 and the railway station closed with the line in 1959. [27] Nothing of the railway station now remains, although its site may be seen at the junction of St. John's Road and Corner Hall Road with Station Road. A combined iron drinking fountain and gas lamp still stands near the site of the now demolished Heath Park Hotel, which had stood directly opposite the railway station.

See also

Notes

  1. 1 2 3 Hemel Hempsted[ sic ] was the spelling used widely by the railway companies at the time on ticketing and signage.

Related Research Articles

<span class="mw-page-title-main">London and Birmingham Railway</span> Early British railway company (1837–1846)

The London and Birmingham Railway (L&BR) was a railway company in the United Kingdom, in operation from 1833 to 1846, when it became part of the London and North Western Railway (L&NWR).

<span class="mw-page-title-main">Hemel Hempstead</span> Town in Hertfordshire, England

Hemel Hempstead is a town in the Dacorum district in Hertfordshire, England. It is 24 miles (39 km) northwest of London, and is part of the Greater London Urban Area. The population at the 2011 census was 97,500.

<span class="mw-page-title-main">Watford Junction railway station</span> Railway station that serves Watford, Hertfordshire

Watford Junction is a railway station that serves Watford, Hertfordshire. The station is on the West Coast Main Line (WCML), 17 miles 34 chains from London Euston and the Abbey Line, a branch line to St Albans. Journeys to London take between 16 and 52 minutes depending on the service used: shorter times on fast non-stop trains and slower on the stopping Watford DC line services. Trains also run to Clapham Junction and East Croydon via the West London Line. The station is a major hub for local bus services and the connecting station for buses to Warner Bros. Studio Tour London – The Making of Harry Potter. The station is located north of a viaduct over the Colne valley and immediately south of Watford Tunnel.

<span class="mw-page-title-main">Bedford railway station</span> Railway station in Bedfordshire, England

Bedford railway station is the larger of two railway stations in the town of Bedford in Bedfordshire, England. It is on the Midland Main Line from London St Pancras to the East Midlands and the terminus of the Marston Vale line from Bletchley through Bedford St Johns.

<span class="mw-page-title-main">Kings Langley railway station</span>

Kings Langley railway station is almost under the M25 motorway near Junction 20. It serves the village of Kings Langley, and the nearby villages of Abbots Langley and Hunton Bridge. The station is 21 miles (34 km) north west of London Euston on the West Coast Main Line. The station and all services calling at the station are operated by London Northwestern Railway.

<span class="mw-page-title-main">Apsley railway station</span> Railway station in Hertfordshire, England

Apsley railway station is in Apsley, on the southern outskirts of Hemel Hempstead, Hertfordshire, England. One of two railway stations now serving the town, the other is Hemel Hempstead just up the line in Boxmoor.

<span class="mw-page-title-main">Hemel Hempstead railway station</span> Railway station in Hertfordshire, England

Hemel Hempstead railway station is on the West Coast Main Line, on the western edge of the town of Hemel Hempstead, Hertfordshire, England. The station is 24+12 miles (39.4 km) north-west of London Euston on the West Coast Main Line. Hemel Hempstead is managed by London Northwestern Railway and all train services are operated by London Northwestern Railway and Southern.

<span class="mw-page-title-main">Berkhamsted railway station</span> Railway station in Hertfordshire, England

Berkhamsted railway station is in the town of Berkhamsted, Hertfordshire, England. It is located just beside Berkhamsted Castle, overlooking the Grand Junction Canal. The station is 28 miles (45 km) north west of London Euston on the West Coast Main Line. London Northwestern Railway operates services to London, Northampton and many other destinations.

<span class="mw-page-title-main">Heath Park Halt railway station</span> Former railway station in Hertfordshire, England

Heath Park Halt was a railway station in Hemel Hempstead, Hertfordshire in England, UK. It was the terminus for passenger services on the Nickey line, a 9-mile (14 km) branch line which ran from Harpenden into Hemel Hempstead town centre. Passenger services were withdrawn in 1947, and the line through the station was closed completely in 1959.

<span class="mw-page-title-main">Boxmoor</span> Human settlement in England

Boxmoor is part of Hemel Hempstead in Hertfordshire. It is within the district of Dacorum and comprises mainly 19th-century housing and meadowland, with transport links from London to the Midlands. At the 2011 Census, the population of Boxmoor was included in the Dacorum ward of Bovingdon, Flaunden and Chipperfield.

<span class="mw-page-title-main">Harpenden railway station</span> National Rail station in Hertfordshire, England

Harpenden railway station is on the Midland Main Line in England, serving the town of Harpenden, Hertfordshire. It is 24 miles 51 chains (39.7 km) down the line from London St Pancras and is situated between St Albans City to the south and Luton Airport Parkway to the north. Its three-letter station code is HPD.

<span class="mw-page-title-main">Dunstable Branch Lines</span>

The Dunstable Branch Lines were railway branch lines that joined the English town of Dunstable to the main lines at Leighton Buzzard and Welwyn. The two lines were under separate ownership and joined just east of the Dunstable North station.

<span class="mw-page-title-main">Dunstable North railway station</span> Former railway station in England

Dunstable North was a railway station on the London and North Western Railway's branch line from Leighton Buzzard which served Dunstable in Bedfordshire from 1848 to 1967. Originally the terminus of the London and North Western Railway's branch line from Leighton Buzzard, Dunstable became the point where the line met with the Great Northern's branch line from Luton in 1858. The station became the hub of a number of sidings connecting a variety of concerns to the line, including Waterlows, Bedfordshire County Council, Associated Portland Cement, Dunstable gasworks and a coal yard operated by the Great Northern. Against a background of falling passenger numbers and declining freight returns, the station closed to passengers in 1965 and to goods in 1967. Connections were retained with the cement works and coal yard, which became an oil depot, until 1988 and the line eventually closed in 1991. The site of the station is now occupied by offices of Central Bedfordshire Council. A section of the former line to the west of the site has become part of route 6 of the National Cycle Network.

<span class="mw-page-title-main">Hatfield and St Albans Railway</span>

The Hatfield & St Albans Railway was a branch of the Great Northern Railway which connected St Albans to Hatfield in Hertfordshire, England. It opened in 1865 with the principal aim of allowing St Albans traffic to access the Great Northern's main line to London at Hatfield, but soon came into difficulties when the Midland Railway inaugurated a direct route to London through St Albans. Passenger receipts declined in the 1930s, resulting in the temporary withdrawal of services in 1939. Passenger services were permanently withdrawn in 1951, leaving goods traffic to linger on until December 1968. Much of the route of the line is now incorporated into the Alban Way, a footpath and cycleway.

<span class="mw-page-title-main">National Cycle Route 57</span> Cycle route in the United Kingdom

National Cycle Route 57 is part of the United Kingdom's National Cycle Network. When complete, it will run west to east from Farmington, Gloucestershire near Northleach to Welwyn Garden City in Hertfordshire.

<span class="mw-page-title-main">Hemel Hempsted railway station</span> Former railway station in England

Hemel Hempsted station was a railway station in the town of Hemel Hempstead in Hertfordshire, England. UK. It was opened in 1877 by the Midland Railway and was originally the terminus of the Nickey Line, a now-defunct branch line which provided railway services to Chiltern Green and Luton and later to Harpenden.

The Hertford, Luton and Dunstable Railway was a railway affiliated to the Great Northern Railway. It was formed when the Hertford and Welwyn Junction Railway merged with the Luton, Dunstable and Welwyn Junction Railway, partly opened in the same year. The merger and change of title took place in 1860. The line joined the Dunstable branch of the London and North Western Railway at Dunstable.

<span class="mw-page-title-main">Stanmore branch line</span>

The Stanmore branch line was a railway line in Harrow, Middlesex, in the United Kingdom. Located to the north of London, it provided commuter rail services between Harrow and the village of Stanmore. Beginning at Harrow station, the line split off from the West Coast Main Line and followed a short 2.12-mile (3.41 km) route to Stanmore.

The London, Midland and Scottish Railway (LMS) Karrier Ro-Railer was a British experimental road-rail (rail)bus built by Karrier in 1931. Its road registration was UR7924. Based on a Karrier Chaser bus with Cravens bodywork, it could run on the road on tyres or on standard gauge track. It had a 6-cylinder petrol engine.

References

  1. 51°44′31″N0°29′28″W / 51.742°N 0.491°W
  2. 51°48′54″N0°21′07″W / 51.815°N 0.352°W
  3. 1 2 Woodward 1996, p.154
  4. Smith, Denis, ed. (2001). London and the Thames Valley. London: Telford. p. 157. ISBN   9780727728760 . Retrieved 6 June 2013.
  5. Birtchnell, Percy (1960). "Our Communications". A Short History of Berkhamsted. ISBN   9781871372007.
  6. Woodward 1996, p.7
  7. Woodward 1996, pp.11-12
  8. Woodward 1996, pp.24-28
  9. Woodward 1996, p.31
  10. 1 2 3 Oppitz, p.121
  11. 1 2 Woodward 1996, p.52
  12. Woodward 1996, p.59
  13. Woodward 1996, pp.99-101
  14. 1 2 3 4 Woodward 2006 – Historical Background
  15. Popular Science Apr 1931
  16. Woodward 1996, p.105
  17. Woodward 2006, plates 49-51
  18. New Scientist Dec 23-30, 1982
  19. Woodward 1996, p.118
  20. Robertson, Alex J. (1989). Bleak midwinter, 1947. Manchester University Press. p. 72. ISBN   0719023475.
  21. Woodward 1996 p.91
  22. Woodward 1996 p.135
  23. Woodward 1996 pp.135-137
  24. Woodward 1996 p.149
  25. "The Nickey Line railway and what happened when it closed". nickeyline.org. Retrieved 23 February 2013.
  26. 1 2 "St Albans City & District Council – The Nickey Line". stalbans.gov.uk. 24 January 2010. Retrieved 23 February 2013.
  27. Butt, R.V.J., (1995) The Directory of Railway Stations, Yeovil: Patrick Stephens
Bibliography