Sydney Gateway

Last updated

Sydney Gateway

Sydney Gateway Twin Arch Bridges December 2023 1.jpg
Twin Arch Bridge over the Alexandra Canal in December 2023
Sydney Gateway
Australia New South Wales relief location map.png
Red pog.svg
Sydney Gateway
Coordinates
General information
TypeRoad junction
Location St George District
Built by John Holland
Seymour Whyte
Maintained by Transport for NSW
History12 November 2023: Stage 2 opened
19 November 2023: Stage 1 opened
21 April 2024: Stage 3 opened
1 September 2024: Final stage opened
Major junctions
North end
South end

The Sydney Gateway is a major road interchange between the WestConnex and the airport terminals of Sydney Airport, and includes a pair of arch bridges over the Alexandra Canal and an eastbound flyover connecting Qantas Drive to the domestic terminal. It connects the Sydney Motorway network with the Sydney Airport and Port Botany precincts via the St Peters Interchange. The project provides significantly improved road links between the Airport, CBD and Port Botany, whilst reducing congestion.

Contents

Construction began in early 2021 and sections of the interchange were progressively opened from November 2023. The interchange opened on 1 September 2024. It was originally planned to fully open in late 2023 in conjunction with the connecting M4–M8 Link, the latter of which opened earlier in January 2023.

The Sydney Gateway was constructed in conjunction with the duplication of the nearby Port Botany railway line by the Australian Rail Track Corporation.

Design

The Sydney Gateway starts at the St Peters Interchange, the junction of the M8 Motorway and M4–M8 Link, all of which were built as part of WestConnex. Viaducts have been constructed over Canal Road, the Port Botany railway line and Tempe Lands. Further southwest, the Sydney Gateway splits into two, leading to Airport Drive and Qantas Drive towards the west and east respectively. [1]

A section of Airport Drive had been closed permanently and traffic between the international and domestic terminals is accessed via Sydney Gateway. [2] A pair of arch bridges has been constructed over the Alexandra Canal for the realigned traffic, and has been referred to as Twin Arch Bridge by the state government. [3]

A single traffic light is also located along the Sydney Gateway for access to and from Link Road, just east of the Twin Arch Bridge. [4] This is the only controlled intersection along the Sydney Gateway, with the rest of the Sydney Gateway being free-flowing traffic.

A 800-metre (2,600 ft) long one-way elevated flyover in the eastbound/southbound direction has also been built linking Qantas Drive towards the Sir Reginald Ansett Drive and the domestic terminals precinct. The flyover bypasses two signalised intersections with Seventh Street and O'Riordan Street, and enables travel from Sydney's motorway network to the domestic terminals without stopping at a single traffic light. [2] The flyover has been named Deborah Lawrie Flyover after Australia's first female commercial pilot Deborah Lawrie. [5] [6]

Tolls

Sydney Gateway is toll-free. [7] However, WestConnex tolls still apply to traffic coming or going via St Peters Interchange, as traffic must use the WestConnex tunnels and cannot exit the St Peters Interchange onto Euston Road or Gardeners Road.

History

Planning

In November 2017, the project was in the design and planning phase that includes developing connections to the St Peters interchange, to Sydney Airport Terminals 1, 2 and 3, grade separation of Robey Street and O’Riordan Street in Mascot, the duplication of a 3-kilometre (1.9 mi) section of the Port Botany railway line, within a complex stakeholder environment, with significant utility assets impacted and a heavily congested area. [8] A 2017 proposal by Lendlease was not accepted. [9] The railway line duplication was separately managed by the Australian Rail Track Corporation. [10] Stages 1 and 3 then formed the remainder of the project managed by the state government. [11] [12]

The proposed alignment passes over Sydney Airport land, which is leased from the Federal Government. As such, the project required both state and federal planning processes. In addition to an Environmental Impact Statement (EIS) as required by state planning process, a Major Development Plan (MDP) was also required before major development at a leased airport could occur. Planning approvals from both the federal and state planning ministers were also required. [13] A combined EIS and MDP was released for exhibition on 20 November 2019. [14] The project was approved by the state planning minister on 27 August 2020. [15] The project was approved by the federal planning minister on 23 September 2020. [16] [17]

Construction

Expressions of interest to construct the Sydney Gateway commenced in July 2019. [7] In October 2019, three bidders were shortlisted: [18]

In November 2020, the John Holland Seymour Whyte joint venture was awarded the design and construction contract. [16] Construction began in early 2021.

In August 2021, the project's Construction Environment Management Plan was approved by the state Department of Planning, Industry & Environment, allowing construction work to be started on state land. [19]

Opening

The Sydney Gateway was originally planned to open in late 2023, together with the M4–M8 Link. However, it was announced in November 2020 that the project was behind schedule and completion of the project would be delayed until 2024. [20]

In mid-2023, it was announced that the Sydney Gateway would be open in stages. The first stage would be the eastbound direction including the eastbound arch bridge and the traffic light connection to Link Road. The second stage would be the flyover from Qantas Drive to the domestic terminal buildings (later named Deborah Lawrie Flyover). The third stage would be the westbound direction including a widened Qantas Drive and the westbound arch bridge. The last and fourth stage would be the connection to WestConnex and St Peters Interchange, and new pedestrian and cycling paths. [21]

The second stage opened first on 12 November 2023, while the first stage opened a week later on 19 November. [5] [3] On 11 February 2024, the westbound traffic was diverted via Sydney Gateway and temporarily via the eastbound arch bridge. [22] On 21 April 2024, the westbound arch bridge opened and westbound traffic was moved onto the new bridge. [23] The final stage opened on 1 September 2024. [24] [25]

Future

The South East Sydney Transport Strategy, released by Transport for NSW in August 2020, proposed a potential extension of Sydney Gateway to Port Botany by 2056, with grade separation at General Holmes Drive, as well as ramps connecting to Canal Road. [12]

Related Research Articles

<span class="mw-page-title-main">Sydney Airport</span> International airport serving Sydney, New South Wales, Australia

Sydney Kingsford Smith Airport — colloquially Mascot Airport, Kingsford Smith Airport, or Sydney Airport — is an international airport serving Sydney, New South Wales, Australia, located 8 km (5.0 mi) south of the Sydney central business district, in the suburb of Mascot. It is the primary airport serving Sydney and is a primary hub for Qantas, as well as a secondary hub for Virgin Australia and Jetstar, and a focus city for Rex Airlines.

King's Highway 409, commonly referred to as Highway 409 and historically as the Belfield Expressway, is a 400-series highway in the Canadian province of Ontario that extends from Highway 401 in Toronto to Pearson International Airport, west of Highway 427, in Mississauga. It is a short freeway used mainly as a spur route for traffic travelling to the airport or Highway 427 northbound from Highway 401 westbound, as these route movements are not accommodated at the complex interchange between Highways 401 and 427.

<span class="mw-page-title-main">Sydney Orbital Network</span> Road in New South Wales, Australia

The Sydney Orbital Network is a 110 kilometre motorway standard ring road around and through Sydney, the capital of New South Wales in Australia. It runs north from Sydney Airport, underneath the CBD to the North Shore, west to the Hills District, south to Prestons and then east to connect with the airport. Much of the road is privately owned and financed by tolls.

<span class="mw-page-title-main">Tampines Expressway</span> Road in Singapore

The Tampines Expressway (TPE) is a highway in the north-eastern fringe of Singapore, joining the Pan Island Expressway (PIE) near Singapore Changi Airport in the east with the Central Expressway (CTE) and Seletar Expressway (SLE) in the north of the island.

<span class="mw-page-title-main">St Peters, New South Wales</span> Suburb of Sydney, New South Wales, Australia

St Peters is a suburb in the Inner West of Sydney, in the state of New South Wales, Australia. It is 7 kilometres south of the Sydney central business district, in the local government area of Inner West Council, with a small section in the southeast in the City of Sydney.

<span class="mw-page-title-main">City West Link</span> Road in Sydney, Australia

City West Link is a 5.0-kilometre (3.1 mi) link road connecting Parramatta Road and the Western Distributor through the Inner West suburbs of Sydney, New South Wales, Australia. It was bypassed by the WestConnex project upon its completion in November 2023. This name covers a few consecutive roads and is widely known to most drivers, but the entire allocation is also known – and signposted – by the names of its constituent parts: Wattle Street, Dobroyd Parade, City West Link proper and The Cresent.

<span class="mw-page-title-main">Pacific Motorway (Sydney–Newcastle)</span> Motorway in New South Wales, Australia

M1 Pacific Motorway is a 127-kilometre motorway linking Sydney to Newcastle via the Central Coast and Hunter regions of New South Wales. Formerly known but still commonly referred to by both the public and the government as the F3 Freeway, Sydney–Newcastle Freeway, and Sydney–Newcastle Expressway, it is part of the AusLink road corridor between Sydney and Brisbane.

The Gateway Motorway is a major tolled motorway in Brisbane, Queensland, Australia which includes the Sir Leo Hielscher Bridges. The motorway is operated by toll road operator Transurban.

Tonkin Highway is an 81-kilometre-long (50 mi) north–south highway and partial freeway in Perth, Western Australia, linking Perth Airport and Kewdale with the city's north-eastern and south-eastern suburbs. As of April 2020, the northern terminus is at the interchange with Brand Highway and Great Northern Highway in Muchea, and the southern terminus is at Thomas Road in Oakford. It forms the entire length of State Route 4, and connects to several major roads. Besides Brand Highway and Great Northern Highway, it also connects to Reid Highway, Great Eastern Highway, Leach Highway, Roe Highway, and Albany Highway.

<span class="mw-page-title-main">M2 Hills Motorway</span> Motorway in Sydney, Australia

M2 Hills Motorway is a 19.3-kilometre (12.0 mi) tolled urban motorway in Sydney, New South Wales that is part of the Sydney Orbital Network and the National Highway west of Pennant Hills Road. Owned by toll road operator Transurban, it forms majority of Sydney's M2 route, with the Lane Cove Tunnel constituting the rest of the M2 route.

<span class="mw-page-title-main">M4 Motorway (Sydney)</span> Motorway in Sydney

The M4 Motorway is a 55-kilometre (34 mi) series of partially tolled dual carriageway motorways in Sydney designated as route M4. The M4 designation is part of the wider A4 and M4 route designation, the M4 runs parallel and/or below ground to Great Western Highway, Parramatta Road and City West Link, which are part of route A44.

<span class="mw-page-title-main">M5 Motorway (Sydney)</span> Motorway in Sydney, Australia

The M5 Motorway is a 28.8-kilometre (17.9 mi) series of tolled motorways located in Sydney, New South Wales designated as route M5. It is part of the Sydney Orbital Network.

<span class="mw-page-title-main">Southern Cross Drive</span> Road in Sydney, Australia

Southern Cross Drive is a 4.8 km (3 mi) dual carriage untolled motorway in Sydney, New South Wales, Australia. Part of the M1 and Sydney Orbital Network, the road, a freeway that opened in 1969, links South Dowling Street at Kensington in the north to General Holmes Drive at Sydney Airport in the south.

Sydney Bypass refers to a number of roads, existing and proposed, that motorists can use to avoid the congested approaches to the Sydney central business district (CBD). The main bypasses are:

<span class="mw-page-title-main">General Holmes Drive</span> Road in Sydney, Australia

General Holmes Drive is a 5-kilometre (3.1 mi) major divided road located in Sydney, New South Wales, Australia. The road forms part of the M1, the A1, the Sydney Orbital Network, and the Australian Highway 1 network. Initially built in 1919 as a two-lane road and duplicated in 1951, the road partially circumnavigates Sydney Airport with its north-eastern terminus in Mascot, heading west and then south and then south-west, with its south-western terminus with The Grand Parade in Brighton-Le-Sands.

WestConnex is a 33-kilometre (21 mi) predominantly underground motorway scheme in Sydney, New South Wales, Australia. A joint project of the New South Wales and Federal governments, the motorway scheme created around 26 kilometres (16 mi) of new tunnels between Homebush and Kingsgrove, passing underneath Inner West suburbs including Haberfield and St Peters. The first of the tunnels, the M4 East, opened to traffic in July 2019. The second of the tunnels, the M8 Motorway, opened to traffic a year later in July 2020. The third of the tunnels which extend the M4 and M8 opened to traffic in January 2023. The final component of the scheme, the Rozelle Interchange, opened to traffic in November 2023.

NorthConnex is a 9-kilometre (5.6 mi) twin-tube motorway tunnel in northern Sydney, New South Wales, Australia, signposted as the M11 Tunnel. It acts as a tunnel bypass of the congested Pennant Hills Road, extending or connecting the M1 Pacific Motorway to the M2 Hills Motorway. Owned by NorthWestern Roads (NWR) Group, it is one of the longest road tunnels in Australia, along with the WestConnex Tunnel. It is also the deepest road tunnel in Australia, with more than half of the tunnel 60 metres (200 ft) deep or more, and the deepest point is underneath the Sydney Metro Northwest, about 90 metres (300 ft) below ground.

<span class="mw-page-title-main">M8 Motorway (Sydney)</span> Motorway in Sydney, Australia

The M8 Motorway is a 15.2-kilometre (9.4 mi) tolled dual carriageway motorway in Sydney that is designated the M8 route marker. It consists predominantly of tunnels and includes tunnel connections to the future Western Harbour Tunnel and the M6 Motorway.

<span class="mw-page-title-main">Rozelle Interchange</span> Motorway interchange in New South Wales, Australia

The Rozelle Interchange is an underground motorway interchange in Sydney, New South Wales, Australia. It was built as part of WestConnex and opened to traffic on 26 November 2023. The interchange includes a toll-free bypass of Victoria Road between the Iron Cove Bridge and the Anzac Bridge known as the Iron Cove Link.

References

  1. "Sydney Gateway – Australia's Front Door". Roads & Maritime Services . Government of New South Wales . Retrieved 17 November 2017.
  2. 1 2 "Sydney Gateway Concept Design Project Overview" (PDF). Roads & Maritime Services Government of New South Wales. Autumn 2019. Retrieved 15 July 2019.
  3. 1 2 "International Terminal Connection" (PDF). Transport for NSW. Retrieved 13 November 2023.
  4. "Interactive Map". Sydney Gateway. Retrieved 1 October 2021.
  5. 1 2 "Flyover to the Domestic Terminals" (PDF). Transport for NSW . Retrieved 13 November 2023.
  6. "Australia's first female pilot at major commercial airline Deborah Lawrie opens Sydney Airport bridge named in her honour". ABC News. 6 November 2023. Retrieved 13 November 2023.
  7. 1 2 "A step forward for Sydney Gateway". Transport for NSW. 14 July 2019. Retrieved 15 July 2019.
  8. "Sydney Gateway Project". MBB Group. 2016. Archived from the original on 17 November 2017. Retrieved 17 November 2017.
  9. O'Sullivan, Matt (4 September 2017). "Double toll looms as Lendlease bids to build motorway to Sydney Airport". Sydney Morning Herald . Retrieved 17 November 2017.
  10. "Botany Rail Duplication Project". Australian Rail Track Corporation . Retrieved 28 May 2020.
  11. "Sydney Gateway". Australia & New Zealand Infrastructure Pipeline. Retrieved 11 September 2020.
  12. 1 2 "South East Sydney Transport Strategy" (PDF). Future Transport 2056. Transport for NSW. August 2020. Retrieved 11 September 2020.
  13. "Sydney Gateway road project - Planning process" (PDF). Roads & Maritime Services. Spring 2018. Retrieved 27 May 2020.
  14. "Sydney Gateway". Roads & Maritime Services. Archived from the original on 18 February 2020. Retrieved 18 February 2020.
  15. "Sydney Gateway Road Project". Department of Planning, Industry & Environment . Retrieved 11 September 2020.
  16. 1 2 "New Gateway to Sydney on its way". Transport for NSW. 2 November 2020. Retrieved 3 November 2020.
  17. "Sydney Gateway". Sydney Airport. Retrieved 30 August 2021.
  18. "Shortlist announced for Sydney Gateway" (PDF). Australia & New Zealand Infrastructure Pipeline. Transport for NSW. 31 October 2019. Retrieved 28 May 2020.
  19. Sydney Gateway - August 2021, Transport for NSW. Retrieved 30 August 2021
  20. "Timeline blowout for Sydney's multibillion-dollar Gateway road project". Sydney Morning Herald. 2 November 2020. Retrieved 3 November 2020.
  21. "Sydney Gateway - Upcoming traffic changes" (PDF). Transport for NSW. Retrieved 13 November 2023.
  22. "New Airport Drive" (PDF). Transport for NSW. Retrieved 17 February 2024.
  23. "Second Twin Arch Bridge" (PDF). Transport for NSW. Retrieved 30 April 2024.
  24. "Connection to St Peters Interchange - Traffic change factsheet" (PDF). Transport for NSW. Retrieved 25 July 2024.
  25. Ready for take off: Sydney Gateway opens Sunday Transport for NSW 30 August 2024