West Station | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||
Location | Ashford Street, Boston, Massachusetts | ||||||||||||||
Coordinates | 42°21′17.21″N71°7′17.62″W / 42.3547806°N 71.1215611°W | ||||||||||||||
Line(s) | Worcester Line | ||||||||||||||
Platforms | 3 [1] | ||||||||||||||
Tracks | 4 | ||||||||||||||
Construction | |||||||||||||||
Accessible | Yes | ||||||||||||||
Other information | |||||||||||||||
Fare zone | 1A | ||||||||||||||
History | |||||||||||||||
Opening | 2040 (planned) [2] | ||||||||||||||
Planned services | |||||||||||||||
| |||||||||||||||
|
West Station is a planned station on the MBTA Commuter Rail Framingham/Worcester Line, to be located in the former Beacon Park Yard in Allston, Massachusetts. It was initially proposed as part of a project to straighten the Massachusetts Turnpike through the yard, allowing much of the land to be redeveloped. As of 2024, plans for the station have not proceeded beyond conceptual studies.
West Station has been proposed for over a decade. By July 2016, the state planned to file a Draft Environmental Impact Statement (DEIS) for the project in 2017 and hoped to break ground in 2019. It was then estimated to cost $25 million, to be split between Harvard University (which owns the surrounding land), the state, and a third party (intended to be Boston University pending negotiations). In December 2017, the state announced that the station cost had increased to $95 million, and that it would not open until 2040. In January 2018, Harvard increased its pledge to $50 million, with an additional $8 million incentive to build an interim station. [3]
In August 2023, the City of Boston, Harvard University, Boston University and the Massachusetts Department of Transportation (MassDOT) collectively committed $300 million to the $1.9 billion I-90 Allston Multimodal Project. This initiative includes the development of a new neighborhood and the construction of West Station on land predominantly owned by Harvard. [4]
The Boston & Albany Railroad originally had a number of stations in the inner ring of suburbs, including stations at Allston (Cambridge Street) and Cottage Farms (Commonwealth Avenue). No station was built near the split with the Grand Junction Railroad as the Grand Junction did not carry passenger service. A large freight yard, Beacon Park Yard, was ultimately built just west of the split. All stations east of Newtonville were closed around 1962 when much of the main line was reduced from 4 to 2 tracks during the building of the Massachusetts Turnpike. The station closures left Allston and Brighton lacking commuter rail service.
In 1998, a new station in Allston-Brighton began to be considered as part of the Urban Ring planning process. In 2007, the City of Boston allocated $500,000 in funding for the Allston Multimodal Station Study. [5] The study analyzed both commuter rail and DMU local service along the corridor, with potential stops at Faneuil, Market Street, Everett Street, Cambridge Street, West (Ashford Street), and Commonwealth Avenue. [6] The final recommendation, for a commuter rail station at Everett Street with DMU stops added later at the other locations, sparked local controversy but was mostly well received. [7] [6]
In 2009 and 2010, the state negotiated a major agreement with CSX Transportation that involved the purchase of several rail lines, including purchasing the line between Framingham and Worcester. The agreement also included CSX moving its intermodal freight operations from Beacon Park Yard to a new yard in Worcester. The abandonment of Beacon Park Yard allows for an increase in MBTA service on the Framingham/Worcester Line; additionally, the elimination of the single-track bottleneck through the yard opened the possibility for a station to be built in Allston (possibly in conjunction with the Urban Ring project) while still allowing passing tracks. [8] However, with no funding source available, construction of a station was not pursued.
In June 2012, New Balance announced that it would build the Everett Street station, Boston Landing, as part of their Boston Landing development. The station opened on May 22, 2017. [9]
In October 2013, MassDOT announced a $260 million plan to straighten the Mass Pike through Beacon Park Yard, replacing the existing toll booths with high-speed all-electronic tolling and allowing Harvard University and others to develop land currently cordoned off by the highway and its interchange ramps. The initial plans included the possibility of an 8 or 9-track commuter rail layover yard next to the Worcester main. [10]
In January 2014, MassDOT released its ten-year plan, which included a six-line diesel multiple unit (DMU) network called the Indigo Line proposed to be implemented by 2024. As proposed, the Indigo Line was envisioned as a new service of the MBTA's rapid transit network and would have mainly utilized existing MBTA Commuter Rail infrastructure within Greater Boston. Initial plans for the Indigo Line included additional service on the Fairmount Line, the Newburyport/Rockport Line (to Lynn), the Lowell Line (to Anderson RTC), and the Worcester Line (to Riverside), as well as new service from Back Bay to the BCEC on Track 61 and from North Station along the Grand Junction to a new station near Boston University's West Campus. This new West Station would offer connections between the Grand Junction DMU route, the Riverside DMU route, and conventional commuter service on the Worcester Line. [11] [12] It was proposed to attract transit oriented development to the Beacon Park area, similar to Assembly Station and the Assembly Square development in Somerville, Massachusetts. [13]
Despite being announcement as a capital investment project, no dedicated funding source was established for the Indigo Line plan, including West Station. [14] In May 2014, MassDOT announced that the station would not be included in the budget for the Turnpike project, placing it in an uncertain future. [15] On September 30, 2014, a press conference was held in Beacon Park Yard to announce that the station would be constructed in concert with the Turnpike straightening. The cost of the $25 million station will be split between Harvard University, the state, and a third party to be determined. [16] In March 2015, the Boston Globe revealed that Boston University was to have been the final third; however, this was not finalized before Deval Patrick left office. BU's contribution would be dependent on a promise that automobile and bus traffic would not travel through BU's West Campus to reach the station, and instead use new roads being constructed during the Beacon Park project (BU later dropped this demand.) [17] [18]
The entire Indigo Line proposal would be blocked by the Baker administration in 2015 which officially canceled all plans for DMU service at West Station and all other lines. [19] By 2016, the station was scheduled to begin construction in 2019 and to be completed along with the highway project. [20] Earlier estimates suggested a 3-4 year construction time. [16] State legislators representing communities along the Worcester Line have expressed concern that Boston Landing and West Station would slow down trips for suburban commuters. [21]
In December 2017, the state announced that the station would not be completed until 2040, after the Harvard-owned land has been redeveloped. The projected cost of the station had increased to $95 million by that time due to the addition of a bus transfer level and other scope increases. [2] In response to a plea from city and state politicians, in January 2018, Harvard University increased its pledge to pay $50 million of the cost, with an additional $8 million incentive to build an early action interim station. [3] [18] The Turnpike straightening is proceeding regardless due to the deteriorating state of the existing viaduct. [18]
Planning for the Turnpike straightening project (since renamed to the Allston Multimodal Project) would once again change in the 2020s, including plans for West Station. Significant design revisions have included reducing the station's track infrastructure and eliminating a proposed layover yard. [4] Funding for the project was bolstered by contributions from Harvard University ($90 million) and Boston University ($10 million). The station's updated design now integrates new connections to the Grand Junction rail line, as well as enhanced pedestrian and bicycle pathways. [22] [23]
In August 2023, the City of Boston, Harvard, and Boston University have pledged $300 million toward the $1.9 billion I-90 Allston Multimodal Project, which includes developing a new neighborhood and West Station on land largely owned by Harvard. [24] This funding, the largest third-party contribution to a state transportation project, will complement federal grants and state investments, with construction set to begin in 2027. The project aims to eliminate an elevated section of the Massachusetts Turnpike. The Allston Multimodal Project is projected for completion by the mid-2030s. [25]
In November 2024, MassDOT reinstated the proposal for a new layover yard within West Station plans. [26]
Transportation in Boston includes roadway, subway, regional rail, air, and sea options for passenger and freight transit in Boston, Massachusetts. The Massachusetts Port Authority (Massport) operates the Port of Boston, which includes a container shipping facility in South Boston, and Logan International Airport, in East Boston. The Massachusetts Bay Transportation Authority (MBTA) operates bus, subway, short-distance rail, and water ferry passenger services throughout the city and region. Amtrak operates passenger rail service to and from major Northeastern cities, and a major bus terminal at South Station is served by varied intercity bus companies. The city is bisected by major highways I-90 and I-93, the intersection of which has undergone a major renovation, nicknamed the Big Dig.
Allston is an officially recognized neighborhood in Boston, Massachusetts, United States. It was named after the American painter and poet Washington Allston. It comprises the land covered by the zip code 02134. For the most part, Allston is administered collectively with the adjacent neighborhood of Brighton. The two are often referred to together as Allston–Brighton. Boston Police Department District D-14 covers the Allston-Brighton area and a Boston Fire Department Allston station is located in Union Square which houses Engine 41 and Ladder 14. Engine 41 is nicknamed "The Bull" to commemorate the historic stockyards of Allston.
The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
The North–South Rail Link (NSRL) is a proposed rail tunnel, or pair of tunnels, that would connect North Station and South Station in downtown Boston, Massachusetts, linking rail networks that serve the city's northern suburbs, New Hampshire, and Maine with the rest of the country. The project would build new underground stations near the existing stations, connect them with about 1.5 miles (2.4 km) of tunnels, and add other tunnels to link up with existing surface tracks.
Riverside station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station located in the Auburndale village of Newton, Massachusetts. It is the western terminal of the Green Line D branch service. The station is located near the interchange of Interstate 95 and the Massachusetts Turnpike (I-90) and serves as a regional park and ride station. West of the station is Riverside Yard, the main maintenance facility and largest storage yard for the Green Line. The station is fully accessible.
The Grand Junction Railroad is an 8.55-mile (13.76 km) long railroad in the Boston, Massachusetts, area, connecting the railroads heading west and north from Boston. The line is notable for its railroad bridge over the Charles River that passes under the Boston University Bridge between Boston and Cambridge, Massachusetts.
The B branch, also called the Commonwealth Avenue branch or Boston College branch, is a branch of the MBTA Green Line light rail system which operates on Commonwealth Avenue west of downtown Boston, Massachusetts. One of four branches of the Green Line, the B branch runs from Boston College station down the median of Commonwealth Avenue to Blandford Street. There, it enters Blandford Street portal into Kenmore station, where it merges with the C and D branches. The combined services run into the Boylston Street subway and Tremont Street subway to downtown Boston. B branch service has terminated at Government Center since October 2021. Unlike the other branches, B branch service runs solely through the city limits of Boston. The Green Line Rivalry between Boston College and Boston University is named in reference to the B branch, which runs to both universities.
The Fairmount Line or Dorchester Branch is a line of the MBTA Commuter Rail system in Boston, Massachusetts, USA. Except for a short portion in Milton, it lies entirely within Boston, running southwest from South Station through the neighborhoods of Dorchester, Mattapan and Hyde Park. Weekend service began on November 29, 2014. Most trains reverse direction at the south end at Readville, but some Franklin/Foxboro Line trains use the Fairmount Line rather than the Northeast Corridor.
The Indigo Line was a proposed rapid transit service of the Massachusetts Bay Transportation Authority (MBTA) that would have incorporated parts of the former Grand Junction Railroad, the Seaport District's Track 61, a spur to Riverside station and segments of other MBTA Commuter Rail lines within the Greater Boston region of Massachusetts. As proposed, the Indigo Line was planned as hybrid rail and would have predominately shared existing infrastructure with the MBTA Commuter Rail.
The Framingham/Worcester Line of the MBTA Commuter Rail system runs west from Boston, Massachusetts, to Worcester, Massachusetts, through the MetroWest region, serving 18 station stops in Boston, Newton, Wellesley, Natick, Framingham, Ashland, Southborough, Westborough, Grafton, and Worcester. It is the third-longest and third-busiest line in the MBTA Commuter Rail system. Service on the line is a mix of local and express trains serving Worcester plus short-turn Framingham locals.
Brookline Village station is a light rail station on the MBTA Green Line D branch, located in the Brookline Village neighborhood of Brookline, Massachusetts, United States. It was originally a commuter rail station on the Boston and Albany Railroad's Highland branch; it closed with the rest of the line in 1958 and reopened on July 4, 1959 as a light rail station. With 3,230 daily boardings, it is the third-busiest surface station on the D branch and the sixth-busiest surface station overall. Brookline Village station has raised platforms for accessibility with low-floor light rail vehicles.
Lansdowne station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Framingham/Worcester Line. Lansdowne is located next to the Massachusetts Turnpike in the Fenway–Kenmore neighborhood near Kenmore Square, below grade between Beacon Street and Brookline Avenue.
The history of the Massachusetts Bay Transportation Authority (MBTA) and its predecessors spans two centuries, starting with one of the oldest railroads in the United States. Development of mass transportation both followed existing economic and population patterns, and helped shape those patterns.
The Green Line Extension (GLX) was a construction project to extend the Massachusetts Bay Transportation Authority (MBTA) Green Line light rail system northwest into Somerville and Medford, two inner suburbs of Boston, Massachusetts. The project opened in two phases in 2022 at a total cost of $2.28 billion. Total ridership on the 4.3-mile (6.9 km) extension is estimated to reach 45,000 one-way trips per day in 2030.
Wachusett station is a commuter rail station on the MBTA Commuter Rail Fitchburg Line. It is northwest of the intersection of Massachusetts Route 2 and Route 31 in Fitchburg, Massachusetts. It serves as the northwestern terminus for Fitchburg Line trains. The opening of Wachusett extended service 4.5 miles (7.2 km) west from Fitchburg on the Pan Am Southern main line, lengthening the Fitchburg Line to 54 miles (87 km). The station was expected to draw 400 daily riders; by 2018, daily ridership was 132.
Talbot Avenue station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Fairmount Line. It is located near Codman Square in the Dorchester neighborhood. The station includes two full-length high-level platforms located north of Talbot Avenue, which are also accessible from Park Street and West Park Street. The station opened on November 12, 2012 as the first of four new stations on the Fairmount Line. Talbot Avenue was the first completely new rail station to open in the City of Boston since Yawkey opened in 1988.
Boston Landing station is an MBTA Commuter Rail station in Boston, Massachusetts, United States. It is served by the Framingham/Worcester Line. It is located in the Brighton neighborhood just west of the Everett Street bridge, next to the Massachusetts Turnpike. It serves the Allston-Brighton area as well as the Boston Landing development including Warrior Ice Arena. The station is fully accessible, with a single full-length high-level island platform. Elevators and stairs lead to Arthur Street and to the Everett Street bridge.
Beacon Park Yard was a CSX Transportation rail yard in Allston, Boston, now owned by Harvard University. The yard opened in 1890 on the site of a former trotting park, from which it took its name. It was closed in 2013 following the relocation of the yard's container operations to Worcester, Massachusetts and opening of a transload facility in Westborough, Massachusetts. Plans for the yard include relocation of the Massachusetts Turnpike Allston exit, construction of a new MBTA commuter rail station, a major real estate development, and possibly a rail layover yard.
Track 61 is an industrial rail terminal track in South Boston, Massachusetts, also known as the Boston Terminal Running Track. Track 61 is the last remnant of the vast rail yards that once covered much of the South Boston waterfront. Track 61 legally begins at Summer Street, while the line from Bay Junction to Summer Street is the Boston Terminal Running Track and Terminal Yard. However, the names are frequently used interchangeably.
East-West Rail is a proposed intercity passenger rail project that would provide new service between Boston and western Massachusetts, with stops including Worcester, Palmer, Springfield, Pittsfield, and Amtrak's Albany–Rensselaer station in New York. The 171-mile (275 km) route between Boston and Albany would use the former mainline of the Boston and Albany Railroad, which is now owned by the Massachusetts Bay Transit Authority and CSX Transportation.