This article lists events related to rail transport that are currently scheduled to occur in 2030. Please be aware that the actual dates on which these events occur may differ substantially from what is shown here.
Transportation in Vietnam is improving rapidly in terms of both quantity and quality. Road traffic is growing rapidly but the major roads are dangerous and slow to travel on due to outdated design and an inappropriate traffic mix. In recent years, the construction of expressways has accelerated. Air travel is also important for long distance travel. Metro systems are under construction in the two metropolises of Hanoi and Ho Chi Minh City.
The Altamont Corridor Express is a commuter rail service in California, connecting Stockton and San Jose during peak hours only. ACE is named for the Altamont Pass, through which it runs. Service is managed by the San Joaquin Regional Rail Commission, and operations are contracted to Herzog Transit Services. The 86-mile (138 km) route includes ten stops, with travel time about 2 hours and 12 minutes end-to-end. In 2023, the line had a ridership of 576,300, or about 2,700 per weekday as of the first quarter of 2024. ACE uses Bombardier BiLevel Coaches, MPI F40PH-3C locomotives, and Siemens Charger locomotives.
The Chennai Mass Rapid Transit System, commonly referred to as Chennai MRTS, is a metropolitan rail transit system in Chennai, India. It is operated by Southern Railway of the state-owned Indian Railways. Opened in 1995, it was the first elevated railway line in India. The railway line runs from Chennai beach to Velachery, covering a distance of 19.34 km (12.02 mi) with 18 stations and is integrated with the wider Chennai suburban railway network.
The Ho Chi Minh City Metro is a planned rapid transit system that will serve Ho Chi Minh City in Vietnam.
Long Thanh International Airport is an international airport under construction in Long Thành district, Đồng Nai province, Vietnam, approximately 40 km (25 mi) east of Ho Chi Minh City. It will be the second airport to serve the Ho Chi Minh City metropolitan area, after the existing Tan Son Nhat International Airport. It is being built as an alternative to the existing airport, in order to relieve its increasing traffic, demand and congestion, as it could not be further expanded due to urban growth around it. The Government of Vietnam approved its construction on 4 January 2021. Construction began the next day on 5 January, and its first phase was scheduled to be finished by September 2025, but now it is expected to be finished by the first half of 2026. The airport will serve over 100 million passengers and five million tonnes of cargo annually when built to the maximum designed capacity, making it the largest airport in Vietnam, Southeast Asia and one of the largest in the world. The project is the most expensive infrastructure project in Vietnam's history. Once open, both airports will operate together. The national carrier, Vietnam Airlines, is suggested by the project consultants as the only Vietnamese carrier to operate flights from Long Thanh, while other airlines will wholly stay at the existing airport.
This is a list of planned, or proposed, high-speed rail projects by country. Although a number of countries have conducted preliminary feasibility studies, many lines are eventually shelved or postponed due to high costs; only a few nations are building high-speed rail lines. Planned lines are separated here from lines under construction, and some countries have both. High-speed rail is public transport by rail at speeds over 200 km/h (125 mph).
The North–South express railway is a proposed high speed railway in Vietnam. The line would begin in Lạng Sơn and end in Cà Mau, connecting the two most urbanised areas in the country: Hanoi in the North, and Ho Chi Minh City in the South. The total proposed length would be 2,070 kilometres (1,290 mi).
The Hanoi Metro is a rapid transit system in Hanoi, the capital city of Vietnam. Owned by Vietnam Railways and operated by Hanoi Metro Company (HMC), it is the first operational rapid transit system in Vietnam. The first line opened to service on 6 November 2021.
The Dhaka Metro Rail, or simply the Dhaka Metro, is a mass rapid transit system serving Dhaka, the capital and largest city of Bangladesh. It is owned and operated by the Dhaka Mass Transit Company Limited (DMTCL). Together with the under construction Dhaka BRT, proposed Dhaka Subway and Dhaka suburban circular rail, it is expected to reduce traffic congestion in the city. The metro rail network has five planned lines which are the MRT Line 6, the only operational line, MRT Line 1 and MRT line 5, which are under construction, and MRT Line 2 and MRT Line 4, which are in the planning stages. It is part of the Strategic Transport Plan outlined by the Dhaka Transport Coordination Authority (DTCA).
Paris Métro Line 18 is one of four new lines of Grand Paris Express, a major expansion project of the Paris Métro. Currently under construction, it will link Orly Airport to Versailles via Massy-Palaiseau, the Saclay Plateau, and Saint-Quentin-en-Yvelines. The line will be 35 kilometers (22 mi) long and will be fully automated. Subsequently, it is planned to be extended by about 15 kilometers (9.3 mi) from Versailles to Nanterre via Rueil-Malmaison.
Merced station is a proposed California High-Speed Rail station in Merced, California, located in Downtown Merced. The originally proposed site was to have been located at ground level on Martin Luther King Jr. Way near the interchange with Route 99/59, placing it about 7 blocks south from the existing Merced Amtrak station. The station was initially intended to be the northern terminus of the system's Initial Construction Segment. An alternative location for a fully elevated station proposed by the City of Merced and other stakeholders, 8 blocks to the west-northwest along 15th Street, between O Street and R Street was approved after a supplemental environmental review. The high-speed rail line will run on the south side of the Union Pacific Railroad right-of-way.
Punggol Coast MRT station is a future underground Mass Rapid Transit (MRT) station on the North East line (NEL) in northern Punggol, Singapore. The station will serve the upcoming Punggol Digital District (PDD), an integrated mixed-use commercial development, alongside the new campus of the Singapore Institute of Technology (SIT). Once completed, it will replace Punggol station as NEL northern terminus.
Livingston station is a future Altamont Corridor Express station in Livingston, California. It is expected to open to revenue service in 2030 as part of the second phase of ACE's expansion to Merced. The station is located on Main Street. Turlock was selected over Atwater as a stop due to the distance between adjacent stations potentially resulting in fewer bottlenecks for freight trains.
Line 1 is a rapid transit line of the Ho Chi Minh City Metro, Vietnam. Line 1 is the city's first metro line, connecting District 1 and Thu Duc City. The line began construction in 2012, initially scheduled for completion in 2018. The project's completion date has been delayed to the end of 2024. Ticket prices will range from VND9,000-23,000 ($0.39-1) per trip.
Line 2 is a planned rapid transit line of the Ho Chi Minh City Metro, Vietnam. Line 2 is the city's second metro line, and will connect District 1 and District 12. Construction began in February 2024, with an expected completion date of 2030.
The Fresno Subdivision is a railroad in California owned and operated by the Union Pacific Railroad. Mostly built by the Southern Pacific Railroad in the 1870s, the line traverses the San Joaquin Valley on a northwest to southeast alignment.