Barney Circle

Last updated
Barney Circle
Neighborhood
800 block Kentucky Avenue SE - Barney Circle - Washington DC - 2014.jpg
800 block of Kentucky Avenue SE in the
Barney Circle neighborhood (2014)
Map barney circle.jpg
Map of Washington, D.C., with the Barney Circle neighborhood highlighted in red
Coordinates: 38°52′42.6″N076°58′50.5194″W / 38.878500°N 76.980699833°W / 38.878500; -76.980699833
CountryUnited States
TerritoryWashington, D.C.
Constructedc. 1917
Named for Commodore Joshua Barney

Barney Circle is a small residential neighborhood located between the west bank of the Anacostia River and the eastern edge of Capitol Hill in southeast Washington, D.C., in the United States. The neighborhood is characterized by its sense of community, activism, walkability, and historic feel. [1] [2] [3] The neighborhood's name derives from the eponymous former traffic circle Pennsylvania Avenue SE just before it crosses the John Philip Sousa Bridge over the Anacostia. The traffic circle is named for Commodore Joshua Barney, Commander of the Chesapeake Bay Flotilla in the War of 1812.

Contents

Neighborhood

The Barney Circle neighborhood or also known as Hill East covers the area bounded by L street SE, Southeast Boulevard SE, 14th Street SE,East Capitol Street SE, 22nd Street SE and Independence Avenue SE. However, many of the residents of the surrounding areas (such as the Lincoln Park and Capitol Hill East neighborhoods) consider themselves to live in Barney Circle. The neighborhood's imprecise boundaries may stretch as far north as East Capitol Street, as far south as the Southeast Boulevard, [4] and as far east as D.C. Jail at 19th and D Streets SE. [5] [6]

History

The Congressional Cemetery was established in 1807 and the Eastern Methodist Cemetery operated from 1824 to 1892. [7] [8] Even though the neighborhood now known as Barney Circle was located near the District's Eastern Market and the Navy Yard, the construction of ammunition depots and the Washington Asylum Hospital in the mid-19th century [9] push development southward on Barrack's Row in lieu of eastward on Pennsylvania Avenue SE. [10] The neighborhood known as Barney Circle remained relatively undeveloped and its streets remained unpaved throughout the 19th century. The Pennsylvania Avenue Bridge that connected the neighborhood known as Barney Circle to neighborhoods east of the Anacostia River built until 1890.

The neighborhood began to develop in 1902 after Arthur E. Randle won approval from the Congress to lay streetcar tracks across the bridge. The first houses in the core of the neighborhood were built in 1905. [11] The East Washington Heights Traction Railroad was incorporated on June 18, 1898.[ citation needed ] By 1903 it ran from the Capitol along Pennsylvania Avenue SE to Barney Circle, and by 1908, it went across the bridge to Randle Highlands (now known as Twining) as far as 27th St SE. [12] [13] [14] By 1917 it had been extended out Pennsylvania Avenue past 33rd Street SE., [15] but the company ceased operations by 1923. [16]

In 1911 the Congress passed an act "to confirm the name of Commodore Barney Circle", [17] after a local builder presented a paper on Barney to the Columbia Historical Society in 1910. [11] The neighborhood experienced a building boom between 1919 and 1924, when over 70% of its buildings were constructed. At one point, up to 25 percent of the neighborhood was populated by individuals who worked at the Navy Yard. [18] The rowhouses built to serve those blue-collar workers were modest, but comfortable. Most of the single-family brick rowhouses homes have at least two stories, two-three bedrooms, a couple of bathrooms, small yards, and low porches.

Earlier developments on Capitol Hill featured homes which were narrow and deep, while the homes in the Barney Circle neighborhood are relatively wide and shallow. [19] These type of homes, an innovation in the first decade of the 20th century, are known as "daylight rowhouses" because each room was lit as much as possible by sunlight coming through windows. [20] The homes in the Barney Circle neighborhood generally are set back from the street at a uniform distance, and have a small front yard and an open-air porch. As with most rowhouses, the homes typically have mansard roofs with dormers which provide third-floor sleeping, working, or storage space. [19]

Although little of the architecture in the area is outstanding, the neighborhood has retained its historic appearance. Few homeowners have installed modern siding or altered their structure in an ahistoric manner. [19]

Education

DCPS operates four schools that serve the neighborhood, including Eastern High School, Eliot-Hine Middle School, Payne Elementary School and the Capitol Hill Cluster School. [21] The cluster school has three campuses: Stuart-Hobson Middle School, Watkins Elementary School, and Peabody Elementary School. [22] President Barack Obama visited Stuart-Hobson in 2011 to commemorate Martin Luther King Jr. Day and First Lady Michelle Obama surprised the students of Watkins in 2016 to promote gardening. [23]

The District of Columbia Public Charter School Board operates Friendship Public Charter School in Barney Circle that serves students from pre-K through the eighth grade. [24]

Governance and Administrative Divisions

Barney Circle is located within Ward 6. [25] Charles Allen has represented the neighborhood on the Council of the District of Columbia since January 2015.

The heart of the community is located within Advisory Neighborhood Commission (ANC) 6B. [26] The core of Barney Circle is zoned in ANC 6B09, and may extend into 6B06, 6B07, 6B08, 6B10, and 7F07.

Culture

The Congressional Cemetery was created in 1807 holds the remains of Elbridge Gerry, a signer of the Declaration of Independence and former Vice President, Civil War photographer Mathew Brady, the "March King" John Philip Sousa, the former FBI Director, among other famous notables. [27] The revival of the Congressional Cemetery in the early 2000s helped rejuvenate the neighborhood. [28] The Association for the Preservation of Historic Congressional Cemetery manages the cemetery's K9 program, a program that allows 770 dogs the privilege to roam freely over the 35-acre property, as well as the "Rest in Bees" honey [29] and "Notes from the Crypt" chamber music concerts. [30] The cemetery also hosts film screenings [31] and weddings.

The announcement to build Nationals Park in September 2014 in Navy Yard - a thirty-five minute walk from the core of Barney Circle - catalyzed further development in the neighborhood like Trusty's Full-Serve bar. Trusty's has functioned as neighborhood tavern that has operated in Barney Circle since 2005 [32] with a clientele who avidly support the Washington Nationals and D.C. United. Wisdom, a gin parlor, opened in 2008 [33] is known for its luxe cocktails and large selection of absinthe. [34] The completion of the pedestrian bridge northwest of the Sousa bridge connected the neighborhood to The Wharf via the Anacostia Riverwalk Trail in the second decade of the 21st century.

Barney Circle has three additional common green spaces where residents walk their dogs, practice guerilla gardening, [35] and other beautification efforts: Dennis Dolinger Memorial Park, Commodore Barney Circle itself, and the Pennsylvania Avenue SE median.

Neighborhood Restaurant Group is planning to open a "culinary clubhouse", branded as "The Roost" in 2020 that will accommodate over 400 seats. [36] The Roost will include a sundae and frozen shop, "retro German health food", [37] a taco stand, a beer bar, and a cocktail bar that will specialize in cocktails with a low alcohol percentage. [38]

Hill Rag, a monthly community newspaper "of record", has reported on developments in and around Barney Circle since 1976. [39]

The Seafarers Yacht Club of Washington, DC, was established in 1945 south of the Congressional Cemetery. It is, by some assessments, the oldest African American boat club on the East Coast. [40] [41]

Transit and transportation

Barney circle is accessible via metro, express bus lines, highways, and Capital Bikeshare dock.[ citation needed ] The neighborhood is served by Potomac Avenue station and Stadium–Armory station and the 36 Pennsylvania Avenue busline. [42]

The John Philip Sousa Bridge was completed in 1942 [43] and is named after the famed composer and DC native, who had died in 1933. [44]

Traffic circle

Barney Circle was part of the original L'Enfant Plan for the District of Columbia. However, it was designated a square, not a traffic circle, on the city's original plats. [45] In 1867, the Philadelphia, Baltimore and Washington Railroad obtained the rights to the land where Barney Circle would be built for the purpose of building a rail crossing over the Anacostia. This along with reports by the Office of Public Buildings and Grounds (OPB&G) in the 1880s and 1890s that much of the area was under water at high tide, prevented the construction of a circular park as had been planned. [46] By 1903, was constructed as a traffic circle instead, with the name "Pennsylvania Avenue Circle", and Pennsylvania Avenue passing through it to the Pennsylvania Avenue Bridge. [47] [48] On August 19, 1911, President William Howard Taft signed S. 306 into law (Public Law No. 33), formally changing the name of the circle to "Commodore Barney Circle" [49] in honor of Commodore Joshua Barney, though it was sometimes referred to as "Admiral Barney Circle". [47] [50]

In 1939, the construction of the downstream span of the new John Philip Sousa Bridge reconfigured Barney Circle. A streetcar turnaround and bus lane was carved from the center of the circle, [45] and a $7,000 bus and streetcar terminal occupied the western portion of the site. The terminal opened on January 26, 1941 and ceased operation in 1960. [51] [46]

The Inner Loop's effect on Barney Circle

The John Philip Sousa Bridge in 1973, with Barney Circle on the far side of the bridge and the Anacostia Freeway interchange in the foreground PENNSYLVANIA AVENUE AND ANACOSTIA BRIDGE LOOKING WEST - NARA - 546693.jpg
The John Philip Sousa Bridge in 1973, with Barney Circle on the far side of the bridge and the Anacostia Freeway interchange in the foreground

In 1956, federal and regional transportation planners proposed an Inner Loop Expressway composed of three circumferential beltways for the District of Columbia. The innermost beltway would have formed a flattened oval about a mile in radius centered on the White House. The middle beltway would have formed an arc along the northern portion of the city, running from the proposed Barney Circle Freeway (whose terminus would have been near Robert F. Kennedy Memorial Stadium) through Anacostia Park, cutting northwest through the Trinidad neighborhood along Mt. Olivet Road NE, following the Amtrak rail line north to Missouri Avenue NW, along Missouri Avenue NW to Military Road NW, along Military Road NW across Rock Creek Park to Nebraska Avenue NW, down Nebraska Avenue NW to New Mexico Avenue NW, and down New Mexico Avenue NW and across Glover-Archbold Park until it terminated near 37th Street NW at the north end of Georgetown. As part of this plan, Barney Circle was again rebuilt in 1971, now with freeway ramps leading to the Southeast/Southwest Freeway and the John Philip Sousa Bridge. [45] Two decades of protest led to the cancellation of all but the Interstate 395 and Interstate 695 portions of the plan. The unbuilt portions of the project were finally cancelled in 1977. [52] [53] [54]

The failure to complete the Inner Loop left the Sousa Bridge's approaches incomplete and confusing. The bus and streetcar terminal were removed, and Pennsylvania Avenue SE now ran directly through the center of the circle. M Street was disconnected from the circle, and now dead-ended in a roundabout a block east of 12th Street SE. Unmarked Interstate 695 delivered three lanes of traffic to a one-lane on-ramp to the bridge, and traffic backed up for miles every day as a traffic light allowed only a few cars onto the bridge's southbound lanes during rush hour. Four lanes of traffic (two northbound, two southbound) passed beneath the bridge's terminus, dead-ending at a non-existent Inner Loop and connected haphazardly to the northeastern side of the circle. An off-ramp delivered most northbound bridge traffic around the incomplete Barney Circle and under the bridge onto Interstate 695 westbound. A dangerous right-hand turn with no deceleration ramp left local traffic coming to a swift halt to access 17th Street SE — but not Kentucky Avenue SE, which now had to be accessed from local streets. K Street SE now curved north and east around the west side of Barney Circle, and traffic lights on the street caused even more backups both on K Street and on the Sousa Bridge. [45]

Barney Circle Freeway fight

In 1975, federal, regional, and city transportation planners proposed an extension to I-695/Southeast Freeway to be called the "Barney Circle Freeway" to help alleviate the problems created by the failure to complete the Inner Loop. [55] The freeway would extend I-695 past its existing terminus at Barney Circle and travel along the western bank of the Anacostia River (through Anacostia Park) to East Capitol Street and Robert F. Kennedy Memorial Stadium. [55] [56] [57] A new bridge over the Anacostia River at Burnham Barrier would provide vehicles easy access to the Anacostia Freeway. [55] [56] [57] The Barney Circle Freeway would have delinked Barney Circle from I-695, and reconstructed the on- and off-ramps to Sousa Bridge so that the bridge returned to its traditional function as a local bridge rather than a route for commuters to access the Anacostia Freeway and points east in the state of Maryland. The combined bridge and freeway project was ready for construction to begin in 1981, [57] and its cost was estimated to be $93.5 million. [56] But after protests from residents of Capitol Hill (who feared the Barney Circle Freeway would cause more traffic to flow into the area) as well as environmentalists, the District of Columbia agreed to reduce the number of lanes on the Barney Circle Freeway to two from four. [58]

The protests and legal and regulatory challenges to the proposed freeway did not end, however, and by 1992 the freeway's cost had ballooned to $160 million and it remained unbuilt. [59] By 1993, although costs for the project had increased to $200 million, D.C. Mayor Sharon Pratt Kelly gave her approval for construction to begin. [60] But construction was delayed yet again when the Sierra Club Legal Defense Fund, Anacostia Watershed Society, Committee of 100 on the Federal City, Citizens Committee to Stop It Again, D.C. Federation of Civic Associations, Friends of the Earth, Kingman Park Civic Association, the Barney Circle Neighborhood Watch, Urban Protectors, and American Rivers sued to force the city to scale back the freeway even further, add exit ramps at the junction of Pennsylvania Avenue SE and I-695, and alter traffic patterns (e.g., creating more one-way streets) on Capitol Hill. [61] [62] [63] Federal Highway Administration (FHWA) officials agreed in August 1994 to conduct an additional environmental impact assessment regarding the project, [64] but later said the assessment's findings did not alter its earlier conclusion that construction of the roadway and bridge project was economically feasible, technologically appropriate, and environmentally sound. [55] [65] However, the D.C. City Council had the final say on whether to proceed with the project or not. In December 1994, the City Council bowed to neighborhood opposition and voted overwhelmingly to reject the project. [66]

Restructuring of Barney Circle

Standing on K Street SE, looking north-northeast at Barney Circle. Pennsylvania Avenue SE southbound is cutting across the image left to right. The traffic attempting to access Pennsylvania Avenue SE is on Barney Circle SE, part of the traffic circle itself. Looking NNE from Barney Circle SE - Washington DC.jpg
Standing on K Street SE, looking north-northeast at Barney Circle. Pennsylvania Avenue SE southbound is cutting across the image left to right. The traffic attempting to access Pennsylvania Avenue SE is on Barney Circle SE, part of the traffic circle itself.
Looking northwest from Sousa Bridge in May 2014 at the then closed off-ramp to Interstate 695, and at Barney Circle. Traffic is approaching Barney Circle in the distance on southbound Pennsylvania Avenue SE. Closed I-695 off-ramp - northbound Sousa Bridge - Washington DC.jpg
Looking northwest from Sousa Bridge in May 2014 at the then closed off-ramp to Interstate 695, and at Barney Circle. Traffic is approaching Barney Circle in the distance on southbound Pennsylvania Avenue SE.
Looking southwest from Barney Circle at decommissioned Interstate 695. The roadway is being torn up and the road bed raised by 20 feet to create a new road to be named "Southeast Boulevard". The now-closed on-ramp from Pennsylvania Avenue SE can be seen to the left. I-695 deconstruction - Washington DC.jpg
Looking southwest from Barney Circle at decommissioned Interstate 695. The roadway is being torn up and the road bed raised by 20 feet to create a new road to be named "Southeast Boulevard". The now-closed on-ramp from Pennsylvania Avenue SE can be seen to the left.

Since the cancellation of the Inner Loop Expressway, motorists wanting to access the Baltimore–Washington Parkway or U.S. Route 50 in Maryland (the John Hanson Highway) would often travel Interstate 695 to Barney Circle, wait at the traffic light there, cross the Sousa Bridge, wait at a traffic light on the southwestern terminus of the bridge, and make a left turn against oncoming traffic to access a narrow and dangerous ramp that led to northbound D.C. Route 295 (the Anacostia Freeway). The combination of traffic lights, left turn, and mixing of both through-traffic and local traffic created extensive traffic congestion on the Sousa Bridge during evening rush hour. [67] [68] [69] [70] [71]

In 2009, the District of Columbia Department of Transportation (DDOT) began the replacement of the 11th Street Bridges. It closed the westbound segment of Interstate 695 from the 11th Street Bridges to Barney Circle in late November 2012, [72] and the eastbound lanes in early 2013. [71] This portion of was Interstate 695 was subsequently decommissioned, turning roughly five blocks of six-lane highway into city streets from the National Highway System. [73] The unfinished "mixing bowl" exchange on the southern terminus of the 11th Street Bridges was also altered. Local traffic was separated from through-traffic by the construction of a bridge dedicated for local traffic only, and ramps connecting the bridge to D.C. Route 295 were created. Construction of the new ramps began in May 2012, [69] with the ramp from southbound D.C. Route 295 onto the 11th Street Bridge completed in July 2012. [70] The ramp from the bridges to northbound D.C. Route 295 opened on December 19, 2012. [74]

These changes removed a significant portion of the traffic using Sousa Bridge, from 50,000 vehicles per day (each way) in 2004 to an estimated 35,000 vehicles per day (each way) in 2030. [75] DDOT also redesigned and rebuilt the ramp from Pennsylvania Avenue SE to northbound D.C. Route 295 to improve its safety. [67] [76]

Decommissioned Interstate 695 began to be transformed into a boulevard named "Southeast Boulevard". [70] The reconstruction project, estimated to take 18 to 24 months, raised the roadway 20 feet (6.1 m) to bring it level with the grade of the surrounding streets. [71] The six-lane former highway began to be turned into a four-lane grand boulevard with a landscaped median and pedestrian nature trail. Southeast Boulevard was designed to link Barney Circle to 11th Street SE. [70]

In 2013, DDOT published plans to reconfigure Barney Circle. Priorities for the project included improving and restoring access to neighborhood streets, and adding pedestrian and bicycle connectivity to local streets and the Anacostia River waterfront. DDOT also began exploring whether to connect Southeast Boulevard to 12th, 13th, 14th, and 15th Streets SE. [77] By 2014, DDOT's plan involved possible reconstructing of Barney Circle into an intermodal transportation hub as well. DDOT planners said that construction on this project might begin as early as 2016, but as of 2017 no work is planned. [78]

Related Research Articles

<span class="mw-page-title-main">Pennsylvania Avenue</span> Street in Maryland and Washington, D.C., US

Pennsylvania Avenue is a primarily diagonal street in Washington, D.C. that connects the United States Capitol with the White House and then crosses northwest Washington, D.C. to Georgetown. Traveling through southeast Washington from the Capitol, it enters Prince George's County, Maryland, and becomes MD Route 4 and then MD Route 717 in Upper Marlboro, and finally Stephanie Roper Highway.

<span class="mw-page-title-main">District of Columbia Route 295</span> Highway in the District of Columbia

District of Columbia Route 295 (DC 295), also known as the Anacostia Freeway as well as the Kenilworth Avenue Freeway north of East Capitol Street, is a freeway in the District of Columbia, and currently the only signed numbered route in the District that is not an Interstate Highway or U.S. Highway. Also, DC 295 is one of the few city-level signed route numbers in the United States, along with Charlotte Route 4. The south end is at the junction of I-295, I-695, and the southern end of the 11th Street Bridges, though I-295 was originally part of DC 295. Its north end is at the border with Maryland where it connects to MD 295 and US 50 via MD 201.

<span class="mw-page-title-main">Interstate 295 (Maryland–District of Columbia)</span> Highway in the Washington, D.C., area

Interstate 295 (I-295) also known as the Anacostia Freeway, is a six-mile (9.7 km) auxiliary Interstate Highway in the US state of Maryland and in Washington, D.C.. It connects I-95/I-495 and Maryland Route 210 near the Potomac River to I-695 and District of Columbia Route 295 (DC 295) in the Anacostia neighborhood of Washington, D.C.

<span class="mw-page-title-main">Interstate 395 (Virginia–District of Columbia)</span> Interstate Highway in the DC area

Interstate 395 (I-395) in Virginia and Washington, D.C., is a 13.79-mile-long (22.19 km) spur route of I-95 that begins at an interchange with I-95 in Springfield and ends at an interchange with US Route 50 (US 50) in Northwest Washington, D.C. It passes underneath the National Mall near the US Capitol and ends at a junction with US 50 at New York Avenue, roughly one mile (1.6 km) north of the 3rd Street Tunnel. Despite its proximity to I-395 in Maryland, the route is unrelated and unconnected.

<span class="mw-page-title-main">Interstate 695 (District of Columbia)</span> Highway in Washington, D.C.

Interstate 695 (I-695), also known as the Southeast Freeway, is a two-mile-long (3.2 km) auxiliary Interstate Highway in Washington, D.C.. It travels from an interchange with I-395 south of the US Capitol building east then south across the 11th Street Bridges to an intersection with I-295 and District of Columbia Route 295 (DC 295) in Anacostia.

<span class="mw-page-title-main">Whitney Young Memorial Bridge</span> Bridge in D.C., U.S.

The Whitney Young Memorial Bridge is a bridge that carries East Capitol Street across the Anacostia River in Washington, D.C. in the United States. Finished in 1955, it was originally called the East Capitol Street Bridge. It was renamed for civil rights activist Whitney Young in early 1974. The bridge is 1,800 feet (550 m) long, its six lanes are 82 feet (25 m) wide, and it has 15 spans resting on 14 piers.

<span class="mw-page-title-main">John Philip Sousa Bridge</span> Bridge in Washington, D.C., United States

The John Philip Sousa Bridge, also known as the Sousa Bridge and the Pennsylvania Avenue Bridge, is a continuous steel plate girder bridge that carries Pennsylvania Avenue SE across the Anacostia River in Washington, D.C., in the United States. The bridge is named for famous United States Marine Band conductor and composer John Philip Sousa, who grew up near the bridge's northwestern terminus.

<span class="mw-page-title-main">Frederick Douglass Memorial Bridge</span> Bridge crossing the Anacostia River in Washington, DC

The Frederick Douglass Memorial Bridge is a through arch bridge that carries South Capitol Street over the Anacostia River in Washington, D.C. It was completed in 2021 and replaced an older swing bridge that was completed in 1950 as the South Capitol Street Bridge. In 1965, the original bridge was renamed after abolitionist Frederick Douglass. In 2007, the original swing bridge was used by 77,000 daily commuters.

<span class="mw-page-title-main">South Capitol Street</span>

South Capitol Street is a major street dividing the southeast and southwest quadrants of Washington, D.C., in the United States. It runs south from the United States Capitol to the D.C.–Maryland line, intersecting with Southern Avenue. After it enters Maryland, the street becomes Indian Head Highway at the Eastover Shopping Center, a terminal or transfer point of many bus routes.

<span class="mw-page-title-main">M Street (Washington, D.C.)</span> Four streets of the same name in Washington, D.C.

The name "M Street" refers to two major roads in the United States capital of Washington, D.C. Because of the Cartesian coordinate system used to name streets in Washington, the name "M Street" can be used to refer to any east–west street located twelve blocks north or south of the dome of the United States Capitol. Thus, in all four quadrants of the city there are streets called "M Street", which are disambiguated by quadrant designations, namely, M Street NW, NE, SW, and SE.

<span class="mw-page-title-main">11th Street Bridges</span> Complex of three bridges across the Anacostia River in Washington, D.C.

The 11th Street Bridges are a complex of three bridges across the Anacostia River in Washington, D.C., United States. The bridges convey Interstate 695 across the Anacostia to its southern terminus at Interstate 295 and DC 295. The bridges also connect the neighborhood of Anacostia with the rest of the city of Washington.

The Inner Loop was two planned freeways around downtown Washington, D.C. The innermost loop would have formed an oval centered on the White House, with a central freeway connecting the southern segment to the northern segment and then continuing on to Interstate 95. Interstate 95 would have met Interstate 66, Interstate 295, Interstate 695, and US 50 while traversing the Inner Loop. A second loop was an arc across the northern section of the city, beginning at East Capitol Street at the Anacostia River and using the Missouri Avenue NW and Nebraska Avenue NW commercial corridors to terminate in Georgetown.

<span class="mw-page-title-main">Kingman Park</span> Place in the United States

Kingman Park is a residential neighborhood in the Northeast quadrant of Washington, D.C., the United States capital city. Kingman Park's boundaries are 15th Street NE to the west; C Street SE to the south; Benning Road to the north; and Anacostia Park to the east. The neighborhood is composed primarily of two-story brick rowhouses. Kingman Park is named after Brigadier General Dan Christie Kingman, the former head of the United States Army Corps of Engineers.

The streets and highways of Washington, D.C., form the core of the surface transportation infrastructure in Washington, D.C., the federal capital of the United States. Given that it is a planned city, the city's streets follow a distinctive layout and addressing scheme. There are 1,500 miles (2,400 km) of public roads in the city, of which 1,392 miles (2,240 km) are owned and maintained by city government.

<span class="mw-page-title-main">Greenway (Washington, D.C.)</span> Neighborhood in Ward 7, United States

Greenway is a residential neighborhood in Southeast Washington, D.C., in the United States. The neighborhood is bounded by East Capitol Street SE, Interstate 295 SE, Fairlawn Avenue SE, Minnesota Avenue SE, Pennsylvania Avenue SE,

<span class="mw-page-title-main">Pennsylvania Avenue Line (Washington, D.C.)</span> Daily Metrobus route in Washington, D.C., United States

The Pennsylvania Avenue Line, designated Routes 32 and 36, is a daily Metrobus route in Washington, D.C., Operating between the Southern Avenue station or Naylor Road station of the Green Line of the Washington Metro and Potomac Park. Until the 1960s, it was a streetcar line, opened in 1862 by the Washington and Georgetown Railroad as the first line in the city.

<span class="mw-page-title-main">District Department of Transportation</span> United States agency

The District Department of Transportation is an agency of the government of the District of Columbia, in the United States, which manages and maintains publicly owned transportation infrastructure in the District of Columbia. DDOT is the lead agency with authority over the planning, design, construction, and maintenance of alleys, bridges, sidewalks, streets, street lights, and traffic signals in the District of Columbia.

<span class="mw-page-title-main">Martin Luther King Jr. Avenue</span> Street in District of Columbia, USA

Martin Luther King Jr. Avenue is a major street in the District of Columbia traversing through both the Southwest and Southeast quadrants.

<span class="mw-page-title-main">Anacostia Line</span> Unfinished streetcar line in Washington, D.C.

The Anacostia Line is a partially constructed line of the DC Streetcar, never put into service, intended to connect the Anacostia neighborhood with Joint Base Anacostia–Bolling. Construction occurred in 2009 and 2010, but was terminated before the line was complete.

References

  1. "Barney Circle: Fostering a Sense of Community". The Washington Post .
  2. "Barney Circle, Washington DC - Neighborhood Guide | Trulia".
  3. "- The Washington Post". The Washington Post .
  4. "Southeast Boulevard and Barney Circle Environmental Assessment". Seboulevard.com. Retrieved 2022-08-20.
  5. Henderson, Nell (November 21, 1992). "Barney Circle: Fostering a Sense of Community". The Washington Post. Retrieved May 6, 2014.
  6. Livingston, Mike (30 March 2006). Newcomer's Handbook for Moving to and Living in Washington D.C.: Including Northern Virginia and Suburban Maryland. ISBN   9780912301662.
  7. Proctor, Black & Williams 1930, p. 538.
  8. "Back From the Tomb". The Washington Post. November 4, 1892. p. 8.
  9. "The Curse of D.C. General". 9 December 1994.
  10. "Morrison's Stranger's Guide for Washington City". 1881.
  11. 1 2 "Historic Preservation Review Board – Application for Historic Landmark or Historic District Designation" (PDF). Government of the District of Columbia Historic Preservation Office. Archived (PDF) from the original on 2017-01-13. Retrieved January 8, 2022.
  12. Washington (Map) (1903 ed.). Hammond, C.S. Retrieved 2007-09-12.
  13. Directory of Electric Railway Companies in United States, Canada and Mexico. New York: McGraw Hill Company Inc. 1920. p.  22. East Washington Heights Traction.
  14. Washington (Map) (1908 ed.). Hammond, C.S. Archived from the original on February 22, 2007. Retrieved 2007-09-13.
  15. Your National Capital (Map) (1917 ed.). United States Geological Survey. Retrieved 2007-09-12.
  16. "Hero of 1812 Remembered - The Washington Post". The Washington Post .
  17. "Collection – United States Statutes at Large" (PDF). Library of Congress. Archived (PDF) from the original on 2017-02-08. Retrieved January 8, 2022.
  18. Baca, Alex (April 27, 2010). "Barney Circle: God Willing, A Smooth Road Ahead For Historic District". Washington City Paper. Archived from the original on 2020-06-14. Retrieved January 8, 2022.
  19. 1 2 3 "Barney Circle Neighborhood: 2009 Most Endangered Places". D.C. Preservation League. 2009. Archived from the original on May 7, 2014. Retrieved May 6, 2014.
  20. Hayward & Belfoure 1999, p. 128.
  21. "SY20-21 School Feeder Patterns | DCPS".
  22. "Home". Capitol Hill Cluster School. Retrieved 2022-08-20.
  23. "The Obamas Visit the Cluster | Capitol Hill Cluster School".
  24. "Friendship Chamberlain Elementary & Middle".
  25. "Neighborhood Planning | op".
  26. "Commissioners – ANC 6B". Archived from the original on 2020-06-14. Retrieved 2020-06-14.
  27. "RESTING IN PIECES - The Washington Post". The Washington Post .
  28. "The Resurrection of Congressional Cemetery | National Trust for Historic Preservation".
  29. "Congressional Cemetery is Selling "Rest in Bees" Honey | Washingtonian (DC)". 15 October 2015.
  30. "One of D.C.'s most exclusive spots? Congressional Cemetery's dog park. - The Washington Post". The Washington Post .
  31. "15 things to do in the D.C. area this weekend - The Washington Post". The Washington Post .
  32. "Trusty's, D.C.'s Neighborhood Bar with a Soul, Turns 10". 31 July 2015.
  33. "Gin Bar Wisdom Celebrates a Decade in Hill East". 10 October 2018.
  34. "Wisdom".
  35. https://www.facebook.com/DennisDolingerMemorialPark/ [ user-generated source ]
  36. "Neighborhood Restaurant Group Will Open a Food Hall in Southeast DC". 23 August 2017.
  37. "A Custard Sundae Shop Will Fit into the Roost Food Hall Coming to Southeast". 10 March 2020.
  38. "Tacos, Butcher and Beer: The Restaurant Rundown for the Roost".
  39. https://www.facebook.com/pg/Hillrag/about/?ref=page_internal [ user-generated source ]
  40. "Civil Rights Tour: Recreation - Seafarers Yacht Club - 1950 M Street SE".
  41. "Seafarers Yacht Club". DC Historic Sites. Retrieved 2023-02-07.
  42. "BusETA".
  43. "Washington DC: A City of Bridges | Washingtonian (DC)". March 2006.
  44. "John Philip Sousa Memorial Sought By Sen. Copeland". The Washington Post. June 16, 1937.
  45. 1 2 3 4 Eisen, Jack (June 19, 1971). "Barney Circle Gone, But Will Return". The Washington Post.
  46. 1 2 Elizabeth Barfold (1993). Historical American Building Survey - Kentucky Avenue (PDF) (Report). National Park Service. p. 2. Retrieved September 8, 2017.
  47. 1 2 Memorial to Congress of the Columbia Historical Society 1911, p. 183.
  48. Real Estate Atlas of Washington, District of Columbia Vol 2. Philadelphia: G. W. Baist. 1903. p. Plate 033. Retrieved 9 August 2017.
  49. Corps of Engineers 1911, p. 3160.
  50. Real Estate Atlas of Washington, District of Columbia Vol 2. Philadelphia: G. W. Baist. 1921. p. Plate 033. Retrieved 9 August 2017.
  51. "Bus Terminal to Be Opened This Morn,ng at Barney Circle". The Washington Post. January 26, 1941.
  52. Levey, Bob; Levey, Jane Freundel (November 26, 2000). "End of The Roads". The Washington Post; Eisen, Jack (July 13, 1973). "Md. Vetoes I-95 Extension Into District". The Washington Post; Feaver, Douglas B. (May 13, 1977). "Three Sisters Highway Project Is Killed - Again". The Washington Post.
  53. Schrag 2004, pp. 648–673.
  54. Mohl 2008, pp. 193–226.
  55. 1 2 3 4 Wheeler, Linda (August 21, 1995). "D.C. Freeway in Limbo". The Washington Post.
  56. 1 2 3 Lynton, Stephen J. (September 26, 1983). "D.C. Plans to Link Two City Freeways". The Washington Post.
  57. 1 2 3 Lippman, Thomas W. (January 5, 1981). "D.C. Is Planning $850 Million For Maintenance, New Projects". The Washington Post.
  58. Lynton, Stephen J. (July 7, 1985). "D.C. Reviving Long-Controversial Anacostia Road Plan". The Washington Post.
  59. Spencer, Duncan (June 18, 1992). "Hill Faces Another Classic Battle Over a Freeway". Roll Call.
  60. Castaneda, Ruben (September 17, 1993). "Construction to Begin in '94 On Anacostia-SE Freeway Link". Washington Post.
  61. Spencer, Duncan (February 3, 1994). "Road Project Hits Legal Dead End". Roll Call.
  62. Cohn, D'Vera (May 13, 1994). "Suit Seeks to Stop D.C. Plans to Build Connector Highway". The Washington Post.
  63. Neufeld, Matt (May 13, 1994). "People Sue to Stop SE Freeway Proposal". The Washington Times.
  64. Neufeld, Matt (August 18, 1994). "Barney Circle Plan Up in Air". The Washington Times.
  65. "Freeway Given Boost". The Washington Post. April 19, 1996.
  66. Loeb, Vernon (March 5, 1997). "Norton Declares Barney Circle Freeway a Dead End". The Washington Post.
  67. 1 2 Thomson, Robert (December 18, 2012). "D.C. Preparing to Open New Highway Link". The Washington Post. Retrieved May 5, 2014.
  68. Thomson, Robert (August 18, 2011). "At Four-Way Stops, A Risky Maximization of Opportunity". The Washington Post.
  69. 1 2 Thomson, Robert (May 27, 2012). "Piece By Piece at 11th Street Bridge". The Washington Post.
  70. 1 2 3 4 Thomson, Robert (August 16, 2012). "Freeway Fragment to Undergo An Identity Swap". The Washington Post.
  71. 1 2 3 Thomson, Robert (October 7, 2012). "Bridge Ramps Remake D.C. Freeways". The Washington Post.
  72. Freeman, Amy (November 27, 2012). "Sousa Bridge Access to Freeway/395 to Close Thursday". WTOP.com. Retrieved May 5, 2014.
  73. DeBonis, Mike (November 28, 2011). "Interstate 695 Reappears in D.C.". The Washington Post.
  74. Thomson, Robert (December 30, 2012). "With A New Freeway Link, Is It Time to Reconsider How the Roads Are Marked?". The Washington Post.
  75. Grahame, Tom (July–August 2005). "Myriad Traffic Studies Reflect Pace of Change to Come" (PDF). Capital Hill Restoration Society Newsletter. p. 1.
  76. Thomson, Robert (July 8, 2012). "D.C. Freeway Ramps, Beltway Paving, Rush Plus Tweaks". The Washington Post.
  77. District of Columbia Department of Transportation 2013, p. 2.
  78. District of Columbia Department of Transportation 2014, p. 10.

Bibliography