Seattle Municipal Light and Power Plant

Last updated
Seattle Municipal Light and Power Plant
Cedar Falls crib dam, 1903 (50532947523).jpg
Cedar Falls crib dam, 1903
USA Washington location map.svg
Red pog.svg
Usa edcp location map.svg
Red pog.svg
Location20030 Cedar Falls Rd. SE, North Bend, Washington
Coordinates 47°25′09″N121°46′55″W / 47.419298°N 121.781868°W / 47.419298; -121.781868 (Camp North Bend)
Area88 acres (36 ha)
Built1904 (1904)
Built byCity of Seattle Engineering Dept.
Architectural styleindustrial vernacular
NRHP reference No. 97001077 [1]
Added to NRHPSeptember 11, 1997

Seattle Municipal Light and Power Plant, also known as Cedar Falls Historic District, is a public hydroelectric plant near North Bend, Washington operated by Seattle City Light. The plant was the first publicly-owned electrical generating plant for Seattle and one of the earliest in the country for a municipality of its size. It was listed on the National Register of Historic Places in 1997. [2]

Contents

The population of Seattle grew rapidly from 3500 in 1880 to 237,000 in 1910, and the city needed to provide power to its population. Electricity was first used for street lights, and then for electric railways. Ultimately, private customers were provided electricity for lighting and appliances. The Seattle Municipal Light and Power Plant's initial capacity of 3500 kilowatts was increased to 13,500 kilowatts by 1910, [2] and further improvements brought capacity to 40,000 kilowatts. [3] Residents of the city paid one of the country's lowest electrical rates per kilowatt hour, [2] more than half the rate charged by the private firm Seattle Electric Company (renamed Puget Sound Power and Light). [4]

Description

The district is within the Cedar River Watershed which provides two-thirds of Seattle's water. A 37-mile transmission line connects the power station to Seattle. The primary components of the historic district are the masonry dam build in 1914, the hydro-generating station added in the 1920s, and the company town. More recent additions, such as administrative buildings for Seattle Water, are within the district boundaries but do not contribute to its historic status. [2]

The first component of the hydroelectric works was a timber crib dam in 1902. The crib dam was 250 feet (76 m) long with a central spillway. In the 1980s, the crib dam was used as a coffer during a major project to improve the masonry dam. It took four years to build the masonry dam which had a height of 215 feet (66 m) and width of nearly 1,000 feet (300 m). The crib dam was breached after a new overflow dike was built downstream. [2]

City engineer Reginald H. Thomson added a sawmill at the lake mouth to provide milled lumber for the dam and other components, cutting about 2,000,000 board feet of lumber. [4] When the natural level of Cedar Lake was raised 18 feet in 1903, it created a reservoir, and a secondary reservoir, Masonry Pool, was formed when the masonry dam was constructed in 1914. Camp One was relocated in 1914 due to rising water in the Masonry Pool. There are no structures remaining at either of the Camp One sites. Cedar Lake was later renamed Chester Morse Lake in honor of a longtime Seattle Water Department superintendent. [2]

The power plant site was cleared in 1902. The original plant was a timber-framed powerhouse with seven bays. Behind it was the transformer house, built of concrete and stone. The transformer house was equipped with nine step-up transformers. The concrete and stone switch house was built behind the transformer house. Northwest of the powerhouse was a wood-framed workshop. An oil house on the hill above the plant provided oil to the transformers via gravity feed. [2]

A second penstock pipeline, two larger generators, two inflow turbines, and a second transmission line to Seattle were added by 1908. The powerhouse was enlarged to 50 by 200 feet (15 m × 61 m) to house the new equipment, and a second switch house was built. [2]

Employee cottages Worker housing at Cedar Falls, Washington, 1914 (48577175356).jpg
Employee cottages

The early construction camp in 1908 included a kitchen, mess hall, bunkhouse, cottages, a foreman's house, and outbuildings. Camp Two was established in 1911, housing around two hundred workers at the height of construction. It remained in service, housing employees and loggers, into the 1930s, although a serious forest fire in 1922 burned many of its structures. Two bungalow-style dormitories and a boarding house replaced the bunkhouse, kitchen, and mess hall in 1912. The streets of the City Light company town were lit by five-globe cluster street lights. In the 1910s, a gymnasium with a pool was built near the community gardens. [2]

Automation reduced the number of on-site employees needed. [5] Houses and outbuildings were removed throughout the 1960s as the number of on-site employees decreased. The 1913 log shelter for fire patrols and timber cruisers was relocated in 1963 to serve as an interpretive display. In 1996, only three residences and two large garage structures remained. [2] The Cedar River Watershed Education Center had a groundbreaking ceremony in March 2000. [5] The power plant is owned and operated by the City of Seattle. The Seattle Water Department owns and operates the townsite. [2]

Contributing resources

Hydroelectric plant sources that contribute to the historic registration are: [2]

Townsite sources that contribute to the historic registration are: [2]

History

In 1902, city engineer Thomson proposed a hydroelectric plant below Cedar Falls that could eventually provide 25,000 horsepower, providing municipal power to Seattle. Seattle voters approved a bond measure of $590,000 for the proposal. [6] :20 James Delmage Ross developed blueprints for the infrastructure and submitted them to Thomson. In 1903, Ross was appointed assistant city engineer and chief electrical engineer for Seattle, developing both the Seattle Municipal Light and Power Plant and the Skagit River Hydroelectric Project. [6] :22–23

The first timber dam on the Cedar River raised the river's level by 18 feet (5.5 m). The water was directed by the dam into an 49 inches (1,200 mm) diameter pipeline that was 15,407 feet (4,696 m) long and connected to a steel penstock. The water flowed from the penstock to two Pelton impulse waterwheels that turned two 1,200-kilowatt generators. The generators supplied power to the light bulbs in the powerhouse for the first time on October 7, 1904, and to the city of Seattle by January 31, 1905, through the newly established Seattle City Light. [6] :24

The demand for power grew beyond the capacity of the original dam, power plant, and single transmission line, even though the amount produced by Cedar Falls by 1908 was four times the amount established in its original design. [6] :27

1915 flood Flood at Cedar Falls, Washington, 1915 (WASTATE 251).jpeg
1915 flood

In 1912, voters approved $1.4 million in bonds to construct a masonry dam which would collect more water and stabilize seasonal fluctuations in the flow. The dam was approved by the Board of Public Works at Ross's urging, despite concerns from geologists about the integrity of the north side of the lake bed. In 1915, the new dam caused a rise in Rattlesnake Lake, destroying the town of Moncton. A second disaster occurred in December, 1918, when it began to rain while engineers were testing the dam; the rise in the lake caused a washout in Boxley Creek and destroyed the town of Edgewick. [6] :35-36

In 1921, a 15,000-kilowatt unit expanded the capacity of the original units. Another 15,000-kilowatt unit was added in 1929. In 1930, the original generators were removed and sent variously to Ketchikan, Alaska and Brazil. [6] :50

The first construction camp became the town of Cedar Falls. It was a joint-company town of Seattle City Light, Seattle Water Department, and Chicago, Milwaukee, St. Paul and Pacific Railroad, with each company providing separate housing and amenities for its employees and their families. [6] :64–66

Seattle eventually purchased 91,000 acres of the upper Cedar River watershed to protect the water supply by prohibiting public access. [7]

Related Research Articles

<span class="mw-page-title-main">Underground power station</span>

An underground power station is a type of hydroelectric power station constructed by excavating the major components from rock, rather than the more common surface-based construction methods.

<span class="mw-page-title-main">Cushman Dam No. 1</span> United States historic place

Cushman Dam No. 1 is a hydroelectric dam on the North Fork of the Skokomish River in Mason County, Washington, which in derogation of the natural and treaty rights of the Native inhabitants impounded and enlarged the formerly natural Lake Cushman, leading to damage claims in excess of $5 billion and an eventual settlement agreement with the Skokomish tribe that terminates the right to operate the dam(s) after 2048. It was built by Tacoma City Light in 1924–1926. Tacoma's demand for electricity grew rapidly after World War I. Tacoma City Light's Nisqually River Hydroelectric Project, built in 1912, could not meet the demand and the utility decided to build a new hydroelectric project on the North Fork Skokomish River. The dam and powerhouse first began to deliver electricity on February 12, 1926.

<span class="mw-page-title-main">Petty Harbour Generating Station</span> Dam in Canada, Newfoundland and Labrador

The Petty Harbour Hydro Electric Generating Station is a hydroelectric generating station in Petty Harbour–Maddox Cove, Newfoundland and Labrador. It was constructed in 1898 and it was the first hydroelectric generating station in Newfoundland. It was built by the St. John's Street Railway Company, a company established by Robert Reid. Operation commenced on 19 April 1900.

<span class="mw-page-title-main">Bull Run Hydroelectric Project</span> Dam in Oregon

The Bull Run Hydroelectric Project was a Portland General Electric (PGE) development in the Sandy River basin in the U.S. state of Oregon. Originally built between 1908 and 1912 near the town of Bull Run, it supplied hydroelectric power for the Portland area for nearly a century, until it was removed in 2007 and 2008. The project used a system of canals, tunnels, wood box flumes and diversion dams to feed a remote storage reservoir and powerhouse. The entire project was removed because of rising environmental costs. Marmot Dam on the Sandy River was demolished in 2007, and the Little Sandy Dam on the Little Sandy River was taken down in 2008.

<span class="mw-page-title-main">Lake Chelan Dam</span> Dam in Chelan, Washington

Lake Chelan Dam officially known as the Lake Chelan Hydroelectric Project is located approximately 32 miles (51 km) north of the city of Wenatchee in Chelan County. The dam is located at the lower or southeasterly end of 50.4 miles long Lake Chelan, and is within the limits of the city of Chelan. The powerhouse is located near the community of Chelan Falls. The reservoir has 677,400 acre-feet (835,600,000 m3) of usable water storage. The 10-year average generation for the Project is 365,000 megawatt hours.

Spruce Falls was the local name for a small waterfall where the Swan River empties into Duck Lake in northeastern Saskatchewan, near the Manitoba boundary. It is at 55°37′ N and 102°7′ W.

<span class="mw-page-title-main">Theodore Roosevelt Dam</span> Dam in Gila and Maricopa Counties, Arizona

Theodore Roosevelt Dam is a dam on the Salt River located northeast of Phoenix, Arizona. The dam is 357 feet (109 m) high and forms Theodore Roosevelt Lake as it impounds the Salt River. Originally built between 1905 and 1911, the dam was renovated and expanded in 1989–1996. The dam is named after President Theodore Roosevelt. Serving mainly for irrigation, water supply, and flood control, the dam also has a hydroelectric generating capacity of 36 megawatts.

<span class="mw-page-title-main">Folsom Powerhouse State Historic Park</span> United States historic place

Folsom Powerhouse State Historic Park is a historical site preserving an 1895 alternating current (AC) hydroelectric power station—one of the first in the United States.

<span class="mw-page-title-main">Croton Dam (Michigan)</span> Dam in Newaygo County, Michigan

Croton Dam is an earth-filled embankment dam and powerplant complex on the Muskegon River in Croton Township, Newaygo County, Michigan. It was built in 1907 under the direction of William D. Fargo by the Grand Rapids - Muskegon Power Company, a predecessor of Consumers Energy. The 40-foot-high (12 m) dam impounds 7.2 billion U.S. gallons (6 billion imp. gal/27 billion L) of water in its 1,209-acre (489 ha) reservoir and is capable of producing 8,850 kilowatts at peak outflow. It was listed on the National Register of Historic Places in 1979.

<span class="mw-page-title-main">James Delmage Ross</span> Canadian-American engineer and electric grid administrator

James Delmage Ross was the superintendent of lighting for Seattle for 28 years and was the first administrator of the Bonneville Power Administration. He was instrumental in developing the Cedar Falls and Skagit River hydroelectric power plants. A self-taught engineer, Ross advocated for public utilities and regional power networks. He also later served as a member of the Securities and Exchange Commission.

<span class="mw-page-title-main">Hauser Dam</span> Dam in Montana, U.S.

Hauser Dam is a hydroelectric straight gravity dam on the Missouri River about 14 miles (23 km) northeast of Helena, Montana, in the United States. The original dam, built between 1905 and 1907, failed in 1908 and caused severe flooding and damage downstream. A second dam was built on the site in 1908 and opened in 1911 and comprises the present structure. The current Hauser Dam is 700 feet (210 m) long and 80 feet (24 m) high. The reservoir formed by the dam, Hauser Lake, is 25 miles (40 km) long, has a surface area of 3,800 acres (1,500 ha), and has a storage capacity of 98,000 acre-feet (121,000,000 m3) of water when full.

<span class="mw-page-title-main">Black Eagle Dam</span> Dam in Montana, U.S.

Black Eagle Dam is a hydroelectric gravity weir dam located on the Missouri River in the city of Great Falls, Montana. The first dam on the site, built and opened in 1890, was a timber-and-rock crib dam. This structure was the first hydroelectric dam built in Montana and the first built on the Missouri River. The dam helped give the city of Great Falls the nickname "The Electric City." A second dam, built of concrete in 1926 and opened in 1927, replaced the first dam, which was not removed and lies submerged in the reservoir. Almost unchanged since 1926, the dam is 782 feet (238 m) long and 34.5 feet (10.5 m) high, and its powerhouse contains three turbines capable of generating seven megawatts (MW) of power each. The maximum power output of the dam is 18 MW. Montana Power Company built the second dam, PPL Corporation purchased it in 1997 and sold it to NorthWestern Corporation in 2014. The reservoir behind the dam has no official name, but was called the Long Pool for many years. The reservoir is about 2 miles (3.2 km) long, and has a storage capacity of 1,710 acre-feet (2,110,000 m3) to 1,820 acre-feet (2,240,000 m3) of water.

<span class="mw-page-title-main">Stave Falls Dam and Powerhouse</span> Dam in Stave Falls

Stave Falls Dam is a dual-dam power complex on the Stave River in Stave Falls, British Columbia, Canada. The dam was completed in 1912 for the primary purpose of hydroelectric power production. To increase the capacity of Stave Lake, the dam was raised in 1925 and the Blind Slough Dam constructed in an adjacent watercourse 500 m (1,600 ft) to the north, which was the site of the eponymous Stave Falls. In 2000, the dam's powerhouse was replaced after a four-year upgrade. The original Stave Falls powerhouse was once British Columbia's largest hydroelectric power source, and is a National Historic Site of Canada.

<span class="mw-page-title-main">Enloe Dam and Powerplant</span> Dam in Okanogan County, Washington

The Enloe Dam, also known as the Similkameen Dam, and its powerplant are located on the Similkameen River about 4 miles (6.4 km) west-northwest of Oroville, Washington. Located just above Similkameen (Coyote) Falls, the concrete arch-gravity dam stands about 54 feet (16 m) high, with a crest length of about 290 feet (88 m), built between 1916 and 1923. The dam was named after the president of the Okanogan Valley Power Company, Eugene Enloe. The dam was operated to generate power at its powerplant, located about 850 feet (260 m) downstream from the dam. Lacking fish ladders, Enloe Dam blocks fish passage and completely extirpated anadromous fish migration into the upper reaches of the Similkameen River and its tributaries in Canada.

<span class="mw-page-title-main">Cooke Dam</span> Dam in Iosco County, Michigan

Cooke Dam is a hydro-electric dam on the Au Sable River in Michigan. It was listed on the National Register of Historic Places in 1996 as the Cooke Hydroelectric Plant.

<span class="mw-page-title-main">Devil's Gate-Weber Hydroelectric Power Plant</span> United States historic place

The Devil's Gate-Weber Hydroelectric Power Plant was built in 1909–1910 on the Weber River in northeastern Utah, United States, about 10 miles (16 km) southeast of Ogden. It was built by the Utah Light and Railway Company under the direction of E.H. Harriman, a director of the Union Pacific Railroad. It was one of the first powerplants in Utah designed to feed an electrical grid rather than as a source of power of a single locality.

<span class="mw-page-title-main">Stairs Station Hydroelectric Power Plant Historic District</span> Historic district in Utah, United States

The Stairs Station Hydroelectric Power Plant was built in 1894-1895 in Big Cottonwood Canyon, about 8 miles (13 km) southeast of Salt Lake City, Utah. The plant comprises the powerhouse, switchyard, penstocks, and a pipeline. A dam next to the site is associated with the Granite Power Plant farther downstream, and is part of neither historic district. The powerhouse is the only remaining building associated with the plant. It is an example of an intact high-head generating plant from the late 19th century.

<span class="mw-page-title-main">Granite Hydroelectric Power Plant Historic District</span> Historic district in Utah, United States

The Granite Hydroelectric Power Station was built in 1896–1897 at the mouth of Big Cottonwood Canyon, about 6 miles (9.7 km) southeast of Salt Lake City, Utah, United States(in what is now eastern Cottonwood Heights. The plant comprises the powerhouse, transformer house, a wooden conduit, penstocks, and a small dam. Like the Stairs Station upstream, it represents an intact high-head generating plant from the late 19th century.

<span class="mw-page-title-main">Eklutna Power Plant</span> United States historic place

The Eklutna Power Plant, also referred to as Old Eklutna Power Plant, is a historic hydroelectric power plant on the Eklutna River in Anchorage, Alaska. Located about 5 miles (8.0 km) downstream of the more modern new Eklutna Power Plant, it was built in 1928–29 to provide electrical power to the growing city, and served as its primary power source until 1956. The facilities include two dams, a tunnel and penstock, and a powerhouse. The main dam, Eklutna Dam, located at the northwestern end of Eklutna Lake, was built in 1941 to replace a series of temporary structures built after an earthen dam failed before the plant began operation. The diversion dam, a concrete arch dam, is located 7 miles (11 km) downstream from the lake, and provides facilities for diverting water into the tunnel. The tunnel is 1,900 feet (580 m) long, and is terminated in a penstock, a structure designed to raise the water pressure. The powerhouse is a concrete-and-steel structure completed in 1929. The diversion dam removal was completed in 2018 to allow for the passage of salmon.

<span class="mw-page-title-main">Snoqualmie Falls Hydroelectric Plant</span>

The Snoqualmie Falls Hydroelectric Plant is located just north of Snoqualmie in King County, Washington state, US. It is situated about 22 mi (35 km) east of Seattle. Located just below the Snoqualmie Falls, the power plant consists of two power houses, Plant 1 and Plant 2. Plant 1 was completed in 1899 and is located underground. It is the first completely underground hydroelectric power plant ever built in the world. Plant 2 was built in 1910 and is located along the right bank of the Snoqualmie River. Both plants receive water from a small reservoir created by a weir atop the falls. Plant 1 has an installed capacity of 13.7 MW and Plant 2 a capacity of 40.2 MW for a total installed capacity of 53.9 MW, enough to power 40,000 homes.

References

  1. "National Register Information System". National Register of Historic Places . National Park Service. November 2, 2013.
  2. 1 2 3 4 5 6 7 8 9 10 11 12 13 Florence K. Lentz (September 1996). "National Register of Historic Places Inventory/Nomination: Seattle Municipal Light and Power Plant". National Park Service . Retrieved January 23, 2021. With 74 accompanying pictures
  3. "Cedar Falls Water Supply". Invention & Technology. Retrieved February 10, 2021.
  4. 1 2 Lange, Greg (January 10, 1905). "Cedar Falls hydroelectric plant begins lighting Seattle streets on January 10, 1905". HistoryLink.org. Retrieved February 10, 2021.
  5. 1 2 Stein, Alan J. (June 27, 1917). "Cedar Falls -- Thumbnail History". HistoryLink.org. Retrieved January 24, 2021.
  6. 1 2 3 4 5 6 7 Wilma, David (2010). Power for the people : a history of Seattle City Light. Seattle, Wash: History Ink, in association with University of Washington Press. ISBN   978-0-295-98576-3. OCLC   613433169.
  7. Alcorn, Jason (September 9, 2015). "Visiting Seattle's off-limits watershed to learn about climate change". InvestigateWest. Retrieved February 12, 2021.