Industry | Railway operator |
---|---|
Founded | 1854 |
Defunct | 28 February 1978 |
Fate | Sold to the federal government |
Successor | Australian National |
Headquarters | , |
Area served | South Australia |
Parent | Government of South Australia |
South Australian Railways (SAR) was the statutory corporation through which the Government of South Australia built and operated railways in South Australia from 1854 until March 1978, when its non-urban railways were incorporated into Australian National, and its Adelaide urban lines were transferred to the State Transport Authority.
The SAR had three major rail gauges: 1600 mm (5 ft 3 in); 1435 mm (4 ft 8+1⁄2 in); and 1067 mm (3 ft 6 in).
The first railway in South Australia was laid in 1854 between Goolwa and Port Elliot to allow for goods to be transferred between paddle steamers on the Murray River and seagoing vessels. The next railway was laid from the harbour at Port Adelaide, to the capital, Adelaide, and was laid with Irish gauge 5 ft 3 in (1,600 mm) track. This line was opened in 1856. Later on, branch lines in the state's north in the mining towns of Kapunda and Burra were linked through to the Adelaide metropolitan system. From here, a south main line extended to meet the horse tramway from Victor Harbor to Strathalbyn, and towards the South Australia/Victoria Border.
With the metropolitan systems being broad gauge, the mid north and south east of the state were originally laid with 3 ft 6 in (1,067 mm) narrow gauge track. These systems were closely based on British practice, as was the broad gauge system prior to 1926. Locomotives and rolling stock were bought from the United Kingdom and United States, from builders such as Beyer, Peacock & Company, Dübs and Company, North British Locomotive Company, and Baldwin Locomotive Works. Nine broad gauge tank locomotives plus the frame of a tenth were bought second-hand from the Canterbury Provincial Railways in New Zealand when it converted to narrow gauge.
In 1922, after the SAR's worst financial deficit, the government appointed American railroad manager William Webb, from the Missouri-Kansas-Texas Railroad as Chief Commissioner. When Webb arrived in Adelaide with his young family, he found a railway system unchanged since the late 19th century. The locomotives and rolling stock were small, wagons and carriages were of wooden construction, the track and bridges were unsuitable for heavy loads, the workshops had antiquated machinery and the signalling system was inflexible. These attributes drove up the ratio of operating costs to revenue.
Webb introduced a rehabilitation plan based on American railroad principles of large, standardised locomotives and steel bodied freight wagons, with automatic couplers to enable a significant increase in productivity. Lightly patronised passenger trains would be replaced by self-propelled rail cars, enabling faster, more frequent and more efficient services. He recruited Fred Shea as his Chief Mechanical Engineer and had him prepare specifications for this new equipment. This resulted in orders being placed for 1,200 wagons of four types from American Car and Foundry, 12 petrol mechanical railmotor cars from the Service Motors Corporation, Wabash, Indiana, and 30 locomotives based on American Locomotive Company plans but built by Armstrong Whitworth & Co in the United Kingdom. These were of the Mountain, Pacific and Mikado wheel arrangements, 10 of each type, which became the 500, 600, and 700 class locomotives. [1] [2]
To carry the heavier trains, the rehabilitation plan included the strengthening of track and bridges, and the conversion of the mid north 3 ft 6 in (1,067 mm) narrow gauge system (the Western division) to 5 ft 3 in (1,600 mm) broad gauge. The antiquated Islington Railway Workshops were demolished and replaced with a thoroughly modern railway maintenance and manufacturing works, a large new round house was built at Mile End, near Adelaide, and several 85 foot turntables were installed throughout the state to enable the much larger locomotives to be turned. Efficient train operations were facilitated by the adoption of American train order working on country lines, and Adelaide railway station was replaced with an imposing new building, opened in 1927. [1] This grand building has been partially taken over by the Adelaide Casino.
When the two shiploads of new locomotives arrived in 1926 they caused a sensation with the public and throughout the railway industry in Australia. The 500 class "Mountain" was over twice the size of the biggest pre-Webb engine, and was the most powerful locomotive in Australia. Henceforth double heading 5 ft 3 in (1,600 mm) broad gauge trains became a rarity in South Australia. The massive locomotives were unloaded at Port Adelaide and taken off the pier by horses (the locomotives weight alone exceeding the dock's maximum loading capacity). Apart from some initial teething problems (mainly to do with overheating bearings and rough riding due to excessive play allowed on driving axles) the new locomotives settled in nicely to their assigned positions. After the success of the original locomotives, ten more 700 class locomotives, with larger tenders, were locally built using the facilities of the new Islington Workshops. These were the 710 class. [1]
The 500 class was rated to haul 400 tons over the Mount Lofty Ranges immediately east of Adelaide, where a 19-mile (31 km) continuous 1-in-45 (2.2%) gradient faced trains heading for Victoria. Two years after their introduction, the class was modified by the addition of a booster engine which required replacement of the two-wheel trailing truck with a four-wheel truck. This altered the wheel arrangement from 4-8-2 to 4-8-4, but the term "Mountains" stuck with the locomotives. Reclassified 500B class, their maximum load to Mount Lofty was increased to 600 tons[ which? ], or eleven passenger cars. In the pre-Webb era the Rx class - a 4-6-0 with a Belpaire firebox was rated at 190 tons for this line, with three of them required to lift a heavy Melbourne Express - two at the front and one banking from the rear. [3]
The 5 ft 3 in (1,600 mm) broad gauge system was the main focus of Webb rehabilitation scheme. The 3 ft 6 in (1,067 mm) narrow gauge systems north of Terowie and on the Eyre Peninsula remained untouched, as did the 3 ft 6 in (1,067 mm) gauge South Eastern division (although it was subsequently converted to 5 ft 3 in (1,600 mm) broad gauge in the early 1950s).
Webb decided not to extend his contract in 1930 and returned to the US, having revolutionised the SAR.
In 1936, the SAR owned 365 locomotives, 51 railcars, 408 passenger carriages, 38 brake vans and 8,219 goods wagons. [4] The following year, ten 620 class 4-6-2 Pacific type locomotives, designed and built at the SAR's Islington Works – were introduced. Their axle load enabled them to traverse the many rural lines laid with 60-pound rail, but they were also usefully deployed on the East-West Express between Adelaide and Port Pirie following the extension of the broad gauge line north from Redhill to Port Pirie in 1937. [2] [ failed verification ]
Other additions to the locomotive fleet after the Depression included the 2-8-4 720 class, a further development of the 700/710 class locomotives, and the 520 class, a 4-8-4 locomotive, externally styled after the Pennsylvania Railroad T1; it had the same light axle load as the 620 class but a 30% higher tractive effort, achieving higher speeds on all mainline passenger services.
In 1949, the diesel era started, tentatively, with two Bo-Bo 350 class shunting locomotives, designed and built by Islington Works and incorporating British components. [5]
Two years later, the SAR's first mainline diesel-electric locomotives entered service: the 900 class, also designed and built by Islington Railway Workshops. Their styling closely followed that of the Alco PA diesels in the United States. Subsequently, and coincidentally, the SAR exclusively purchased American Locomotive Company products made under licence in Sydney by AE Goodwin: the 930, 830, 600 and 700 classes. In the 1950s, railcars were introduced: the 250 and 100 class "Bluebirds" for regional services and the 300 and 400 class "Red Hens" for Adelaide suburban services.
A major change occurred in 1970, when the remaining 400 kilometres (250 miles) length of the Sydney-Perth rail corridor that was not built to 1435 mm (4 ft 8+1⁄2 in) standard gauge, the Port Pirie-Broken Hill line, was gauge-converted.
In the 1972 election, the Whitlam Federal Government made a commitment to invite the states to hand over their railway systems to the federal government. The Government of South Australia took up the offer, but elected to retain the Adelaide metropolitan services, which were transferred to the State Transport Authority. Financial responsibility for the remaining services passed to the Federal Government on 1 July 1975, although the SAR continued services until operations were formally transferred on 1 March 1978 to the Australian National Railways Commission. [6]
The penultimate head of the SAR, commissioner Ron Fitch, reflecting on the end of the railway administration, wrote: "The merging of the major part of the SAR into the Australian National Railways Commission, and the remainder into the South Australian State Transport Authority, cannot but tend to consign the former state railway system into eventual oblivion. But posterity should not be allowed to forget its achievements:
|
|
|
In June 1965, Rail News was launched as a quarterly staff newsletter. [20] It was published monthly from January 1970. [21] The last edition was published in March 1973, with Keeping Track superseding it the next month. [22] [23]
Australians generally assumed in the 1850s that railways would be built by the private sector. Private companies built railways in the then colonies of Victoria, opened in 1854, and New South Wales, where the company was taken over by the government before completion in 1855, due to bankruptcy. South Australia's railways were government owned from the beginning, including a horse-drawn line opened in 1854 and a steam-powered line opened in 1856. In Victoria, the private railways were soon found not to be financially viable, and existing rail networks and their expansion were taken over by the colony. Government ownership also enabled railways to be built to promote development, even if not apparently viable in strictly financial terms. The railway systems spread from the colonial capitals, except for a few lines that hauled commodities to a rural port.
With railways, a break of gauge occurs where a line of one track gauge meets a line of a different gauge. Trains and rolling stock generally cannot run through without some form of conversion between gauges, leading to passengers having to change trains and freight requiring transloading or transshipping; this can add delays, costs, and inconvenience to travel on such a route.
The first railway in colonial South Australia was a line from the port of Goolwa on the River Murray to an ocean harbour at Port Elliot, which first operated in December 1853, before its completion in May 1854.
Rail gauges in Australia display significant variations, which has presented an extremely difficult problem for rail transport on the Australian continent since the 19th century. As of 2022, there are 11,914 kilometres (7,403 mi) of narrow-gauge railways, 18,007 kilometres (11,189 mi) of standard gauge railways and 2,685 kilometres (1,668 mi) of broad gauge railways. In the 19th century, each of the colonies of Australia adopted their own gauges.
Rail transport in Australia involves a number of narrow-gauge railways. In some states they formed the core statewide network, but in the others they were either a few government branch lines, or privately owned and operated branch lines, often for mining, logging or industrial use.
The National Railway Museum, Port Adelaide, South Australia is the largest railway museum in Australia. More than 100 major exhibits, mainly from the South Australian Railways (SAR) and Commonwealth Railways and their successor, Australian National, are displayed at its 3.5 hectares site. A very large archival collection of photographs of those railways and records created by them is also managed by the museum. The museum is operated with a large number of volunteers.
Bogie exchange is a system for operating railway wagons on two or more gauges to overcome difference in the track gauge. To perform a bogie exchange, a car is converted from one gauge to another by removing the bogies or trucks, and installing a new bogie with differently spaced wheels. It is generally limited to wagons and carriages, though the bogies on diesel locomotives can be exchanged if enough time is available.
Railways with a track gauge of 5 ft 3 in fall within the category of broad gauge railways. As of 2022, they were extant in Australia, Brazil and on the island of Ireland.
The 700 class is a class of six diesel-electric locomotives based on the Alco DL500G model, built by AE Goodwin, Auburn, New South Wales for the South Australian Railways. They are virtually identical to the New South Wales 442 class locomotive.
The South Australian Railways 600 class was a class of 4-6-2 steam locomotives operated by the South Australian Railways.
The GE U26C diesel locomotive model was introduced by GE Transportation Systems in 1971. All examples of this model are six axle units, and have the wheel arrangement C-C or Co'Co'.
The South Australian Railways W and Wx class was a class of 2-6-0 steam locomotives operated by the South Australian Railways. Some were used by the Commonwealth Railways in the Northern Territory and by contractors.
Numerous narrow-gauge railway lines were built in Oceania, most in 3 ft 6 in, 2 ft 6 in and 2 ft track gauge.
The South Australian Railways 700 class was a class of 2-8-2 steam locomotives operated by the South Australian Railways.
The South Australian Railways 710 class was a class of 2-8-2 steam locomotives operated by the South Australian Railways.
Port Pirie railway station (Mary Elie Street) was the fifth of six railway stations for passengers that operated at various times from 1876 to serve the small maritime town (later city) of Port Pirie, 216 kilometres (134 miles) by rail north of Adelaide, South Australia. As with several of Port Pirie's other stations before it, the station was built to accommodate a change of track gauge on railway lines leading into the town.
The first South Australian Railways I class locomotive was built by Neilson and Company, Scotland for the Canterbury Provincial Railways, New Zealand in 1873 and numbered 9. In May 1878, the South Australian Railways (SAR) purchased it. The ship that transported it to South Australia was wrecked, but the locomotive was salvaged and entered service on the SAR in April 1879 as number 38. In 1880 or 1881, it was renumbered 48. It was allocated to "I" class – which was ultimately to be known as the "first I class" – in 1887 or 1888. In October 1905, the SAR withdrew it from service, then sold it in May 1906 to the South Australian Harbours Board for use in the construction of the Outer Harbour breakwater. It was scrapped in August 1909.
Eighteen South Australian Railways K class (broad-gauge) locomotives were built by Beyer, Peacock and Company for the South Australian Railways (SAR) between 1878 and 1884. Despite having a fundamental design flaw that affected their original role as light-line passenger locomotives, they eventually performed shunting duties exclusively. They operated for six decades.
The South Australian Railways O Class (2nd) locomotive was a 4-4-0WT built by Robert Stephenson and Company in 1868 for the Launceston and Western Railway Company. It entered service with the South Australian Railways in 1912 and was cut up in 1930.
The South Australian Railways K class (narrow gauge) comprised a single locomotive. The design, by South Australian Railways Locomotive Engineer William Thow, was very similar to that of the broad-gauge K class, but it was smaller and lighter. It was allocated number 52 within the sequence allocated to the larger locomotives.