Symphony | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Massachusetts Avenue at Huntington Avenue Boston, Massachusetts | ||||||||||
Coordinates | 42°20′34″N71°05′06″W / 42.34278°N 71.08500°W | ||||||||||
Line(s) | Huntington Avenue subway | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections | MBTA bus: 1, 39 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
History | |||||||||||
Opened | February 16, 1941 [1] | ||||||||||
Passengers | |||||||||||
FY2019 | 1,646 boardings (weekday average) [2] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Symphony station is an underground light rail station in Boston, Massachusetts on the E branch of the MBTA Green Line. It is located at the intersection of Massachusetts Avenue and Huntington Avenue. Symphony is the outermost underground station on the E branch; after leaving Symphony, outbound trains emerge onto the surface and continue down the median of Huntington Avenue. Symphony station is named after the nearby Symphony Hall.
The station is not accessible. Utility work for accessibility renovations began in 2023, with station reconstruction work to last from 2024 to 2026.
The station opened February 16, 1941 as part of the Huntington Avenue tunnel, which was a Works Progress Administration project that eliminated streetcars from Boylston Street and Copley Square in order to ease congestion. The tunnel ran from just west of Copley to just east of Opera Place, with intermediate stations near the major performance halls at Mechanics and Symphony. [1]
Unusually for subway stations, the inbound and outbound tracks of the station are widely separated. The Huntington Avenue underpass was constructed at the same time as the station, with lanes for motor vehicles passing under Massachusetts Avenue at track level between the inbound and outbound platforms of the station. A sub-passage connected the two platforms; it was sealed off in the early 1960s when the MTA converted the station to no longer need employees present. Each platform had two entrance/exit stairways on opposite sides of Massachusetts Avenue, each of which split into a pair of stairways to street level. [3]
In August 1978, the MBTA board authorized $91,750 for new glass entrance shelters for the station. [4] Around that time, as part of the construction of the Symphony Plaza Towers, the stairways serving the inbound side were realigned, with each stairway from the station connecting to a single angled surface stairway rather than the original two.
From January 3, 1981 to June 1982, the station was closed due to budget cuts. [1] [5] Moderate renovations were performed to the station in the early 1990s which included new tiling and improved lighting.
Since their construction, Symphony and Prudential were the only two underground stops on the Green Line where riders paid upon boarding the train rather than when entering the station.[ citation needed ] In May 2006, the MBTA installed the CharlieCard electronic fare collection system at the two stations, making them fare-controlled like the rest of the system. Passengers now pay with their CharlieCard or CharlieTicket at platform level when entering the station, and can board at any door to the train.[ citation needed ]
Symphony is one of a small number of MBTA subway stations - along with Bowdoin, Hynes Convention Center, and Boylston - which are not accessible. Renovations are planned as part of the Light Rail Accessibility Project which would make Symphony station fully accessible. The renovations will include two elevators to each platform, platform modifications, and changes to other station elements to meet Americans with Disabilities Act of 1990 specifications. Planning proved difficult due to the number of historic structures in the area, as well as utility and code issues. Design reached 15% (conceptual) level in September 2011. [6]
Plans presented in July 2017 added emergency exits and restrooms as well as the accessibility renovations. [7] The MBTA issued a $6 million design contract in August 2019. [8] Design reached 75% in March 2021; station design was completed in early 2022, with utility design completed midyear. [9] [10] The project was split into two construction phases in 2022. Utility work was bid in August–September 2022. [11] In December 2022, the MBTA was awarded a $66.6 million Federal Transit Administration grant to fund the renovations. [12] [13]
Utility relocation work began in April 2023, with station work expected to begin a year later and last into 2026. [14] In June 2024, the MBTA reported that "[b]ids received far exceeded the estimated project cost and allocated budget", forcing re-evaluation of the project. [15]
The Green Line is a semi-metro system run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts, metropolitan area. It is the oldest MBTA subway line, and with tunnel sections dating from 1897, the oldest subway in North America. It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 137,700 in 2019, it is the third-most heavily used light rail system in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of the Emerald Necklace of Boston.
Park Street station is an MBTA subway station in Boston, Massachusetts. It is located at the intersection of Park Street and Tremont Street at the eastern edge of Boston Common in Downtown Boston. One of the two oldest stations on the "T", and part of the oldest subway line in the United States, Park Street is the transfer point between the Green and Red lines, as one of the quartet of "hub stations" on the MBTA subway system. Park Street is the fifth-busiest station in the MBTA network, with an average of 16,571 entries each weekday in FY2019.
Kenmore station is an underground light rail station on the MBTA Green Line, located under Kenmore Square in the Fenway/Kenmore neighborhood of Boston, Massachusetts, United States. It is served by the B, C, and D branches of the Green Line. The station has two island platforms, one for each direction. Kenmore is the primary station for Fenway Park, which is 1,000 feet (300 m) to the south. The station opened on October 23, 1932 as a one-station extension of the Boylston Street subway to relieve congestion in the square. It was renovated for accessibility in 2050–2010.
Central station is a Massachusetts Bay Transportation Authority (MBTA) rapid transit station in Cambridge, Massachusetts. It serves the Red Line and has a street-level terminal for the MBTA bus system. It is located at the intersection of Massachusetts Avenue with Western Avenue, Prospect Street, and Magazine Street at Central Square.
Longwood Medical Area station is a light rail stop on the MBTA Green Line E branch, located in the Mission Hill neighborhood of Boston, Massachusetts. It is named for the adjacent Longwood Medical Area.
Brigham Circle station is a station on the light rail MBTA Green Line "E" branch, located just east of Brigham Circle in the Mission Hill neighborhood of Boston, Massachusetts. With raised platforms installed in a 2001-03 renovation, the station is accessible when served by low-floor streetcars.
Northeastern University station is a surface-level trolley stop on the MBTA Green Line. It is located in a dedicated median along Huntington Avenue in Boston, between Opera Place and Forsyth Street, and is adjacent to the Krentzman Quad on the campus of Northeastern University. It is the first surface-level stop going outbound along the Green Line E branch; trolleys rise from a portal located between Opera Place and Gainsborough Street and continue along the surface down Huntington Avenue towards Mission Hill.
Oak Grove station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in the northern section of Malden, Massachusetts, just south of the Melrose border. It is the northern terminus of the rapid transit Orange Line and a stop on the Haverhill Line commuter rail service. The accessible station has a 788-space park and ride lot and is served by three MBTA bus routes.
Heath Street station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station in Boston, Massachusetts. It is the southwestern terminus of the Green Line E branch. It is located at the intersection of South Huntington Avenue and Heath Street on the border between the Mission Hill and Jamaica Plain neighborhoods.
Hynes Convention Center station is an underground light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line. It is located at the intersection of Newbury Street and Massachusetts Avenue near the western end of the Back Bay neighborhood of Boston, Massachusetts. The station is named for the Hynes Convention Center, which is located about 700 feet (210 m) to the east along Boylston Street. It has two side platforms serving the two tracks of the Boylston Street subway, which are used by the Green Line B branch, C branch, and D branch. The main entrance to the station from Massachusetts Avenue leads to a fare lobby under the 360 Newbury Street building.
Ashmont station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station located at Peabody Square in the Dorchester neighborhood of Boston, Massachusetts. It is the southern terminus of the Ashmont branch of the rapid transit Red Line, the northern terminus of the connecting light rail Ashmont–Mattapan High-Speed Line, and a major terminal for MBTA bus service. Ashmont has two side platforms serving the below-grade Red Line and a single side platform on an elevated balloon loop for the Mattapan Line. The station is fully accessible for all modes.
Arlington station is an underground light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line located at the southwest corner of the Boston Public Garden at the corner of Arlington and Boylston Streets at the east end of the Back Bay neighborhood of Boston, Massachusetts. Arlington station was not included in the original construction of the Boylston Street subway, which opened in 1914. Its construction was delayed by World War I, and the station ultimately opened in 1921.
Museum of Fine Arts is a surface-level light rail stop on the MBTA Green Line E branch, located the median of Huntington Avenue in Boston, Massachusetts, between Museum Road and Ruggles Street. The station is named after the adjacent Museum of Fine Arts, although it also provides access to Northeastern University, Wentworth Institute of Technology, and the Isabella Stewart Gardner Museum. Museum of Fine Arts station is accessible.
Bowdoin station is a Massachusetts Bay Transportation Authority (MBTA) rapid transit station in Bowdoin Square in Boston, Massachusetts. The station is the downtown terminus of the Blue Line, part of the MBTA subway system. It has a single wedge-shaped island platform located inside a balloon loop. Bowdoin is the only Blue Line station that is not accessible.
Copley station is an underground light rail station on the MBTA Green Line, located in the Back Bay section of Boston, Massachusetts. Located in and named after Copley Square, the station has entrances and exits along Boylston Street and Dartmouth Street.
Waban station is a surface-level light rail station on the Massachusetts Bay Transportation Authority's Green Line D branch, located just south of Beacon Street at Waban Square in the Waban section of Newton, Massachusetts. The station is located below grade; access to both platforms is via Wyman Street on the outbound side of the tracks or a stairway from Beacon Street. Waban is not accessible.
Chinatown station is a rapid transit station on the Massachusetts Bay Transportation Authority (MBTA) Orange Line, located at the edge of the Chinatown neighborhood in the downtown core of Boston, Massachusetts. The station has two offset side platforms, which run under Washington Street from Hayward Place to Lagrange Street. The three entrances are located at the intersection of Washington Street with Essex and Boylston streets. Like all Orange Line stations, both the subway platforms and all bus connections are fully accessible.
Eliot station is a light rail station on the MBTA Green Line D branch located just north of Route 9 between the Newton Highlands and Newton Upper Falls villages of Newton, Massachusetts. The station has a parking lot at the end of Lincoln Street, a pedestrian entrance from Meredith Avenue, and pedestrian entrances from both sides of Route 9. A footbridge, built in 1977, crosses Route 9 adjacent to the railroad bridge.
Newton Highlands station is a surface-level light rail station located in Newton, Massachusetts on the Green Line D branch of the Massachusetts Bay Transportation Authority.
Four Corners/Geneva station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Fairmount Line. It is located in the Mount Bowdoin section of the Dorchester neighborhood. The new station was being built as part of the Fairmount Line Improvement Project, which included four new stations as well as infrastructure upgrades. It has two full-length high-level platforms with walkways connecting them to Washington Street and Geneva Avenue. Four Corners/Geneva Ave opened on July 1, 2013, along with Newmarket.