Water resources management in Nicaragua [1] | |
---|---|
Withdrawals by sector 2000 |
|
Renewable water resources | 189.7 km3 (45.5 cu mi) |
Surface water produced internally | 192.6 km3 (46.2 cu mi) |
Groundwater recharge | 59 km3 (14 cu mi) |
Overlap shared by surface water and groundwater | 55 km3 (13 cu mi) |
Renewable water resources per capita | 34,692 m3/a (1,225,100 cu ft/a) |
Wetland designated as Ramsar sites | 405,691 ha (1,002,480 acres) |
Hydropower generation | 10% |
Water resources management in Nicaragua is carried out by the National water utility and regulated by the Nicaraguan Institute of water. Nicaragua has ample water supplies in rivers, groundwater, lagoons, and significant rainfall. Distribution of rainfall is uneven though with more rain falling on an annual basis in the Caribbean lowlands and much lower amounts falling in the inland areas. Significant water resources management challenges include contaminated surface water from untreated domestic and industrial wastewater, and poor overall management of the available water resources.
The legal framework has historically been fundamentally flawed by a lack of specific water laws and regulations with numerous agencies sharing management duties. There was a 1998 reform aimed a specifying management roles for each of the management institutions and a National Water Law was approved in 2007 that focuses on water resources and regulates water use of different sectors.
Although water covers ten percent of Nicaragua's surface, environmental degradation, pollution, and simple scarcity in some regions threaten the country's ability to provide potable water to sustain its population and productivity. Today, nearly a third of Nicaraguans do not have access to potable water. In rural areas, where 72% of people lack such access, citizens must often procure their water from shallow wells, rivers, streams, and lakes that are polluted with residential sewage, pesticides, and industrial toxins. Although 93% of urban residents can claim to have either legal or illegal water connections, cities are subject to frequent water outages, particularly during the dry season. [2]
Many of the problems in water management were due to the lack of a national water sector and national water law before the passing of such a law in 2007. Lack of technical capacity and inconsistent leadership of water resource management institutions is a significant and ongoing challenge. [3]
Deforestation, with its devastating environmental consequences, is a serious problem. Deforestation accelerates soil erosion, decreases the amount of recharge to aquifers by increasing surface runoff, damages barrier reefs and ecosystems, increases turbidity which affects mangroves, decreases agricultural production, and causes increased maintenance of water infrastructure. Decades of land abuse and environmental neglect exacerbated the devastation of Hurricane Mitch (1998), where deforestation played a major role. [3]
The nexus between competing demands such as irrigation, navigation, and hydroelectric potential has created management challenges and conflicts between these sectors. Conflicts with water use are one of barriers whenever a plan for hydroelectric power or construction of an inter-oceanic canal is presented. This point is especially poignant since between 300 and 400 m3/s of the existing river flow is already used to meet the requirements for potable water and irrigation of suitable farmland in the Pacific Region of Nicaragua. [4]
There are 742,000 hectares (1,830,000 acres) of land suitable for irrigation in León-Chinandega plain. However, a proposed plan to irrigate this land would appropriate yet more water from Lake Colcibolca and further reduce its ability to supply enough water for navigation and existing irrigation projects in the surrounding region. [4]
Other aspects to be considered with this idea are the adverse effects on aquatic life of the San Juan River, lakes Managua and Colcibolca, the existing flora and fauna in the area that would be flooded by a proposed dam in the plan, and the environmental impact of the dam construction and all of the other related works. There is a conflict in the use of water for this irrigation project because the more area that is irrigated, the less water that is available for power generation and drinking water supply. [4]
Dating back two hundred years, there have been disputes over the management and usage of the San Juan River forming a border between Nicaragua and Costa Rica. The San Juan River has also long been thought by both countries as offering the promise for another canal route across Central America. This was the case when the Panama Canal site was chosen rather than the San Juan River as the ultimate ship navigation route across the Americas. [5]
The conflict between Nicaragua and Costa Rica continues. The Nicaraguan government announced in August 2009 that it will begin construction at the end of September 2009 to reroute the San Juan River. The head of the committee for development of the San Juan River in Nicaragua said that the $1 million project is intended to "recover the 1,700 cubic meters per second of water that was lost after Costa Rica rerouted it toward its Colorado River between 1945 and 1950." [5]
Costa Rica responded, issuing a statement that said a ruling by an international court "forcefully denies Nicaragua's wish to dredge a new route on the San Juan River." In July 2009, the United Nations’ International Court of Justice (ICJ) unanimously reaffirmed Nicaragua's sovereignty over the river and upheld the ban that does not allow Costa Rican police and military forces to use the river. Nicaragua's exclusive sovereignty over the San Juan River was established in 1858 with the Cañas-Jerez treaty. [5]
According to the 151-year-old Cañas-Jerez treaty, the San Juan River is fully Nicaraguan property. Costa Rica can use the river freely for transport, without any restrictions from its neighbouring country. Costa Rica says Nicaragua is reneging on its obligations by requiring visas and forcing Costa Rican boats to stop for military inspection on the northern bank. All passengers are made to pay a $5 fee and every boat must fly the Nicaraguan flag. Nicaragua also banned commercial fishing by Costa Rican fisherman in retribution of Costa Rica initiating the ICJ suit in 2005. [6]
San Juan River | |
---|---|
The wet or rainy season in Nicaragua lasts from May until October, while December through April is dry. Average rainfall in the country is about 80 inches per year. The Pacific region which covers the Pacific rim and portions of the San Juan River receive lower mean rainfall totals ranging between 40 and 60 inches per year. [3]
Groundwater is abundant and the capital city of Managua is completely supplied by subterranean resources including 'lagoons' or water that has infiltrated through Volcano craters. The Atlantic and Caribbean sloping lowlands receive between 100 and 255 inches of rainfall per year making stormwater runoff and flooding a considerable challenge. [3]
The availability of surface water varies markedly from east to west. The eastern Atlantic sloping side has water basins covering 15,000 km2, many flowing rivers and abundant water resources overall. Thirteen major watersheds discharge into the Atlantic from this side accounting for 91% of the land area. By contrast, the Pacific slope on the western side of the country has water basins covering only 4,000 km2, rivers less than 20 km in length and with lower flows. There are eight watersheds that account for 9% of the land area and drain to the Pacific Ocean. [7]
Annual internal renewable water resources stand at 189.7 km3 while also featuring 6.9 km3 of annually shared water from the San Juan River which forms the border with Costa Rica. Because water has been so abundant and demand is low, there are no treaties for joint utilization. The Cañas-Jerez treaty of 1858 however, established Nicaragua's sovereignty over the San Juan River and has sparked conflict between Nicaragua and Costa Rica over many years.
The potential of abundant groundwater is much greater on the Pacific side and relatively lower in the Central and Atlantic regions. On the Pacific side, permeable volcanic soil favors water infiltration and the formation of aquifers or "lagoons" with great output potential. In an average year, 42 km3 of water infiltrates these aquifers, and 16 km3/year can be easily exploited for use. [7]
Lake Nicaragua | |
---|---|
Coordinates | 11°37′N85°21′W / 11.617°N 85.350°W |
Primary outflows | San Juan River |
Catchment area | 23,844 km2 (9,206 sq mi) |
Basin countries | Nicaragua |
Surface area | 8,264 km2 (3,191 sq mi) |
Max. depth | 26 m (85 ft) |
Water volume | 108.00 km3 (87,560,000 acre⋅ft) |
Surface elevation | 32 m (105 ft) |
Islands | 400+ (Ometepe, Zapatera, Solentiname) |
Nicaragua's wealth of surfacewater is located in the two largest lakes in Central America. Lake Managua or "Xolotlán" is 1,052.9 km2 and is 37.8 meters above sea level and is quite contaminated. The other lake is the very large Lake Nicaragua or Cocibolca and has an area of 8,143.7 km2. Lake Colcibolca occupies the middle section of the tectonic valley shared with two other watersheds: Lake Xolotlán at upper and the San Juan River. This area forms the largest international drainage basin in Central America, with a total area of 41,600 km2, of which 70% or 29,000 km2 are in Nicaraguan territory and 12,600 or 30% in Costa Rica. [8]
Because these two lakes are so big, approximately 3,000 mm (120 in) of water is lost to evaporation each year. Additionally, there are 18 other lakes with nine of those in the Pacific region, another five in the Central region and four in the Atlantic region. There are four reservoirs: three are for hydroelectric purposes and one is for irrigation and fish farming. [7]
Water quality in Nicaragua was monitored from 1971 to 1986. Due to economics, the monitoring ceased in 1986. Since then, the only information available on water quality is obtained from site-specific studies. It has been recommended that an environmental water monitoring system be established for the purpose of monitoring water quality.
Much of the research and data on water quality in Nicaragua is focused on the health and condition of Lake Colicbolca and the San Juan River. This is due to their importance for Nicaragua in terms of water supply, navigation and transportation, hydroelectric potential, and irrigation. Sedimentation, damaging navigation, and untreated wastewater have transformed Lake Colibolca and the San Juan River into highly contaminated waterways and pose a significant challenge to those making efforts to reverse the pollution.
Agricultural practices such as burning of vegetation and stover in the sloping regions around Lake Colcibolca have resulted in significant sedimentation of the lake. The sediments flowing into the lake are volcanic and become clay when introduced with water forming an impermeable layer of sediment throughout the lake. Navigation on the San Juan River and in Lake Nicaragua are affected by the progressive sedimentation of both water bodies. Navigation is also an important source of pollution of the water resources, due to the fact that boats are washed and serviced in both water bodies. [4]
The waterbodies have therefore become depositaries of hydrocarbon residue, agricultural chemicals, basic grains, and excrement from farm and domesticated animals that are transported on these bodies of water. Untreated municipal and industrial wastewater poses a threat to water quality as well. Most of the population discharges its used water in riverbeds, streams, or directly in the lake with no prior treatment. The quality of water in those bodies of water has noticeably deteriorated. [4]
According to statistics from the Food and Agriculture Organization of the United Nations (FAO), national water coverage of potable water was 63% in 2000. Total annual water withdrawals are approximately 248 m3 with 83% of extracted water being used and/or appropriated for agriculture. Non-revenue water losses are also high, whereby more than half of the water is lost due to leaks and broken pipes. Domestic water use is around 14% and the industry sector uses just over 2% of the water. [7]
The private sector began irrigating in 1950 in the lowland plains of the Pacific region of Nicaragua where banana and sugar cane plantations are prevalent. From 1980, the state sponsored irrigation development in favor of cooperatives and large organized groups of farmers. Subsidies were in place to cover the full cost of construction, purchasing of equipment, and operation and maintenance of irrigation systems. They introduced spray irrigation systems and by 1985, the area with installed irrigation infrastructure increased to 82,000 ha. [7]
In 1990, irrigated area reached a maximum of 93,000 ha; corresponding to 49,000 ha managed by the private sector and 44,000 ha by the public sector. The majority of irrigated surface area is located in the Pacific region (76%) and 24% in the central region. In 1990, the Government eliminated subsidies and liberated the price of energy. When combined with inefficient equipment, the cost of irrigating increased beyond the point at which farmers could maintain their systems. Consequently, systems were abandoned and then deteriorated. As a result, irrigated area decreased to just 23,000 ha using only surface water to irrigate traditional crops such as banana, sugarcane, and rice. [7]
Despite efforts, a government institution responsible for the activities of irrigation has not been established. There are no irrigation districts in the country either. A study was carried out in 1985 for the irrigation development in the Pacific region and suggested the creation of 14 irrigation districts; however, these suggestions were not implemented. The state does respond to requests from the private sector for investment into the irrigation sector by selecting projects of small and medium producers for financing through the Institute for Rural Development. [7]
Drainage problems are isolated in an area north of the Pacific region where issues of salinity of the soil exist; however, it is not believed there is a great risk to the land under irrigation here. FAO reports that there are no statistics on work carried out in the field of drainage. It is known however, that land in the Central region's Sébaco Valley has been recovered using surface drains and ongoing cleaning of natural drains. The Atlantic region is prone to flooding, therefore, both adequate surface and underground drainage is required. It is estimated that 350,000 ha in Nicaragua require proper drainage. [7]
Table: Potential irrigated area in both the medium and long term and area under irrigation in each Department.
Department | Irrigable area: long term (ha) | Irrigable area: medium term (ha) | Irrigable area with infrastructure (ha) | Irrigated area (ha) |
---|---|---|---|---|
Chinandega-N | 1,175 | 1,175 | 1,175 | 1,175 |
Chinandega-s | 90,000 | 24,609 | 24,609 | 20,591 |
Leon | 20,000 | 3,120 | 3,120 | 2,567 |
Rivas | 3,000 | 50 | 20 | 20 |
Managua-Rivas | 20,000 | 20,200 | 6,200 | 5,106 |
Managua | 15,000 | 2,350 | 350 | 350 |
León-Managua | 7,000 | 2,150 | 2,150 | 1,688 |
Matagalpa | 15,000 | 12,000 | 8,700 | 6,090 |
Chontales | 80,000 | 23,000 | 11,750 | 10,250 |
Río San Juan | 20,000 | 2,097 | 2,097 | 2,097 |
Estelí | 2,000 | 1,194 | 1,194 | 1,194 |
Total | 273,175 | 91,945 | 61,365 | 51,128 |
Source: FAO 1998
Management of stormwater drainage is major challenge for the Alcaldia of Managua. Sedimentation and the accumulation of solid waste in the conveyance channels are also a constant concern. Investments in environmental protection and stormwater drainage works have been concentrated in one of the eight subwatersheds of the Southern Watershed, where most of the population and the majority of private investment have historically been concentrated. "Subwatershed II" is located entirely within the territory of Managua. Another important subwatershed serving Managua covers 178 km2. It is the most important recharge area of the aquifer that provides drinking water to Managua, with three wellfields producing 60% of the city's water supply. [9]
Urban growth has developed without the use of urban planning instruments and adequate building standards, and without a corresponding increase in municipal services or an extension of the stormwater drainage system, which impacts the ecological regeneration of the subwatershed and the percolation of rainwater into the Managua aquifer. The sediment and solid waste conveyed through the drainage system exposes the lower areas to floods in the rainy season. Additionally, the absence of basic services in the informal settlements causes wastewater to enter the stormwater system. [9]
Excerpts drawn from Electricity sector in Nicaragua
Hydroelectric plants account for about 10% of the electricity produced in Nicaragua. The public company Hidrogesa owns and operates the two existing plants Centroamérica and Santa Bárbara both of which generate 50 MW.
Nicaragua is a net importer of petroleum and its overdependence on oil products for the generation of electricity has created a long-standing energy crisis. In response, there are now plans for the construction of new hydroelectric plants. In 2006 the Central American Bank for Economic Integration (BCIE) and the Government reached an agreement by which the BCIE will provide US$120 million in the next five years (2007–2012) in order to finance the following hydroelectric projects:
Business News Americas reported in the first weeks of 2010 that Nicaragua's government did indeed sign the financing agreement with BCIE for development of the Larreynaga hydroelectric project. The bank will provide up to US$22.9 million, which will supplement the US$36.7 million originally approved for the 17-MW project. The project is located in Jinotega Province about 160 kilometers north of Managua. Spain's Cobra engineering and construction firm began construction of the project in 2009, however, the plant will be operated by state power firm Enel. Project officials have said that Larreynaga will increase the country's physical generation by 2.8 percent and installed capacity by 3.4 percent. [10]
In March 2008 the government of Iran approved a US$230 million credit for the construction of a 70MW hydropower plant by the name of Bodoke on the Tuma River in the northern department of Jinotega. According to press reports the project will be carried out by a state-owned Iranian company with financing from the Iranian Export Bank under an agreement with the Nicaraguan Ministry of Energy and Mines. [11]
The existing legal framework is inadequate and a lack of consistent institutional capacity does not favor or precipitate the ongoing development of water resources. The National Constitution established the State with responsibility and obligation to regulate the handling of natural resources. The Civil Code recognizes water resources as a public good and this is subject to the rules that also govern the private ownership of land. The Code states that the consumption of water for irrigation purposes is not regulated and the extraction of groundwater is free. The last water bill was presented to the National Assembly for approval in the working agenda in 1999. That proposal introduced the concepts of integrated water resources management (IWRM) and the creation of The Water Authority (ADAGUA). [7]
There is also a lack of good water rights that govern the use of water resulting in confusion about what body or individual has the right to use a particular water resource. Institutions are state agencies and whenever the political atmosphere and leadership change, so does the leadership of the institutions. This constant turnover in leadership does not lend itself to successful management of water resources institutions.
The World Health Organization (WHO) reported that user fees in urban centers of Nicaragua were increased annually by ENACAL between 1998 and 2001. Fee increases ranged from 12% to 28%. The fee increases strengthened the finances of ENACAL; however, they also led to civil protests and legal action against a proposed 30% increase for the year 2002. Fees were frozen until 2008 nearly leading ENACAL into bankruptcy. To compensate, the Government of Nicaragua has transferred approximately US$100 million to ENACAL since 2005.
The Ramsar Convention on Wetlands came into force for Nicaragua on November 30, 1997. Nicaragua presently has 8 sites designated as wetlands of international importance, with a total surface area of 405,691 hectares (1,002,480 acres). [24] The wetlands of Nicaragua protect coastal communities from flooding and provide bountiful supplies of fish and beautiful freshwater.
Ramsar wetland sites: [25]
It has been proved that climate change will affect Nicaragua sooner rather than later due to its geographic location in the traditional path of strong Atlantic tropical storms and hurricanes. Planning efforts in Nicaragua are directed towards adapting to wider climate variability including stronger storms in some years and more severe droughts in others, and higher temperatures that will provoke increased evaporation. This will lead to even drier years than the Nicaraguan agriculture had already suffered in past decades. Moreover, there is a high deforestation rate in Nicaragua that makes the country even more vulnerable to climate change induced flooding and landslides. [26]
Climate change predictions by the Ministry of National Resources and the Environment in Nicaragua indicate that within this century rainfall will decline by an average of 30%, and temperatures rise by 1-2o C. These changes could effectively eliminate coffee production in the northern pacific slope highlands of Segovias, the highest quality coffee in Nicaragua. Over the past four years the El Niño/La Niña climate cycles have increased infrequency. Cycles having alternated from one year to the next; 2004 and 2006 were low rainfall El Niño years, 2006 having historically low rainfall, while 2005 and 2007 were very high rainfall La Niña years. [27]
The Nicaragua project of the One Drop foundation focuses on the Estelí region which is located in the Dry Tropic Zone. The Estelí region is located in the north of Nicaragua and home to 5.5 million people. The area experiences sporadic and intermittent rainfall. This, coupled with a decade-long civil war that destroyed basic infrastructure, resulted in the people living there having little access to safe water. [28] The Nicaragua project (2006–2010) directly impacts 1,200 families and will ultimately benefit approximately 10,000 men, women and children. [29]
Technical and Material Contributions
Energy-efficient stoves: 1,200/1,200
Family Gardens: 1,200/1,200
Grey water filters: 1,230/1,230
Hen houses: 1,200/1,200
Potable water filters: 1,350/1,350
Rehabilitated water wells: 90/90
SchoolGardens: 30/30
Water reservoirs: 120/120
Social Arts and Popular Education
Community activities led: 18/18
Educational and artistic workshops: 281/281
Multidisciplinary touring shows: 202/130
Microfinance
Number of recipients: 1,350 families [30]
Nicaragua is a country in Central America, bordering both the Caribbean Sea and the North Pacific Ocean, between Costa Rica and Honduras. Nicaragua is the largest country in Central America in square kilometers.
Nicaragua is a country in Central America with constitutional democracy with executive, legislative, judicial, and electoral branches of government. The President of Nicaragua is both head of state and head of government. Executive power is exercised by the government.
Drinking water supply and sanitation coverage in Honduras has increased significantly in the last decades. However, the sector is still characterized by poor service quality and poor efficiency in many places. Coverage gaps still remain, particularly in rural areas.
Drinking water and sanitation in Nicaragua are provided by a national public utility in urban areas and water committees in rural areas. Despite relatively high levels of investment, access to drinking water in urban areas has barely kept up with population growth, access to urban sanitation has actually declined and service quality remains poor. However, a substantial increase in access to water supply and sanitation has been reached in rural areas.
Territorial disputes of Nicaragua include the territorial dispute with Colombia over the Archipelago of San Andrés, Providencia and Santa Catalina and Quita Sueño Bank. Nicaragua also has a maritime boundary dispute with Honduras in the Caribbean Sea and a boundary dispute over the Rio San Juan with Costa Rica.
Costa Rica has made significant progress in the past decade in expanding access to water supply and sanitation, but the sector faces key challenges in low sanitation connections, poor service quality, and low cost recovery.
The Dominican Republic has achieved impressive increases in access to water supply and sanitation over the past two decades. However, the quality of water supply and sanitation services remains poor, despite the country's high economic growth during the 1990s.
While Peru accounts for about four per cent of the world's annual renewable water resources, over 98% of its water is available east of the Andes, in the Amazon region. The coastal area of Peru, with most of economic activities and more than half of the population, receives only 1.8% of the national freshwater renewable water resources. Economic and population growth are taking an increasing toll on water resources quantity and quality, especially in the coastal area of Peru.
Water resources management (WRM) in Honduras is a work in progress and at times has advanced; however, unstable investment and political climates, strong weather phenomena, poverty, lack of adequate capacity, and deficient infrastructures have and will continue to challenge developments to water resource management. The State of Honduras is working on a new General Water Law to replace the 1927 Law on Using National Waters and designed to regulate water use and management. The new water law will also create a Water Authority, and the National Council of Water Resources which will serve as an advising and consultative body.
The Choluteca river basin lies on the hot and dry southern Pacific coast of Honduras, and is bordered by Nicaragua to the east. The name Choluteca, thought to mean ‘broad valley,’ originates from the indigenous Chorotega tribe who inhabited the region prior to Spanish conquest. The Choluteca river and its tributaries together form the Cabeceras catchment located in southern Honduras where it stretches over four administrative departments covering 7,848 km2 and drains into the Pacific Ocean. The Choluteca river basin provides water to the capital city of Tegucigalpa with population around 1 million inhabitants.
Water resources management (WRM) functions in Argentina are handled by multiple institutions operating at the national, provincial, and river basin level, with a variety of functions and jurisdictions. On the national level, the National Institute for Water and the Environment (INA) and the National Water and Sanitation Utility (AySA) are charged with the duties of researching, water resources preservation, developing services, and implementing water projects.
Urban water management in Bogotá, a metropolitan area of more than 8 million inhabitants, faces three main challenges: improving the quality of the highly polluted Bogotá River, controlling floods and revitalizing riparian areas along the river. The main public entities in charge of water resources management in Bogotá are the district government, the regional environmental agency Corporación Autónoma Regional (CAR) of the department of Cundinamarca, and the water and sanitation utility Empresa de Acueducto y Alcantarillado de Bogotá (EAAB). A court mandated that these entities cooperate to improve the river's quality, a ruling that translated into an agreement signed in 2007 that defined the responsibilities of each entity and forced them to approach the water management challenges in an integrated way. The agreement prepared the ground for the expansion of the Salitre wastewater treatment plant, construction of a new one, widening and protecting of riparian zones, restoring the natural meander of the river, and hydraulically connecting the river to its flood plains. These measures are supported by the World Bank and the Inter-American Development Bank.
Costa Rica is divided into three major drainage basins encompassing 34 watersheds with numerous rivers and tributaries, one major lake used for hydroelectric generation, and two major aquifers that serve to store 90% of the municipal, industrial, and agricultural water supply needs of Costa Rica. Agriculture is the largest water user demanding around 53% of total supplies while the sector contributes 6.5% to the Costa Rica GDP. About a fifth of land under cultivation is being irrigated by surface water. Hydroelectric power generation makes up a significant portion of electricity usage in Costa Rica and much of this comes from the Arenal dam.
Water resources management in El Salvador is characterized by difficulties in addressing severe water pollution throughout much of the country's surface waters due to untreated discharges of agricultural, domestic and industrial run off. The river that drains the capital city of San Salvador is considered to be polluted beyond the capability of most treatment procedures.
The management of Jamaica's freshwater resources is primarily the domain and responsibility of the National Water Commission (NWC). The duties of providing service and water infrastructure maintenance for rural communities across Jamaica are shared with the Parish Councils. Where possible efficiencies have been identified, the NWC has outsourced various operations to the private sector.
Guatemala faces substantial resource and institutional challenges in successfully managing its national water resources. Deforestation is increasing as the global demand for timber exerts pressure on the forests of Guatemala. Soil erosion, runoff, and sedimentation of surface water is a result of deforestation from development of urban centers, agriculture needs, and conflicting land and water use planning. Sectors within industry are also growing and the prevalence of untreated effluents entering waterways and aquifers has grown alongside.
Water resources management in Belize is carried out by the Water and Sewerage Authority (WASA) in most cases. One of the primary challenges the country is facing with regard to water resources management, however, is the lack of coordinated and comprehensive policies and institutions. Furthermore, there are various areas of water management that are not well addressed at all such as groundwater data and provision of supply. Data on irrigation and drainage is not adequately available either. Demand on water resources is growing as the population increases, new economic opportunities are created, and the agriculture sector expands. This increased demand is placing new threats on the quality and quantity of freshwater resources. Other constant challenge for management entities are the constant threat of floods from tropical storms and hurricanes. The Belize National Emergency Management Organization (NEMO) is charged with flood management as they occur but it is unclear what institution has responsibility for stormwater infrastructures.
The Nicaragua–Costa Rica San Juan River border dispute was a series of periodical conflicts between the Costa Rica and Nicaragua over the correct delimitation of their common border at its east-end, and the interpretation of the navigation rights on the San Juan River established in the Cañas-Jerez Treaty of 1858.
The Costa Rica–Nicaragua border is the 309 kilometres (192 mi) long international border, extending east–west, between the Caribbean Sea (E) and the Pacific Ocean (W) it separates the northern part of Costa Rica from the Southern part of Nicaragua. It passes near Lake Nicaragua. The southern bank of the River San Juan lies on the border for much of its length.
{{cite web}}
: |author=
has generic name (help){{cite web}}
: |author=
has generic name (help)