Charing Cross (District line) tube crash

Last updated

Charing Cross (District Line) tube crash
Details
Date17 May 1938
09:55
Locationbetween Charing Cross and Temple stations.
CountryUnited Kingdom
Line District line
Operator London Passenger Transport Board
Incident typerear-end collision
Cause Wrong-side failure caused by inadequate maintenance.
Statistics
Trains2
Deaths6
Injured46
List of UK rail accidents by year

The Charing Cross (District line) tube crash occurred on 17 May 1938 at about 09:55 hours, between Charing Cross (now Embankment) and Temple stations. Six people were killed when a Circle line service ran into the rear of a District line service held at an automatic signal. A wiring error had caused the preceding signal to incorrectly display a green aspect.

Contents

Preliminary events

The track circuits connected to the signal cabin at Charing Cross had been converted to alternating current on the morning of 8 May. As a result, there was some wiring which needed to be secured. This work was carried out during the engineering hours on 17 May.

Signal fault

The signal wiring engineer had secured and reconnected all wires between the various circuit breakers in the cabin. However, one wire, which linked circuit breaker number 8 to circuit breaker number 9 had been put on the wrong terminal of circuit breaker number 9. This caused signal EH9, the eastbound starter signal, to clear even though the section ahead was occupied by a train held at automatic signal number 823.

The cabin was put into automatic mode as this was how it was normally set, but no testing was carried out, and traffic began with no observation from the engineers. Manual working was only used when a train was to be reversed at Charing Cross.

Problem reported

The problem did not appear until the line became busy. On arrival at Temple at 09:40, a motorman reported that he had nearly run into the train ahead.

The message was conveyed to Charing Cross but no action was taken despite further reports that the signal was working incorrectly. By the time it became clear that there was a significant problem, it was too late to prevent the collision.

Allocation of blame

The Ministry of Transport report held the Signal Installer and Chief Lineman responsible for the wiring error and the failure to test the signals thoroughly. The Station Foreman, Porter and Inspector were responsible for not acting promptly to prevent a collision.

Similar accident

A similar accident involving a signal wiring error had occurred near the same station on the Northern line on 10 March 1938.

Related Research Articles

In engineering, a fail-safe is a design feature or practice that, in the event of a failure of the design feature, inherently responds in a way that will cause minimal or no harm to other equipment, to the environment or to people. Unlike inherent safety to a particular hazard, a system being "fail-safe" does not mean that failure is impossible or improbable, but rather that the system's design prevents or mitigates unsafe consequences of the system's failure. That is, if and when a "fail-safe" system fails, it remains at least as safe as it was before the failure. Since many types of failure are possible, failure mode and effects analysis is used to examine failure situations and recommend safety design and procedures.

<span class="mw-page-title-main">Embankment tube station</span> London Underground station

Embankment is a London Underground station in the City of Westminster, known by various names during its history. It is served by the Circle, District, Northern and Bakerloo lines. On the Bakerloo line and the Charing Cross branch of the Northern line, the station is between Waterloo and Charing Cross stations; on the Circle and District lines, it is between Westminster and Temple and is in Travelcard Zone 1. The station has two entrances, one on Victoria Embankment and the other on Villiers Street. The station is adjacent to Victoria Embankment Gardens and is close to Charing Cross station, Embankment Pier, Hungerford Bridge, Cleopatra's Needle, the Royal Air Force Memorial, the Savoy Chapel and Savoy Hotel and the Playhouse and New Players Theatres.

<span class="mw-page-title-main">Clapham Junction rail crash</span> 1988 rail crash in London

The Clapham Junction rail crash occurred on the morning of 12 December 1988, when a crowded British Rail passenger train crashed into the rear of another train that had stopped at a signal just south of Clapham Junction railway station in London, England, and subsequently sideswiped an empty train travelling in the opposite direction. A total of 35 people died in the collision, while 484 were injured.

A wrong-side failure describes a failure condition in a piece of railway signalling equipment that results in an unsafe state. A typical example would be a signal showing a 'proceed' aspect when it should be showing a 'stop' or 'danger' aspect, resulting in a "false clear".

The Purley station rail crash was a train collision that occurred just to the north of Purley railway station in the London Borough of Croydon on Saturday 4 March 1989, leaving five dead and 88 injured. The collision was caused by the driver of one of the trains passing a signal at danger; he pleaded guilty to manslaughter and was sentenced to 12 months in prison plus six months suspended, although this was reduced to four months upon appeal, and in 2007 overturned. The Department of Transport report noted that the signal had a high incidence of being passed at danger and recommended that an automatic train protection system should be introduced without delay and in the interim a repeater for the signal that had been passed be installed.

<span class="mw-page-title-main">Track circuit</span> Electrical device used to detect the presence of trains on rail tracks

A track circuit is an electrical device used to prove the absence of a train on rail tracks to signallers and control relevant signals. An alternative to track circuits are axle counters.

<span class="mw-page-title-main">Clayton Tunnel rail crash</span> 1861 railway accident near Brighton, England

The Clayton Tunnel rail crash occurred on Sunday 25 August 1861, five miles (8 km) from Brighton on the south coast of England. At the time it was the worst accident on the British railway system. A train ran into the back of another inside the tunnel, killing 23 and injuring 176 passengers.

The Gaisal train collision occurred on 2 August 1999, when two trains carrying about 2,500 people collided at the remote station of Gaisal in West Bengal, India. Owing to a signalling error, both trains were using the same track on a day when three of the four tracks on the line were closed for maintenance. Their combined speeds were so great that the trains exploded on impact, killing at least 285 people.

There was a rail crash near Welwyn Garden City railway station in Hertfordshire, England, in 1935 which killed fourteen people, and another in 1957 with one fatality.

<span class="mw-page-title-main">Cowden rail crash</span> 1994 collision in Kent, England

The Cowden rail crash occurred on 15 October 1994, near Cowden Station in Kent (UK), when two trains collided head-on, killing five and injuring thirteen, after one of them had passed a signal at danger and entered a single-line section. The cause was driver error, possibly involving a guard who was in the cabin against regulations.

<span class="mw-page-title-main">Spa Road Junction rail crash</span>

The Spa Road Junction rail crash was an accident on the British railway system which occurred during the peak evening rush hour of 8 January 1999 at Spa Road Junction in Bermondsey, in South East London.

The Barnes rail crash, in which 13 people were killed and 41 were injured, occurred at Barnes railway station late in the evening of Friday 2 December 1955.

The Charing Cross tube crash occurred at 08:32 hours on 10 March 1938, when a Northern line train ran into the rear of a stationary train near Charing Cross in London. Twelve people were slightly injured. The accident was caused by a signal technician carrying out a temporary repair to a faulty signal even though he was not familiar with the layout and did not have access to the signalling diagram.

The Wrawby Junction rail crash was a train crash which occurred on 9 December 1983, at Wrawby Junction, near Barnetby station, North Lincolnshire, England.

<span class="mw-page-title-main">June 2009 Washington Metro train collision</span> 2009 public transit accident in the Washington, D.C. neighborhood of Northeast

During the afternoon rush hour of June 22, 2009, a subway train wreck occurred between two southbound Red Line Washington Metro trains in Northeast, Washington, D.C., United States. A moving train collided with a train stopped ahead of it; the train operator along with eight passengers died, and 80 people were injured, making it the deadliest crash in the history of the Washington Metro.

The Halle train collision was a collision between two NMBS/SNCB passenger trains carrying a combined 250 to 300 people in Buizingen, in the municipality of Halle, Flemish Brabant, Belgium, on 15 February 2010. The accident occurred in snowy conditions at 08:28 CET (07:28 UTC), during rush hour, on railway line 96 (Brussels–Quévy) about 12 kilometres (7.5 mi) from Brussels between P-train E3678 from Leuven to Braine-le-Comte and IC-train E1707 from Quiévrain to Liège. A third train was able to come to a stop just in time. The collision killed 19 people and injured 171, making it the deadliest rail accident in Belgium in over fifty years.

The Marden rail crash occurred on 4 January 1969 near Marden, Kent, United Kingdom, when a passenger train ran into the rear of a parcels train, having passed two signals at danger. Four people were killed and 11 were injured. One person was awarded the British Empire Medal for his part in the aftermath of the collision.

On 3 February 2003, a Comeng electric multiple unit train rolled away from Broadmeadows station in Melbourne, Australia, before it ran for nearly 17 kilometres (11 mi) out of control without a driver and eventually crashed into another train about to depart Spencer Street station. Train controllers attempted several times to stop or redirect the train, but were limited in their ability to intervene, instead being forced to alter the route of other trains to avert a more serious collision. Eleven people on board the stationary train were injured; authorities did not know until after the crash if any passengers were on board the runaway. An investigation identified driver error as the cause of the accident, but the runaway event prompted significant debate about the role of government authorities and private operators in ensuring safety and reliability on the Melbourne rail network.

<span class="mw-page-title-main">Coppenhall Junction railway accident</span> 1962 disaster in the United Kingdom

On the evening of 26 December 1962, cold weather and snow in and around Crewe had caused points to become frozen and trains were being detained at signals. About midway between Winsford and Crewe, the 13:30 Glasgow Central to London Euston Mid-Day Scot, hauled by an English Electric type 4 diesel, D215, with 13 coaches and 500 passengers, was stopped at a signal but the driver found the telephone to Coppenhall Junction, the next signal box ahead, out of order. Seeing the next signal ahead he decided to proceed down towards it and use the telephone there, but too fast. In the darkness he failed to notice the 16:45 express from Liverpool Lime Street to Birmingham New Street, hauled by an electric locomotive with eight coaches with 300 passengers, standing on the line ahead and collided with it at about 20 mph (32 km/h).

References