Credit Valley Railway

Last updated
Credit Valley Railway
Credit Valley Railway Station.jpg
CVR station in Streetsville. A new station was built in 1914, and the original building was moved to a different location. [1]
Overview
Reporting mark CVR
Locale Ontario
Dates of operation18711883
Successor Canadian Pacific Railway
Technical
Track gauge 4 ft 8+12 in (1,435 mm) [2]
Previous gauge3 ft 6 in (1,067 mm) [2]

The Credit Valley Railway was a railway located in Ontario, Canada from Toronto to St. Thomas. Chartered in 1871 by Ontario railway magnate George Laidlaw, it operated as an independent company until 1883 when it was leased by the Ontario and Quebec Railway, a Canadian Pacific Railway (CPR) operating company building a network of lines in southern Ontario.

Contents

The section from Toronto to Woodstock remains in use as the CPR mainline through Ontario, forming portions of what is now the Galt and Windsor Subdivisions. The section from Woodstock to St. Thomas is operated by OSR as a short line railway. The branch to Orangeville is currently operated as the Orangeville Brampton Railway. The Elora branch was abandoned and converted to rail trail use.

History

Formation

Following initial discussions held in Milton [3] and Brampton [4] in 1870, the Credit Valley Railway was incorporated by Act of the Legislative Assembly of Ontario in 1871, authorized to build a railway line from Toronto to Orangeville, with branches to Milton, Galt (today part of Cambridge), Berlin (Kitchener) and Waterloo. [5] Later Acts authorized further branches from the Forks of the Credit to Salem, [6] and from Galt to St. Thomas, [7] where it would connect with the Canada Southern Railway. There was also discussion on extending the line to Port Burwell. [8]

In addition to the issue of shares and debt, the CVR's construction was subsidized through other forms of public funding:

CVR public funding by source (to 1880) [9]
SourceAmount
Bonuses contingent on construction of the line$1,035,000
Exchange of municipal debentures for railway bonds$75,000
Interest earned on subscriptions $100,000
Provincial construction subsidy$420,000
Total public funding$1,630,000

The CVR's president was George Laidlaw, [10] and its chief engineer was James Ross, who later became general manager. [11] Other key players in the company were William Mackenzie, [12] Herbert Samuel Holt [13] and Henry Suckling. [14]

Construction

Timetable from 1878 for Ingersoll-Woodstock section of CVR. Credit Valley Railway timetable 1878.jpg
Timetable from 1878 for Ingersoll-Woodstock section of CVR.
Timetable from 1883, showing lines and stations served. CVR 1883 timetable2.jpg
Timetable from 1883, showing lines and stations served.

Originally intended to be an auxiliary narrow gauge line to the Toronto Grey & Bruce Railway, [15] by 1873 its design was changed to standard gauge in order to enable it to become a rival to the Grand Trunk and Great Western lines. [15]

The rail network eventually went from Toronto to Orangeville with branchlines from Cataract to Elora and Streetsville to St. Thomas. Construction occurred in several stages: [16]

  • Survey work was done in 1873, with grading beginning early in 1874
  • Work was suspended in 1875, and resumed in earnest in the autumn of 1878 following negotiations with the various municipalities for connected bonuses and bond subscriptions [9]
  • The line opened from Parkdale railway station to Milton, Ontario in 1877. [17]
  • The track reached Brampton, Ontario in December 1878, and the huge trestle spanning the Credit River near the Credit Forks was completed in September 1879. A station was built at the Forks of the Credit. [18]
  • The Milton line was extended to Galt, Ontario in September 1879.
  • The line was opened to Orangeville and Elora, Ontario in December 1879.

The Galt line was extended to St. Thomas through a parallel works project:

  • a section between Ingersoll and Woodstock was in operation in September 1878, connecting with the Port Dover & Lake Huron Railway
  • freight service between Ayr and Ingersoll began in October 1879 [19]
  • in December 1879, the CVR bridge over the Grand River was opened to rail traffic, and service between Ingersoll and Toronto began in January 1880 [19] A test run over the bridge during that month had proved to be successful. By that time, the company had built basic freight and passenger buildings in Galt. [20]
  • through service to St. Thomas began in September 1881. It was formally opened in September 1879 by the Governor General of Canada, the Marquis of Lorne. [21] Earlier that year, a carriage carrying its directors on a recently opened length of track was run into by a locomotive, and all suffered serious injuries, of which one was fatal. [22]
Parkdale roundhouse in 1884. Credit Valley Railway parkdale roundhouse L.jpg
Parkdale roundhouse in 1884.
CVR locomotive (1881). Credit Valley Railway No19.jpg
CVR locomotive (1881).
  • the line passing through Galt was taken over by the Canadian Pacific Railway in 1883; the company built a brick passenger building that still stands. [23]

Extension to Toronto waterfront

The CVR's extension from Parkdale to the waterfront lots in Toronto was met with stiff opposition from the Grand Trunk Railway and the Northern Railway of Canada. [24] In July 1879, the Railway Committee of the Privy Council of Canada ordered that the line be extended to the Esplanade, [25] but the other railways later secured a court order declaring that it did not constitute a right of way. [26] [27] The Parliament of Canada subsequently passed an Act on the matter in 1880 [28] (which attracted considerable controversy during its debate as it concerned a provincially incorporated railway). [29] All remaining disputes were later resolved through arbitration, [30] leading to connection to the Union Station later that year. [16]

By arrangement with the Michigan Central Railroad, the CVR offered through train service between Toronto and Chicago. [31]

Financial stress

The CVR experienced financial difficulties at various points in its existence, which mainly arose from the effects of the worldwide Long Depression. [32] During its construction, concerns were expressed as to whether it would result in overcapacity in providing rail traffic west of Toronto, which the Toronto Telegram noted:

The enterprise was conceived in folly and nurtured in scheming. Even were it in running order at this moment, it would starve to death for lack of support. It runs midway between the Grand Trunk and Great Western lines, and is as necessary to the welfare of Toronto as would be a sidewalk for passengers down the middle of Yonge Street with the pavement on each side. [33]

Such concerns continued to be expressed after its opening, as existing competition between the GTR and the GWR had already depressed freight rates on that corridor. [9]

As early as 1874, it received approval to settle certain debts through exchange into shares, [34] and in 1876, it was requesting that the provincial construction subsidy of $2000/mile [35] be increased to $3500/mile. [36] [37] In 1877, it had to obtain longer terms with respect to the bonds it had issued. [38] Existing provisions allowing municipalities that subsidized the CVR to appoint directors to its board were broadened in 1878, [39] and further provision for exchanging bonds was made in 1880 [40] and 1881. [41] George Stephen played a significant role in bailing out the CVR in 1880, [42] together with a group of entrepreneurs organized by E.B. Osler, [43] when the lack of cash prompted a strike over wages being three months in arrears. [44]

Upon its completion in 1881, these difficulties were still present, and discussions arose on the possibility of a lease to the Great Western Railway, while other discussions occurred at the same time concerning the GWR being leased to the CPR. [16] The GWR was eventually leased to the Grand Trunk Railway, and the CPR (through the Ontario and Quebec Railway) acquired the CVR following its acquisition of a 999-year lease to a railway line between Woodstock and London from the London Junction Railway. [43] [45] The CVR was amalgamated with the O&Q in 1883. [46] In the following year, The O&Q was taken over by the CPR on January 4. [47]

In 1888, William Van Horne admitted at a meeting that the CPR had been dealing with problems arising from the original construction of the track, declaring, "It takes all our time to try and straighten out the line of the Credit Valley Railway, laid down and built by Mr. Laidlaw, because it is so crooked." [48]

Current status of lines

The line from Toronto to Woodstock now forms part of CP's Galt Subdivision and Windsor Subdivision. The section from Woodstock to St. Thomas is operated by Ontario Southland Railway. The Orangeville branch is now operated by the Orangeville Brampton Railway. The Elora branch was closed in 1987, and has since been converted into a trail by the Credit Valley Conservation Authority and the Grand River Conservation Authority. [49]

See also

Related Research Articles

<span class="mw-page-title-main">Canadian Pacific Railway</span> Class I railroad in Canada and the United States

The Canadian Pacific Railway, also known simply as CPR or Canadian Pacific and formerly as CP Rail (1968–1996), was a Canadian Class I railway incorporated in 1881. The railway was owned by Canadian Pacific Railway Limited, which began operations as legal owner in a corporate restructuring in 2001.

<span class="mw-page-title-main">Cambridge, Ontario</span> City in Ontario, Canada

Cambridge is a city in the Regional Municipality of Waterloo, Ontario, Canada, located at the confluence of the Grand and Speed rivers. The city had a population of 138,479 as of the 2021 census. Along with Kitchener and Waterloo, Cambridge is one of the three core cities of Canada's tenth-largest metropolitan area.

<span class="mw-page-title-main">Wellington County, Ontario</span> County in Ontario, Canada

Wellington County is a county located in Southwestern Ontario, Canada and is part of the Greater Golden Horseshoe. The county, made up of two towns and five townships, is predominantly rural in nature. However many of the residents in the southern part of the county commute to urban areas such as Guelph, Kitchener, Waterloo, Brampton, Mississauga, Toronto and Hamilton for employment. The northern part of the county is made up of mainly rural farming communities, except for a few larger towns such as Mount Forest and Arthur. According to the 2021 census, the population of the county was 241,026.

<span class="mw-page-title-main">Dufferin County</span> County in Ontario, Canada

Dufferin County is a county and census division located in Central Ontario, Canada. The county seat is Orangeville, and the current Warden is Wade Mills. The current chief administrative officer is Sonya Pritchard. Dufferin covers an area of 1,486.31 square kilometres (573.87 sq mi), and its population was 61,735 at the time of the 2016 Census.

<span class="mw-page-title-main">Streetsville GO Station</span> Railway station in Mississauga, Ontario, Canada

Streetsville GO Station is a GO Transit railway station on the Milton line in the Greater Toronto Area, Ontario, Canada. It is located in the community of Streetsville in Mississauga.

Galt is a community in Cambridge, Ontario, Canada, in the Regional Municipality of Waterloo, Ontario on the Grand River. Prior to 1973, it was an independent city, incorporated in 1915, but amalgamation with the village of Hespeler, the town of Preston and the village of Blair formed the new municipality of Cambridge. Being the largest constituent community in the city, it is also seen as the downtown core of Cambridge. The first mayor of Cambridge was Claudette Millar.

The Ontario and Quebec Railway (O&Q) was a railway located in southern and eastern Ontario, Canada. It was initially chartered in March 1881 by managers of the Canadian Pacific Railway to run between Toronto and Perth, where it would connect, via a short branch line, to the CPR-controlled Brockville and Ottawa Railway. Construction began in 1882, and the line was completed in August 1884.

The Toronto Suburban Railway was a Canadian electric railway operator with local routes in west Toronto, and a radial (interurban) route to Guelph.

<span class="mw-page-title-main">Orangeville Brampton Railway</span> Short line railway

The Orangeville-Brampton Railway was a 55-kilometre (34-mile) long short line railway between Orangeville and Streetsville Junction in Mississauga, Ontario. It passed through the City of Brampton and the Town of Caledon.

<span class="mw-page-title-main">Canada Southern Railway</span>

The Canada Southern Railway, also known as CSR, was a railway in southwestern Ontario, Canada, founded on February 28, 1868 as the Erie and Niagara Extension Railway. Its name was changed to Canada Southern Railway on December 24, 1869. The 1868 Act specified that it was to be constructed at a broad gauge of 5 ft 6 in, but that requirement was repealed in the 1869 Act, thus allowing construction at the standard gauge of 4 ft 8+12 in.

<span class="mw-page-title-main">Narrow-gauge railways in Canada</span>

Although most railways of central and eastern Canada were initially built to a 5 ft 6 in broad gauge, there were several, especially in Atlantic Canada and Ontario, which were built as individual narrow-gauge lines. These were generally less expensive to build, but were more vulnerable to frost heaving because vertical displacement of one rail caused greater angular deflection of the narrower two-rail running surface. Most of the longer examples were regauged starting in the 1880s as the railway network began to be bought up by larger companies.

<span class="mw-page-title-main">William Durie Lyon</span> Canadian politician

William Durie Lyon was a merchant and political figure in Ontario, Canada.

The Victoria Railway was a 55.52-mile (89.35 km) long Canadian railway that operated in Central Ontario. Construction under Chief Engineer James Ross began in 1874 from Lindsay, Ontario, with authority to build through Victoria County to Haliburton, Ontario, to which it opened on November 24, 1878. The line is best known as having been built by a large group of Icelandic immigrants, who found the Kinmount winters too rough, and so they all moved to Gimli, Manitoba. The line became part of the Midland Railway of Canada and then later part of the Canadian National Railways. The line was abandoned completely by the early 1990s.

The Northern and Pacific Junction Railway (N&PJ) is a historic railway located in northern Ontario, Canada. It connected the Northern Railway of Canada's endpoint in Gravenhurst to the Canadian Pacific Railway (CPR) at Nipissing Junction, near North Bay. The N&PJ provided an almost straight line north-south route from Toronto to the transcontinental line, competing with a similar line of the Canadian Northern Railway (CNoR) a short distance to the west.

<span class="mw-page-title-main">CN Halton Subdivision</span>

The CN Halton Subdivision is a major railway line in Southern Ontario, Canada. It is owned and operated by the Canadian National Railway (CN).

The Toronto, Grey and Bruce Railway (TG&B) was a railway company which operated in Ontario, Canada in the years immediately following the Canadian Confederation of 1867. It connected two rural counties, Grey County and Bruce County, with the provincial capital of Toronto to the east.

<span class="mw-page-title-main">Toronto and Nipissing Railway</span> First public narrow-gauge railway in North America

The Toronto and Nipissing Railway (T&N) was the first public narrow-gauge railway in North America. It chartered in 1868 to build from Toronto to Lake Nipissing in Ontario, Canada, via York, Ontario, and Victoria counties. At Nipissing it would meet the transcontinental lines of the Canadian Pacific, providing a valuable link to Toronto. It opened in 1871, with service between Scarborough and Uxbridge. By December 1872 it was extended to Coboconk, but financial difficulties led to plans of the line being built further abandoned at this point. The railway merged with the Midland Railway of Canada in 1882.

<span class="mw-page-title-main">Parkdale station (Toronto)</span> Railway station in Toronto, Ontario, Canada

Parkdale railway station or North Parkdale railway station as it was also known was a passenger train station in Toronto, Ontario, Canada. The station served the Parkdale village on the then-outskirts of Toronto. The station served trains on the Northern Railway of Canada and Credit Valley Railway, later the Canadian Pacific Railway, railways. It was situated at the intersection of Dufferin Street and Queen Street West. The train station was decommissioned in the 1970s.

<span class="mw-page-title-main">Lake Erie and Northern Railway</span> Former interurban railway in Ontario, Canada

The Lake Erie and Northern Railway was an interurban electric railway which operated in the Grand River Valley in Ontario, Canada. The railway owned and operated a north–south mainline which ran from Galt in the north to Port Dover on the shore of Lake Erie in the south. Along the way, it ran through rural areas of Waterloo County, Brant County, and Norfolk County, as well as the city of Brantford, where it had an interchange with the Brantford and Hamilton Electric Railway. Construction on the mainline began in 1913. The railway began operations in 1916 as a subsidiary of the Canadian Pacific Railway (CPR), which had purchased the line before construction had finished. In 1931, it was consolidated with the Grand River Railway under a single CPR subsidiary, the Canadian Pacific Electric Lines (CPEL), which managed both interurban railways, though they continued to exist as legally separate entities. Passenger service was discontinued in 1955 but electric freight operations continued until 1961, when the LE&N's electric locomotives were replaced by diesel CPR locomotives and the line was de-electrified. In the same year, service on the mainline from Simcoe to Port Dover was discontinued, but the remainder continued to operate as a branchline which as early as 1975 was known as the CP Simcoe Subdivision. The remainder of the line was officially abandoned in the early 1990s, ending almost seventy-five years of operation.

References

  1. "Credit Valley Railway Station, Streetsville". City of Mississauga. 1914.
  2. 1 2 Laidlaw 1876, p. 14.
  3. "Railway Meeting". The Canadian Champion. Milton. December 8, 1870. p. 2.
  4. "Railroad Meeting". The Canadian Champion. Milton. December 1, 1870. p. 2.
  5. An Act to Incorporate the Credit Valley Railway Company , S.O. 1870–71, c. 38
  6. An Act to amend the Act passed in the thirty-fourth year of Her present Majesty's reign, and intituled "An Act to Incorporate the Credit Valley Railway Company," and to extend the powers conferred on the said Company , S.O. 1871–72, c. 47
  7. An Act to amend the several Acts relating the Credit Valley Railway Company , S.O. 1873, c. 80
  8. "Credit Valley Extension to Port Burwell". The Globe. Toronto. July 29, 1878. p. 2.
  9. 1 2 3 Engineering 1880b, p. 156.
  10. McIlwraith, Thomas F. (1982). "Laidlaw, George". In Halpenny, Francess G (ed.). Dictionary of Canadian Biography . Vol. XI (1881–1890) (online ed.). University of Toronto Press.
  11. "James Ross, Noted Financier, is Dead". The Ottawa Citizen . September 20, 1913. p. 1.
  12. Fleming, R.B. (1991). The Railway King of Canada: Sir William Mackenzie, 1849-1923. Vancouver: UBC Press. p. 13. ISBN   0-7748-0486-6.
  13. "Sir Herbert Holt, 85, Noted Financier Dies". Ottawa Citizen . September 29, 1941. p. 9.
  14. "Henry E. Suckling, Treasurer of CPR, Died in 75th Year". The Montreal Gazette . March 23, 1925. p. 5.
  15. 1 2 Engineering 1880a, p. 86.
  16. 1 2 3 Kennedy
  17. Scheinman 2009, p. 13-3.
  18. "Landscape Inventory Report page 7-31" (PDF). 1 March 2016. Retrieved 26 February 2019. With the rail link in place, Credit Valley sandstone was shipped throughout southern Ontario but primarily to Toronto and Hamilton. Queen's Park and the old Toronto City Hall are two significant examples of the many important buildings completed in this material. Four varieties of 'dimension' sandstone were available from the Forks' quarries: a grey with occasional brown spots; a uniform grey stone of particularly high quality; a brownstone which varied from chocolate to deep brown depending on the quarry with occasional deposits of a pinkish brown stone (particularly prized) and a piebald mix of white and brown stone.
  19. 1 2 W. H. Breithaupt (1917). "Waterloo County Railway History (President's Address - Fifth Annual Report of the Waterloo Historical Society)". Waterloo Historical Society.
  20. "Flash from the Past: Private moment goes public in Galt rail yard". 5 January 2018.
  21. "Vice-Regal Visit to our County Town". The Acton Free Press. Acton. September 25, 1879. p. 2.
  22. "Terrible Railroad Accident!". The Montreal Gazette . May 12, 1879. p. 3.
  23. "Flash from the Past: Private moment goes public in Galt rail yard". 5 January 2018.
  24. George Laidlaw (January 28, 1880). "The Credit Valley Railway (letter)". The Montreal Gazette . p. 2.
  25. Application of the Credit Valley Railway for Right of Way and Crossings at the City of Toronto. Toronto: Hunter Rose & Co. 1880. pp. 7–8. ISBN   9780665052750.
  26. "The Grand Trunk Railway Company v. The Credit Valley Railway Company". The Canada Law Journal. XV: 271. September 1879.
  27. "Toronto". The Daily Advertiser. London. January 8, 1880. p. 1.
  28. An Act respecting the Credit Valley Railway Company , S.C. 1880, c. 54
  29. "Credit Valley Railway Company Bill (Bill 53), Second Reading". Parliamentary Debates (Hansard) . Canada: House of Commons. March 10, 1880. pp. 584–590.
  30. Trevelyan Ridout (1883). Statutes Special and General, Relating to the Northern Railway Company of Canada. Toronto: Hunter Rose & Co. pp. 453–458.
  31. Timetable: Credit Valley Railway. October 10, 1883. ISBN   9780665338946.
  32. Burnet 1995, p. 213.
  33. "The Position of the Country". The Acton Free Press. Acton. June 8, 1876. p. 2.
  34. An Act amending Acts relating to the Credit Valley Railway Company , S.O. 1874, 1st Sess., c. 42
  35. authorized by An Act respecting aid to certain Railways, and for other Purposes , S.O. 1875–76, c. 22, s. 1(4)
  36. Laidlaw 1876, p. 3.
  37. $3460.80/mile (in half-yearly instalments over twenty years) was granted under An Act respecting aid to certain Railways and the creation of a Railway Land Subsidy Fund , S.O. 1877, c. 14, s. 1(5)
  38. An Act respecting the Credit Valley Railway Company , S.O. 1877, c. 77
  39. An Act respecting the Credit Valley Railway Company , S.O. 1878, c. 44
  40. An Act to amend the Acts relating to the Credit Valley Railway Company , S.O. 1880, c. 52
  41. An Act to amend the Acts relating to the Credit Valley Railway Company , S.O. 1881, c. 61
  42. Berton, Pierre (1971). The Last Spike . Toronto: McClelland & Stewart. p.  127. ISBN   0-7710-1327-2.
  43. 1 2 Burnet 1995, p. 215.
  44. "Strike on the Credit Valley". The Globe. Toronto. July 8, 1880. p. 3.
  45. "Credit Valley Railway Co". The Toronto Daily Mail. October 13, 1883. p. 9.
  46. An Act respecting the Credit Valley Railway Company , S.O. 1882–83, c. 50 , and An Act to amend an Act to incorporate the Ontario and Quebec Railway Company, S.C. 1883, c. 58
  47. "Inventory Report page 13-3" (PDF). Caledon. 1 March 2011. Retrieved 26 February 2019.
  48. "New C.P.R. Branch". The Canadian Champion. Milton. August 2, 1888. p. 2.
  49. "Elora Cataract Trailway". GRCA. Archived from the original on 2006-09-08. Retrieved 2014-09-15.

Further reading