Greensborough Highway

Last updated

Greensborough Highway

(numerous constituent roads)

Greensborough Bypass at M80 intersection.jpg
Greensborough Bypass, looking northeast towards Plenty River at the Metropolitan Ring Road intersection
Australia Victoria metropolitan Melbourne location map.svg
Red pog.svg
Southwest end
Red pog.svg
Northeast end
Coordinates
General information
TypeHighway
Length13.1 km (8.1 mi) [1]
Route number(s)
  • Australian state route 44.svg Metro Route 44 (1965–present)
    (Ivanhoe–Rosanna)
  • Australian state route 46.svg Metro Route 46 (1965–present)
    (Yallambie–Greensborough)
Major junctions
Southwest endAustralian state route 46.svg Heidelberg Road
Ivanhoe, Melbourne
 
Northeast endAustralian state route 46.svgDiamond Creek Road
Civic Drive
Greensborough, Melbourne
Location(s)
Major settlements Ivanhoe East, Eaglemont, Heidelberg, Rosanna, Yallambie, Watsonia
Highway system

Greensborough Highway is a highway in the north-eastern suburbs of Melbourne, Australia, and is an important route for north-east Melbourne. This name is not widely known to most drivers, as the entire allocation is still best known as by the names of its constituent parts: Lower Heidelberg Road, Rosanna Road, Lower Plenty Road, Greensborough Road and Greensborough Bypass. [2] This article will deal with the entire length of the corridor for sake of completion, as well to avoid confusion between declarations.

Contents

Route

Lower Heidelberg Road starts at the intersection of Heidelberg Road and Upper Heidelberg Road in Ivanhoe and heads east as a four-lane, single-carriageway road through Eaglemont, crossing Banksia Street at Heidelberg (and the beginning of Greenborough Highway), nearly immediately crossing Burgundy Street and changing name to Rosanna Road to Rosanna, where it intersects with and changes name to Lower Plenty Road and widens to a six-lane, dual-carriageway road. It continues north-east, where after a short distance it intersects with and changes name to Greensborough Road, heading north as a four-lane, single-carriageway road until it meets Watsonia Road in Watsonia, changing names to Greensborough Bypass and continues north-east as a six-lane, dual-carriageway road, crossing Grimshaw Street and turning east at the intersection with Metropolitan Ring Road in Greensborough before eventually ending at the roundabout with Diamond Creek Road and Civic Drive.

History

Lower Heidelberg Road and Rosanna Road were signed as Metropolitan Route 44 between Ivanhoe and Yallambie in 1965; Greensborough Road was also signed as Metropolitan Route 46 in 1965, originally turning east along Grimshaw Street to run through Greensborough and along Diamond Creek Road east beyond it. When the Greensborough Bypass was opened in the late 1980s, Metropolitan Route 46 was re-aligned along it to bypass Greensborough and re-join Diamond Creek Road beyond.

In the late 1980s, the northern section of Greensborough Road south of Grimshaw Street was extended and significantly altered, with the original road north of Lenola Street in Macleod re-aligned to the west as a service road, the new road being a divided highway up to a new intersection at Grimshaw Street. North of here the road was extended as a single carriageway bypass road, sweeping north-west around central Greensborough and terminating at a large roundabout interchange with Diamond Creek Road and Civic Drive, known locally (and sign-posted) as the Greensborough Bypass. The original alignment north of Nepean Street was repurposed for local traffic only, still known today as Greensborough Road. [3] Construction on the northern half, the 3 km section between Grimshaw Street and Diamond Creek Road, started in 1985 [4] and opened in March 1988 [5] (this section was later declared a State Highway in 1989 [6] ); construction on the southern half, the 2 km section between Grimshaw and Lenola Streets, started in late 1985, [7] and opened in September 1989. [8]

The passing of the Transport Act of 1983 [9] (itself an evolution from the original Highways and Vehicles Act of 1924 [10] ) provided for the declaration of State Highways, roads two-thirds financed by the State government through the Road Construction Authority (later VicRoads). Greensborough Highway was declared a State Highway in December 1990, [11] from Banksia Street in Heidelberg to Diamond Creek Road in Greensborough (incorporating the newly constructed road previously declared as a State Highway the year before); however the road was still presently known (and signposted) as its constituent parts.

Throughout the 1990s the Metropolitan Ring Road was constructed, terminating at the Greensborough Bypass section of the highway. Around this time, the road north of Grimshaw Street was progressively widened and duplicated, with the final section being a new bridge over the Plenty River, completed in 2005. [12]

The passing of the Road Management Act 2004 [13] granted the responsibility of overall management and development of Victoria's major arterial roads to VicRoads: in 2004, VicRoads re-declared the road as Greensborough Highway (Arterial #6850), from Banksia Street in Heidelberg to Heidelberg-Kinglake Road (known as Diamond Creek Road) in Greensborough; [2] as before, the road is still presently known (and signposted) as its constituent parts.

Timeline of construction

1969 Melbourne Transportation Plan

The route was originally designated in the 1969 Melbourne Transportation Plan as the F18 Freeway, extending further than Diamond Creek Road to finish at Ryans Road, Diamond Creek, and at the southern end extending past Lower Plenty Rd to link up with Eastern Freeway between Bulleen Road and Burke Road, via the Banyule Flats Reserve.

Future Upgrades

In recent years, Greensborough Highway has become extremely congested, with sections of the road carrying upwards of 60,000 vehicles per day. [15] The road is one of the only major arterials that connects the north eastern suburbs with Eastern Freeway (and by extension the Melbourne CBD), with sections of Greensborough Road and Rosanna Road carrying unsustainable amounts of traffic as well as a significant number of trucks within residential areas. The North East Link project, announced in 2016, aims to fix these problems by creating a freeway-grade connection and road tunnels between the Metropolitan Ring Road and Eastern Freeway in Bulleen, aiming to take vehicles off Greensborough Highway and also involves significant reworking of the northern section of the route. The project began in late 2020 with the tunnels scheduled to begin construction in 2024, [16] and the entire project is anticipated to be completed in 2028. [17]

See also

Australia road sign W5-29.svg   Australian Roadsportal

Related Research Articles

<span class="mw-page-title-main">Hume Highway</span> Major national highway in Australia

Hume Highway, inclusive of the sections now known as Hume Freeway and Hume Motorway, is one of Australia's major inter-city national highways, running for 840 kilometres (520 mi) between Melbourne in the southwest and Sydney in the northeast. Upgrading of the route from Sydney's outskirts to Melbourne's outskirts to dual carriageway was completed on 7 August 2013.

<span class="mw-page-title-main">Princes Highway</span> Highway in Australia

Princes Highway is a major road in Australia, extending from Sydney via Melbourne to Adelaide through the states of New South Wales, Victoria and South Australia. It has a length of 1,941 kilometres (1,206 mi) or 1,898 kilometres (1,179 mi) via the former alignments of the highway, although these routes are slower and connections to the bypassed sections of the original route are poor in many cases.

<span class="mw-page-title-main">Greensborough, Victoria</span> Suburb of Melbourne, Victoria, Australia

Greensborough is a suburb of Melbourne, Victoria, Australia, 17 km (11 mi) north-east from Melbourne's Central Business District, located within the City of Banyule and Shire of Nillumbik local government areas. Greensborough recorded a population of 21,070 at the 2021 census.

<span class="mw-page-title-main">Watsonia railway station</span> Railway station in Melbourne, Australia

Watsonia railway station is located on the Hurstbridge line in Victoria, Australia. It serves the north-eastern Melbourne suburb of Watsonia, and it opened on 23 June 1924.

<span class="mw-page-title-main">Greensborough railway station</span> Railway station in Melbourne, Australia

Greensborough railway station is located on the Hurstbridge line in Victoria, Australia. It serves the north-eastern Melbourne suburb of Greensborough, and it opened on 5 June 1902.

<span class="mw-page-title-main">Hurstbridge railway line</span> Passenger rail service in metropolitan Melbourne, Victoria, Australia

The Hurstbridge railway line is a commuter railway line in the city of Melbourne, Victoria, Australia. Operated by Metro Trains Melbourne, it is the city's seventh longest metropolitan railway line at 36.7 kilometres (22.8 mi). The line runs from Flinders Street station in central Melbourne to Hurstbridge station in the north-east, serving 28 stations via Clifton Hill, Heidelberg, Greensborough, and Diamond Creek. The line operates for approximately 19 hours a day with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 15 minutes are operated with services every 20-30 minutes during off-peak hours. Trains on the Hurstbridge line run with a two three-car formations of X'Trapolis 100 trainsets.

Melton Highway links Melbourne's outer north-western suburbs of Melton and Taylors Lakes, connecting the Western Freeway and Calder Freeway to provide a more-direct route between Ballarat and Melbourne's northern airports ; it has a Victorian route designation of C754.

<span class="mw-page-title-main">Monash Freeway</span> Freeway in Victoria, Australia

The Monash Freeway is a major urban freeway in Victoria, Australia, linking Melbourne's CBD to its south-eastern suburbs and beyond to the Gippsland region. It carries up to 180,000 vehicles per day and is one of Australia's busiest freeways. The entire stretch of the Monash Freeway bears the designation M1.

<span class="mw-page-title-main">Calder Highway</span> Highway in Victoria

Calder Highway is a rural highway in Australia, linking Mildura and the Victoria/New South Wales border to Bendigo, in North Central Victoria. South of Bendigo, where the former highway has been upgraded to freeway-standard, Calder Freeway links to Melbourne, subsuming former alignments of Calder Highway; the Victorian Government completed the conversion to freeway standard from Melbourne to Bendigo on 20 April 2009.

<span class="mw-page-title-main">Mornington Peninsula Freeway</span>

The Mornington Peninsula Freeway is a freeway in Melbourne, Victoria, Australia, that provides a link from south-eastern suburban Melbourne to the Mornington Peninsula. Whilst the entire freeway from Dingley Village to Rosebud is declared by VicRoads as the Mornington Peninsula Freeway, the section between EastLink in Carrum Downs and Moorooduc Highway in Moorooduc is locally and commonly known as Peninsula Link. The entire freeway corridor bears the designation M11.

<span class="mw-page-title-main">Western Highway (Victoria)</span> Highway in Victoria

The Western Highway is the Victorian part of the principal route linking the Australian cities of Melbourne and Adelaide, with a length of approximately 258 kilometres (160 mi) of single carriageway, then 161 kilometres (100 mi) of dual carriageway known as the Western Freeway. It is a part of the National Highway network and designated routes A8 and M8. The western end continues into South Australia as the Dukes Highway, the next section of the Melbourne–Adelaide National Highway. The Western Freeway joins Melbourne's freeway network via the Western Ring Road, in the western suburbs of Melbourne.

<span class="mw-page-title-main">Division of Jagajaga</span> Australian federal electoral division

The Division of Jagajaga is an Australian Electoral Division in the state of Victoria. It is located in the north-eastern suburbs of Melbourne, and lies north of the Yarra River. It covers an area of approximately 104 square kilometres and comprises the suburbs of Bellfield, Briar Hill, Diamond Creek, Eaglemont, Greensborough, Heidelberg, Heidelberg Heights, Heidelberg West, Ivanhoe, Ivanhoe East, Lower Plenty, Montmorency, Plenty, Rosanna, St Helena, Viewbank, Yallambie, Watsonia and Watsonia North; and parts of Bundoora, Eltham, Eltham North, Hurstbridge, Macleod, Wattle Glen and Yarrambat.

Watsonia North is a suburb of Melbourne, Victoria, Australia, 17 km north-east of Melbourne's Central Business District, located within the City of Banyule local government area. Watsonia North recorded a population of 3,799 at the 2021 census. In 2022 Watsonia North has emerged as Australia’s most tightly held suburb, with homeowners hanging onto their houses for more than 23 years on average before selling.

The River Gum Walk Trail is a shared use path for cyclists and pedestrians in the suburb of Rosanna, an inner northern suburb of Melbourne, Victoria, Australia.

Warrigal Road is a major inner urban road in southeastern Melbourne, Australia. On weekdays, it is heavily trafficked as it runs through many major suburbs along its route, traversing some of Melbourne's eastern and south-eastern suburbs. These suburbs include Chadstone, Oakleigh, and Cheltenham. The Chadstone Shopping Centre can be accessed directly from Warrigal Road at its eastern entrance.

<span class="mw-page-title-main">State (Bell/Springvale) Highway</span> Highway in Melbourne, Victoria

State (Bell/Springvale) Highway, also known as Bell Street/Springvale Road State Highway, is the longest self-contained urban highway in Melbourne, Australia, linking Tullamarine Freeway and Nepean Highway through Melbourne's north-eastern suburbs. These names are not widely known to most drivers, as the entire allocation is still best known as by the names of its constituent parts: Bell Street, Banksia Street, Manningham Road, Williamsons Road, Doncaster Road, Mitcham Road, Springvale Road and Edithvale Road. This article will deal with the entire length of the corridor for sake of completion, as well to avoid confusion between declarations.

<span class="mw-page-title-main">Shire of Diamond Valley</span> Local government area in Victoria, Australia

The Shire of Diamond Valley was a local government area about 20 kilometres (12 mi) northeast of Melbourne, the state capital of Victoria, Australia. The shire covered an area of 74.38 square kilometres (28.72 sq mi), and existed from 1964 until 1994.

<span class="mw-page-title-main">1969 Melbourne Transportation Plan</span>

The 1969 Melbourne Transportation Plan was a road and rail transport plan for Melbourne, the state capital of Victoria, Australia, instituted by Henry Bolte's state government. Most prominently, the plan recommended the provision of an extensive freeway network, much of which has since been built.

The North East Link is an under construction 26–kilometre tolled motorway scheme in Melbourne, Australia. Its stated objective is to connect the Metropolitan Ring Road at Greensborough with the Eastern Freeway at Bulleen, where the freeway would be upgraded from Hoddle Street to Springvale Road at Nunawading.

<span class="mw-page-title-main">M80 Ring Road</span> Freeway in Melbourne, Australia

The M80 Ring Road is a partially complete urban freeway ring road around Melbourne, Australia. This article will deal with the entire length of the corridor for sake of completion, as well to avoid confusion between declarations.

References

  1. Google (16 November 2021). "Greensborough Highway" (Map). Google Maps . Google. Retrieved 16 November 2021.
  2. 1 2 VicRoads. "VicRoads – Register of Public Roads (Part A) 2015" (PDF). Government of Victoria. p. 1037. Archived from the original on 1 May 2020. Retrieved 19 October 2021.
  3. "THROWBACKTHURSDAY: GREENSBOROUGH BYPASS CONSTRUCTION, 1986".
  4. "Road Construction Authority of Victoria. Annual Report for the year ended 30 June 1985". Road Construction Authority of Victoria. Melbourne: Victorian Government Library Service. 25 October 1985. p. 11.
  5. 1 2 "Road Construction Authority of Victoria. Annual Report for the year ended 30 June 1988". Road Construction Authority of Victoria. Melbourne: Victorian Government Library Service. 24 September 1988. p. 27.
  6. "Road Construction Authority of Victoria. Annual Report for the year ended 30 June 1989". Road Construction Authority of Victoria. Melbourne: Victorian Government Library Service. 14 November 1989. p. 50.
  7. "Road Construction Authority of Victoria. Annual Report for the year ended 30 June 1986". Road Construction Authority of Victoria. Melbourne: Victorian Government Library Service. 14 September 1986. pp. 15–6.
  8. 1 2 "VicRoads Annual Report 1989-90". VicRoads . Melbourne: Victorian Government Library Service. 18 October 1990. p. 55.
  9. State of Victoria, An Act to Re-enact with Amendments the Law relating to Transport including the Law with respect to Railways, Roads and Tramways... 23 June 1983
  10. State of Victoria, An Act to make further provision with respect to Highways and Country Roads Motor Cars and Traction Engines and for other purposes 30 December 1924
  11. "Victorian Government Gazette". State Library of Victoria. 19 December 1990. pp. 3783–4. Retrieved 30 December 2021.
  12. 1 2 "VicRoads Annual Report 2005-06". VicRoads . Melbourne: Victorian Government Library Service. 25 August 2006. p. 48.
  13. State Government of Victoria. "Road Management Act 2004" (PDF). Government of Victoria. Archived (PDF) from the original on 18 October 2021. Retrieved 19 October 2021.
  14. "VicRoads Annual Report 1997-98". VicRoads . Melbourne: Victorian Government Library Service. 31 August 1998. p. 31.
  15. "Traffic Volumes for Freeways and Arterial Roads".
  16. "North East Link Program Tunnel construction in Watsonia and Macleod". Victoria's Big Build. 6 April 2023. Retrieved 10 May 2023.
  17. "North East Link Program Overview". Victoria's Big Build. 1 February 2023. Retrieved 10 May 2023.