KSLV-III

Last updated

KSLV-III is a medium orbit geostationary launch vehicle currently under development in South Korea, with the goal of its first launch in 2030.

Contents

History

In February 2018, the Ministry of Science and ICT held a National Space Committee meeting and announced the 3rd Basic Plan for the Promotion of Space Development. [1] In the launch vehicle sector, in order to establish a self-powered launch service foundation, a plan was established to foster a launch service ecosystem based on Nuri in the first stage from 2021 to 2025, and to secure price competitiveness through a domestic satellite launch mass production system in the second stage from 2026 to 2030. [1]

On November 29, 2022, the MSIT held a meeting of the National Research and Development Project Evaluation Committee and passed the preliminary feasibility study for the Next-Generation Launch Vehicle Development Project; [2] it was decided to develop the next-generation launch vehicle, KSLV-III, by investing 2.132 trillion won from 2023 to 2032. [3]

In March 2024, Hanwha Aerospace was selected as the preferred bidder for the government-commissioned Next-Generation Launch Vehicle Development Project Launch Vehicle General Production project, passing the technology capability suitability assessment. [4]

Design

Compared to Nuri, which was developed in June 2021, KSLV-III is more advanced in comprehensive propulsion performance. Nuri's first stage thrust is 300 tons generated by four 75 tons liquid engines, but that of KSLV is 500 tons. [3]

The KSLV-III's payload is over 10 tons, and it can be used to build a space station or assemble a lunar lander. Methane engines, hydrogen engines, launch vehicle reuse research, and solid booster technology are also being handled by the KSLV-III project. [5]

In November 2022, the MSIT announced that "unlike Naro-1 and Nuri, which were developed under the leadership of the Korea Aerospace Research Institute, we plan to enter into joint design of the KSLV-III with a system integration company." [3]

Mission

One of the most important missions is to transport the lunar lander. It can send a 1.8-ton object to the moon. The launch vehicle is scheduled to be launched three times in total, and the main plan is as follows: [3]

The preliminary model of the lunar lander will not carry any lunar exploration equipment and will only land on the moon. The final model, scheduled for launch in 2032, is expected to carry various exploration equipment. [3]

See also

Related Research Articles

<span class="mw-page-title-main">H-II Transfer Vehicle</span> Uncrewed cargo spacecraft developed by JAXA


The H-II Transfer Vehicle (HTV), also called Kounotori, is an expendable Japanese automated cargo spacecraft designed for International Space Station (ISS) resupply missions, particularly the Kibō Japanese Experiment Module (JEM).

The Lunar Precursor Robotic Program (LPRP) is a NASA program that uses robotic spacecraft to prepare for future crewed missions to the Moon. The program gathers data such as lunar radiation, surface imaging, areas of scientific interest, temperature and lighting conditions, and potential resource identification.

<span class="mw-page-title-main">Korea Aerospace Research Institute</span> South Korean space agency

The Korea Aerospace Research Institute, established in 1989, is the aeronautics and space agency of South Korea. Its main laboratories are located in Daejeon, in the Daedeok Science Town. KARI's vision is to continue building upon indigenous launch capabilities, strengthen national safety and public service, industrialize satellite information and applications technology, explore the Moon, and develop environmentally-friendly and highly-efficient cutting-edge aircraft and core aerospace technology. Current projects include the KSLV-2 launcher. Past projects include the 1999 Arirang-1 satellite. The agency was founded in 1989. Prior to South Korea's entry into the Institute for Advanced Engineering (IAE) in 1992, it focused primarily on aerospace technology. As of May 2024, KARI is an affiliated research institute of the Korea AeroSpace Administration.

<span class="mw-page-title-main">Naro-1</span> South Koreas first carrier rocket, used from 2009 to 2013

Naro-1, previously designated the Korea Space Launch Vehicle or KSLV, was South Korea's first carrier rocket, and the first South Korean launch vehicle to achieve Earth orbit. On January 30, 2013, the third Naro-1 vehicle built successfully placed STSAT-2C into low Earth orbit.

<span class="mw-page-title-main">Exploration Systems Architecture Study</span> NASA study

The Exploration Systems Architecture Study (ESAS) is the official title of a large-scale, system level study released by the National Aeronautics and Space Administration (NASA) in November 2005 of his goal of returning astronauts to the Moon and eventually Mars—known as the Vision for Space Exploration. The Constellation Program was cancelled in 2010 by the Obama Administration and replaced with the Space Launch System, later renamed as the Artemis Program in 2017 under the Trump Administration.

<span class="mw-page-title-main">Naro Space Center</span> South Korean spaceport in South Jeolla

The Naro Space Center is a South Korean spaceport in South Jeolla's Goheung County, operated by the state-run Korea Aerospace Research Institute.

<span class="mw-page-title-main">Korea Aerospace Industries</span> South Korean Aerospace company

Korea Aerospace Industries, Ltd. is a South Korean aerospace and defense manufacturer. It was originally established as a joint venture of Daewoo Heavy Industries' aerospace division, Samsung Aerospace, and Hyundai Space and Aircraft. During 1999, KAI became more independent of its founding members, acquiring their aerospace interests at the behest of the South Korean government following the financial troubles of these companies that had resulted from the 1997 Asian financial crisis.

<span class="mw-page-title-main">Ares V</span> Canceled NASA rocket key to Project Constellation

The Ares V was the planned cargo launch component of the cancelled NASA Constellation program, which was to have replaced the Space Shuttle after its retirement in 2011. Ares V was also planned to carry supplies for a human presence on Mars. Ares V and the smaller Ares I were named after Ares, the Greek god of war.

<span class="mw-page-title-main">Nuri (rocket)</span> First South Korean orbital launch vehicle developed domestically

Nuri, also known as KSLV-II, is a three-stage launch vehicle, the second one developed by South Korea and the successor to Naro-1 (KSLV-1). Nuri is developed by Korea Aerospace Research Institute (KARI). All three stages use indigenously developed launch vehicle engines, making Nuri the first indigenously developed South Korean orbital launch vehicle.

<span class="mw-page-title-main">South Korean space program</span>

The South Korean space program began in earnest in the 1980s when research on space development began. Korea Aerospace Research Institute was established in October 1989, and the Korea AeroSpace Administration was established in May 2024.

<span class="mw-page-title-main">Science and technology in South Korea</span> Overview of science and technology in South Korea

Science and technology in South Korea has advanced throughout the decades. The advancement of science and technology has become an integral part of economic planning in South Korea. Fast-growing industries have created a massive demand for new and more advanced technologies. Additionally, Korean engineers and scientists propose that the advancement of science and technology in partnership with North Korea could help facilitate the peaceful reunification of North and South Korea.

<span class="mw-page-title-main">Blue Moon (spacecraft)</span> Lunar lander family developed by Blue Origin for the Artemis program

Blue Moon is a family of lunar landers and their associated infrastructure, intended to carry humans and cargo to the Moon, under development by a consortium led by Blue Origin and including Lockheed Martin, Draper, Boeing, Astrobotic, and Honeybee Robotics. Two versions of Blue Moon are under development: a robotic lander originally planned to land on the Moon in 2024 and delayed to 2025, and a larger human lander planned to land a crew of four astronauts on the lunar surface for the NASA Artemis V mission in 2030.

<span class="mw-page-title-main">Danuri</span> First South Korean lunar orbiter

The Korea Pathfinder Lunar Orbiter (KPLO), officially Danuri, is South Korea's first lunar orbiter. The orbiter, its science payload and ground control infrastructure are technology demonstrators. The orbiter will also be tasked with surveying lunar resources such as water ice, uranium, helium-3, silicon, and aluminium, and produce a topographic map to help select future lunar landing sites.

<span class="mw-page-title-main">Artemis program</span> NASA-led lunar exploration program

The Artemis program is a Moon exploration program led by the United States' National Aeronautics and Space Administration (NASA), formally established in 2017 via Space Policy Directive 1. It is intended to reestablish a human presence on the Moon for the first time since the Apollo 17 mission in 1972. The program's stated long-term goal is to establish a permanent base on the Moon to facilitate human missions to Mars.

Yenisei, project name RN STK-1, is a super-heavy launch vehicle being developed by the Russian space industry. The main developer is RSC Energia.

<span class="mw-page-title-main">Long March 10</span> Chinese super-heavy carrier rocket

Long March 10, also known as the “Next Generation crewed launch vehicle”, and previously and unofficially as the “921 rocket” or the "Long March 5G", is a Chinese super-heavy carrier rocket for crewed lunar missions that is currently under development. The nickname "921" refers to the founding date of China's human spaceflight program. In 2022, the first flight was targeted for 2027. In April 2024, it was announced that program development was complete.

Korean Lunar Exploration Program is led by the Korea Aerospace Research Institute (KARI), which develops lunar orbiters and landers. The plan includes the Danuri, a lunar lander launched in 2022, and the lunar probe, which is scheduled to be launched in 2032.

References

  1. 1 2 "10년 늦춰진 달 탐사… 더 멀어진 '우주강국 꿈'". Korea Economic Daily . 5 February 2018.
  2. "'누리호' 이을 차세대 발사체 2조 예산 예타 통과… 목표는 '달 착륙'". Chosun Biz7. 29 November 2022.
  3. 1 2 3 4 5 "달 착륙선 실을 '차세대 발사체' 예타 통과…개발에 2조원 투입". Kyunghyang Shinmun . 29 November 2022.
  4. "한화에어로, 차세대발사체 사업자 선정…2032년 달착륙선 보낸다". Yonhap News . 20 March 2024.
  5. "4차부터는 한화가 총사령관…한국판 '스페이스X' 뜬다". Seoul Economic Daily. 25 May 2023.