K Ingleside

Last updated

K Ingleside
K Ingleside logo.svg
Outbound train at Ocean and Victoria (2), August 2024.jpg
An outbound train at Ocean and Victoria in 2024
Overview
Owner San Francisco Municipal Transportation Agency
Locale San Francisco, California
Termini
Stations24
Service
Type Light rail
System Muni Metro
Operator(s) San Francisco Municipal Railway
Rolling stock Breda LRV3, Siemens LRV4
Daily ridership13,400 (January 2024) [1]
History
OpenedFebruary 3, 1918 (1918-02-03)
Technical
CharacterAt grade and underground
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification Overhead line,  600 V DC
Route map
K Ingleside K Ingleside highlighted in sky
BSicon uSTR+l.svg
BSicon uCONTfq.svg
BSicon lCONTf4.svg
BSicon tSTR2+4.svg
BSicon utSTRa.svg
Bart-logo.svg to East Bay
BSicon tSTRc1.svg
BSicon lvKRZvo.svg
BSicon MSTR.svg
BSicon utUST.svg
BSicon STR2h+4.svg
BSicon tSHI4c3.svg
J Church logo.svg K Ingleside logo.svg L Taraval logo.svg M Ocean View logo.svg S Shuttle logo.svg turnback
BSicon utdINTACC.svg
BSicon lvINTACC-.svg
BSicon tdBHF.svg
Embarcadero
Ferry symbol.svg BSicon CCAR.svg Bart-logo.svg E Embarcadero logo.svg F Market & Wharves logo.svg
BSicon utdINTACC.svg
BSicon lvINTACC-.svg
BSicon tdBHF.svg
Montgomery
Bart-logo.svg F Market & Wharves logo.svg
BSicon utCONTgq.svg
BSicon lKRZo+L.svg
BSicon HUBa.svg
BSicon utACCq.svg
BSicon umtvSTR.svg
BSicon lKRZo+R.svg
BSicon utCONTf@Fq.svg
Union Sq/​Market St
T Third Street logo.svg
BSicon HUBl.svg
BSicon utdINTACC.svg
BSicon cHUBq.svg
BSicon HUBeq.svg
BSicon lvINTACC-.svg
BSicon tdBHF.svg
Powell
BSicon CCAR.svg Bart-logo.svg F Market & Wharves logo.svg
BSicon utdINTACC.svg
BSicon lvINTACC-.svg
BSicon tdBHF.svg
Civic Center
Bart-logo.svg F Market & Wharves logo.svg
BSicon tv-STRl.svg
BSicon utvSTR-.svg
BSicon LSTReq.svg
Bart-logo.svg to Balboa Park
BSicon utACC.svg
Van Ness
BSicon BUS3.svg F Market & Wharves logo.svg
BSicon ulCONTg@Gq.svg
BSicon PORTALl.svg
BSicon uABZq+l.svg
BSicon utABZgr.svg
BSicon uSTRl.svg
BSicon utACC.svg
BSicon utTHST.svg
BSicon uLKRW+r.svg
Church
F Market & Wharves logo.svg
BSicon utSTR.svg
BSicon uLSTRe.svg
J Church logo.svg to Balboa Park
BSicon utACC.svg
Castro
F Market & Wharves logo.svg
BSicon utACC.svg
Forest Hill
BSicon lACC.svg
BSicon utBHFe@g.svg
West Portal
S Shuttle logo.svg
BSicon uCONTgq.svg
BSicon uABZgr+xr.svg
L Taraval logo.svg to SF Zoo
BSicon uHST.svg
West Portal and 14th Avenue
BSicon uHSTACC.svg
St. Francis Circle
BSicon uLKRW+l.svg
BSicon uKRWgr.svg
M Ocean View logo.svg to Balboa Park
BSicon uLSTRe.svg
BSicon uHSTACC.svg
Junipero Serra and Ocean
BSicon uHST.svg
Ocean and San Leandro
BSicon uHST.svg
Ocean and Aptos
BSicon ueHST.svg
Ocean and Westgate/Cerritos
closed
2024
BSicon uHST.svg
Ocean and Fairfield/Victoria
BSicon uHSTACC.svg
Ocean and Dorado/Jules
BSicon uHST.svg
Ocean and Miramar
BSicon uexKHSTaq.svg
BSicon ueABZgr.svg
Brighton and Grafton
closed
1952
BSicon uHSTACC.svg
Ocean and Lee
BSicon ueWSLgl.svg
Phelan Loop
closed
1981
BSicon uHSTACC.svg
City College
BSicon RP4q.svg
BSicon uSKRZ-G4o.svg
BSicon RP4q.svg
BSicon uLSTRa.svg
BSicon uABZg+l.svg
BSicon uABZq+l.svg
BSicon uLSTRr.svg
J Church logo.svg to Church
BSicon LSTRa.svg
BSicon NULf@f.svg
BSicon uKRWgl.svg
BSicon NULg.svg
BSicon uKRWg+r.svg
Bart-logo.svg to Civic Center
BSicon HUBaq.svg
BSicon tINTACC.svg
BSicon lHSTACC~L.svg
BSicon HUBtf.svg
BSicon uSTRl.svg
BSicon lHSTACC~R.svg
BSicon dHUBeq.svg
BSicon uxABZgr.svg
Balboa Park
Bart-logo.svg
BSicon tSTR.svg
BSicon HUBe.svg
BSicon uKHSTACCa.svg
BSicon uexSTR.svg
San Jose and Geneva M Ocean View logo.svg
BSicon tSTR.svg
BSicon uSTR.svg
BSicon uexKHSTe.svg
Mission and Onondaga
closed
1952
BSicon tSTR.svg
BSicon uLSTRe.svg
M Ocean View logo.svg to St. Francis Circle
BSicon tCONTf.svg
Bart-logo.svg to Millbrae & SFO

The K Ingleside is a light rail line of the Muni Metro system in San Francisco, California. It mainly serves the West Portal and Ingleside neighborhoods. The line opened on February 3, 1918, and was the first line to use the Twin Peaks Tunnel.

Contents

Route description

The outer terminal of the K Ingleside is at Balboa Park station, where it shares a terminal loop plus loading and unloading platforms with the J Church. The line runs in a dedicated median in Ocean Avenue as far as Ocean Avenue/CCSF Pedestrian Bridge station, then in mixed traffic to Junipero Serra and Ocean station. Surface stations are typically boarding islands located between the tracks and the outer traffic lanes. The line again has a short dedicated median on Junipero Serra Boulevard. It joins the M Ocean View at St. Francis Circle station, from where the lines run in mixed traffic to a junction with the L Taraval outside West Portal station. The K Ingleside runs through the Twin Peaks Tunnel and Market Street subway to its inner terminal at Embarcadero station.

Operation

The K Ingleside begins service at 5 a.m. on weekdays, 6 a.m. Saturdays and 8 a.m. Sundays, with the end of service occurring around 12:30 a.m. each night. Weekday daytime headways are 10 minutes. [2] Weekend daytime headways are 12 minutes. [3]

A K Ingleside terminating at Balboa Park Station in 2023 K Ingleside Terminating at Balboa Park in 2023.jpg
A K Ingleside terminating at Balboa Park Station in 2023

Service is provided by overnight Owl buses during the hours that rail service is not running. The L Owl serves the portion between West Portal and Embarcadero, and the 91 Owl serves the portion between Balboa Park and West Portal. The K Owl bus runs a limited number of trips during late nights and early mornings.

Prior to the COVID-19 pandemic, on weekends, service is provided by K Ingleside Bus, which runs from 5 a.m. until the start of rail service. The bus line largely follows the rail line, but it uses surface streets to parallel sections where the rail line has dedicated rights-of-way. [4]

History

Market Street Railway

The Market Street Railway opened a branch – built in just six days – of its Mission Street line along Ocean Avenue to Victoria Street on December 4, 1895, to serve the new Ingleside Racetrack. [5] The line was extended to the Ingleside House (where Ocean Avenue now meets Junipero Serra Boulevard) shortly thereafter. [6] The 1906 earthquake damaged many cable car and streetcar lines; in the aftermath, the United Railroads (URR) – successor to the Market Street Railway – closed many cable car lines and expanded the electric streetcar system. The URR resumed service on the Ocean Avenue line on May 6, 1906; the line (route 12) was soon extended to Ocean Beach via Junipero Serra Boulevard and Sloat Boulevard. [7]

Municipal Railway

A PCC Streetcar on K Ingleside in 1967 Muni 1031 as K Ingleside at Ocean and Lee, August 1967.jpg
A PCC Streetcar on K Ingleside in 1967

The San Francisco Municipal Railway (Muni) opened its K line along with the Twin Peaks Tunnel on February 3, 1918. The line originally ran from St. Francis Circle station along West Portal Avenue, through the tunnel, along Market Street to Van Ness Avenue (joining the J Church at Church Street), and along existing tracks on Van Ness Avenue to Pine Street. On June 1, 1918, the J and K lines were removed from Van Ness Avenue and extended along Market Street to a loop at the Ferry Building. [7]

The existing URR streetcar service on Ocean Avenue formed a barrier to continued Muni expansion into the Ingleside district. On November 25, 1918, the city and the private URR signed the "Parkside Agreements", which allowed Muni streetcars to use URR trackage on Ocean Avenue as far as Harold Avenue, as well as on Taraval Street, in exchange for a cash payment and shared maintenance costs. [8] :74 The K Ingleside line was extended south on Junipero Serra Boulevard and east on Ocean Avenue to Miramar Avenue on February 21, 1919. On May 18, it was extended several blocks further east to Brighton Avenue, then two blocks south on Grafton to a stub-end terminal at Grafton Avenue. [7]

Every other inbound car on Sundays and holidays continued onto the L Taraval line (rather than to downtown) beginning on April 13, 1919; this ended on October 21, 1923, when the L Taraval line was extended to downtown at all times. [7] Every other inbound car operated to the new East Bay Terminal beginning on January 15, 1939; all cars ran there starting on January 1, 1941. [7] Muni bought the Market Street Railway (ex-URR) in 1944; route 12 service was removed from Ocean Avenue on April 8, 1945, leaving just the K Ingleside. On April 21, every other outbound K car was extended on Ocean Avenue and Onondaga Street to Mission Street, providing a direct connection to route 14. [7]

On January 21, 1951, the 48 crosstown route replaced streetcars on the K and L lines on evenings and holidays. All-rail service returned on May 18, 1952, at which time the trackage on Brighton Avenue was abandoned and replaced with the Phelan Loop at Phelan Avenue near City College. [8] :186 Service past the loop to Mission ended on October 10, 1952, although trackage as far as San Jose Avenue was kept for non-revenue moves to the carhouse. [7]

Service was diverted to Duboce Avenue, Church Street, and 17th Street on December 2, 1972, due to construction of the Market Street subway. [9] On April 23, 1979, the line was lengthened to Balboa Park BART Station. Initially, only supplemental trips running from West Portal and using newly-in-service Boeing Light Rail Vehicles (LRVs) served the new extension, weekdays only, and most K-line service continued to use PCC streetcars running from downtown to Phelan Loop. [10] The LRV shuttle service ended in February 1980, and PCC-operated service was extended to Balboa Park but lasted only four months before the weekday service was replaced by a temporary K-L crosstown route using LRVs (and weekend service cut back to Phelan Loop). Additional changes to the service configuration followed until finally on December 17, 1980, the K line became operated as a through service from Embarcadero Station to Balboa Park, using LRVs, on weekdays only. [10] Weekend service continued to use PCC cars until September 1982, [11] when the Muni Metro became fully operational.

From February 2001 to June 7, 2003, K Ingleside service was cut back to St. Francis Circle and replaced by buses on Ocean Avenue for the Ocean Avenue Reconstruction and Improvement Project, a major street repaving and utility replacement project. The Muni tracks and overhead power system were replaced, boarding islands were reconstructed, and accessible platforms built at Ocean and Lee. [12]

Following service changes on June 30, 2007, the K Ingleside and the T Third Street lines were spliced together inside the Market Street subway tunnel, [13] though keeping their respective line designations, resulting in an upside-down horseshoe-shaped route from Balboa Park to Bayshore and Sunnydale. At West Portal Station, inbound K trains heading towards downtown change their signs to the T line; conversely, at Embarcadero Station, T trains heading into downtown change signs to the K line. The trains show the ultimate destination of the spliced lines rather than the intermediate "terminus" of the individual line.

Later changes

Service on the line was modified from June 25 to August 24, 2018 due to the Twin Peaks Tunnel shutdown. The underground section of the line was closed west of Castro station, while the surface section of the K line was through-routed with the J Church line. [14]

On August 25, 2018, at the conclusion of the shutdown, Muni began running permanently two-car trains on the K/T line (as had been used east of Castro during the shutdown). Because of insufficiently-long boarding islands, the rear car was closed on the Ocean Avenue section of the line. [15] Passengers in the rear car on outbound trains were forced to move to the front car at Junipero Serra and Ocean station, and inbound K trains did not open the rear car to passengers until passing Junipero Serra and Ocean. [16]

On March 30, 2020, Muni Metro service was replaced with buses due to the COVID-19 pandemic. [17] Rail service returned on August 22, 2020, with the routes reconfigured to improve reliability in the subway: K Ingleside and L Taraval service were interlined, running between Taraval and Sunset and Balboa Park station; no K Ingleside or L Taraval service entered the subway. The T Third Street line was interlined with the M Ocean View line instead of the K Ingleside. [18] The forced transfer at West Portal was criticized by disability advocates. [19] K Ingleside light-rail service was replaced again by the K Bus on August 25, 2020 due to issues with malfunctioning overhead wire splices and the need to quarantine control center staff after a positive COVID-19 case. [20]

K Ingleside light-rail service resumed again on May 15, 2021; again, through-routed with T Third Street. [21] On January 7, 2023, the T Third Street line was rerouted into the Central Subway ending 16 years of being interlined with the K Ingleside, which resumed terminating at Embarcadero. [22] The K Ingleside and T Third Street will be again interlined from February 26 to March 14, 2025, during a closure of the Central Subway. [23]

In 2023, the SFMTA began planning work on the K Ingleside Rapid Project, which was intended to increase capacity and reduce travel time on the Ocean Avenue portion of the line. Planned changes included longer platforms at four stops to allow use of two-car trains, elimination of one stop, and transit lanes between Junipero Serra Boulevard and Lee Avenue. [24] These changes were approved by the SFMTA board on March 5, 2024. [25] "Quick-build" implementation of some project elements, including platform reconstruction, began in August 2024. [26] The stop at Ocean and Westgate / Ocean and Cerritos was closed on September 28, 2024. At that time, the second car began staying open to passengers as far as Ocean Avenue/CCSF Pedestrian Bridge on Balboa Park-bound trains. [27] Construction of the full project is planned to take place from 2027 to 2029. [28]

Future

Several long-term changes to the line were proposed in 2016. An SFMTA rail strategy plan proposed a 3-mile (4.8 km) light rail line from Balboa Park to Bayshore station, likely to be an extension of the K Ingleside. Its costs were estimated between $260 million and $610 million, with completion in the 2030s. [29] A proposal for a M Ocean View subway included the K using the new subway as far west as St. Francis Circle, with a new portal in the median of Junipero Serra Boulevard. [30]

Station listing

The K Ingleside line stops at concrete boarding islands in the middle of the street next to the tracks. Some stops have raised platforms for accessibility.

Station/StopNeighborhoodMuni Metro linesNotes and connections
Wheelchair symbol.svg Embarcadero Financial District J Church logo.svg L Taraval logo.svg M Ocean View logo.svg N Judah logo.svg S Shuttle logo.svg
Wheelchair symbol.svg Montgomery Street J Church logo.svg L Taraval logo.svg M Ocean View logo.svg N Judah logo.svg S Shuttle logo.svg
Wheelchair symbol.svg Powell Street Mid-Market,
Civic Center,
Tenderloin
J Church logo.svg L Taraval logo.svg M Ocean View logo.svg N Judah logo.svg S Shuttle logo.svg
T Third Street logo.svg (at Union Square/Market St)
Wheelchair symbol.svg Civic Center/UN Plaza J Church logo.svg L Taraval logo.svg M Ocean View logo.svg N Judah logo.svg S Shuttle logo.svg
Wheelchair symbol.svg Van Ness J Church logo.svg L Taraval logo.svg M Ocean View logo.svg N Judah logo.svg S Shuttle logo.svg
Wheelchair symbol.svg Church Duboce Triangle,
Mission Dolores
J Church logo.svg (Surface stop)
L Taraval logo.svg M Ocean View logo.svg S Shuttle logo.svg
Wheelchair symbol.svg Castro Castro District L Taraval logo.svg M Ocean View logo.svg S Shuttle logo.svg
Wheelchair symbol.svg Forest Hill Forest Hill L Taraval logo.svg M Ocean View logo.svg S Shuttle logo.svg Aiga bus trans.svg Muni: 36, 43, 44, 52
Wheelchair symbol.svg West Portal West Portal L Taraval logo.svg M Ocean View logo.svg S Shuttle logo.svg
West Portal and 14th Avenue M Ocean View logo.svg Aiga bus trans.svg Muni: 57
Wheelchair symbol.svg St. Francis Circle St. Francis Wood M Ocean View logo.svg Aiga bus trans.svg Muni: 23, 57
Wheelchair symbol.svg Junipero Serra and Ocean Ingleside Terraces,
Balboa Terrace
Aiga bus trans.svg Muni: 57
Ocean and San Leandro
Ocean and Aptos
Ocean and Fairfield (inbound)
Ocean and Victoria (outbound)
Ingleside Terraces
Wheelchair symbol.svg Ocean and Dorado (inbound)
Wheelchair symbol.svg Ocean and Jules (outbound)
Ingleside,
Westwood Park
Ocean and Miramar
Wheelchair symbol.svg Ocean and Lee Aiga bus trans.svg Muni: 29
Wheelchair symbol.svg Ocean Avenue/CCSF Pedestrian Bridge
Wheelchair symbol.svg Balboa Park Balboa Park J Church logo.svg M Ocean View logo.svg

References

  1. "Average daily Muni boardings by route and month (pre-pandemic to present)". San Francisco Municipal Transportation Agency. January 2024.
  2. Weekday Frequency Guide (Effective October 2, 2021). San Francisco Municipal Transit Agency.
  3. Weekend Frequency Guide (Effective October 2, 2021). San Francisco Municipal Transit Agency.
  4. Aguilar, Enrique (February 10, 2020). "Service Changes Coming February 22". (Press release). San Francisco Municipal Transit Agency. Retrieved November 23, 2021.
  5. Rice, Walter; Echeverria, Emiliano (2002). When Steam Ran on the Streets of San Francisco. Harold E. Cox. p. 66.
  6. Southern Pacific Company (1897). "Guide Map Of The City of San Francisco". H.S. Crocker Co. via David Rumsey Map Collection.
  7. 1 2 3 4 5 6 7 Stindt, Fred A. (October 1990). San Francisco's Century of Street Cars. pp. 119, 189. ISBN   0961546514.
  8. 1 2 Perles, Anthony (1981). The People's Railway: The History of the Municipal Railway of San Francisco. Interurban Press. ISBN   0916374424.
  9. Callwell, Robert (September 1999). "Transit in San Francisco: A Selected Chronology, 1850–1995" (PDF). San Francisco Municipal Railway.
  10. 1 2 McKane, John; Perles, Anthony (1982). Inside Muni: The Properties and Operations of the Municipal Railway of San Francisco. Glendale, CA (US): Interurban Press. p. 198. ISBN   0-916374-49-1.
  11. Perles, Anthony (1984). Tours of Discovery: A San Francisco Muni Album. Interurban Press. p. 126. ISBN   0-916374-60-2.
  12. "Grand Re-Opening of Ocean Avenue Celebrated" (Press release). San Francisco Municipal Railway. June 20, 2003. Archived from the original on December 5, 2004. Retrieved February 12, 2020.
  13. Gordon, Rachel (June 4, 2007). "T-Third line causing delays, so officials consider new routes". San Francisco Chronicle . Retrieved December 15, 2013.
  14. "Twin Peaks Tunnel Improvements". San Francisco Municipal Transportation Agency. June 25, 2018. Archived from the original on June 26, 2018.
  15. von Krogh, Bonnie Jean (August 24, 2018). "Two-Car Trains Now Permanent on K/T Line" (Press release). San Francisco Municipal Transportation Agency.
  16. "Two-Car Trains on K and T Line". San Francisco Municipal Transportation Agency. 2018. Retrieved August 27, 2018.
  17. Fowler, Amy (March 26, 2020). "Starting March 30: New Muni Service Changes" (Press release). San Francisco Municipal Transportation Agency.
  18. Maguire, Mariana (August 18, 2020). "Major Muni Service Expansion August 22" (Press release). San Francisco Municipal Transportation Agency.
  19. Graf, Carly (August 18, 2020). "Muni 'improvements' could make things harder for seniors, disabled". San Francisco Examiner.
  20. "Bus Substitution for All Rail Lines" (Press release). San Francisco Municipal Transportation Agency. August 25, 2020.
  21. "Welcome Back to the Westside, K Ingleside Trains!" (Press release). San Francisco Municipal Transportation Agency. April 16, 2021.
  22. "Central Subway Opens November 19 with Special Weekend Service" (Press release). San Francisco Municipal Transportation Agency. November 1, 2022.
  23. Fowler, Amy (February 20, 2025). "Central Subway to Close Feb. 26 - March 14: What We're Fixing and How to Get Around" (Press release). San Francisco Municipal Transportation Agency.
  24. "K Ingleside Rapid Project Detail Boards" (PDF). San Francisco Municipal Transportation Agency. January 2024.
  25. "Quick-build improvements coming after K Ingleside Rapid Project Approved by SFMTA Board" (Press release). San Francisco Municipal Transportation Agency. March 2024.
  26. "Ocean Avenue Quick-Build Safety Upgrades Start August 10" (Press release). San Francisco Municipal Transportation Agency. August 2024.
  27. "Muni Service Changes: Effective Saturday, September 28, 2024" (Press release). San Francisco Municipal Transportation Agency. September 2024.
  28. "K Ingleside Rapid Project". San Francisco Municipal Transportation Agency. January 2024. Archived from the original on January 16, 2024.
  29. "Draft Rail Capacity Strategy" (PDF). San Francisco Municipal Transportation Agency. February 2016. p. 32.
  30. 19th Avenue/M Ocean View Project: Subway Station Entrances (PDF) (Report). San Francisco Municipal Transportation Agency. February 2016.
Template:Attached KML/K Ingleside
KML is not from Wikidata

Commons-logo.svg Media related to K Ingleside at Wikimedia Commons