Overview | |
---|---|
Headquarters | Penygroes |
Locale | Wales |
Dates of operation | 1828–1865 |
Successor | Carnarvonshire Railway |
Technical | |
Track gauge | 3 ft 6 in (1,067 mm) and 4 ft 8+1⁄2 in (1,435 mm) |
Nantlle Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Nantlle Railway (or Nantlle Tramway) was a Welsh narrow gauge railway. It was built to carry slate from several slate quarries across the Nantlle Valley to the harbour at Caernarfon for export by sea. The line provided a passenger service between Caernarfon and Talysarn from 1856 to 1865. It was the first public railway to be operated in North Wales. [1]
A tramway linking the Nantlle slate quarries to Caernarfon was proposed in the 1810s. The Nantlle Railway was authorised by an Act of Parliament in May 1825, and the company began construction of the railway. The line was designed and constructed by George Stephenson and his brother, Robert. [2] The line opened in 1828 and was operated using horses.
During the 1860s and 1870s, a portion of the line was replaced by the standard gauge branch of the London and North Western Railway (LNWR) which acquired the line in the late 1860s. The Nantlle Railway was closed in 1963 by British Railways (BR), when it was the last line to be operated by BR using horse traction. Much of the route has been overlaid with roads or obliterated by other developments, but several railway structures remain. Two miles of the northern section of the original Nantlle Railway trackbed, between Dinas and the Coed Helen Lane tunnel, are part of the reopened Welsh Highland Railway, although much is off line as was the Carnarvonshire Railway route on which the restored WHR was constructed.
The first proposals for a railway in the Nantlle Valley were made during 1813. Slate quarries had developed to north and west of Nantlle, and the slate was transported to wharves at Caernarfon by pack horse. A more efficient system was required to enable the quarries to compete with Dinorwic and Penrhyn.
A 9 miles (14 km) route for the line was surveyed, running westwards from tramways linked to the quarries, towards Talysarn and Penygroes. The line then turned northwards, passing through Groeslon, Llanwnda, Dinas and Bontnewydd. The line was also carried copper from the mine at Drws-y-coed, to the east of Nantlle.
Nantlle Railway Act 1825 | |
---|---|
Act of Parliament | |
Long title | An Act for making and maintaining a Railway or Tram Road from or near a certain Slate Quarry called Gloddfarlon, in the Parish of Llandwrog, in the County of Carnarvon, to the Town and Port of Carnarvon, in the same County. |
Citation | 6 Geo. 4. c. lxiii |
Dates | |
Royal assent | 20 May 1825 |
Text of statute as originally enacted |
The Nantlle Railway Act 1825 (6 Geo. 4. c. lxiii) was passed on 20 May 1825. The Nantlle Railway Company was incorporated in June 1825 to construct and operate the railway, and in August 1825 it advertised for a sub-contractor to build the line. [3] The company raised a working capital of £20,000 by issuing shares at £100 each. Most of the shareholders were owners of the quarries served by the line. The chief engineer was the railway pioneer George Stephenson, and construction was overseen by his son Robert, who was assisted by John Gillespie. [1]
The line was run as a toll road with customers charged a fee for their goods to be hauled to their destination.
Nantlle Railway Act 1827 | |
---|---|
Act of Parliament | |
Citation | 7 & 8 Geo. 4. c. iii |
Dates | |
Royal assent | 21 March 1827 |
Text of statute as originally enacted |
Nantlle Railway Act 1828 | |
---|---|
Act of Parliament | |
Citation | 9 Geo. 4. c. lxii |
Dates | |
Royal assent | 23 May 1828 |
Text of statute as originally enacted |
On 21 March 1827, a second act of Parliament, the Nantlle Railway Act 1827 (7 & 8 Geo. 4. c. iii), was passed, authorising an additional £70,000 of shares to finance construction. The act mortgaged the railway's infrastructure, and restricted the fees it could charge until all debts were paid. On 23 May 1828, in response to slower than expected progress, a third act, the Nantlle Railway Act 1828 (9 Geo. 4. c. lxii) was passed extending by five years the time available for construction. Robert Williams of Bangor was appointed the resident engineer and William Owen of Gwaenfynydd, Anglesey was contracted to construct the railway.
The railway required significant civil engineering work, including a 400 feet (120 m) long embankment and culvert to the west of Bontnewydd, two tunnels, and a bridge. The short Coed Helen Tunnel carried the line underneath a road on a gentle gradient, rising from north to south. Its walls and roof were built of coursed blocks up to 4 feet (1.2 m) long. The line crossed under the driveway of Plas Dinas house in the 150 feet (46 m) long Plas Dinas Tunnel. It was 8 feet (2.4 m) wide and had a semi-circular arched roof, 6 feet (1.8 m) high, made of three rings of brick, supported on walls of stone rubble. The Plas Dinas Tunnel is approached by a pair of 35 feet (11 m) deep cuttings.
The Afon Gwyrfai Bridge is 50 feet (15 m) long with a single arch that carried the railway over the Afon Gwyrfai to the west of Bontnewydd. It is 20 feet (6.1 m) wide at its base, narrowing towards the crown and 18 feet (5.5 m) above water level. It is built from rusticated stone blocks. In September 1999, the Afon Gwyrfai Bridge was listed as a Grade II structure.
The track was laid with lightweight wrought iron fish-bellied rails to 3 ft 6 in (1,067 mm), significantly wider than the 2 ft (610 mm) gauge found on contemporary quarry railways, and narrower than the 4 ft 8+1⁄2 in (1,435 mm) which became the standard gauge.
The Nantlle Railway was single track throughout, with 22 passing loops but without any signals. Trains ran from one passing place to the next using line of sight to ensure safe working. This led to disputes when trains met between passing loops. Trains typically consisted of four or five wagons, pulled by a single horse travelling at walking pace of around 3 miles per hour (4.8 km/h).
The Nantlle Railway was acquired by the Carnarvonshire Railway. On 25 July 1867, the line from Pant on the southern edge of Caernarfon at Coed Helen, to Tyddyn Bengam, north of Penygroes, was replaced by a single-track standard-gauge line. The Carnarvonshire Railway ran trains from Caernarfon to Afon Wen.
In July 1870, the Carnarvonshire Railway and the remaining narrow-gauge section of the Nantlle Railway was acquired by the London and North Western Railway (LNWR). [4]
This left 3 ft 6 in (1,067 mm) gauge sections at the north and south ends of the line, with 5 miles (8.0 km) of standard gauge in the middle. Slates were loaded onto narrow gauge wagons near the quarries and drawn by horses to Tyddyn Bengam, where the narrow gauge wagons and their contents were loaded onto standard-gauge transporter wagons, three at a time. North of Pant, the narrow gauge wagons were unloaded onto the narrow-gauge tracks and hauled by horses along the last 50 chains (1.0 km) to the quayside at Caernarfon Harbour. This process was slow, costly.[ citation needed ]
In 1870, the LNWR extended the standard gauge line north from Pant to Caernarfon Station where it met a branch built from Bangor in 1852. In December 1871, the standard gauge tracks were extended onto the quayside, removing the need for transhipment and the isolated Caernarfon section of the Nantlle was abandoned. That same year, the LNWR built a short branch from Penygroes to a new station at Talysarn, named Nantlle. This was built partly on a new alignment and partly over the narrow gauge tracks. Extensive transshipment yards were laid out at 'Nantlle' where slate arriving on the narrow-gauge was loaded into standard-gauge wagons. [5]
The remaining approximately 2 miles (3.2 km) of 3 ft 6 in (1,067 mm) gauge horse-drawn tramway linked Nantlle with the quarries to the west and north. [1] It was operated by the LNWR until 1923 when it was absorbed into the London Midland and Scottish Railway (LMS). From 1948, the line was owned and operated by British Railways (BR). [6]
In its final years, the line attracted enthusiasts' railtours. [7] When the Ffestiniog Railway celebrated its Centenary of Steam on 22 May 1963, a Nantlle horse and handler hauled a demonstration train at Porthmadog. [8]
The railway was closed in 1963, when the branch to which it was connected was shut. [9] The last recorded use of horses by BR was on the Nantlle railway.[ citation needed ]
The narrow gauge line was a wagonway constructed to a gauge of 3 ft 6 in (1,067 mm) and equipped with four wheeled wagons fitted with double-flanged wheels, [10] [11] which were loose on fixed axles. For many of their later years many wagons had extended axles which protruded beyond the wheels. [12] Some wagons had eyes bolted to the tops of their sides to enable them to be lifted bodily by the Blondins used in some of the quarries. [13] The wagons were owned by the tramway, rather than the quarries and the many that survived into BR ownership had narrow steel plate bodies, which were mounted between the wheels and bolted to the axles. Their shape and structure appears to have changed little from the railway's earliest years.
Two miles of the northern section of the original Nantlle Railway trackbed, between Dinas and the Afon Seiont, now is part of the reopened Welsh Highland Railway. Much of the route has been built over, but in 2016 the remains of three significant Nantlle Railway structures could still be found:
The Ffestiniog Railway is a heritage railway based on 1 ft 11+1⁄2 in narrow-gauge, located in Gwynedd, Wales. It is a major tourist attraction located mainly within the Snowdonia National Park.
The North Wales Narrow Gauge Railways (NWNGR) was a railway company that planned to build a number of inter-connected 1 ft 11+1⁄2 in narrow-gauge railways across North Wales. The first two of these lines - jointly known as the "Moel Tryfan Undertaking" - were authorised by Act of Parliament 1872 and were built and opened in the 1870s. The original main line ran from Dinas Junction to Bryngwyn and opened in 1877. The second line was a branch from Tryfan Junction to South Snowdon, though shortly after opening, the company designated the Tryfan Junction to Bryngwyn section as the branch, and the Dinas Junction to South Snowdon section as the main line.
The Nantlle Valley is an area in Gwynedd, North Wales, characterised by its numerous small settlements.
The Penrhyn Quarry Railway was a narrow-gauge railway in Caernarfonshire, Wales. It served the Penrhyn quarry near Bethesda, taking their slate produce to Port Penrhyn, near Bangor. The railway was around six miles (9.7 km) long and used a gauge of 1 ft 10+3⁄4 in.
The Croesor Tramway was a Welsh, 2 ft narrow gauge railway line built to carry slate from the Croesor slate mines to Porthmadog. It was built in 1864 without an Act of Parliament and was operated using horse power.
Dinas is a large hamlet near Bontnewydd, Caernarfon, in Gwynedd, north-west Wales.
Dinas is a station on the narrow gauge Welsh Highland Railway, which was built in 1877 as the North Wales Narrow Gauge Railways Moel Tryfan Undertaking to carry dressed slate for trans-shipment to the LNWR. Passenger services ceased on 26 September 1936 until which time Dinas had been a joint station, known as Dinas Junction with the LNWR and later the LMS. In 1951, British Railways closed their part of the station but the line through the station remained open until the line from Caernarvon to Afon Wen was closed in 1964. The trackbed was subsequently developed as the Lôn Eifion tourist cycle route.
Bontnewydd is an unstaffed halt on the narrow gauge Welsh Highland Railway. The halt was opened on 31 May 1999 on the petition of the villagers of Bontnewydd, and is between Caernarfon and Dinas on the Lôn Eifion cycle route. It is a request stop with no station buildings and a single low platform. The train services are operated by the Festiniog Railway Company.
Caernarfon Station is the northern terminus of the narrow gauge Welsh Highland Railway, located in the town of Caernarfon. It was opened on 11 October 1997 when the line was constructed from Dinas.
The Carnarvonshire Railway was a railway connecting Caernarvon with Afon Wen.
The Gorseddau Tramway was a 3 ft narrow gauge railway built in Wales in 1856 to link the slate quarries around Gorseddau with the wharves at Porthmadog. It was an early forerunner of the Gorseddau Junction and Portmadoc Railway and subsequently the Welsh Highland Railway.
Lôn Eifion is part of Lôn Las Cymru, the Welsh National Cycle Route, which is about 400 km (250 mi) long.
The restoration of the Welsh Highland Railway has a colourful and complex history. This article provides the modern history.
Chaloner is a preserved narrow-gauge steam locomotive. It was built in 1877 at De Winton's Union Works in Caernarfon and is an example of their distinctive vertical-boilered design, used in the North Wales slate industry.
Cilgwyn quarry is a slate quarry located on the north edge of the Nantlle Vale, in North Wales. It is one of the earliest slate quarries in Great Britain, being worked as early as the 12th century. King Edward I of England was reputed to have stayed in a house roofed by Cilgwyn slates, during the Welsh wars of independence. It is one of the major slate quarries in the Nantlle Valley area.
Carnarvon (Pant) was the temporary northern terminus of the Carnarvonshire Railway, located on the southern fringe of Caernarfon, Gwynedd, Wales.
Nantlle was a railway station located in Talysarn, a neighbouring village to Nantlle, in Gwynedd, Wales.
Carnarvon Castle railway station was opened in 1856 by the narrow gauge Nantlle Railway near the foot of what is today the Allt Y Castell which slopes down to Caernarfon's harbour area. It was the line's northern terminus and was the closest of Caernarfon's ultimately five stations to the historic town centre.
The Slate Industry in the Nantlle Valley was the major industry of the area. The Nantlle Valley is the site of oldest slate quarry in Wales at Cilgwyn, and during the nineteenth and twentieth centuries it was a major centre of the Slate industry in Wales. The quarries of the area are a World Heritage Site.
Hugh Beaver Roberts was a solicitor, originally based in Bangor, Caernarfonshire who became an entrepreneur involved in the construction of narrow gauge railways and the ownership of slate quarries in North Wales during the second half of the 19th century.