Sierra SunTower

Last updated
Sierra SunTower
Sierra SunTower Power Plant.jpg
The Sierra SunTower power plant in Lancaster, California.
Sierra SunTower
CountryUnited States
Location Mojave Desert, California
Coordinates 34°43′53″N118°08′19″W / 34.73139°N 118.13861°W / 34.73139; -118.13861
StatusOperational
Construction began2009;15 years ago (2009)
Commission date 2010;14 years ago (2010)
Decommission date
  • December 2014
Owner(s) eSolar
Operator(s) eSolar
Solar farm
Type CSP
CSP technology Solar power tower
Collectors 24,000
Site area20 acres (0 km2)
Power generation
Nameplate capacity 5 MW
Annual net output 540 MWh
External links
Commons Related media on Commons

Sierra SunTower was a 5 MW commercial concentrating solar power (CSP) plant built and operated by eSolar. The plant is located in Lancaster, California. As of mid-September, 2022, the two towers that were the center of the facility are no longer standing. However the rest of the plant is still present.

Contents

Overview

Sierra SunTower was designed to validate eSolar's technology at full scale, effectively eliminating scaleup risks, and to serve as a model from which future plants of this type would be built. [1]

The Sierra SunTower facility was based on power tower CSP technology. The plant had an array of heliostats which reflected solar radiation to a tower-mounted thermal receiver. The concentrated solar energy boiled water in the receiver to produce steam. The steam was piped to a turbine generator which converted the energy to electricity. The steam coming out of the turbine was condensed and pressurized back into the receiver. [2]

History

In the summer of 2009, eSolar unveiled the 5 MW Sierra SunTower plant, a commercial power facility in Lancaster, California, to demonstrate the efficacy of this CSP technology. The Sierra SunTower was connected to the Southern California Edison (SCE) grid and, in spring 2010, it was the only commercial CSP tower facility in North America.

At the plant's official unveiling, California Governor Arnold Schwarzenegger praised the eSolar solution, “...proving that California’s energy and environmental leadership are advancing carbon-free, cost-effective energy that can be used around the world.” [2]

Shutdown

In 2015, the Sierra SunTower was shut down for commercial operation, as it was deemed to be too costly to operate except on the sunniest of days. [3]

Location

The project site occupied approximately 8 hectares (20 acres) in an arid valley in the southwestern corner of the Mojave Desert at 35° north latitude, on private farm land. [4]

Equipment

The Sierra SunTower included two modules. 24,000 heliostats, divided between four sub-fields, tracked the sun and focused its energy onto two tower-mounted receivers. The focused heat converted feedwater piped to the receivers into superheated steam that drove a reconditioned 1947 GE turbine generator to produce electricity. The steam passed through a steam condenser, reverted to water through cooling, and the process repeated.

The Sierra SunTower power plant Sierra SunTower Site.jpg
The Sierra SunTower power plant

During the 12 months of construction, Sierra SunTower created over 300 temporary jobs. During operation, the site employed 21 permanent employees.

Output

Sierra SunTower was certified by the California Energy Commission as a renewable energy facility. Power from the facility was sold under a Power Purchase Agreement (PPA) with SCE, with a projected maximum output sufficient to power approximately 4,000 homes.

The 5 MW output from Sierra SunTower displaced CO2 emissions by 7,000 tons per year, an amount equivalent to planting 5,265 acres (21.31 km2) of trees, removing 1,368 automobiles from the road, or saving 650,000 gallons of gasoline. [5]

Awards

In December 2009, editors of Power Engineering magazine selected Sierra SunTower as the winner of the “Best Renewable Project”. Each year, Power Engineering magazine recognizes the world's best energy projects. The award distinguished Sierra as an exceptional power generation project toward meeting growing global demand. [6]

In February 2010, Sierra SunTower won Renewable Energy World's “Renewable Project of the Year” award. The award recognized eSolar's achievements in the clean energy industry by naming Sierra SunTower an exceptional breakthrough in the commercialization of solar thermal technology. [5]

Performance data from US Treasury Dept.

According to US Treasury Department - Performance Report and Certification Form, the eSolar Sierra SunTower generated 539 MWh (MegaWatt-hour) of electricity from August 1, 2010, to July 31, 2011. A total of 539 MWh of gross electrical energy was generated at Sierra during the period Aug 1, 2010 and July 31, 2011. This was approximately 12.6% of the expected power generation of the initial estimate of 4270 MWh.

Production

Generation (MW·h) of Sierra SunTower Solar Gen Station [7]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
20101133147667573655324208476
2011012172734433738262177270
201222357821131221058378613123780
2013000000000009494
20140000000000000
Total1,620

See also

Related Research Articles

<span class="mw-page-title-main">Solar thermal energy</span> Technology using sunlight for heat

Solar thermal energy (STE) is a form of energy and a technology for harnessing solar energy to generate thermal energy for use in industry, and in the residential and commercial sectors.

<span class="mw-page-title-main">The Solar Project</span>

The SOLAR Project consists of the Solar One, Solar Two and Solar Tres solar thermal power plants based in the Mojave Desert, United States and Andalucía, Spain. The US Department of Energy (DOE) and a consortium of US utilities built the country's first two large-scale, demonstration solar power towers in the desert near Barstow, California.

<span class="mw-page-title-main">Nevada Solar One</span> Concentrated solar power station

Nevada Solar One is a concentrated solar power plant, with a nominal capacity of 64 MW and maximum steam turbine power output up to 72 MW net (75 MW gross), spread over an area of 400 acres (160 ha). The projected CO2 emissions avoided is equivalent to taking approximately 20,000 cars off the road. The project required an investment of $266 million USD, and the project officially went into operation in June 2007. Electricity production is estimated to be 134 GWh (gigawatt hours) per year.

<span class="mw-page-title-main">Gemasolar Thermosolar Plant</span> Concentrated solar power plant

Gemasolar is a concentrated solar power plant with a molten salt heat storage system. It is located within the city limits of Fuentes de Andalucía in the province of Seville, Spain.

<span class="mw-page-title-main">Themis (solar power plant)</span> Solar power station and research and development centre in France

The THEMIS solar power tower is a research and development centre focused on solar energy. It is located near the village of Targasonne, in the department of Pyrénées-Orientales, south of France, 3 kilometres from the world's largest solar furnace in Odeillo.

<span class="mw-page-title-main">Solar power plants in the Mojave Desert</span> Supplies power to the electricity grid using excellent solar radiation

There are several solar power plants in the Mojave Desert which supply power to the electricity grid. Insolation in the Mojave Desert is among the best available in the United States, and some significant population centers are located in the area. These plants can generally be built in a few years because solar plants are built almost entirely with modular, readily available materials. Solar Energy Generating Systems (SEGS) is the name given to nine solar power plants in the Mojave Desert which were built in the 1980s, the first commercial solar plant. These plants have a combined capacity of 354 megawatts (MW) which made them the largest solar power installation in the world, until Ivanpah Solar Power Facility was finished in 2014.

<span class="mw-page-title-main">Solar power in Spain</span>

Spain is one of the first countries to deploy large-scale solar photovoltaics, and is the world leader in concentrated solar power (CSP) production.

<span class="mw-page-title-main">PS10 solar power plant</span> Concentrated solar power station in Spain

The PS10 Solar Power Plant, is the world's first commercial concentrating solar power tower operating near Seville, in Andalusia, Spain. The 11 megawatt (MW) solar power tower produces electricity with 624 large movable mirrors called heliostats. It took four years to build and so far has cost €35 million (US$46 million). PS10 produces about 23,400 megawatt-hours (MW·h) per year, for which it receives €271 (US$360) per MW·h under its power purchase agreement, equating to a revenue of €6.3 million per year.

<span class="mw-page-title-main">Solana Generating Station</span> Solar thermal power station in Arizona

The Solana Generating Station is a solar power plant near Gila Bend, Arizona, about 70 miles (110 km) southwest of Phoenix. It was completed in 2013. When commissioned, it was the largest parabolic trough plant in the world, and the first U.S. solar plant with molten salt thermal energy storage. Built by the Spanish company Abengoa Solar, the project can produce up to 280 megawatts (MW) gross, supplied by two 140 MW gross (125 MW net) steam turbine generators: enough electricity to meet the needs of approximately 70,000 homes and obviate the emission of roughly 475,000 tons of CO2 every year. Its name is the Spanish term for "sunny spot".

<span class="mw-page-title-main">PS20 solar power plant</span> Solar thermal energy plant in Spain

The PS20 solar power plant (PS20) solar power plant is a solar thermal energy plant in Sanlucar la Mayor near Seville in Andalusia, Spain. It was the world's most powerful solar power tower until the Ivanpah Solar Power Facility in California became operational in 2014. The 20 megawatt (MW) solar power tower produces electricity with large movable mirrors called heliostats.

<span class="mw-page-title-main">Concentrated solar power</span> Use of mirror or lens assemblies to heat a working fluid for electricity generation

Concentrated solar power systems generate solar power by using mirrors or lenses to concentrate a large area of sunlight into a receiver. Electricity is generated when the concentrated light is converted to heat, which drives a heat engine connected to an electrical power generator or powers a thermochemical reaction.

<span class="mw-page-title-main">BrightSource Energy</span>

BrightSource Energy, Inc. is an Oakland, California based, corporation that designs, builds, finances, and operates utility-scale solar power plants. Greentech Media ranked BrightSource as one of the top 10 greentech startups in the world in 2008.

<span class="mw-page-title-main">Solar power tower</span> Type of solar furnace with a tower receiving focused light

A solar power tower, also known as 'central tower' power plant or 'heliostat' power plant, is a type of solar furnace using a tower to receive focused sunlight. It uses an array of flat, movable mirrors to focus the sun's rays upon a collector tower. Concentrating Solar Power (CSP) systems are seen as one viable solution for renewable, pollution-free energy.

SolarReserve was a developer of utility-scale solar power projects which include Concentrated Solar Power (CSP) and Photovoltaic (PV) technology. The company has commercialized solar thermal energy storage technology that enables solar power tower CSP plants to deliver electricity day and night. In this technology, a molten salt is used to capture the energy from the sun and store it. When electricity is needed, the stored liquid salt is used to turn water into steam to turn a turbine and generate electricity.

eSolar Concentrating solar power

eSolar is a privately held company that develops concentrating solar power (CSP) plant technology. The company was founded by the Pasadena-based business incubator Idealab in 2007 as a developer of CSP plant technology. The company aims to develop a low cost alternative to fossil fuels through a combination of small heliostats, modular architecture, and a high-precision sun-tracking system. In October 2017, an article in GreenTech Media suggested that eSolar ceased business in late 2016.

Martin Next Generation Solar Energy Center is the solar parabolic-trough component of an integrated solar combined cycle (ISCC) 1150 MW plant, in western Martin County, Florida, United States, just north of Indiantown. The project was built by Florida Power & Light Company (FPL). Lauren Engineers & Constructors (Abilene, TX) was the EPC contractor for the project. Its construction began in 2008 and was completed by the end of 2010.

<span class="mw-page-title-main">Ivanpah Solar Power Facility</span> Concentrated solar thermal power station in the Mojave Desert of California

The Ivanpah Solar Electric Generating System is a concentrated solar thermal plant in the Mojave Desert. It is located at the base of Clark Mountain in California, across the state line from Primm, Nevada. The plant has a gross capacity of 392 megawatts (MW). It deploys 173,500 heliostats, each with two mirrors focusing solar energy on boilers located on three 459 feet (140 m) tall solar power towers. The first unit of the system was connected to the electrical grid in September 2013 for an initial synchronisation test. The facility formally opened on February 13, 2014. In 2014, it was the world's largest solar thermal power station.

<span class="mw-page-title-main">Mojave Solar Project</span>

The Mojave Solar Project (MSP) is a concentrated solar power (CSP) facility in the Mojave Desert in California, about 20 miles (32 km) northwest of Barstow. Surrounding the hamlet of Lockhart, Mojave Solar is adjacent to Harper Lake and the SEGS VIII–IX solar plant.

<span class="mw-page-title-main">Cerro Dominador Solar Thermal Plant</span> Chilean electrical plant

Cerro Dominador Solar Power Plant is a 210-megawatt (MW) combined concentrated solar power and photovoltaic plant located in the commune of María Elena in the Antofagasta Region of Chile, about 24 kilometres (15 mi) west-northwest of Sierra Gorda. The project was approved by the Chilean government in 2013 and construction was started by Abengoa Solar Chile, a branch of the multinational Abengoa Spain. The plant was inaugurated on June 8, 2021. A follow-up project called Likana Solar bid $33.99/MWh in an auction in August 2021.

References

  1. Fehrenbacher, Katie (5 August 2009). "Live: eSolar Flips the Switch on First Solar Power Tower in U.S." Earth2tech.com.
  2. 1 2 "ESolar: Utility-Scale Solar Power". Archived from the original on 2009-08-11. Retrieved 2010-03-22.
  3. "eSolar Sierra SunTower: a History of Concentrating Solar Power Underperformance - GUNTHER Portfolio". Guntherportfolio.com. 5 April 2013.
  4. Mernit, Judith Lewis. A solar plant a tortoise could love High Country News, 10 August 2009. Accessed: 9 January 2011.
  5. 1 2 "Excellence in Renewable Energy Award Winners Announced". Renewableenergyworld.com.
  6. "2009 Projects of the Year". Powergenworldwide.com.
  7. "Sierra SunTower Solar Gen Station, Monthly". Electricity Data Browser. Energy Information Administration . Retrieved March 8, 2017.