Beacon Solar Project

Last updated
Beacon Solar Project
Beacon Solar Project
CountryUnited States
Location Kern County, California
Coordinates 35°15′25″N118°00′47″W / 35.257°N 118.013°W / 35.257; -118.013
StatusOperational
Construction began2014
Commission date 2017
Owner(s) Los Angeles Department of Water and Power
Solar farm
Type Flat-panel PV
Site area2,500 acres (1,000 ha)
Power purchase agreement < $0.085 / kWh for 25 years [1]
Power generation
Nameplate capacity 250 MW ac (291 MWac)

The Beacon Solar Project is a photovoltaic power station in the northwestern Mojave Desert, near California City in eastern Kern County, California. [2] [3] Split into five phases, the combined Beacon solar facilities generate 250 MW of renewable energy for the Los Angeles Department of Water and Power (LADWP). [3] The five phases of the project, fully completed in December 2017, include a total of 903,434 individual solar photovoltaic modules, mounted onto Nextracker single-axis tracking systems. [4]

Contents

The Beacon Solar Project was originally proposed by NextEra Energy using parabolic trough mirrors as solar energy collectors for a solar thermal electric energy generation project. The solar thermal electric powerplant technology configuration raised significant concerns during the CEQA environmental permitting process. [5] Among the many environmental concerns, the natural gas supply, the wastewater management and disposal, and the water supply during construction and during operation of the plant were concerns specific to the solar thermal technology. The project was reconfigured, simplified and rescoped to a photovoltaic technology, eliminating the solar thermal technology concerns, though significant other environmental concerns remained. [6]

LADWP acquired the entire project, including the land and the environmental permitting for the site in 2012 as photovoltaic technology, which gained economic advantages over solar thermal and other technologies as a result of rapidly decreasing costs of solar photovoltaic modules. [7] LADWP contracted Hecate Energy to develop three phases of the project, for 162 MW, and SunEdison, to develop the other two phases, for 88 MW. [8] SunEdison's stake in the project was later acquired by Capital Dynamics. [9] Hecate Energy's stake in the project was acquired by sPower [10] (Sustainable Power), and was completed by sPower, who was later acquired by AES.

In October 2018, LADWP commissioned the Beacon Battery Energy Storage System (BESS), with 10 MWh/20 MW of storage to stabilize the energy sent to the grid by the solar panels. [4]

Projects

The Beacon Solar Project consists of 5 solar power station projects:

Production

Beacon 1 Generation, Annual

Beacon 2 Generation, Annual [18]

Beacon 3 Generation

Generation (MW·h) of Beacon 3 [19]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
20163,0133,013
20176,3737,63012,9616,37316,33049,667
Total52,680
Generation (MW·h) of Beacon 4 [20]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
20164,9624,962
20175,1866,52511,3015,18614,01742,215
Total47,177


Beacon 5 Generation, Annual [21]

See also

Related Research Articles

<span class="mw-page-title-main">Solar Energy Generating Systems</span> Concentrated solar thermal power station in the Mojave Desert of California

Solar Energy Generating Systems (SEGS) is a concentrated solar power plant in California, United States. With the combined capacity from three separate locations at 354 megawatt (MW), it was once the world's second largest solar thermal energy generating facility, until the commissioning of the even larger Ivanpah facility in 2014. It consisted of nine solar power plants in California's Mojave Desert, where insolation is among the best available in the United States.

<span class="mw-page-title-main">The Solar Project</span>

The SOLAR Project consists of the Solar One, Solar Two and Solar Tres solar thermal power plants based in the Mojave Desert, United States and Andalucía, Spain. The US Department of Energy (DOE) and a consortium of US utilities built the country's first two large-scale, demonstration solar power towers in the desert near Barstow, California.

<span class="mw-page-title-main">Solar power plants in the Mojave Desert</span> Supplies power to the electricity grid using excellent solar radiation

There are several solar power plants in the Mojave Desert which supply power to the electricity grid. Insolation in the Mojave Desert is among the best available in the United States, and some significant population centers are located in the area. These plants can generally be built in a few years because solar plants are built almost entirely with modular, readily available materials. Solar Energy Generating Systems (SEGS) is the name given to nine solar power plants in the Mojave Desert which were built in the 1980s, the first commercial solar plant. These plants have a combined capacity of 354 megawatts (MW) which made them the largest solar power installation in the world, until Ivanpah Solar Power Facility was finished in 2014.

<span class="mw-page-title-main">Solar power in the United States</span>

Solar power includes solar farms as well as local distributed generation, mostly on rooftops and increasingly from community solar arrays. In 2022, utility-scale solar power generated 145.6 terawatt-hours (TWh), or 3.4% of electricity in the United States. Total solar generation that year, including estimated small-scale photovoltaic generation, was 204 TWh.

<span class="mw-page-title-main">Topaz Solar Farm</span>

Topaz Solar Farm is a 550 megawatt (MWAC) photovoltaic power station in San Luis Obispo County, California, United States. Construction on the project began in November 2011 and ended in November 2014. It is one of the world's largest solar farms. The $2.5 billion project includes 9 million CdTe photovoltaic modules based on thin-film technology, manufactured by U.S. company First Solar. The company also built, operates and maintains the project for MidAmerican Renewables, a Berkshire Hathaway company. Pacific Gas and Electric will buy the electricity under a 25-year power purchase agreement. According to First Solar, it created about 400 construction jobs.

<span class="mw-page-title-main">California Valley Solar Ranch</span> Photovoltaic power plant in the Carrizo Plain, northeast of California Valley.

The California Valley Solar Ranch (CVSR) is a 250 megawatt (MWAC) photovoltaic power plant in the Carrizo Plain, northeast of California Valley. The project is owned by NRG Energy, and SunPower is the EPC contractor and technology provider. The project constructed on 1,966 acres (796 ha) of a 4,365-acre (1,766 ha) site of former grazing land. It is utilizing high-efficiency, crystalline PV panels designed and manufactured by SunPower. The project includes up to 88,000 SunPower solar tracking devices to hold PV panels that track the sun across the sky.

<span class="mw-page-title-main">Solar power in California</span>

Solar power has been growing rapidly in the U.S. state of California because of high insolation, community support, declining solar costs, and a renewable portfolio standard which requires that 60% of California's electricity come from renewable resources by 2030, with 100% by 2045. Much of this is expected to come from solar power via photovoltaic facilities or concentrated solar power facilities.

<span class="mw-page-title-main">Sierra SunTower</span>

Sierra SunTower was a 5 MW commercial concentrating solar power (CSP) plant built and operated by eSolar. The plant is located in Lancaster, California. As of mid-September, 2022, the two towers that were the center of the facility are no longer standing. However the rest of the plant is still present.

<span class="mw-page-title-main">Blythe Mesa Solar Power Project</span> Linux solar power

The Blythe Mesa Solar Power Project, also known as the Blythe Solar Energy Center, is a 235 megawatt (MWAC) photovoltaic power plant near the city of Blythe in Riverside County, California. It occupies about 2,000 acres of public land managed by the Bureau of Land Management in the Mojave Desert. The construction uses CdTe thin film panels from the U.S. firm First Solar, and the majority of the output is being sold to Kaiser Permanente and Southern California Edison under 20-year power purchase agreements.

The 21 megawatt Blythe Photovoltaic Power Plant is a photovoltaic (PV) solar project in California. It is located in Blythe, California, in Riverside County about 200 miles (320 km) east of Los Angeles. Commercial operation began in December 2009. Electricity generated by the power plant is being sold to Southern California Edison under a 20-year power purchase agreement. Another 20 MW plant called NRG Solar Blythe II came online in April 2017.

<span class="mw-page-title-main">Copper Mountain Solar Facility</span> Solar power plant in Nevada, United States

The Copper Mountain Solar Facility is a 802 megawatt (MWAC) solar photovoltaic power plant in Boulder City, Nevada, United States. The plant was developed by Sempra Generation. When the first unit of the facility entered service on December 1, 2010, it was the largest photovoltaic plant in the U.S. at 58 MW. With the opening of Copper Mountain V in March 2021, it again became the largest in the United States. It is co-located with the 64 MW Nevada Solar One, 150 MW Boulder Solar, and 300 MW Techren Solar projects in the Eldorado Valley, thus forming a more than 1 gigawatt (GW) solar generating complex. By comparison, generating capacity at the nearby Hoover Dam is about 2 GW.

<span class="mw-page-title-main">Desert Sunlight Solar Farm</span> Photovoltaic power station in California

The Desert Sunlight Solar Farm is a 550-megawatt (MWAC) photovoltaic power station approximately six miles north of Desert Center, California, United States, in the Mojave Desert. It uses approximately 8.8 million cadmium telluride modules made by the US thin-film manufacturer First Solar. As of Fall 2015, the Solar Farm has the same 550 MW installed capacity as the Topaz Solar Farm in the Carrizo Plain region of Central California, making both of them tied for the second largest completed solar plants by installed capacity.

The Avenal Solar Facility is a 57.7 megawatt (MW) photovoltaic power station in Kings County, California, constructed using 450,900 SHARP-128W thin-film modules. At its completion, it was California's largest photovoltaic facility.

The Antelope Valley Solar Ranch 1 (AVSR1) is a 230 megawatt (MWAC) photovoltaic power plant near Lancaster within Antelope Valley, in the western Mojave Desert, Southern California. It uses cadmium telluride modules made by the US thin-film manufacturer First Solar. The project was developed by First Solar and later bought by Exelon Corporation in 2011. The solar facility was fully commissioned in April 2014.

The McCoy Solar Energy Project is a 250 megawatt (MWAC) photovoltaic power plant near the city of Blythe in Riverside County, California. It occupies about 2,300 acres of mostly public land in the Mojave Desert. The construction uses CdTe thin film panels from First Solar, and the output is being sold to Southern California Edison under a power purchase agreement.

Mount Signal Solar, also known as Imperial Valley Solar Project, is a 794 MWp (614 MWAC) photovoltaic power station west of Calexico, California, United States, in the southern Imperial Valley, near the Mexican border. The facility is being developed and constructed by 8minutenergy Renewables in three phases, with two completed as of 2018. At full build-out, it will be one of the world's largest PV solar farms with a capacity of about 800 MWp (600 MWAC). The project has been supported by several environmental groups, as the power station was built on low productivity farmland.

Solar Star is a 579-megawatt (MWAC) photovoltaic power station near Rosamond, California, United States, that is operated and maintained by SunPower Services. When completed in June 2015, it was the world's largest solar farm in terms of installed capacity, using 1.7 million solar panels, made by SunPower and spread over 13 square kilometers.

The Springbok Solar Farm is a 443 MWp (350 MWAC) photovoltaic power station in the northwestern Mojave Desert, near California City in eastern Kern County, California. The facility was developed and constructed by 8minutenergy Renewables in three phases. It is among the country's largest PV solar farms with a capacity of about 440 MWp (350 MWAC).

<span class="mw-page-title-main">Stateline Solar</span>

Desert Stateline Solar Facility is a 300 MWp utility-scale solar photovoltaic power station constructed by First Solar in San Bernardino County in California, USA. It is located at the base of Clark Mountain in California, across the state line from Primm, Nevada, and adjacent to the Ivanpah Solar Power Facility.

The Moapa Southern Paiute Solar Project is a 250 megawatt (MWAC) photovoltaic power plant located in Clark County, Nevada on the Moapa River lands of the Southern Paiute people. The project was commissioned in March 2017 and was constructed by First Solar and its sub-contractors in close consultation with the Moapa Band of Paiutes and federal agencies. It is the first utility-scale solar project to be located on North American tribal lands, and is anticipated to evolve as a model for similar future economic and environmental partnerships.

References

  1. Woods, Lucy (2014-07-23). "Work set to begin on LA's 250MW Beacon Solar project". PVTech.org. Power purchase agreements (PPA) for the 200MW are for 25 years, capped at US$85 per MWh.
  2. "Draft Environmental Impact Report: Beacon Photovoltaic Project" (PDF). Kern County Planning and Community Development Department. July 2012.
  3. 1 2 "LADWP Begins Construction on Major Solar Project that Will Deliver 300 MW of Solar Power to Los Angeles" (Press release). Los Angeles Department of Water and Power. July 25, 2014.
  4. 1 2 Tucker, Carol. "Beacon of Light: A Solar Plant Shines in the Mojave Desert". digital.apogee-mg.com. Retrieved 2020-01-23.
  5. "State of California, California Energy Commission Docket Log 08-AFC-02".
  6. Schneck, Gregory (13 May 2013). "Letter to California Energy Commission". Beacon LLC.
  7. Clarke, Chris (July 22, 2014). "L.A. to Break Ground on Big Desert Solar Project". KCET.
  8. "Amendment to the Beacon Sites 1, 3, and 4 PPAs" (PDF). Los Angeles Department of Water and Power. April 27, 2016.
  9. "Resolution No. 017-110" (PDF). Los Angeles Department of Water and Power. November 15, 2016.
  10. "sPower Gets $434M in Financing for Its Beacon Solar Projects". sPower. Retrieved 10 May 2018.
  11. "Beacon 1". Hecate Energy LLC.
  12. sPower lines up financing for 183 MW of Beacon Solar projects in California, Transmission Hub, Barry Cassell, November 15, 2016
  13. 1 2 "Beacon Solar Project - Amendment No. 1 to the Power Purchase Agreements, Interconnection Agreements, Ground Lease, and Option Agreements for Power Purchase Agreements" (PDF). Los Angeles Department of Water and Power. November 22, 2016.
  14. 1 2 "Resolution No. 014-229" (PDF). Los Angeles Department of Water and Power. June 5, 2014. p. 6.
  15. [https://solarindustrymag.com/capital-dynamics-sells-majority-stake-of-beacon-solar-portfolio Beacon Solar Portfolio Finds Two New Owners, Solar Industry, Matthew Mercure, December 29, 2020
  16. "Beacon 3". Hecate Energy LLC.
  17. "Beacon 4". Hecate Energy LLC.
  18. "Beacon 2, Annual". Electricity Data Browser. Energy Information Administration.
  19. "Hecate Energy Beacon 3, Monthly". Electricity Data Browser. Energy Information Administration . Retrieved July 30, 2017.
  20. "Hecate Energy Beacon 4, Monthly". Electricity Data Browser. Energy Information Administration . Retrieved July 30, 2017.
  21. "Beacon 5, Annual". Electricity Data Browser. Energy Information Administration.