USS Skate (SSN-578)

Last updated

USS Skate (SSN-578);0857816.jpg
Skate with an ice pack behind her
History
Flag of the United States.svgUnited States
NameUSS Skate
Ordered18 July 1955
Builder Electric Boat
Laid down21 July 1955 [1]
Launched16 May 1957 [1]
Sponsored by Mrs Lewis L. Strauss [1]
Commissioned23 December 1957
Decommissioned12 September 1986
Stricken30 October 1986
HomeportNew London, Connecticut, Submarine Tender USS Fulton (AS-11)
FateDisposed of by submarine recycling 6 March 1995
General characteristics
Class and type Skate-class submarine
Displacement
  • 2,550 long tons (2,591 t) surfaced
  • 2,848 long tons (2,894 t) submerged
Length267 ft 7 in (81.56 m)
Beam25 ft (7.6 m)
Propulsion S3W reactor [2]
Speed
  • 15.5 knots (17.8 mph; 28.7 km/h) surfaced
  • 18 kn (21 mph; 33 km/h) submerged
Complement8 officers and 76 men
Armament8× 21 in (530 mm) torpedo tubes (6 forward, 2 aft)

USS Skate (SSN-578) was the third submarine of the United States Navy named for the skate, a type of ray, was the lead ship of the Skate class of nuclear submarines. She was the third nuclear submarine commissioned, the first to make a completely submerged trans-Atlantic crossing, the second submarine to reach the North Pole, and the first to surface there.

Contents

Construction and commissioning

The contract to build Skate was awarded to the Electric Boat division of General Dynamics on 18 July 1955, and her keel was laid in Groton, Connecticut, on 21 July 1955. She was launched on 16 May 1957, sponsored by Alice Hanauer Strauss, wife of Lewis L. Strauss, and commissioned on 23 December 1957 with Commander James F. Calvert in command.

Operational history

USS Skate in August 1958, possibly at Drifting Ice Station Alfa USS Skate - 0857806.jpg
USS Skate in August 1958, possibly at Drifting Ice Station Alfa
USS Skate in the Dutch port of Rotterdam, March 1958 Bezoek van de Skale Amerikaans atoomduikboot aan Rotterdam, Bestanddeelnr 909-4076.jpg
USS Skate in the Dutch port of Rotterdam, March 1958

Skate conducted shakedown training out of New London, Connecticut until 29 January 1958, when she cruised to the Bermuda operating area, then returned to her home port on 8 February. Sixteen days later, the nuclear powered submarine set a course for the Isle of Portland, England. Before returning home, she had also visited ports in France and the Netherlands. [3]

First visit to North Pole

On 30 July, Skate sought the Arctic where she operated under the ice for 10 days. During this time, she surfaced nine times through the ice, navigated over 2,400 miles (3,900 km) under it, and on 11 August, 9:47 pm EDT [4] (the week after USS Nautilus) became the second sea ship to reach the North Pole. Skate was unable to surface precisely at the Pole on the August voyage due to dangerous ice conditions as noted in the captain's 1960 book, Surface at the Pole: The Extraordinary Voyages of the USS Skate, [5] where Calvert said, "Seldom had the ice seemed so heavy and so thick as it did in the immediate vicinity of the pole. For days we had searched in vain for a suitable opening to surface in." [6] The closest was to make radio contact at the surface from a polynya around 30  nm away, but not to surface fully owing to the risk of damage from ice. [5] Skate did manage to surface and make contact with Drifting Ice Station Alpha at 85ºN, 300 nm away. [7]

After being denied access to visit Copenhagen in Denmark, she sailed into Bergen, Norway on 23 August. There she was inspected by king Olav V of Norway, US ambassador Frances E. Willis and minister of defence Nils Handal. [8] The submarine made port calls in the Netherlands, Belgium, and France before returning to New London on 25 September 1958. In recognition of the dangerous and historic feat, the Skate and its crew were given the Navy Unit Commendation award for "... braving the hazards of the polar ice pack...."[ citation needed ]

Second visit to North Pole

While the Skate was unable to surface on its first voyage to the pole, on 17 March 1959, she became the first submarine to surface at the North Pole. Calvert described the historic moment in his book, saying, "Slowly we blew the tanks and the Skate moved reluctantly upward. It was apparent we were under heavier ice here than any we had experienced before." While at the pole, Calvert and the crew planted an American flag in a cairn they built out of ice blocks, and put a waterproof container in the cairn with a note commemorating the event. The crew also held a ceremony for the late Arctic explorer Sir Hubert Wilkins and committed his ashes at the pole. [9] In 1931, Sir Hubert had conducted an Arctic expedition in the disarmed research submarine Nautilus (ex-USS O-12). After reaching the Pole, the Skate continued its mission to pioneer arctic operations during periods of extreme cold and maximum ice thickness. When the submarine returned to port, she was awarded a bronze star in lieu of a second Navy Unit Commendation for demonstrating "for the first time the ability of submarines to operate in and under the Arctic ice in the dead of winter". In the fall of 1959 and in 1960, Skate participated in exercises designed to strengthen American antisubmarine defenses. [10]

USS Skate surfaced in Arctic - 1959 USS Skate (SSN-578) surfaced in Arctic - 1959.jpg
USS Skate surfaced in Arctic – 1959

Skate returned to General Dynamics in January 1961 for a regular overhaul and to have her reactor refueled for the first time. [1] She put to sea in August and, for the next 11 months, conducted exercises to increase the operational readiness of her crew.[ citation needed ]

Third visit to North Pole

On 7 July 1962, Skate again set course towards the North Pole. Five days later, USS Seadragon, did likewise from Pearl Harbor. The two submarines made their rendezvous on 31 July. After meeting, they operated together for over a week. Both submarines surfaced at the North Pole on 2 August and official greetings and insignia of Submarine Force Atlantic Fleet and Submarine Force Pacific Fleet were exchanged.[ citation needed ]

Later years

Skate returned to New London and performed fleet and local operations for the next several years. She entered the Norfolk Naval Shipyard on 28 April 1965, the first nuclear submarine overhauled there, for nuclear refueling and installation of the SUBSAFE package. Skate was the first submarine to finish this major conversion program, which was instituted after the loss of USS Thresher in 1963. The process was not completed until September 1967. [1]

After sea trials and a shakedown cruise in the Caribbean, the submarine returned to New London and participated in exercises involved in the development of new undersea tactics and equipment.[ citation needed ]

In October 1968, Skate was deployed to the Mediterranean where she operated with the Sixth Fleet for two months. The polar veteran operated under the Arctic ice again in March and April 1969, in October 1970, and in February 1971 . The remainder of her at sea time was spent in various Atlantic Fleet and NATO exercises. In July 1971, she began her third regular overhaul at the Norfolk Naval Shipyard and did not return to New London until 17 November 1973. In August 1974, Skate operated as a unit of the Atlantic Fleet.[ citation needed ]

In late 1977, Skate transferred to Pearl Harbor, where she joined the other three Skate-class submarines as a member of Submarine Squadron 7.[ citation needed ]

Decommissioning

Skate was decommissioned on 12 September 1986, stricken from the Naval Vessel Register on 30 October 1986, and disposed of by submarine recycling at Puget Sound Naval Shipyard on 6 March 1995.[ citation needed ]

Awards

Skate′s first Navy Unit Commendation was for the period 9 through 12 August 1958 and the second for the period 4 March through 6 April 1959. Her Meritorious Unit Commendations were for the periods 24 March through 15 April 1969, 12 October through 18 November 1970, and 26 February through 9 March 1971. [11]

Related Research Articles

USS <i>Seawolf</i> (SSN-575) US Navy nuclear attack submarine

USS Seawolf (SSN-575) was the third ship of the United States Navy to be named for the seawolf, the second nuclear submarine, and the only US submarine built with a liquid metal cooled (sodium), beryllium-moderated nuclear reactor, the S2G. Her overall design was a variant of Nautilus, but with numerous detail changes, such as a conning tower, stepped sail, and the BQR-4 passive sonar mounted in the top portion of the bow instead of further below. This sonar arrangement resulted in an unusual bow shape above the water for a U.S. submarine. Originally laid down in 1953, her distinctive reactor was later replaced with a standard pressurized water reactor, the replacement process lasting from 12 December 1958 to 30 September 1960.

USS <i>Nautilus</i> (SSN-571) First nuclear-powered submarine of the US Navy, in service from 1954 to 1980

USS Nautilus (SSN-571) was the world's first operational nuclear-powered submarine and on 3 August 1958 became the first submarine to complete a submerged transit of the North Pole. Her initial commanding officer was Eugene "Dennis" Wilkinson, a widely respected naval officer who set the stage for many of the protocols of today's Nuclear Navy of the US, and who had a storied career during military service and afterwards.

USS <i>Tullibee</i> (SSN-597) Submarine of the United States

USS Tullibee (SSN-597), a unique submarine, was the second ship of the United States Navy to be named for the tullibee, any of several whitefishes of central and northern North America.

<i>Skate</i>-class submarine United States Navy submarine class

The Skate-class submarines were the United States Navy's first production run of nuclear-powered submarines. They were an evolution of the Tang class in everything except their propulsion plants, which were based on the operational prototype USS Nautilus. The four Skate class boats re-introduced stern torpedo tubes. Although among the smallest nuclear-powered attack submarines ever built, the Skate class served for many years, with the last being decommissioned in 1989. USS Skate was the first submarine to surface at the North Pole, on 17 March 1959.

USS <i>Sargo</i> (SSN-583) Submarine of the United States

USS Sargo (SSN-583), a Skate-class nuclear-powered submarine, was the second ship of the United States Navy to be named for the sargo, a food and game fish of the porgy family, inhabiting coastal waters of the southern United States.

USS Seadragon (SSN-584), a Skate-class submarine, was the second ship of the United States Navy to be named for the seadragon, a name for some types of seahorse. She was a nuclear-powered submarine.

USS <i>Skipjack</i> (SSN-585) Submarine of the United States

USS Skipjack (SSN-585), the lead ship of her class of nuclear-powered attack submarine, was the third ship of the United States Navy to be named after the skipjack tuna.

USS <i>Shark</i> (SSN-591) Submarine of the United States

USS Shark (SSN-591), a Skipjack-class submarine, was the seventh ship of the United States Navy to be named for the shark.

USS <i>Tinosa</i> (SSN-606) Permit-class submarine operated by the United States Navy

USS Tinosa (SSN-606), a Permit-class submarine, was the second ship of the United States Navy to be named for the tinosa, a poisonous, black, tropical fish.

USS <i>Whale</i> (SSN-638) Submarine of the United States

USS Whale (SSN-638) was a Sturgeon-class submarine nuclear-powered attack submarine of the United States Navy. She was the second ship of that name, after the whale family of aquatic mammals.

USS <i>Pintado</i> (SSN-672) United States submarine

USS Pintado (SSN-672), a short hull Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the pintado, a large mackerel-like fish, whose elongated spots suggested the Spanish language word meaning "painted."

USS <i>Tautog</i> (SSN-639) Submarine of the United States

USS Tautog (SSN-639), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the tautog, a wrasse commonly found along the Northern Atlantic coast. The submarine was in service from 17 August 1968 to 31 March 1997.

USS <i>Sturgeon</i> (SSN-637) Sturgeon class submarine

USS Sturgeon (SSN-637), was the lead ship of her class of nuclear-powered attack submarines. She was the third ship of the United States Navy to be named for the sturgeon.

USS <i>Trepang</i> (SSN-674) Submarine of the United States

USS Trepang (SSN-674), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the trepang, Holothuroidea, a marine animal with a long, tough, muscular body.

USS <i>Gurnard</i> (SSN-662) Submarine of the United States

USS Gurnard (SSN-662), a Sturgeon-class submarine, was the second ship of the United States Navy to be named for the gurnard, a food fish of the genus Trigla and part of the sea robin family.

USS <i>Ray</i> (SSN-653) Submarine of the United States

USS Ray (SSN-653), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the rays.

USS <i>Pargo</i> (SSN-650) Submarine of the United States

USS Pargo (SSN-650), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the pargo, also known as the red snapper, a fish of the genus Lutjanus found in the West Indies.

USS <i>Seahorse</i> (SSN-669) Submarine of the United States

USS Seahorse (SSN-669), a Sturgeon-class attack submarine, was the second submarine and third ship of the United States Navy to be named for the seahorse.

USS <i>Compass Island</i>

Compass Island (EAG-153) was launched 24 October 1953 as Garden Mariner by the New York Shipbuilding Corporation, Camden, New Jersey and sponsored by Mrs. H. A. Smith. Acquired by the Navy 29 March 1956 and commissioned 3 December 1956.

<span class="mw-page-title-main">James F. Calvert</span>

James Francis Calvert served in the United States Navy, where he commanded USS Skate, the third nuclear submarine commissioned and the second submarine to reach the North Pole, which became the first to surface at the pole. Skate surfaced at the North Pole on 17 March 1959 to commit the ashes of the famed explorer Sir Hubert Wilkins to the Arctic waste. He later served as the 46th superintendent of the United States Naval Academy.

References

  1. 1 2 3 4 5 "Welcome Aboard USS Skate" (PDF). USN.
  2. USS Skate (SSN 578)
  3. "Het vaderland". 15 March 1958.
  4. Rindskopf, Mike H. (1994). Steel Boats, Iron Men: History of the U.S. Submarine Force. Turner Publishing Company. p. 71. ISBN   978-1-56311-081-8.
  5. 1 2 Calvert, James, Vice Admiral USN Ret. (1996) [1960]. Surface at the Pole. Annapolis, Maryland: Bluejacket Books. pp. 93–95. ISBN   1-55750-119-X.{{cite book}}: CS1 maint: multiple names: authors list (link)
  6. Calvert (1996), p. 92.
  7. Calvert (1996), p. 101–108.
  8. NRK Filmavisen 4 September 1958
  9. Calvert (1996), pp. 184–186.
  10. "Afterwards: USS Skate surfacing at the North Pole, March 17, 1959. Wilkins 35-5-1". Ohio State University Libraries Exhibition Under the North Pole.
  11. US Navy Unit Awards Webpage