Arekere | |
---|---|
neighbourhood | |
Coordinates: 12°53′N77°36′E / 12.89°N 77.60°E | |
Country | India |
State | Karnataka |
Metro | Bangalore |
Languages | |
• Official | Kannada |
Time zone | UTC+5:30 (IST) |
PIN | 560076 |
Arekere is a residential area on Bannerghatta Road in South Bangalore. The name Arekere (Are: Half, Kere: lake) originates from a water reservoir in the area.
Residential areas within Arekere include Arekere Mico Layout, which is a BDA layout developed in the late 1970s, Samrat Layout, Pandurangnagar, Shantiniketan Layout and Sarvabhoumanagar. [1]
The neighbourhood has undergone rapid development since the early 2000s due to the presence of information technology and BPO companies. BPL Medical, Apollo Hospitals and Fortis Hospital are located nearby. [2] Educational institutes in the vicinity include IIM Bangalore, Stepping Stones, BGS National Public School and Mitra Academy
Bannerghatta road, one of the main arterial roads in the southern part of city passes through Arekere. With new neighbourhoods opening up further down the city, congestion has increased over the years. [3] The under-construction Kalena Agrahara-Nagawara route of Namma Metro passes through the area and is expected to decongest vehicular traffic once it is functional. [4] The locality is well connected to other parts of the city and to the airport by BMTC buses.
Whitefield is a suburb of Bangalore in the state of Karnataka, India. Established in 1882 as a settlement for the Eurasians and Anglo Indians of Bangalore, Whitefield remained a quaint little settlement at the eastern periphery of Bangalore city till the late 1990s when the local IT boom turned it into a major suburb. It is now a major part of Greater Bangalore. Whitefield is Bengaluru's first tech corridor to be connected by Namma Metro.
Bannerghatta Road is an Indian State Highway in Karnataka. It connects Bangalore with the towns of Bannerghatta, Jigani, and Anekal. It extends for 49 kilometres (30 mi). It starts as a branch from Hosur Road near the Adugodi Christian Cemetery and ends at Anekal.
Madiwala is a locality in southeastern Bangalore, India.
Basaveshwaranagara, also known as Basaveshwaranagar, Basaveshnagara or Basaveshnagar is a largely residential neighbourhood in the west of Bengaluru, Karnataka, India. It is located to the west of Rajajinagara and is sandwiched between the localities of Mahalakshmi Layout to the north and Vijayanagara to the south, spread across multiple sub-localities, three assembly constituencies and seven Bruhat Bengaluru Mahanagara Palike (BBMP) wards. The area of Basaveshwaranagara is often considered West of Chord Road as it lies to the west of Chord Road, an arterial road in the western part of Bengaluru.
The Outer Ring Road (ORR), officially renamed as ಡಾ.ಪುನೀತ್ ರಾಜ್ಕುಮಾರ್ ವರ್ತುಲ ರಸ್ತೆ (Dr. Puneeth Rajkumar Vartula Raste), is a ring road that runs around most of the perimeter of the city of Bangalore, Karnataka, India. This 60-kilometre-long (37 mi) road was developed by the Bangalore Development Authority and different sections were opened progressively between 1996 and 2002. IT firms on the Outer Ring Road generate revenue of US$ 22 billion every year, accounting for 32% of Bengaluru’s total IT revenue.
Indiranagar, is an affluent, mid-sized neighbourhood in east Bangalore, Karnataka, India. Indiranagar is one of the most expensive cosmopolitan neighbourhoods in Bangalore.
Namma Metro, also known as Bengaluru Metro, is a rapid transit system serving the city of Bengaluru, the capital city of the state of Karnataka, India. It is the second-longest operational metro network in India with an operational length of 73.75 kilometers, just behind Delhi Metro. Upon its inauguration in 2011, it became the first underground metro system in South India. Namma Metro has a mix of underground, at grade, and elevated stations. Out of the 66 operational metro stations of Namma Metro as of October 2023, there are 57 elevated stations, eight underground stations and one at-grade station. The system runs on standard-gauge tracks.
Bangalore is the capital and the largest city of the Indian state of Karnataka. It is India's third largest city and fifth largest metropolitan area. Modern Bengaluru was founded in 1537 CE by Kempe Gowda, a vassal of the Vijayanagara Empire. Kempe Gowda built a mud fort in the vicinity of modern Bengaluru. By 1831, the city was incorporated into the British Raj with the establishment of the Bangalore Cantonment. The British returned dominion of the city to the King of Mysore, choosing however, to retain jurisdiction over the cantonment. Therefore, Bengaluru essentially became a twin city, with civic and infrastructural developments of the cantonment conforming to European styles of planning.
Gottigere is a suburb in the southern periphery of Bangalore city, along Bannerghatta Road in the Indian state of Karnataka. It is surrounded by the famous NICE Road and smaller areas like Basavanapura and Kalena Agrahara. It has been named after "Gottigere lake" which is near NICE Road. This area has seen fast growth due to many IT companies establishment near Bannerghatta Road & Electronic city.
Vijayanagara, is a residential neighborhood in west Bangalore, India. It derives its name from the Vijayanagara empire that flourished in South India during the 15th and 16th centuries. It is bound by Mysore Road and Magadi Road, with Chord Road cutting through. It is the northernmost area in South Bangalore.
BTM Layout, an abbreviation of Byrasandra, Tavarekere and Madiwala Layout is a locality in Bengaluru, Karnataka, India located in the South and Southeast parts of the city between Hosur Road and Bannerghatta Road. It is one of the first layouts in Bangalore.
Bilekahalli is a suburb in Bangalore, India, situated off Bannerghatta Road. It has gained prominence in recent times due to a boom in real estate and profusion of Information technology companies. Several prominent hospitals as well as residential complexes have been set up in this area.
Arekere Lake is situated in the Arekere - Hulimavu area of the city of Bangalore. Originally spread over an area of approximately 37 acres, the lake is bounded on the west by Bannerghatta Road, on the north by BDA Eighty Feet Road, on the east by Shantinikethan Layout and on the south by Hulimavu Main Road. According to the BBMP website, the perimeter of the lake is about 3 kilometres (1.9 mi). It was possibly a manmade water reservoir created approximately 100 years ago.
The Pink Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 21.25 km (13.20 mi) line connects Kalena Agrahara station on Bannerghatta Road in the south with Nagawara station on Outer Ring Road in the north. The Pink Line is mostly underground but also has a 6.98 km (4.34 mi) elevated section and a 0.48 km (0.30 mi) at-grade (surface) section. There are 18 stations on the line, including 12 underground and 6 elevated ones. Pink Line will have an interchange with the Purple Line at MG Road station. It will also have interchanges with the Yellow line at Jayadeva Hospital station and with the Blue Line at Nagawara. Both these lines are under construction.
The Yellow Line of Namma Metro is almost complete and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 18.82 km (11.69 mi) line connects R.V. Road with Bommasandra, and is fully elevated with 16 stations. R.V. Road station is the terminal station on the city side where an interchange is being provided with the Green Line. Jayadeva Hospital station will serve as another elevated interchange station with the Pink Line that is also under construction in Phase 2 of Namma Metro's expansion. Upon its opening, the Jayadeva Station will be the tallest and largest metro station in Bengaluru, with five levels of transport, including the metro lines. Central Silk Board station will be another interchange station between the Yellow Line and Blue Line. The other end of the Yellow Line will terminate at Bommasandra. The line was scheduled to open in June 2023, but due to construction delays the new date was estimated to be July 2024. As per the latest reports, the Yellow Line will be operational from November 2024. This postponement has been attributed to a delay in the delivery of coaches from China.
Jayadeva Hospital is an upcoming double-elevated interchange metro station on the North-South corridor of the Yellow Line and Pink Line of Namma Metro in Bangalore, India. This metro station will be the first multi-elevated interchange metro station in the Namma Metro network. This metro station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Guruppanpalya, Jayanagar and JP Nagar 3rd Phase.
Kalena Agrahara is an upcoming elevated southern terminal metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station serves residential properties and a few other locations including Prestige Elysian, Holy Spirit School (ICSE), Doddakammanahalli suburban area and Decathlon.
Hulimavu is an upcoming elevated metro station on the North-South corridor of the Pink Line of Namma Metro in Bangalore, India. This metro station serves mainly the Christ University, and the nearby prime locations such as Royal Meenakshi Mall, Sri Meenakshi Sundareshwara Temple, Hulimavu Police Station and Kothanur Metro Depot, which will handle all the Pink Line trainsets for maintenance purposes.
Akshay Nagar is a neighbourhood in Begur ward in Southeast Bangalore. It is surrounded by Hulimavu to the west and Begur to the east. The area has undergone rapid residential and commercial development since the early 2010s, including several high-rise apartment complexes. The locality is in close proximity to the Bannerghatta National Park, thus leading to occasional sightings of wild animals from the forest reserve. The area has a lake spread over 5 acres. It also features a wide mix of modern architecture and buildings.
The Orange Line or ORR-West Line is an upcoming metro line serving Bangalore as part of the Namma Metro network in the city. This metro line will serve the industrial areas, manufacturing units, educational institutions, providing connectivity to the southern part of the city, thereby improving last-mile connectivity to commercial centres, industrial hubs, educational institutions, and healthcare facilities. The line was approved by the Union Cabinet on August 17th, 2024 and is scheduled for completion in 2029.